MARKET SURVEY (W912HN18R3007)

CONTRACTOR NAME: ______________________________

CONTRACTOR ADDRESS: __________________________

CONTRACTOR POINT OF CONTACT: __________________________

CONTRACTOR PHONE/FAX: ________________________

DUNS NUMBER: _____________________________

CAGE CODE: ________________________________

1. NAICS: This market survey applies to work associated with NAICS code 237120— Oil and Gas Pipeline and Related Structures Construction, as described in the Sources Sought posting. Please indicate below whether your company is currently registered under this code in the System for Award Management (SAM), https://www.sam.gov/:

· _____ Yes

· _____ No

2. BUSINESS SIZE: NAICS code 237120 has a size standard of $36.5M. Check all for which your firm is certified by SBA:

8(a)

HUBZONE

SERVICE DISABLED VETERAN OWNED SMALL BUSINESS

WOMEN-OWNED SMALL BUSINESS

ECONOMICALLY DISADVANTAGED WOMEN-OWNED SMALL BUSINESS

SMALL BUSINESS

LARGE

3. BONDING CAPABILITY: ____________________________Per Project*

____________________________Aggregate*

*as evidenced by submission of Surety Company letter stating bonding capacity

4. CAPABILITY:

Please submit 3 projects in which your company served as the Prime. Examples of relevant scopes include:

· New Construction of fuel truck unloading and load stand facilities capable of simultaneous receipt and delivery with a minimum contract value of $10 million and successfully completed, or fully designed and at least 50% construction progress completed within six (6) years preceding the date of this solicitation. The Government will not consider multiple projects, such as individual task orders, combined to meet the minimum contract value. Each project shall demonstrate experience with: new construction of truck unloading and load stand facilities, AND installation of utilities, storm sewer, pavement, access roads, area lighting, emergency generator, cathodic protection, leak detection, fire protection, communications, site preparation and improvements, canopies for drop tanks and fill stands.

· In addition to project submissions, please describe/list your experience with construction of projects in compliance with UFC 3-460-01.

Project details to submit include:

· Title of Project _______________________

· Design-Build ______ (or) Design-Bid-Build ______

· Contract & Task Order Number ______________________________

· Dollar Value ____________________________

· Location ____________________________

· Completion Date __________________________________

· Project Description: