This document is a draft request for proposal for multiple award task order contracts to provide reconstruction services at Tyndall Air Force Base in Florida. The scope of work includes six projects in Zones 10-12 to replace and construct new facilities damaged or destroyed by Hurricane Michael in 2018. The projects consist of constructing a new visiting quarters lodging facility with 368 guestrooms, a new dorm complex with two five-story permanent party dormitories and one technical training dormitory, a new chapel complex, two new community common facilities including a recreation center and base library, new research and testing facilities for the Air Force Civil Engineer Center including a main research building and various support structures, and multiple replacement facilities at the Silver Flag training site. The government intends to award up to five MATOC contracts for an estimated total value of $950 million, with an initial minimum guarantee of $2,500 per contract. Comments from industry are requested on the draft RFP by the specified date.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W912HN20R3002
Section 00 00 00 - Procurement and Contracting Requirements
DRAFT RFP INSTRUCTIONS
Request for Industry Comment
Purpose:
This is a DRAFT Request for Proposal (RFP). It is NOT in complete form. The Draft RFP posting is to engage Industry for comments and questions as it relates to this specific RFP. Questions or comments can be in regards to evaluation, Tyndall AFB, logistics, and/or anything related to this procurement action that Industry deems pertinent, relevant, a challenge or an issue. The intent of this engagement is to utilize the opportunity of the pre-solicitation posting to find any potential errors or clear up/provide clarity at Solicitation posting based upon questions and information gathered during this time.
1. Government requests Industry to utilize ProjNet for all Pre-solicitation – RFP related questions.
2. Government will provide opportunity for Industry to have a question and answer session with Government following Pre-soliciation close via teleconference. Appointments will be set up individually.
3. Any questions that Industry is unsure of posting in ProjNet please contact the Contract Specialist, Tonja Dreke at tonja.j.dreke@usace.army.mil or 912-652-6071.
Information gathered, pertinent to all will be incorporated into the solicitation.
Section 00 10 00 - Solicitation
DELIVERY INFORMATION
| CLIN |
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| DODAAC / CAGE |
Section 00 20 00 - Instructions for Procurement
INSTRUCTIONS FOR PROCUREMENT
1. LIQUIDATED DAMAGES: Will be made on a Task Order basis.
2. MONTHLY ANTICIPATED ADVERSE WEATHER DELAY: Will be made on a Task Order basis.
3. GENERAL DECISION NUMBER: See Section 00 73 00. The Wage Decision may be subject to change prior to award. All proposed pricing shall include the most current wage rates. All Offerors are encouraged to review wage rates established by the Department of Labor prior to submitting proposals. Seed Project will utilize the most current Wage Determination included for Bay County.
4. QUALITY CONTROL SYSTEM (QCS): Any contract award resulting from this solicitation will require the mandatory use of the automated Quality Control System.
5. SECURITY REQUIREMENTS: Increased security at military installations may require vehicle and personnel registration, as well as 100% ID checks and random vehicle searches.
TECHNICAL MATTERS:
Technical inquiries are to be submitted via Bidder Inquiry in ProjNet at www.projnet.org/projnet . All questions regarding this Request for Proposal (RFP) must be submitted in writing via Bidder Inquiry in ProjNet within no less than 10 calendar days prior to the date established in the RFP for receipt of proposals. The Government reserves the right to decline addressing questions received less than 10 calendar days prior to receipt of proposals.
If an Offeror believes the requirements in this Request for Proposal contain an error, omission, or are otherwise unsound, the Offeror shall immediately notify the Contract Specialist in writing with supporting rationale. The Offer is reminded that the Government reserves the right to award this Request for Proposal based on the initial proposal, as received, without discussion.
To submit and review bid inquiry items, Offerors will need to be a current registered user or selfregister into the system. To self-register, go to web page, click BID tab, select Bidder Inquiry, select agency USACE, enter Key for this solicitation listed below, your e-mail address, and click login. Fill in all required information and click create user. Verify all information on the next screen is correct and click continue. From this page you may view all bidder inquiries or add inquiry.
Offerors will receive an acknowledgement of their question via e-mail, followed by an answer to their question after it has been processed by our technical team.
Bidder Inquiry Key: JHCFI6-7752AQ
Section 00 21 16 - Instructions to Proposers
CLAUSES INCORPORATED BY REFERENCE
| 52.204-7 |
| System for Award Management |
| OCT 2018 |
| 52.204-16 |
| Commercial and Government Entity Code Reporting |
| JUL 2016 |
| 52.204-22 |
| Alternative Line Item Proposal |
| JAN 2017 |
| 52.207-6 |
| Solicitation of Offers from Small Business Concerns and Small Business Teaming Arrangements or Joint Ventures (Multiple-Award Contracts) |
| OCT 2016 |
| 52.211-6 |
| Brand Name or Equal |
| AUG 1999 |
| 52.215-1 |
| Instructions to Offerors--Competitive Acquisition |
| JAN 2017 |
| 52.215-20 |
| Requirements for Certified Cost or Pricing Data or Information Other Than Certified Cost or Pricing Data |
| OCT 2010 |
| 52.215-22 |
| Limitations on Pass-Through Charges--Identification of Subcontract Effort |
| OCT 2009 |
| 52.216-27 |
| Single or Multiple Awards |
| OCT 1995 |
| 52.222-5 |
| Construction Wage Rate Requirements--Secondary Site of the Work |
| MAY 2014 |
| 52.225-12 |
| Notice of Buy American Requirement - Construction Materials Under Trade Agreements |
| MAY 2014 |
CLAUSES INCORPORATED BY FULL TEXT
52.217-5 EVALUATION OF OPTIONS (JUL 1990)
Except when it is determined in accordance with FAR 17.206(b) not to be in the Government's best interests, the Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. Evaluation of options will not obligate the Government to exercise the option(s).
(End of provision)
52.228-1 BID GUARANTEE (SEP 1996)
(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.
(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States. The Contracting Officer will return bid guarantees, other than bid bonds, (1) to unsuccessful bidders as soon as practicable after the opening of bids, and (2) to the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.-
(c) The amount of the bid guarantee shall be ____20____ percent of the bid price or $3 Million, whichever is less.-
(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.-
(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.
52.233-2 SERVICE OF PROTEST (SEP 2006)
(a) Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from
US Army Corp of Engineers, Savannah District Attn: CECT-SAS-E (Jennifer Murphy) 100 W Oglethorpe Ave.
Savannah, GA 31401
(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.
52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995)
(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.
(b) Site visits may be arranged during normal duty hours by contacting:
| Name: |
| Address: |
| Telephone: |
52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)
This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):
[Insert one or more Internet addresses]
52.252-3 ALTERATIONS IN SOLICITATION (APR 1984)
Portions of this solicitation are altered as follows:
252.204-7008 COMPLIANCE WITH SAFEGUARDING COVERED DEFENSE INFORMATION CONTROLS (OCT 2016)
(a) Definitions. As used in this provision--
Controlled technical information, covered contractor information system, covered defense information, cyber incident, information system, and technical information are defined in clause 252.204-7012, Safeguarding Covered Defense Information and Cyber Incident Reporting.
(b) The security requirements required by contract clause 252.204-7012 shall be implemented for all covered defense information on all covered contractor information systems that support the performance of this contract.
(c) For covered contractor information systems that are not part of an information technology service or system operated on behalf of the Government (see 252.204-7012(b)(2))--
(1) By submission of this offer, the Offeror represents that it will implement the security requirements specified by National Institute of Standards and Technology (NIST) Special Publication (SP) 800-171, ``Protecting Controlled Unclassified Information in Nonfederal Information Systems and Organizations'' (see http://dx.doi.org/10.6028/NIST.SP.800-171) that are in effect at the time the solicitation is issued or as authorized by the contracting officer not later than December 31, 2017.
(2)(i) If the Offeror proposes to vary from any of the security requirements specified by NIST SP 800-171 that are in effect at the time the solicitation is issued or as authorized by the Contracting Officer, the Offeror shall submit to the Contracting Officer, for consideration by the DoD Chief Information Officer (CIO), a written explanation of—
(A) Why a particular security requirement is not applicable; or
(B) How an alternative but equally effective, security measure is used to compensate for the inability to satisfy a particular requirement and achieve equivalent protection.
(ii) An authorized representative of the DoD CIO will adjudicate offeror requests to vary from NIST SP 800-171 requirements in writing prior to contract award. Any accepted variance from NIST SP 800-171 shall be incorporated into the resulting contract.
252.211-7002 AVAILABILITY FOR EXAMINATION OF SPECIFICATIONS, STANDARDS, PLANS, DRAWINGS, DATA ITEM DESCRIPTIONS, AND OTHER PERTINENT DOCUMENTS (DEC. 1991)
The specifications, standards, plans, drawings, data item descriptions, and other pertinent documents cited in this solicitation are not available for distribution but may be examined at the following location:
(Insert complete address)
252.236-7008 CONTRACT PRICES - BIDDING SCHEDULES. (DEC 1991)
(a) The Government's payment for the items listed in the Bidding Schedule shall constitute full compensation to the Contractor for --
(1) Furnishing all plant, labor, equipment, appliances, and materials; and
(2) Performing all operations required to complete the work in conformity with the drawings and specifications.
(b) The Contractor shall include in the prices for the items listed in the Bidding Schedule all costs for work in the specifications, whether or not specifically listed in the Bidding Schedule.
Section 00 22 00 - Supplementary Instructions
SUPPLEMENTAL INSTRUCTIONS
PROPOSAL SUBMISSION REQUIREMENTS AND INSTRUCTIONS, BASIS OF AWARD, AND EVALUATION CRITERIA
A. DESCRIPTION OF WORK
This Request for Proposal (RFP) solicits for a Multiple Award Task Order Contract (MATOC) under which task orders for General Construction are expected to be issued for projects at Tyndall Air Force Base, Florida. Work contemplated on this MATOC may be conducted for Army, Air Force, Navy, Marine Corps, National Guard and Reserve Components, and other Department of Defense (DoD) and Federal Agencies located on Tyndall Air Force Base. Task Orders issued under any resultant contract(s) will be Firm-Fixed Price and may be either for Design-Build or Design-Bid-Build General Construction. A project requiring use of civil funds is not authorized under this contract. (See solicitation section 01 11 00 for the complete scope of the anticipated contract to be awarded under this RFP.)
For the purposes of this solicitation, the Government will utilize the Two-Phase Design-Build Selection Process. In Phase One of the Two-Phase Design-Build selection procedure, interested Offerors will submit specified performance capability proposals for review, consideration and evaluation by the Government. The Government will evaluate these performance capability proposals in accordance with the criteria described herein.
The Government will evaluate the performance capability proposals in accordance with the criteria described herein and will select no more than six (6) of the most highly qualified Offerors to participate in Phase Two. Evaluations of both Phase One and Phase Two will be used in the selection of offerors for award of the MATOC.
Only those Offerors who receive a written notification from the Savannah District Contracting Officer that their firm has been selected to participate in Phase Two of this solicitation will be invited to submit a Phase Two proposal. Those Offerors selected for Phase Two will be provided the technical requirements package for a Seed Task Order that will be representative of the type work and task orders anticipated to be issued under any resultant contract(s).
B. GENERAL INSTRUCTIONS
1. This requirement will be advertised for full and open competition; any legally organized firm may submit a proposal. Offerors submitting as a joint venture must provide the agreement forming the joint venture.
Information submitted about any company other than the Offeror, whether a predecessor company, affiliated company, subsidiary (including wholly owned subsidiaries), or subcontractors that will perform major or critical aspects of this requirement, or other associated business, WILL NOT be evaluated for any factor. Only exceptions to this is that the designer of record will be evaluated in Factor 2.
Offerors shall submit their proposal to the address shown in the schedule of the Notes to Offererors section of Standard Form 1442.
In an effort to reduce paperwork and reduce cost, all proposals shall be submitted electronically, except for the Bid Bond (required in Phase II).
All submissions shall be in Adobe PDF format. Offerors may use compressions utility software such as WinZip or PKZip to reduce file size and facilitate transmission.
Title the file(s) in the following format:
W912HN20R3XXX_COMPANY NAME_ VOLUME I
W912HN20R3XXX_COMPANY NAME_ VOLUME II
W912HN20R3XXX_COMPANY NAME_ VOLUME III
W912HN20R3XXX_COMPANY NAME_ VOLUME IV
Submit proposals electronically via the ARL SAFE website at:
https://safe.apps.mil/
***Offerors are required to submit a primary and secondary point of contact (POC) to Tonja Brazeau-Dreke (Tonja.J.Dreke@usace.army.mil). Once received, you will receive an email notification from the DoD SAFE with language that “this is a request from (Contract Specialist’s name) of USACE. Please click on the link below and drop off the file or files I have requested. This link is only valid for 14 days from the time of this email.” *** Please do this as soon as possible to ensure the request is received in enough time to submit your Phase Two proposal.
The link provided in the email described above will take you to a site which states that “This web page will allow you to drop-off (upload) one or more files for anyone (either a DoD user or others). The recipient will receive an automated email containing the information you enter below and instructions for downloading the file.” This site allows up to 8192MB. You will see a prompt to “Click to Add Files or Drag Them Here.” Once all files are uploaded, select “Drop-off Files.” Please note this link is only available once—any missed or forgotten documents that were not uploaded will need to be sent via new link and a new request will be required by the Contract Specialist.
When your proposal is submitted via the DoD SAFE website, the website will provide notification of the submittal to the Government recipient(s).
The date and time of delivery will be established by the time of receipt of the e-mail notification to the Contract Specialist and Contracting Officer by the DoD SAFE website, not by the date and time of uploading of the proposal into the DoD SAFE website. Do not assume that electronic communication is instantaneous – in fact, it can take several minutes or even hours in some cases. Please make allowances for delays in transmittal. If an electronic submission is uploaded minutes before the deadline but notification is not actually received in the recipients’ e-mail inboxes until after the deadline, the submission will be considered late.
The Government will not be responsible for proposals delivered to any location or to anyone other than those designated to receive proposals on its behalf. Offerors are responsible for ensuring that proposals are submitted so as to reach the designated recipient of proposals. Offerors are responsible for allowing sufficient time for the proposal to be received in accordance with the instructions provided.
Proposals are due no later than the time and date specified in Block 13 of Standard Form 1442.
2. SUBMITTAL OF OFFERS:
a) Offerors submitting proposals for this project should limit submissions to data essential for evaluation of proposals so that a minimum of time and monies will have been expended in preparing information required herein. However, in order to be effectively and equitably evaluated, the proposals must include information sufficiently detailed to clearly describe the Offeror's experience and capability, past performance, and use of small business necessary for successful completion of the project. Requirements stated in this RFP are minimums.
b) Innovative, creative or cost-saving proposals that meet or exceed the requirements are encouraged and will be rated accordingly.
c) The Offeror’s conformance with the specified format, submission requirements, and the Offeror’s attention to detail (e.g., typographical, grammatical, and reference errors) will be considered during the technical evaluation and trade-off. Failure to comply with the formatting and/or submission requirements or a lack of attention to detail may be seen as indicative of the type of problems that could be expected during contract performance. Lack of conformance or attention to detail could therefore result in a higher risk assessment, in addition to any other impacts on the evaluation. Material omission(s) may result in a deficiency, which will cause the technical proposal to be rejected as unacceptable. However, in accordance with FAR 52.215-1, the Government may waive informalities and minor irregularities in proposals.
d) Technical proposals that do not provide the specified information in the specified location in accordance with the submission instructions may be found to have weaknesses or significant weaknesses. The Government is under no obligation to search for information that is not in the specified location.
e) Responses that are essentially blanket offers of compliance are not adequate substitutes for the detailed and complete technical information necessary to establish that an Offeror can meet Government needs. The proposal submission instructions are written to give prospective contractors, where feasible, an indication of the level of detail desired by the Government. The Offeror’s failure to include information that the Government has indicated should be included may result in the proposal being assigned a (significant) weakness and/or being found deficient if inadequate detail is provided.
f) Any prescribed page and formatting limitations will be strictly adhered to and enforced by the Government. The Government will not evaluate any excess information resulting from the Offeror’s failure to comply with the submission instructions.
g) Conditioning of Offer. Do not include exceptions to the terms and conditions of the solicitation in either the technical or price proposal volumes. Inclusion of any standard company terms and conditions that conflict with the terms and conditions of the solicitation may result in a determination that the offer is unacceptable and thus ineligible for award. Resolve questions about the terms and conditions or technical requirements of the solicitation prior to submission of the offer; see “Instructions to Proposer”, located in Section 00 21 16, for instructions. Notwithstanding the above, the Offeror must clearly describe in the proposal cover sheet submitted with the price volume any exceptions, within the offer, to the contractual and/or technical terms and conditions of the solicitation.
h) Restrictions on Offeror-Provided Information. “Confidential” projects cannot be submitted to demonstrate capability unless all of the information required for evaluation as specified herein can nonetheless be provided to the Government as part of the Offeror’s technical proposal. Confidential Project is defined as projects containing confidential information of which reasonably could be expected to cause damage to the national security with the unauthorized disclosure. Offerors that include in their proposals information that they do not want disclosed to the public for any purpose, or used by the Government except for evaluation purposes, must clearly mark the information in accordance with FAR 52.215-1, “Instructions to Offeror – Competitive Acquisition”, paragraph (e), “Restriction on disclosure and use of data”. Files shall not contain classified data.
C. PROPOSAL FORMAT
1. General Proposal Format:
a) ALL Volumes shall contain:
1) Title Page. Include the title of the solicitation, solicitation number, Offeror name, and date of the submittal.
2) Table of Contents. Each volume of the proposal shall contain a detailed table of contents. Any materials submitted but not required by this solicitation (such as company brochures) shall be relegated to appendices.
3) Tabs. Proposals shall be organized and tabbed in accordance with the tabbing per Phase and Volume.
b) All Volumes shall be formatted as follows:
1) Electronic Matter Submissions. Written material shall be on single sided 8 ½ x 11 size pages in no less than a 10 pitch or 10 font. Page limitations, where specified in the RFP, shall be considered a maximum. Pages in excess of any specified limitation shall not be evaluated.
2) Number of Copies. Offerors SHALL submit an electronic version (PDF Format) of the original Volume I and Volume II. Offerors SHALL submit only two files in PDF format (i.e. Volume I and Volume II). These two files should be named in a specific format: Solicitation Number, Offerors Company and the volume (i.e. W912HN20R3XXX_USACE_VolumeI.pdf). Given the limited time and resources of the evaluation board, failure to provide proposal in the correct format may hinder the board's ability to evaluate the Offeror's proposal.
2. PHASE One Formatting:
a) VOLUME I (Contract Requirements):
1) TAB A – Standard Form 1442, completed and signed by authorized individual(s) of the Offeror. Offers submitted in the name of a Joint Venture must be signed in accordance with the terms and conditions specified in the joint venture agreement as evidenced in the proposal.
2) TAB B – Section 00 45 00 – Representations and Certifications.
3) TAB C – Proposal Data Sheet – See Attachment 1 provided in the solicitation. Offerors should ensure telephone number, fax number, e-mail address and DUNS number are all included. The DUNS number provided will be used to access Contractor Performance Assessment Reporting System (CPARS) data. If a separate DUNS has been created for a joint venture it must also be submitted. A DUNS number shall also be provided for the Designer of Record identified in Factor 2. The Offeror shall also submit its Tax ID number on the proposal data sheet.
4) TAB D – Joint Venture Agreement, if applicable. See paragraph D. 1. A) 2).
5) TAB E - The Offeror is not required to submit a bid bond in Phase One but is required to submit a letter, stamped with an official seal and notarized, from the contractor’s surety validating the Offeror’s single and aggregate bonding capability and a power of attorney if applicable. FAR clause 52.228-1, “Bid Guarantee” will be included in the contract. At the discretion of the Contracting Officer, a Bid Bond will be required for each task order.
b) VOLUME II (Non-technical Requirements):
1) TAB D – Joint Venture Agreement, if applicable. (Duplicate of Volume I)
2) TAB F – FACTOR 1 Past Performance
3) TAB G – FACTOR 2 Design Experience
3. PHASE Two formatting: (For those who move to Phase Two and as it relates to Seed Task Order)
a) VOLUME III (Contract Requirements and Price Proposal):
1) TAB A – Standard Form 1442, completed and signed by authorized individual(s) of the Offeror. Offers submitted in the name of a Joint Venture must be signed in accordance with the terms and conditions specified in the joint venture.
2) TAB B – Proposal Pricing Schedule, Section 00 10 00 - Schedule A Base Contract Bid Schedule & Schedule B, Seed Task Order Pricing.
3) TAB C – Bid Bond – Solicitation Requirement: The Offeror is required to submit a bid bond for the amount of the seed project. This is to be submitted in original form and sent to the Contracting Office with an electronic copy included here in Tab C. In addition, the Surety should provide a letter to validate the Offeror’s bonding capability taking into account the Seed Task Order and any ongoing project at this current point in time. Submit originals; photocopied or scanned copies are not acceptable. FAR clause 52.228-1, “Bid Guarantee” will be included in the contract. At the discretion of the Contracting Officer, a Bid Bond will be required for each task order.
4) TAB D – Subcontracting Plan – FOR LARGE BUSINESS OFFERORS ONLY. Subcontracting Plan shall be prepared in accordance with FAR 52.219-9, and SBA’s Electronic Subcontracting Reporting System (eSRS) located at http://esrs.gov . Instructions for completion of requisite forms, as well as guidance on coordinating and preparing for all compliance reviews by Federal agencies can be found at this website. Offerors are to ensure subcontractors agree to submit to ESRS. Savannah District’s assigned subcontracting goals are as reflected in Local Clause, Subcontracting Plan for Small Business.
5) TAB E – Responsibility Determination Documentation:
· Financial Information & Bonding Capability (e.g. past three years financial statements, annual reports, Dun & Bradstreet Ratings and/or number, etc.)
· Provide a list of all current contracts held, total dollar value, award date, anticipated completion, performance and payment bond amount.
b) VOLUME IV (Technical Requirements):
1) TAB F – FACTOR 3 – MANAGEMENT APPROACH
2) TAB G – FACTOR 4 – SMALL BUSINESS PARTICIPATION PLAN
D. SUBMISSION REQUIREMENTS AND EVALUATION CRITERIA - PHASE 1
1. Phase One, Volume II, Tab F – Factor 1 – Past Performance:
a) SUBMISSION REQUIREMENTS:
1) The Offeror shall demonstrate a record of construction performance and experience on recent and relevant projects using the Past Performance Questionnaire Summary Sheet (Attachment 2) and the Past Performance Questionnaire (PPQ) (Attachment 3) or CCASS/CPARS. The PPQ is provided for the Offeror to submit to the client (Point of Contact) for each relevant project submitted. Offeror must ensure correct phone numbers and email addresses are provided for the client. Completed PPQs must be submitted with your proposal by the specified closing date and time. Offerors should follow-up with clients to ensure timely submittal of completed questionnaires. If the offeror is unable to obtain a completed PPQ from a point of contact for a project(s) before proposal closing date, the Offeror shall complete blocks 1 – 5 of the PPQ and submit it with the proposal. Please note that, at a minimum, this first page of the PPQ must contain sufficient information for the government to determine the relevancy of the project. In addition, this will provide contract and client information for the respective project(s). The Government may call and confirm information provided by the Offeror on the PPQs with the points of contact to the extent necessary to verify the information in the PPQ or to obtain additional information. The Government reserves the right to interview other individuals if the point of contact is not available. By exception, the client may request submission of questionnaires directly to the Government’s point of contact (Contract Specialist), Tonja Brazeau-Dreke. Request may be made via email to Tonja.J.Dreke@usace.army.mil . This request must be coordinated by the client in advance no later than five (5) business days before the proposal due date. PPQ’s submitted directly to the Contract Specialist shall be mailed via trackable means (certified US Mail, FedEx, or UPS). If the PPQ fails to arrive before the closing date and time, or if the information on the PPQ is insufficient to determine the Offeror’s name and appropriate solicitation number, it will not be considered.
2) Offerors are cautioned that the information submitted pertaining to a project shall be limited to the PPQ form and an additional page referenced below and shall contain enough information to determine the similarity and relevancy of a project. Likewise, Project Information submitted in a format other than or in lieu of the PPQ format or CCASS /CPARS will not be considered. Offerors shall not incorporate by reference into their proposal PPQs previously submitted for other solicitations. Offerors may submit PPQs submitted on other procurements provided they are on the NAVFAC/USACE Past Performance Questionnaire Form. Offerors may attach one additional single-sided page (per PPQ) to further describe how the project is similar to the RFP requirements.
In addition to the PPQ or CCASS/CPARS, the Offeror’s proposal shall include the Past Performance Questionnaire Summary Sheet (Attachment 2) to provide a summary of the PPQs included and/or submitted to clients. The summary sheet shall include information for all columns.
Offerors may identify state and local government and private contracts that are similar to the Government’s requirements described in D.1.b) 1).
If the Offeror is a joint venture, the projects do not have to have been performed by the joint venture submitting the offer. These project could have been performed by either company in the joint venture. Offerors are advised to submit projects wherein the Offeror, or proposed joint venture members, played a significant role and to clearly define those roles. If any Offeror has multiple functions or divisions, limit the project examples to those performed by the division or unit submitting the offer. Ensure that the PPQs or CCASS/CPARS submitted for this Factor clearly describe the relevant characteristics of the project.
b) PARAMETERS:
1) Offeror shall submit a minimum of three (3), but no more than five (5), recent relevant projects that have a minimum value of no less than $40 million each. Projects with similar size, scope, and complexity of the following may be considered relevant projects:
Design-build or design-bid-build construction of Medical Facilities, Headquarters and Operational Facilities, Sensitive Compartmented Information Facilities (SCIFs), Administrative & Office Buildings, Educational Facilities, Military Training Facilities, Weapons Training Facilities, Animal Training & Storage Facilities, Religious Facilities, Recreational & Storage Facilities, Dining Facilities, Vehicle Maintenance Facilities, Aircraft Storage Facilities, Air Traffic Control Towers/Facilities, Barracks Buildings, Ranges, and Access Control Points.
2) At least one of the five projects MUST be Design-Build construction.
3) All projects must be successfully completed or fully designed and at least 50% construction progress completed within six (6) years preceding the date of this solicitation. Projects that meet these criteria will be evaluated to determine the level of relevancy.
Please note that projects submitted by design firms will not be evaluated in this factor. Design firms shall submit projects in accordance with the requirements in Factor 2.
4) Offerors shall submit no more than five (5) PPQs or CCASS/CPARS in accordance with D.1.a) 1). Project information on a PPQ shall be limited to the PPQ and one additional page. Where a project was awarded as a task order or delivery order under an IDIQ type contract, Offerors are cautioned to submit information specific to the task or delivery order considered relevant to the requirements of this RFP, rather than the umbrella contract. For purposes of this Request for Proposal, if the Offeror is submitting as a Joint Venture, no more than five (5) total project examples may be submitted for the entire JV. If an Offeror submits more than five (5) total project examples, only the first five (5) will be evaluated. Offerors are advised to submit projects wherein the Offeror played a significant role and to clearly define those roles. Offerors shall submit only projects wherein the Offeror or proposed joint venture members were the prime contractors and played a significant role in the successful completion of the project. If any firm has multiple functions or divisions, limit the project examples to those performed by the division, unit or team member submitting the offer.
5) Other Sources. In addition to the above, the Government may review any other sources other than those provided by the Offeror for evaluating past performance and experience. These other sources may include but are not limited to, past performance and experience information retrieved through the Past Performance Information Retrieval System (PPIRS), including Contractor Performance Assessment Reporting System (CPARS), using all CAGE/DUNS numbers identified in the proposal on the Proposal Data Sheet, inquiries of owner representative(s), Federal Awardee Performance and Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), and any other known sources not provided by the Offeror. If a CPARS evaluation exists for a submitted project, it will be considered.
6) While the Government may elect to consider data from other sources, the offeror must provide detailed, current, accurate and complete past performance information for evaluation by the Government.
The experience and/or past performance of individuals will NOT be considered under this factor.
c) EVALUATION CRITERIA:
1) Past Performance Evaluation: The past performance and experience evaluation results in an assessment of the Government’s confidence in the ability of the Offeror to meet the solicitation requirements. The past performance evaluation considers each Offeror’s demonstrated record of performance and experience on recent and relevant projects that involve a similar scope and magnitude of effort and complexities as this solicitation requires. One performance confidence assessment rating is assigned for each Offeror after evaluating the Offeror’s recent past performance and experience, focusing on performance and experience that is relevant to the contract requirements.
2) If a firm has multiple functions or divisions, the Government will only evaluate the past performance and experience of the unit or division submitting the offer.
3) Projects must meet the minimum criteria in paragraph D.1.b) in order to be considered recent and relevant and will be evaluated against the requirements of the RFP. The Government will not consider multiple projects, such as individual task orders, combined to meet the minimum value. Projects will be evaluated for relevancy based on the description of the project. Past performance evaluations on projects that are not recent and relevant will not be considered.
4) Table 1. Past Performance Relevancy Rating Method:
| Rating |
| Definition |
| Very Relevant |
| Present/past performance effort involved essentially the same scope and magnitude of effort and complexities this solicitation requires. |
| Relevant |
| Present/past performance effort involved similar scope and magnitude of effort and complexities this solicitation requires. |
Somewhat Relevant Present/past performance effort involved some of the scope and magnitude of effort and complexities this solicitation requires.
Not Relevant Present/past performance effort involved little or none of the scope and magnitude of effort and complexities this solicitation requires.
d) CONFIDENCE ASSESSMENT:
1) Offerors may increase the SSEB’s level of confidence in Past Performance if they are able to demonstrate successful performance in a wide variety of work as described in paragraph D.1.b)1). Conversely, the SSEB may have a decreased level of confidence in Offerors whose experience is limited amongst the project types described in D.1.b)1). Offerors may increase the SSEB’s level of confidence if they submit more than one Design-Build projects.
2) The Government will evaluate the Offeror's past performance and experience using the sources available to it including but not limited to: the example projects identified by the Offeror and submitted on the PPQs or CCASS/CPARS and any additional information received from references and other CCASS/CPARS or other sources. Offerors may be provided an opportunity to address any negative past performance information about which the Offeror has not previously had an opportunity to respond if such information is determined to impact the rating to be assessed.
3) The Government will consider the recency of the performance, the relevancy including the context of the data, and the quality of the performance and general trends in performance and source of the information to reach a confidence assessment rating using Past Performance Confidence Ratings. S
4) If no recent/relevant performance record is available or the Offeror’s performance record and experience is so sparse that no meaningful confidence assessment rating can be reasonably assigned this factor will be assigned a rating of “Unknown Confidence” (Neutral).
5) Past Performance Confidence Ratings:
Table 2. Confidence Ratings
| Rating |
| Definition |
| Substantial Confidence |
| Based on the offeror’s recent/relevant performance record, the Government has a high expectation that the offeror will successfully perform the required effort. |
| Satisfactory Confidence |
| Based on the offeror’s recent/relevant performance record, the Government has a reasonable expectation that the offeror will successfully perform the required effort. |
| Neutral Confidence |
| No recent/relevant performance record is available or the |
offeror’s performance record is so sparse that no meaningful confidence assessment rating can be reasonably assigned. The offeror may not be evaluated favorably or unfavorably on the factor of past performance.
| Limited Confidence |
| Based on the offeror’s recent/relevant performance record, the Government has a low expectation that the offeror will successfully perform the required effort. |
| No Confidence |
| Based on the offeror’s recent/relevant performance record, the Government has no expectation that the offeror will be able to successfully perform the required effort. |
2. Phase One, Volume II, Tab G – Factor 2 – Design Experience:
a) SUBMISSION REQUIREMENTS and PARAMETERS:
1) Offeror shall submit a narrative not to exceed a total of five (5) single side pages describing its Design Experience or the intended Designer of Record’s (DOR) experience on a minimum of three (3), but no more than five (5) projects that have a minimum construction value of no less than $40 million each and that demonstrate Design Experience similar to the various requirements described in paragraph D.1.b)1) and subparagraphs.
2) Two of the five projects MUST be Design-Build construction. Projects must be fully designed within six (6) years preceding the date of this solicitation. In the narrative, clearly state the project construction cost, if design-build or design-bid-build, the role of the AE, and date of design completion.
3) In addition to the five (5) page narrative, Offerors may submit an additional two (2) single sided pages describing the relationship between the Prime and the Designer of Record for the performance of a subsequent contract (business agreement, formal arrangement, etc.).
NOTE: Government reserves the right to check past performance on any of the projects submitted via any means available such as CCASS or interview other individuals if the point of contact is not available.
b) EVALUATION CRITERIA – Design Experience:
1) Design Experience: The evaluation considers the demonstrated record of the Offeror’s DOR experience on recent and relevant projects that involve a similar scope and magnitude of effort and complexities as this solicitation requires.
2) Offerors may receive additional consideration in meeting the requirements of this Factor if they are able to demonstrate the successful design experience of the DOR in a wide variety of work as described in paragraph D. 1. b) 1) and subparagraphs. Conversely, the DORs may receive less consideration from the SSEB if the experience is limited amongst the project types described in paragraph D.1.b)1). DORs may receive additional consideration from the SSEB if they submit more than three Design-Build projects. DORs may also receive additional consideration if they submit evidence of business agreement/level of commitment to the Prime Offeror.
3) Design Experience Ratings:
Table 3. Design Experience Ratings
Adjectival Rating
Description
| Outstanding |
| Proposal indicates an exceptional approach and understanding of the requirements and contains multiple strengths, and risk of unsuccessful performance is low. |
| Good |
| Proposal indicates a thorough approach and understanding of the requirements and contains at least one strength, and risk of unsuccessful performance is low to moderate. |
| Acceptable |
| Proposal meets requirements and indicates an adequate approach and understanding of the requirements, and risk of unsuccessful performance is no worse than moderate. |
| Marginal |
| Proposal has not demonstrated an adequate approach and understanding of the requirements, and/or risk of unsuccessful performance is high. |
| Unacceptable |
| Proposal does not meet requirements of the solicitation, and thus, contains one or more deficiencies, and/or risk of unsuccessful performance is unacceptable. Proposal is unawardable. |
4) Risk Ratings:
Table 4. Definition of Risk:
| Adjectival Rating |
| Description |
| Low |
| Proposal may contain weakness(es) which have little potential to cause disruption of schedule, increased cost or degradation of performance. Normal contractor effort and normal Government monitoring will likely be able to overcome any difficulties. |
| Moderate |
| Proposal contains a significant weakness or combination of weaknesses which may potentially cause disruption of schedule, increased cost or degradation of performance. Special contractor emphasis and close Government monitoring will likely be able to overcome difficulties. |
| High |
| Proposal contains a significant weakness or combination of weaknesses which is likely to cause significant disruption of schedule, increased cost or degradation of performance. Is unlikely to overcome any difficulties, even with special contractor emphasis and close Government monitoring. |
| Unacceptable |
| Proposal contains a material failure or a combination of significant weaknesses that increases the risk of unsuccessful performance to an unacceptable level. |
3. RELATIVE IMPORTANCE OF PHASE 1 FACTORS:
NON-COST FACTORS.
FACTOR 1: PAST PERFORMANCE. This factor is the most important factor
FACTOR 2: DESIGN EXPERIENCE. This factor is the least important factor.
4. PHASE 1 – PROPOSAL EVALUATION.
a) The SSEB will be established to conduct the evaluation of proposals received in response to this solicitation. An initial review will take place to ensure that all required forms and certifications are complete and that both a technical and price proposal were received at the Phase they are required.
b) The evaluation will be based on the content of the proposal, proposal corrections and any information obtained from other sources, e.g. past performance information. The SSEB will not consider any documents incorporated by reference, except as expressly allowed by this solicitation.
c) Each member of the SSEB will independently consider all information provided in the proposal. Once these individual analyses are completed, the SSEB will assign a consensus rating for each evaluation factor. It is the responsibility of each member of the SSEB to provide and document sufficient strengths, weaknesses, and/or deficiencies to support the assigned rating for each factor. Comments are required for all ratings.
d) The final ratings on individual factors, to include all support documentation, will be provided to the Source Selection Authority. The Source Selection Authority, independently exercising prudent business judgment, will determine which Offerors, if any, will proceed to Phase Two.
E. SUBMISSION REQUIREMENTS AND EVALUATION CRITERIA – PHASE 2 - (Seed Task Order)
1. Phase Two, Volume III – Contract Requirements and Price Proposal
a) SUBMISSION REQUIREMENTS: See C.3. PHASE Two formatting for Volume 3 tabbing and format requirements.
b) An initial review will take place to ensure that all required forms and certifications are complete and that both a technical and price proposal were received.
c) Failure to submit all the data in the format indicated in this section may be cause for determining a proposal incomplete and, therefore, not considered for evaluation, and for subsequent award.
2. Phase Two, Volume IV, Technical Requirements, Tab F – Factor 3 – Management Approach
a) SUBMISSION REQUIREMENTS and PARAMETERS:
1) Offeror shall submit a narrative not to exceed eight (8) single sided pages, including charts and graphs that outlines how the Offeror will plan, execute, monitor and control projects under this MATOC. It should be presented as a high level management approach that the Offeror shall use when executing task orders under this contract.
2) The Management Approach should demonstrate a thorough understanding of the requirement, and demonstrate compliance with requirements of the RFP.
3) The Management Approach Plan shall address the following key points:
(a) Key Point 1: Team Management: The Offeror shall provide a corporate organization chart that clearly indicates how the firm plans to organize and execute task orders. Include any key firms/subs or types of subcontractors that participate in task orders. The organization chart should diagram the roles, responsibilities, and relationships between the prime contractor and subcontractors for the project, and the contracting organization. The chart should clearly define lines of responsibility and communication.
(b) Key Point 2: Resource Management: Describe how the Offeror manages resources and integrates construction subcontractors into the construction process. Address the Offeror’s plan to address anticipated challenges in Resource Management.
(c) Key Point 3: Schedule Management: Describe the Offeror’s approach to schedule development and management. Demonstrate the Offeror’s ability to proactively develop, manage, and adapt the project schedule over the period of performance.
(d) Key Point 4: Quality Management: Describe the Offeror’s Design and Construction Quality Control Program. Demonstrate the ability to comply with Government quality control management processes, Quality Control analysis and monitoring of performance against requirements and standards.
(e) Key Point 5: Design and Construction Management: Describe the Offeror’s processes for handling design and construction problems. Identify possible challenges associated with the project and the means and methods to mitigate those risks.
(f) Key Point 6: Change Management: Describe the Offeror’s process for integrating design changes after award and handling construction changes/modifications. Include any proposed processes for addressing and resolving construction issues, Request for Information (RFI’s), communication with Government representatives, and contractor’s organizational management involvement throughout the Change Management process.
b) EVALUATION CRITERIA – Management Approach:
1) The Management Approach Plan should describe how the Offeror plans and executes the work in each of the management key points listed in E. 2.a) 3).
2) Strengths and Weaknesses: The Government will evaluate the strengths, weaknesses and any deficiencies in the submission. Based on the submission provided, the Government will evaluate the Offeror’s overall understanding of the design-build and design-bid-build process and its capability to execute an awarded contract.
3) The Offeror will be evaluated on how well defined and clear the Management Approach is for the submission requirements listed in E. above.
4) Management Approach – Factor 3 – Ratings
Table 5. Management Approach Ratings Adjectival Rating
Description
| Outstanding |
| Proposal indicates an exceptional approach and understanding of the requirements and contains multiple strengths, and risk of unsuccessful performance is low. |
| Good |
| Proposal indicates a thorough approach and understanding of the requirements and contains at least one strength, and risk of unsuccessful performance is low to moderate. |
| Acceptable |