This abstract of bids document summarizes offers received in response to solicitation number W912HN22B5006 for the Jones Oysterbed Island Dredged Material Containment Area Dike Raising and Weir Improvements project in Savannah Harbor, Jasper County, South Carolina. The scope of work involves raising the perimeter dike by six feet, rehabilitating five existing weir structures, and regrading barge and dredge access points. Four contractors submitted bids by the July 7th deadline: Ashridge, Inc. proposed completing the work for $11,176,205; Dredgit Corporation for $13,785,445; Herve Cody Contractor LLC for $13,798,175; and R.E. Goodson Construction Co., Inc. for $15,362,979. All contractors provided the required bid bond and acknowledged the two amendments issued. The government estimate ranged from $24,821,400 to $6,000,000 for various contract line items. The soliciting agency is the U.S. Army Corps of Engineers Savannah District.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. SOLICITATION NUMBER 2. DATE ISSUED 3. DATE OPENED PAGE OF PAGES

1-Jun-22 7-Jul-22 1 2

4. ISSUING OFFICE NAME AND TITLE OF CERTIFYING OFFICIAL (TYPE)

SIGNATURE DATE SIGNED

Whittni C. Hiscox

5. PROJECT TITLE AND SET ASIDE: 8. GOVERNMENT ESTIMATE

(Check A, B or C and complete D, E and F.) A. OFFEROR A. OFFEROR

Jones Oysterbed Island (JOI) Dredged Material Containment Area (DMCA) Dike Raising and Weir Improvements Savannah Harbor, Jasper County, South Carolina

A. HIRED LABOR

X

7A. ITEM NO.

7B. DESCRIPTION OF OFFERED ITEM 7C.

EST QTY.

D.

UNIT

E. UNIT

PRICE

F. ESTIMATED

AMOUNT

E. UNIT

PRICE

F. ESTIMATED

AMOUNT

E. UNIT

PRICE

F. ESTIMATED

AMOUNT

0001 Mobilization and Demobilization 1 Job $ 498,400.00 $ 498,400.00 $ 1,000,000.00 $ 1,000,000.00 $ 6,000,000.00 $ 6,000,000.00

0002 Temporary Silt Fence Installation and Removal

0002AA First 45,000 Linear Feet 45,000 LF $ 7.40 $333,000.00 $ 11.50 $ 517,500.00 $ 5.00 $ 225,000.00

0002AB All Over 45,000 Linear Feet 1,000 LF 7.40$ $7,400.00 11.50$ 11,500.00$ 5.00$ 5,000.00$

0003 Clearing Within DMCA JOI

0003AA First 300 Acres 300 AC $ 535.00 $160,500.00 $ 1,700.00 $ 510,000.00 $ 3,500.00 $ 1,050,000.00

0003AB All Over 300 Acres 200 AC $ 535.00 $107,000.00 $ 100.00 $ 20,000.00 $ 3,500.00 $ 700,000.00

0004 Hauling of Rock Within Embankment Footprint to Stockpile Location 1 Job 185,350.00$ 185,350.00$ 500,000.00$ 500,000.00$ 250,000.00$ 250,000.00$

0005 Dike and Ramp Embankment Fill From Within DMCA JOI

0005AA First 1,000,000 Cubic Yards 1,000,000 CY 7.50$ $7,500,000.00 6.95$ 6,950,000.00$ 13.20$ 13,200,000.00$

0005AB All Over 1,000,000 Cubic Yards 77,000 CY 7.50$ $577,500.00 2.00$ 154,000.00$ 13.20$ 1,016,400.00$

0006 Repairs and Modifications to Weirs JO1, JO2, JO3, JO4, JO5 1 Job $ 1,374,600.00 $ 1,374,600.00 $ 3,991,170.00 $ 3,991,170.00 $ 2,000,000.00 $ 2,000,000.00

Hot Gas Extrusion Thermoplastic Welds for Repairs to Weirs JO1, JO2, JO3, JO4, and JO5

0007AA First Linear Foot 1 LF $ 4,055.00 $4,055.00 $ 29,500.00 $ 29,500.00 $ 1,000.00 $ 1,000.00

0007AB All Over 1 Linear Foot 85 LF $ 350.00 $29,750.00 $ 15.00 $ 1,275.00 $ 1,000.00 $ 85,000.00

0008 DMCA JOI Dike and Ramp Grassing - See

0008AA First 80 Acres 80 AC $ 2,760.00 $220,800.00 $ 400.00 $ 32,000.00 $ 3,000.00 $ 240,000.00

0008AB All Over 80 Acres 5 AC $ 2,760.00 $13,800.00 $ 400.00 $ 2,000.00 $ 3,000.00 $ 15,000.00

0009 Agricultural Lime 240 Actual Tons $ 370.00 $ 88,800.00 $ 100.00 $ 24,000.00 $ 100.00 $ 24,000.00

00010 Fertilizer, Nitrogen 50 Actual Tons $ 695.00 $ 34,750.00 $ 250.00 $ 12,500.00 $ 100.00 $ 5,000.00

0011 Fertilizer, Mixed Grade 50 Actual Tons 810.00$ 40,500.00$ 600.00$ 30,000.00$ $100.00 5,000.00$

TOTAL OVERALL BID (CLIN No. 0001 thru 0018) 11,176,205.00$ 13,785,445.00$ 24,821,400.00$

NO. 1

Contracting Officer

W912HN22B5006

ABSTRACT OF Bids - CONSTRUCTION

Department of the Army, Corps of Engineers Savannah District Contracting Office

100 W Oglethorpe Ave.

Savannah, GA 31401

9. OFFERS

NO. 2

I CERTIFY that I have opened, read, and recorded on this abstract all offers received In response to this solicitation.

Ashridge, Inc Dredgit Corporation

6. NUMBER OF AMENDMENTS ISSUED: 2 C. REASONABLE CONTRACT

C. AMENDMENTS ACKNOWLEDGED

Yes

C. AMENDMENTS ACKNOWLEDGED

Yes

B. REASONABLE CONTRACT

(WITHOUT PROFIT)

B. BID SECURITY (Type and Amount) Bid Bond 20%

B. BID SECURITY (Type and Amount) Bid Bond $3M

1. SOLICITATION NUMBER PAGE OF PAGES

2 2 ABSTRACT OF OFFERS - CONSTRUCTION INSTRUCTIONS - Attach this form to OF 1419, Abstract of Offers - Construction, when more than 2 offers are received on

CONTINUATION SHEET a construction project. Each Continuation Sheet will accommodate 14 contract items to conform to the number of items which can be entered on the OF 1419. Use additional OF 1419's for contract items in excess of 14 and attach additional

Continuation Sheets (OF 1419A) as needed.

2. PROJECT TITLE

NO. 3 NO. 4

A. OFFEROR A. OFFEROR

B. BID SECURITY (TYPE AND AMT) B. BID SECURITY (TYPE AND AMT)

3. CONTRACT ITEMS C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED

A. B. C.

ITEM ESTIMATED UNIT D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED

NO. QUANTITY PRICE AMOUNT PRICE AMOUNT

0001 1 Job 1,700,000.00$ 1,700,000.00$ 1,600,000.00$ 1,600,000.00$

0002AA 45,000 LF 5.75$ 258,750.00$ 25.00$ 1,125,000.00$

0002AB 1,000 LF 5.75$ 5,750.00$ 25.00$ 25,000.00$

0003AA 300 AC 1,500.00$ 450,000.00$ 600.00$ 180,000.00$

0003AB 200 AC 250.00$ 50,000.00$ 600.00$ 120,000.00$

0004 1 Job 50,000.00$ 50,000.00$ 440,000.00$ 440,000.00$

0005AA 1,000,000 CY 7.90$ 7,900,000.00$ 8.04$ 8,040,000.00$

0005AB 77,000 CY 7.90$ 608,300.00$ 0.50$ 38,500.00$

0006 1 Job 1,750,000.00$ 1,750,000.00$ 2,787,879.00$ 2,787,879.00$

0007AA 1 LF 2,000.00$ 2,000.00$ 8,000.00$ 8,000.00$

0007AB 85 LF 1,175.00$ 99,875.00$ 800.00$ 68,000.00$

0008AA 80 AC 7,200.00$ 576,000.00$ 5,280.00$ 422,400.00$

0008AB 5 AC 5,500.00$ 27,500.00$ 5,280.00$ 26,400.00$

0009 240 Actual Tons 500.00$ 120,000.00$ 1,320.00$ 316,800.00$

0010 50 Actual Tons 2,000.00$ 100,000.00$ 1,650.00$ 82,500.00$

0011 50 Actual Tons 2,000.00$ 100,000.00$ 1,650.00$ 82,500.00$

TOTAL 13,798,175.00$ 15,362,979.00$

Yes yes

W912HN22B5006

Jones Oysterbed Island (JOI) Dredged Material Containment Area (DMCA) Dike Raising and Weir Improvements Savannah Harbor, Jasper County, South Carolina

Herve Cody Contractor LLC R.E. Goodson Construction Co., Inc.

Bid Bond 20% and $3M Bid Bond 20%

W912HN22B5006_BID ABSTRACT 1