W912HN-18-B-5002_AMD4_VOL1.pdf
PDF 8 MB Posted
- Attached to
- McCoy's Cut Diversion Structure, McCoombs and Rife Cut Closures and Channel Improvements
- Solicitation number
- W912HN18B5002
About this file
Drawings Vol 1 Amd 4
View the file
Other files
| File | Type | Posted |
|---|---|---|
| B.01.02_Abstract_W912HN18B5002_McCoy's_Cut.pdf | ||
| B.01.02_Sign-In_Roster_W912HN18B5002_06-12-18.pdf | ||
| amd4.pdf | ||
| 18B5002.pdf | ||
| amd3.pdf | ||
| 18B5002.pdf | ||
| 18B5002.pdf | ||
| W912HN-18-B-5002_AMD2.PDF | ||
| amd2.pdf | ||
| amd01.pdf | ||
| McCoysCutDiversion_20-22mar2018.xyz | XYZ file | |
| 18B5002.pdf | ||
| Pre-Bid_Conference_McCoy's_Cut.pdf | ||
| W912HN-18-B-5002_VOL1.pdf | ||
| W912HN-18-B-5002_VOL2.pdf | ||
| 18B5002.pdf |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A S S
H O
W N
R P
N
J S
C
S R
D
R N
H
INDEX OF DRAWINGS
STANDARD ABBREVIATIONS
EARTH (ORIGINAL GRADE)
EARTH (COMPACTED FILL)
GRAVEL
CONCRETE
MORTAR - CEMENT - PLASTER - STUCCO
SMALL\ SCALE - PLAN)
CONCRETE MASONRY UNITS (C.M.U.,
SCALE - SECTION)
CONCRETE MASONRY UNITS (C.M.U., LARGE
TILE (SMALL SCALE - SECTION)
CONCRETE MASONRY UNITS OR HOLLOW
METAL (ELEVATION)
STEEL (CROSS SECTION)
INSULATION (RIGID)
INSULATION (LOOSE OR BATT)
BRICK
WOOD (BLOCKING)
WOOD (FINISH)
BAL.
BLDG.
BLK.
BOT.
BRG.
B.T.U.H.
CAB.
CAP.
CEM.
CER.
C.F.M.
BALANCE
BOARD
BUILDING
BLANK
BEAM
BOTTOM
BEARING
BRITISH THERMO UNIT/HOUR
CABINET
CAPACITY
CIRCUIT BREAKER
CEILING DIFFUSER
CEMENT
CERAMIC
CUBIC FEET/MINUTE EA. EACH
E
AREA DRAIN
A.H.U.
ALT.
ALUM.
AMP., A.
APPROX.
ARCH.
A.T.C.
AIR HANDLING UNIT
ALTERNATE
ALUMINUM
AMPERES
ACCESS OPENING
APPROXIMATELY
ARCHITECTURAL
ASPHALT TILE
ACOUSTIC TILE CEILING
ABOVE FINISHED FLOOR
CKT.
L
CEIL.
CL.
CIRCUIT
CENTER LINE
CEILING
CLOSET
C.M.U.
C.O.
COL.
CONC.
COND.
CONN.
CONST.
CONT.
CONTR. JT.
C.S.C.
C.T.
C.T.B.
C. TO C.
CONCRETE MASONRY UNIT
CLEAN OUT
COLUMN
CONCRETE
CONDENSATE
CONNECTION
CONSTRUCTION
CONTINUOUS
CONTRACTION JOINT
COLOR SYMBOL CODE
CERAMIC TILE
CERAMIC TILE BASE
CENTER TO CENTER
CLEARCLR.
DET.
DIA.
DIFF.
DIM.
DISC.
D.J.
DN.
DR.
D.S.
DWG.(S)
DETAIL
DIAMETER
DIFFUSER
DIMENSION
DISCONNECT
DUMMY JOINT
DOWN
DRAIN
DOWN SPOUT
DRAWING(S)
D
GA.
GAL.
GALV.
G.F.E.
GL.
GND.
GOV'T
G.P.H.
G.P.M.
GR.
G.W.B.
H.
GAGE
GALLON
GALVANIZED
GOVERNMENT FURNISHED
EQUIPMENT
GLASS
GROUND
GOVERNMENT
GALLONS/HOUR
GALLONS/MINUTE
GRILLE
GYPSUM WALL BOARD
HIGH
H.B.
H.C.
HT.
I.D.
I.E.
IN.
INCAND.
INSUL.
INT.
J.B.
JCT.
JT.
KVA
LB.,#
LG.
HOSE BIBB
HOLLOW CORE
HEIGHT
INSIDE DIAMETER
INVERT ELEVATION
INCHES
INCANDESCENT
INSULATION
INTERIOR
JUNCTION BOX
JUNCTION
JOINT
KILOVOLT AMPERE
POUND
LONG
M.
MAINT.
MAX.
M.D.P.
MECH.
MTL.
MIN.
MISC.
M.O.
M.T.
MTD.
MTG.
M.V.
M.G.T.
N.A.
N.I.C.
NO.
O.A.
P.
PART. MOTOR
MAINTENANCE
MAXIMUM
MAIN DISTRIBUTION PANEL
MECHANICAL
METAL
MINIMUM
MISCELLANEOUS
MASONRY OPENING
METAL THRESHOLD
MOUNTED
MOUNTING
MECHANICAL VENTILATION
MATT GLAZE TILE
NOT APPLICABLE
NOT IN CONTRACT
NUMBER
OUTDOOR AIR
PAPER
PARTITION
PER.
QTR.
QUAN.
R.
R.A.
RAD.
RD.
REG.
REINF.
REQ.
RET.
R.G.
RM.
R.P.M.
PERIMETER
QUARTER
QUANTITY
RISER
RETURN AIR
RADIUS
ROUND
REGISTER
REINFORCING
REQUIRED
RETURN
RETURN GRILLE
ROOM
REVOLUTION/MINUTE
T.
TEL.
TEMP.
THK.
THD.
TOILET
W.
W/
WD.
W.D.
W.G.
WP.
S.A.
SCH.
SECT.
SERV.
SHT.
S.J.
SPEC.
SQ. FT.
ST.
STOR.
STRUC.
SUSP.
SW.
SUPPLY AIR
SCHEDULE
SECTION
SERVICE
SHEET
SAWED JOINT
SPECIFICATIONS
SQUARE FEET
STEEL
STORAGE
STRUCTURAL
SUSPENDED
SWITCH
S. SUPPLY
WOOD
WIDE FLANGE
WINDOW DIMENSION
WATT
WITH
WAINSCOATING
WATER GAGE
WEATHERPROOF
TELEPHONE
TEMPERATURE
THICKNESS
THRESHOLD
L
P M
N
Q
O
R
S
T
W
H
I
J
K
G
WC
WF
EXT.
EXIST.
EXTERIOR
EXISTING
F.A.
F.C.
F.D.
F.E.C.
FIN.
FL.
FT.
FTG.
FIRE ALARM
FLEXIBLE CONNECTION
FLOOR DRAIN
FIRE EXTINGUISHER CABINET
FINISH
FLOOR
FOOT, FEET
FOOTING
F
EXP. JT
EXH.
E.W.C.
E.W.
EQUIP.
ELEC.
E.F.
EXPANSION JOINT
EXHAUST
ELECTRIC WATER COOLER
EACH WAY
EQUIPMENT
ELECTRIC
EACH FACE
H.P.
HR.
HTG.
HTR.
H.&V.
HW.
HYD.
HORSE POWER
HOUR
HEATING
HEATER
HEATING AND VENTILATING
HARDWARE
HYDRANT
H.M. HOLLOW METAL
HORIZ. HORIZONTAL
LTG. LIGHTING
LIGHTING PANELL.P.
L.L.V. LONG LEG VERTICAL
OL.
OPNG.
OPP.
O.S.D.
OVERLOAD
OPENING
OPPOSITE
OPEN SIGHT DRAIN
O.C. ON CENTER
L, PL.
PLBG.
PLYW'D
PNL.
PRESS.
PSF
PSI
PSIG
PT.
PTD.
PLATE
PLUMBING
PLYWOOD
PANEL
PRESSURE
POUNDS/SQUARE FOOT
POUNDS/SQUARE INCH
POUNDS/SQUARE INCH GAGE
POINT
PAINTED
P
PREFORMED JOINT FILLERP.J.F.
TOIL.
TYP.
TOILET
TYPICAL
T.O.C.
T.O.F.
TOP OF CONCRETE
TOP OF FOOTING
V.
V.A.T.
VENT.
VERT.
VOLT
VINYL ASBESTOS TILE
VENTILATION
VERTICAL
VENT THRU ROOF
V
VTR
L H
A-101
SECTION OR DETAIL IS SHOWN
PLATE NUMBER ON WHICH
VIEW SECTION
ELEVATION IS SHOWN
PLATE NUMBER ON WHICH
TITLE WHERE DETAIL IS SHOWN
A-101
SIM
B
A-101
SECTION SYMBOLS
BD.
BM.
C/B
C.D.
A
B
C
A.D.
A
A.O.
A.T.
A.F.F.
Z K
Z G -0
.d g n
IN
D
E X O
F D
R A
W
IN
G S
PVC PIPE
STAINLESS STEEL
NEOPRENE
SECOND STAGE CONCRETE
/2
/2
G-001
CSP CORRUGATED STEEL PIPE
STA. STATION
NUMBER IDENTIFICATION
SECTION LETTER OR DETAIL
SYMBOL WHERE TAKEN
DETAIL
IDENTIFICATION LETTER
ELEVATION/SECTION
ELEVATION/ SECTION SYMBOL
c
AC. ACRE/S
L.F. LINEAL FEET
SF SQUARE FEET
A.S. ARMOR STONE
WTR.
W.W.F.
WATER
WELDED WIRE FABRIC
W.S. WEIR STONE
WSE WATER SURFACE ELEVATION
TITLETITLESHEET ID SHEET ID
A N
S I
D
S - 507
S - 506
S - 505
S - 504
S - 503
S - 502
S - 501
S - 201
C - 504
C - 503
C - 502
C - 501
C - 319
C - 318
C - 317
C - 316
C - 315
C - 314
C - 313
C - 312
C - 311
C - 310
C - 309
C - 308
C - 307
C - 306
C - 305
C - 304
C - 303
C - 302
C - 301
C - 202
C - 201
C - 111
C - 110
C - 109
C - 108
C - 107
C - 106
C - 105
C - 104
C - 103
C - 102
C - 101
B - 607
B - 606
B - 605
B - 604
B - 603
B - 602
B - 601
B - 101
G - 003
G - 002
G - 001
G - 000
SIGN SCHEDULE
ATON DETAILS
SHORE PROTECTION WALLS CAP BEAM DETAILS
DIVERSION STRUCTURE CAP BEAM SHIM DETAILS
DIVERSION STRUCTURE CAP BEAM TIEDOWN AND CONSTRUCTION TOLERANCE
DIVERSION STRUCTURE CAP BEAM DETAILS
DIVERSION STRUCTURE END PILE DETAILS
DIVERSION STRUCTURE PLAN, PROFILE, AND GENERAL NOTES
"SOUTH" CANTILEVERED WALL TYPICAL SECTION 2
"SOUTH" CANTILEVERED WALL TYPICAL SECTION 1
"NORTH" CANTILEVERED WALL TYPICAL SECTION
TEMPORARY EROSION CONTROL MEASURE DETAILS
"NORTH" SHORELINE PROTECTION SECTIONS 6
"NORTH" SHORELINE PROTECTION SECTIONS 5
"NORTH" SHORELINE PROTECTION SECTIONS 4
"NORTH" SHORELINE PROTECTION SECTIONS 3
"NORTH" SHORELINE PROTECTION SECTIONS 2
"NORTH" SHORELINE PROTECTION SECTIONS 1
"SOUTH" SHORELINE PROTECTION SECTIONS 5
"SOUTH" SHORELINE PROTECTION SECTIONS 4
"SOUTH" SHORELINE PROTECTION SECTIONS 3
"SOUTH" SHORELINE PROTECTION SECTIONS 2
"SOUTH" SHORELINE PROTECTION SECTIONS 1
HARDENED CHANNEL SECTIONS 6
HARDENED CHANNEL SECTIONS 5
HARDENED CHANNEL SECTIONS 4
HARDENED CHANNEL SECTIONS 3
HARDENED CHANNEL SECTIONS 2
HARDENED CHANNEL SECTIONS 1
DIVERSION STRUCTURE CROSS SECTIONS 2
DIVERSION STRUCTURE CROSS SECTIONS 1
HARDENED CHANNEL OFFSET PROFILES
DIVERSION STRUCTURE / HARDENED CHANNEL PROFILE
EROSION CONTROL MEASURES
DA-2A DISPOSAL AREA
DREDGING PLAN
"NORTH" SHORE PROTECTION SHEETING PLAN
"SOUTH" SHORE PROTECTION SHEETING PLAN
McCOY'S CUT PLAN NORTH
McCOY'S CUT PLAN SOUTH
SITE PREPARATION "SOUTH" SHORE
EXISTING CONDITIONS
SURVEY CONTROL AND ON-SHORE WORK LIMITS PLAN
McCOY'S CUT OVERALL SITE PLAN
BORING LOGS THL-MCN-1, THL-MCN-2, THL-MCN-3
BORING LOGS THL-MCS-3, THL-MCS-3A
BORING LOGS THL-MCS-1, THL-MCS-2
BORING LOGS TH-MC-4
BORING LOGS TH-MC-3
BORING LOGS TH-MC-2, TH-MC-2A
BORING LOGS TH-MC-1,TH-MC-1A
GEOTECHNICAL BORE HOLE LOCATION PLAN
VICINITY AND LOCATION MAP
GENERAL NOTES
INDEX OF DRAWINGS
PROJECT TITLE SHEET
R
E V
IS
E D I
N A
C C
O R
D A
N C
E W
IT
H A
M E
N D
M E
N T
M
A Y
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D
2 3
C
4 5
A
B S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
D E
S C
R
IP
T
IO
N D
A T
E
C O
N T
R A
C T N
O
SAVANNAH
OF ENGINEERS
US ARMY CORPS
S Y
M B
O L
B Y
C A
T E
G O
R Y C
O D
E
F Y P
N
M c C
O Y 'S C
U T D
IV
E R
S
IO
N S
T R
U C
T U
R E
G E
O R
G
IA
A
N D S
O U
T H C
A R
O L
IN
A
S A
V A
N N
A H
G E
O R
G
IA
S A
V A
N N
A H D
IS
T R
IC
T
W
E S
T O
G L E
T H
O R
P E A
V E
N U
E
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
W
H N -1
-B -5
X X
X X
X X -X
X -X -X
X X
X
C W
K
IS
S
U E D
A T
E
J U
L
ISSUED FOR CONSTRUCTION
S
IZ
E
L:\2012\12-055\CAD\Sheets\McCoysCut\ZKZG-001.dgn
7:33:44 AM
sean.fitzroy
SHEET ID
R P
N
R N
H
S R
D
B S
T
Z K
Z G -0
.d g n
/2
/2
G-002
A S S
H O
W N
G E
N E
R A
L N
O T
E S
A N
S I
D
R E
V
IS
E D I
N A
C C
O R
D A
N C
E W
IT
H A
M E
N D
M E
N T
M
A Y
INSTALLED PER MANUFACTURER’S REQUIREMENTS, MAY BE USED IN LIEU OF SCDOT SILT FENCING.”
CONSTRUCTION. BIODEGRADABLE EROSION CONTROL BAGS EQUAL TO “FILTREXX” SEDIMENT CONTROL, 18-INCH BAG SIZE, FENCING THROUGHOUT THE CONSTRUCTION PERIOD AND ALSO REMOVAL UPON COMPLETION AND ACCEPTANCE OF THE UPLAND SURFACE RUNOFF FROM MIGRATING INTO THE SAVANNAH RIVER. WORK IS TO ALSO INCLUDE MAINTENANCE OF SILT CONTINUOUS SILT FENCE IS TO BE INSTALLED IMMEDIATELY UPLAND OF PROPOSED SHORELINE STABILIZATION TO PREVENT IN ACCORDANCE WITH SOUTH CAROLINA, DHEC STORM WATER MANAGEMENT FIELD MANUAL, 2005 OR CURRENT EDITION. A STORMWATER SUPPLEMENT (APRIL 2009) TO THE 2000 MANUAL, AS APPROPRIATE. EROSION CONTROL MEASURES ARE TO BE MANUAL, 2005 OR CURRENT EDITION, OR GEORGIA MANUAL FOR EROSION AND SEDIMENT CONTROL (2000) AND THE COASTAL EROSION CONTROL WORK IS TO BE IN ACCORDANCE WITH SOUTH CAROLINA DHEC STORM WATER MANAGEMENT FIELD 15.
GEORGIA 811 AND SC811. IF A UTILITY IS NOT NAMED, PLEASE CONTACT THEM DIRECTLY.
KEEPING IN MIND THE 2 FEET ALLOWANCE ON EITHER SIDE OF THE MARKINGS. NOT ALL UTILITIES ARE MEMBERS WITH THEIR UNDERGROUND FACILITY LINES. ONCE ANY EXISTING LINES HAVE BEEN MARKED, YOU MAY BEGIN CAREFULLY TO DIG, THEN SEND EITHER ONE OF THEIR EMPLOYEES OR A CONTRACT LOCATOR TO YOUR DIG SITE TO MARK THE LOCATION OF LOCATION OF THE DIGGING SITE AND NOTIFY MEMBER COMPANIES OF YOUR INTENT TO DIG. EACH MEMBER COMPANY WILL HTTP://WWW.SC1PUPS.ORG/PDF/WEBUSERGUIDE.PDF A GEORGIA 811 AND SC811 REPRESENTATIVE WILL RECORD THE CALL SC811 BY DIALING 811 OR (888) 721-7877, OR BY CONTACTING THEM THROUGH THE FOLLOWING WEBSITE ADDRESS:
NOTICE (NOT INCLUDING THE DAY OF THE CALL) PRIOR TO DIGGING, CALL GEORGIA 811 BY DIALING 811, OR (800) 282-7411, WORKING DAYS (NOT INCLUDING THE DAY OF CALL) BEFORE STARTING THE DIGGING WORK. AT LEAST 3 FULL WORKING DAY OR ONE CALL CENTER WITH ADEQUATE INFORMATION REGARDING THE DIG. EACH EXCAVATOR IS REQUIRED TO WAIT 3 FULL EARTH, ROCK OR OTHER MATERIALS IN OR ON THE GROUND REQUIRES THE EXCAVATOR TO CONTACT THE UTILITY COMPANY SOUTH CAROLINA AND GEORGIA STATE LAW REQUIRES ANY ACTIVITY THAT RESULTS IN THE MOVEMENT OR REMOVAL OF 14.
MATERIALS.
SHALL NOTIFY THE CONTRACTING OFFICER OF ANY VARIANCES PRIOR TO COMMENCEMENT OF WORK OR PURCHASING ANY COMPANIES, AND THE CONTRACTOR SHALL COOPERATE WITH THEM DURING RELOCATION OPERATIONS. THE CONTRACTOR ANY UTILITIES WHICH INTERFERE WITH THE PROPOSED CONSTRUCTION SHALL BE RELOCATED BY THE RESPECTIVE UTILITY 13.
CLAY.
ADDED BY THE CONTRACTOR SHALL CONSIST OF A MIXTURE OF ABOUT 50 PERCENT SAND AND 50 PERCENT SILT OR SILTY WHEN THE DISPOSAL AREA 1N HAUL ROAD REQUIRES MAINTENANCE AND MAKEUP MATERIAL, ROAD TOPPING MATERIAL 12.
SOUTHERLY SHORELINE. THE EXISTING STOCKPILE LOCATION IS SHOWN ON SHEET C-104.
CONSTRUCTION FILL, BACKFILL MATERIAL SHALL BE TAKEN FROM EXISTING STOCKPILED DREDGE SOIL LOCATED ALONG THE NO FILL IS ANTICIPATED TO BE REQUIRED FOR CONSTRUCTION. IF ANY EARTH MATERIAL IS REQUIRED FOR USE AS 11.
SHOWN.
QUANTITIES OF STONE SHOWN ARE BASED ON THE TOTAL ROCK VOLUME REQUIRED TO OBTAIN THE CROSS SECTIONS 10.
TO CLEARING AND GRUBBING AS THIS AREA IS ALSO AFFECTED BY CONSTRUCTION METHODS.
EXCAVATION. THE CONTRACTOR IS ALSO TO MAKE HIS OWN DETERMINATION OF ALL QUANTITIES INCLUDING BUT NOT LIMITED WEATHER; CONTRACTOR EQUIPMENT SELECTION, ETC. MAY EACH AFFECT THE TOTAL VOLUME OF SOIL REQUIRED FOR TECHNIQUES, BURIED OR SUBMERGED STUMPS, LOGS AND ROOTS; LOCALIZED SOIL MAKEUP; GROUNDWATER CONDITIONS;
QUANTITIES ARE FURNISHED TO THE CONTRACTOR FOR INFORMATION ONLY. INDIVIDUAL CONTRACTOR CONSTRUCTION IN-PLACE BACKFILL VOLUMES ESTIMATED TO MEET CROSS SECTIONS SHOWN IN THE SECTION PLAN SHEETS. EXCAVATION SHORELINE CROSS SECTIONS. EARTHWORK CALCULATIONS HAVE BEEN FURNISHED AND SHOW IN-PLACE EXCAVATION AND OF EXCAVATION, AND DREDGING REQUIRED TO OBTAIN THE REQUIRED CROSS SECTIONS SHOWN ALONG THE RIVERBED AND THE CONTRACTOR SHALL BE RESPONSIBLE TO MAKE HIS OWN ESTIMATE OF THE NUMBER OF TONS OF ROCK, CUBIC YARDS 9.
THROUGH THE TIME OF CONSTRUCTION.
DUE TO SETTLEMENTS WHICH MIGHT OCCUR BETWEEN THE TIME THE EXISTING CROSS SECTIONS WERE TAKEN AND SETTLEMENT, CONSOLIDATION, SHRINKAGE, ELASTIC DISTORTION, ETC. OR VARIATIONS IN THE EXISTING CROSS SECTIONS ON THE CONSTRUCTION PLANS. THE NEAT VOLUME DOES NOT INCLUDE ANY ADDITIONAL QUANTITY REQUIRED DUE TO VOLUME REQUIRED FOR THE CONSTRUCTION OF THE PROPOSED SLOPE AND CHANNEL BOTTOM PROTECTION AS DEPICTED THE QUANTITIES SHOWN ON THE PLANS AND IN THE BID DOCUMENTS FOR ROCK PLACEMENT ARE THE NEAT OR TEMPLATE 8.
OR THE REPLACEMENT OF ANY DAMAGED DRAINAGE STRUCTURES AT THE DISPOSAL SITE.
STRUCTURES CROSSING THE HAUL ROADS. NO ADDITIONAL PAYMENT WILL BE MADE FOR THE MAINTENANCE OF HAUL ROADS ASSUME PROPER RUNOFF OF WATER ALONG THE ROADWAY. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL DRAINAGE REQUIRED TO MAINTAIN THE DITCHES ALONG THE PROPOSED HAUL ROAD AND TO MAINTAIN A CROWN ON THE HAUL ROAD TO THE BEGINNING OF CONSTRUCTION. IF ROAD DAMAGE CAN BE ATTRIBUTED TO THE CONTRACTOR, A MOTOR GRADER WILL BE SHALL LEAVE ANY PRE-EXISTING ROADS IN AS GOOD A CONDITION UPON COMPLETION OF THE CONTRACT AS IT WAS PRIOR TO THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE MAINTENANCE OF EXISTING HAUL ROADS AT DISPOSAL AREA 1N AND 7.
SHARED DISPOSAL AREA 1N SHALL ALSO BE COORDINATED THROUGH THE CONTRACTING OFFICER’S REPRESENTATIVE.
ANY AND ALL SHARED MAINTENANCE TASKS SUCH AS THOSE FOR MAINTENANCE OF MUTUALLY USED HAUL ROADS OR 6.
NOT BE CONSIDERED FOR ANY ADDITIONAL PAYMENT BY THE GOVERNMENT.
CONTRACTOR’S OPERATIONS AS A RESULT OF SHARED USE WILL BE THE RESPONSIBILITY OF THE CONTRACTORS AND SHALL CONTRACTING OFFICER WILL BE BINDING ON ALL PARTIES CONCERNED. ANY CHANGES AND/OR MODIFICATIONS TO OFFICER WHO WILL THEN MAKE A DETERMINATION FOR OPERATIONAL PROCEDURES. DETERMINATIONS MADE BY THE DISPUTES OR DISAGREEMENTS ARISING FROM AREA USE SHALL BE BROUGHT TO THE ATTENTION OF THE CONTRACTING CONTRACTORS AS NEEDED TO ENSURE THE ORDERLY PROGRESS OF EACH INDEPENDENT CONSTRUCTION PROJECT. ANY DISPOSAL AREA 1N THROUGHOUT THE PROJECT TIMELINE. THE CONTRACTOR SHALL COORDINATE WORK WITH ANY OTHER THE CONTRACTOR IS TO BE AWARE THAT OTHER CONSTRUCTION ACTIVITY MAY BE UNDERWAY IN THE PROXIMITY OF 5.
THE EASTERLY SHORE OF THE SAVANNAH RIVER OPPOSITE THE GEORGIA PORTS FACILITY.
1N, NEAR STATION 93+000, IS APPROXIMATELY 3 MILES NORTHWEST OF THE TALMADGE MEMORIAL BRIDGE AND LIES ALONG ROADWAYS FROM THE HUTCHINSON ISLAND TALMADGE MEMORIAL BRIDGE EXIT. THE DOWNSTREAM END OF DISPOSAL AREA DISPOSED OF AT THE HUTCHINSON ISLAND DISPOSAL AREA 1N. DISPOSAL CELL 1N CAN BE ACCESSED VIA SURFACE DREDGE MATERIAL FROM THE McCOY’S CUT DIVERSION STRUCTURE PROJECT CAN, AT THE CONTRACTOR’S OPTION, BE 4.
PERSONNEL TO MONITOR SITE ACCESS FOR THE LOCATION WHILE WORK IS UNDERWAY AT THE SITE.
SUPPLIES, AND MANPOWER AT ALL TIMES. THE CONTRACTOR WILL BE RESPONSIBLE FOR PROVIDING AND STAFFING RIVER. CONTRACTORS ARE TO TAKE PROTECTIVE MEASURES AS THEY DETERMINE HOW TO PROTECT THEIR EQUIPMENT, THE CONTRACTOR IS TO BE AWARE THAT THE PROJECT SITE IS OPEN TO THE GENERAL PUBLIC VIA BOATS ON THE SAVANNAH 3.
ONSHORE WORK IS TO BE MINIMIZED AND LIMITED TO APPROVED WORK AREAS DESIGNATED ON THE CONSTRUCTION PLANS.
UPLAND AREAS INCLUDED WITHIN THE PROJECT WORKSITE ARE PART OF THE SAVANNAH NATIONAL WILDLIFE REFUGE. 2.
BURTON MOORE AT TEL: (912) 652-6086.
PORT WENTWORTH. DURING THE BIDDING PROCESS, CONTRACTORS ARE TO COORDINATE SITE ACCESS BY CONTACTING MR.
WITH SPECIFIC SITE ISSUES. THE SITE IS ONLY ACCESSIBLE FROM WATER AND IS APPROXIMATELY 5 MILES DISTANT FROM IT IS RECOMMENDED THAT CONTRACTORS BIDDING ON THIS PROJECT VISIT THE SITE PRIOR TO BIDDING TO GAIN FAMILIARITY 1.
GENERAL NOTES:
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D
2 3
C
4 5
A
B S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
D E
S C
R
IP
T
IO
N D
A T
E
C O
N T
R A
C T N
US ARMY CORPS
S Y
M B
O L
B Y
C A
T E
G O
R Y C
O D
E
F Y P
N
M c C
O Y 'S C
U T D
IV
E R
S
IO
N S
T R
U C
T U
R E
G E
O R
G
IA
A
N D S
O U
T H C
A R
O L
IN
A
S A
V A
N N
A H
G E
O R
G
IA
S A
V A
N N
A H D
IS
T R
IC
T
W
E S
T O
G L E
T H
O R
P E A
V E
N U
E
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
W
H N -1
-B -5
X X
X X
X X -X
X -X -X
X X
X
C W
K
IS
S
U E D
A T
E
J U
L
ISSUED FOR CONSTRUCTION
S
IZ
E
L:\2012\12-055\CAD\Sheets\McCoysCut\ZKZG-002.dgn
7:33:11 AM
sean.fitzroy
SHEET ID
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D
2 3
C
4 5
A
B S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
D E
S C
R
IP
T
IO
N D
A T
E
C O
N T
R A
C T N
US ARMY CORPS
S Y
M B
O L
B Y
C A
T E
G O
R Y C
O D
E
F Y P
N
M c C
O Y 'S C
U T D
IV
E R
S
IO
N S
T R
U C
T U
R E
G E
O R
G
IA
A
N D S
O U
T H C
A R
O L
IN
A
S A
V A
N N
A H
G E
O R
G
IA
S A
V A
N N
A H D
IS
T R
IC
T
W
E S
T O
G L E
T H
O R
P E A
V E
N U
E
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
W
H N -1
-B -5
X X
X X
X X -X
X -X -X
X X
X
C W
K
IS
S
U E D
A T
E
J U
L
ISSUED FOR CONSTRUCTION
S
IZ
E
L:\2012\12-055\CAD\Sheets\McCoysCut\ZKZG-003.dgn
7:32:33 AM
sean.fitzroy
SHEET ID
SOUTH CAROLINA
GEORGIA
S COLUMBIA AVE
GEORGIA 21
GEORGIA 405
I-95
ALLIGATOR ALLEY
SOUTH CAROLINA 170
SPEEDWAY BLVD
US 17
WHYTE HARDEE BLVD
US 17
JASPER HWY
I-95
SAVANNAH RIVER
MAIN ST
SOUTH CAROLINA 46
FREEDOM PKWY
SOUTH CAROLINA 170
JASPER HWY
I-95
SAVANNAHSAVANNAH
PORT WENTWORTH
SEE SHEET C-101
PROJECT SITE
DISPOSAL SITE 1N
N. COASTAL HWY
GEORGIA 25
P
N
R N
H
S R
D
B S
T
Z K
Z G -0
.d g n
/2
/2
G-003
A S S
H O
W N
L O
C A
T
IO
N M
A P
V
IC
IN
IT
Y A
N D
N
0 20000'10000'
SCALE:1"=10000'
A N
S I
D
E
V
IS
E D I
N A
C C
O R
D A
N C
E W
IT
H A
M E
N D
M E
N T
M
A Y
-20
-16
-14
-14
-12
-12
-12
-10
-10
-8
-8
-8
-8
-8
-6
-6
-6
-4
-4
-4
-4 -4-4
-4-4
-2
-2
-2
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D
2 3
C
4 5
A
B S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
D E
S C
R
IP
T
IO
N D
A T
E
C O
N T
R A
C T N
US ARMY CORPS
S Y
M B
O L
B Y
C A
T E
G O
R Y C
O D
E
F Y P
N
M c C
O Y 'S C
U T D
IV
E R
S
IO
N S
T R
U C
T U
R E
G E
O R
G
IA
A
N D S
O U
T H C
A R
O L
IN
A
S A
V A
N N
A H
G E
O R
G
IA
S A
V A
N N
A H D
IS
T R
IC
T
W
E S
T O
G L E
T H
O R
P E A
V E
N U
E
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
W
H N -1
-B -5
X X
X X
X X -X
X -X -X
X X
X
C W
K
IS
S
U E D
A T
E
J U
L
ISSUED FOR CONSTRUCTION
S
IZ
E
L:\2012\12-055\CAD\Sheets\McCoysCut\ZIBC-109.dgn
7:30:06 AM
sean.fitzroy
SHEET ID
-17
-17
-17 -17
-17
-17
-17-17
-16
-16
-16
-16 -16 -16
-16
-16
-16
-15
-15
-15
-15
-15-15-15-15
-15
-15
-15
-15 -15 -15 -15
-14
-14
-14 -14 -14
-14
-14
-14-14-14
-13
-13
-13-13
-13
-13
-13
-13
-13
-13
-13 -13
-12-12-12
-12
-12
-12
-12
-12 -12 -12
-11-11
-11 -11
-11
-11 -11
-11
-11 -11
-10
-10
-10 -10-10-10-10
-10
-10
-10
-10 -10 -10 -10 -10
-10 -10 -10
-9-9-9
-9 -9
-9 -9-9-9
-9
-9
-9
-9
-9 -9 -9 -9
-9
-9
-9
-8
-8 -8
-8 -8
-8-8
-8
-8
-8
-8 -8 -8
-8 -8
-8
-8
-8 -8
-7
-7 -7
-7 -7
-7 -7
-7
-7
-7
-7 -7
-7 -7
-7 -7
-7
-7 -7 -6
-6 -6
-6 -6
-6 -6
-6
-6
-6
-6
-6 -6
-6 -6
-6 -6
-5 -5
-5 -5
-5
-5
-5
-5
-5
-5
-5
-5
-5 -5
-5 -5
-5 -5
-5
-4
-4
-4
-4
-3
-3
-3
-3
-2
-2
-2
-1
-1
-1
12+0013+0014+0015+0016+0017+0018+00
S A
V A
N N
A H R
IV
E
A
S
H O
W N
R P
N
R N
H
S R
D
B S
T
/2
/2
Z
IB
C -1
.d g n
60'
SCALE:1"= 30'
0 30'
F L
O W
B
C-302
B
C-303
C
C-201
A
Know what'sbelow.
before you dig.Call
R
LIMIT OF HARDENED CHANNEL DREDGING
N
LIMIT OF HARDENED CHANNEL (TYP.)
SAVANNAH RIVER
APPROXIMATE C/L
CHANNEL DREDGING
LIMIT OF HARDENED
D R
E D
G
IN
G P
L A
N
C-109
VARIES
SLOPE
0.0%20.0%
:1 S
L O
P E T
Y P
T
Y P
T
Y P
:1 S
L O
P E T
Y P
J
C-202
K
C-202
SEE SHEET C-105
DIVERSION STRUCTURE
PROPOSED FLOW
1.4%±
"A" LINE
E 971509.09 N 810914.46
STA. 18+20.00
POE "A" LINE EL -17.00 MLLW
E 971870.26 N 810460.67
EL -17.00 MLLW
E 971820.72 N 810432.35
EL -17.00 MLLW
E 971911.69 N 810529.08
EL -17.00 MLLW
E 971914.95 N 810519.95
EL -17.00 MLLW
E 971687.06 N 810570.44
EL -13.00 MLLW
E 971674.60 N 810586.09
EL -17.00 MLLW
E 971804.42 N 810663.86
EL -9.00 MLLW
E 971611.36 N 810906.40
EL -9.00 MLLW
E 971494.00 N 810812.99
EL -3.00 MLLW
E 971467.49 N 810846.30
EL -3.00 MLLW
E 971576.22 N 810950.52
EL -3.00 MLLW
E 971548.23 N 810916.08
SEE SHEET C-106
SHORE PROTECTION
PROPOSED NORTH
HARDENED CHANNEL C/L
EXISTING GRADE (VARIES)
2'
1VARIES
TYPICAL DREDGING SECTION
VARIES75'75'VARIES
1" = 15'
DREDGED BOTTOM (VARIES)
2'
A
SEE SHEET S-506
DOUBLE-SIDED SIGN.
NAV. LIGHT AND
3 PILE DOLPHIN W/
EL -17.00 MLLW
E 971805.99 N 810430.02
EL -17.00 MLLW
E 971794.348 N 810435.672
EL -17.00 MLLW
E 971913.27 N 810512.43
EL -13.00 MLLW
E 971791.96 N 810679.51
STABILIZER AGGREGATE
GROUP 2, TYPE III. MOD
LIMIT OF GDOT AGGREGATE
HARDENED CHANNEL
PROPOSED 150' WIDE
AND REMOVED FROM SITE (TYP.)
MATERIAL TO BE DREDGED
ELEVATION MLLW (TYP)
UPON COMPLETION OF CONSTRUCTION, REMOVE TEMPORARY SIGNS.4.
SEE SHEET S-506 AND S-507.
FOR SIGN / DOLPHIN LOCATIONS AND TEMPORARY MANATEE SIGN DETAILS 3.
SIGN ON BANK IN APPROX. LOCATION SHOWN ON S-506.
AND DOLPHIN NO. 2. FIELD LOCATE / ATTACH ONE MANATEE AWARENESS
FIELD ATTACH ONE MANATEE AWARENESS SIGN EACH TO DOLPHIN NO. 1 2.
WATER-BASED CONSTRUCTION / DREDGING.
MANATEE AWARENESS SIGNS PRIOR TO THE INITIATION OF
PROVIDE AND MAINTAIN THREE EACH 3 FOOT BY 4 FOOT TEMPORARY 1.
TEMPORARY MANATEE SIGN NOTES:
A N
S I
D
M
A Y
R E
V
IS
E D I
N A
C C
O R
D A
N C
E W
IT
H A
M E
N D
M E
N T
PLACED ON SHORE OUTSIDE OF DESIGNATED WORK LIMITS.
NO FRESHLY DREDGED OR EXCAVATED MATERIAL IS TO BE2.
SEE VOLUME 2 SHEET GI104 FOR DISPOSAL AREA 1N INFORMATION.1.
NOTES:
| G - 001 INDEX OF DRAWINGS |
| G - 002 GENERAL NOTES |
| G - 003 VICINITY AND LOCATION MAP |
| C - 109 DREDGING PLAN |
File details come from the government source that posted it.