amd1.pdf
PDF 127 KB Posted
- Solicitation number
- W912HN19B3000
About this file
W912HN-19-B-3000 AMD1
View the file
Other files
| File | Type | Posted |
|---|---|---|
| C.04.01_Bid_Opening_Sign-In_Sheet-W912HN19B3000.pdf | ||
| C.04.01_Abstract-W912HN19B3000.pdf | ||
| W912HN-19-B-3000_AMD2.PDF | ||
| 19B3000vol2.PDF | ||
| 19B3000vol1.PDF | ||
| amd2.pdf | ||
| 19B3000vol1.PDF | ||
| W912HN-19-B-3000.pdf | ||
| 19B3000vol2.PDF | ||
| 19B3000vol1.PDF |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
This amendment is issued to include the Site Visit notes as w ell as a list of attendees. All other terms and conditions remain the same.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 28-Nov-2018
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912HN19B3000
X 9B. DATED (SEE ITEM 11)
08-Nov-2018
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
28-Nov-2018
CODE
USACE - SAVANNAH DISTRICT
100 W. OGLETHORPE AVE
SAVANNAH GA 31401
W912HN 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912HN19B3000
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
AMENDMENT 0001 - SITE VISIT
SUBJECT: Site Visit Minutes, IFB W912HN19B3000, Vehicle Paint Prep Facility PN86711, Fort Stewart, GA
1. The senior project manager, Steven Hill held a pre-proposal site visit on 13 November 2018 at 1300 hours at the CESAS Resident Engineer Office conference room at Fort Stewart for the above subject project. Bidders were advised that this is an “Invitation For Bid” solicitation to be awarded to the Lowest Priced qualified bidder. Bidders were advised that the bids were due to the Savannah District Contracting Office NLT 1400 Hours 13 December 2018. Bid opening will be held at the SpringHill Suites Hotel at 150 Montgomery Street in Savannah. The bid schedule consists of two base bid CLINS. Project scope includes a 5,382 SF metal building with motorized roll-up doors to facilitate large vehicles. Project will include a vehicle bay to allow for associated maintenance. Project will include all infrastructure work. Facility will contain a decontamination room for personnel. Facility will meet all applicable NFPA, NRTL, and OSHA requirements. Bidders were cautioned to ensure all documentation required by the solicitation was submitted. The attendees at the meeting were:
a. Steven Hill, CESAS
b. David Warren, CESAS
c. Kenneth Panly, Copper Construction
d. Greg Tyler, Tyler Construction
e. Christina McAlhey, Brantley Construction
f. Cody Findley, SAC
g. Matthew Cassis, SAC
h. Jackson Rackley, Harbor Enterprises
i. Bill Bersson, HRC Construction
j. Michael Carroll, SAC
k. Atkins, Windamir
l. Joe Mantilla, JAM Construction
m. Chase O’Neil, Outside the Box
n. Jim Cermy, SES
o. WH Gross, Gross Construction
p. Flip Dreger, Gross Construction
q. Susan Cermy, SES
2. General questions were taken during the meeting with a reminder to follow the requirements of the solicitation, which states that all technical inquiries are to be submitted via
W912HN19B3000
Bidder Inquiry in ProjNet. Attendees were reminded that all concerns should be entered early prior to bid opening in ProjNet.
3. The site visit was concluded at the project location along Tilton Avenue vicinity Veterans Parkway.
Prepared by:
Steven A. Hill Senior Project Manager, CESAS PM-ME
(End of Summary of Changes)