AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
Solictation W912HN-16-T-0022 is being amended to include a revised Scope of Work and a revised bid schedule. CLINS 0001, 0008, 0015, 0022, and 0029 are deleted per this amendment. The quantities in CLIN 0006, 0013, 0020, 0027 and 0034 has changed from 4.0 to 3.5. The quote due date is extended until 18 August 2016 at 12:00 p.m.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 17
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 04-Aug-2016
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912HN-16-T-0022
X 9B. DATED (SEE ITEM 11)
14-Mar-2016
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
04-Aug-2016
CODE
SAS EXECUTION BRANCH
USAED SAVANNAH
100 WEST OGLETHORPE AVE
SAVANNAH GA 31401
W912HN 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912HN-16-T-0022
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 1449 - CONTINUATION SHEET
SOLICITATION/CONTRACT FORM
The required response date/time has changed from 21-Mar-2016 12:00 AM to 18-Aug-2016 12:00 AM.
SUPPLIES OR SERVICES AND PRICES
CLIN 0001
The CLIN extended description has changed from The contractor shall furnish all labor, equipment, materials, and tools to provide herbicide application and nuisance plant control services for specific areas in Elbert
County, GA and Abbeville County, SC at the US Army Corps of Engineers Richard B. Russell Project. to CLIN
0001 deleted by Amendment 0001.
The pricing detail quantity has decreased by 1.00 from 1.00 to 0.00.
The FSC code F006 has been deleted.
The PROG code S10 has been deleted.
The SIC code 0782 has been deleted.
The NAICS code 561730 has been deleted.
The MDAP/MAIS Code 000 has been deleted.
CLIN 0006
The CLIN extended description has changed from up to 4 Acres. to up to 3.5 Acres..
The pricing detail quantity has decreased by 0.50 from 4.00 to 3.50.
CLIN 0008
The pricing detail quantity has decreased by 1.00 from 1.00 to 0.00.
CLIN 0013
The CLIN extended description has changed from Application up to 4 Acres to Application up to 3.5
Acres.
CLIN 0015
CLIN 0020
The CLIN extended description has changed from Application up to 4 acres. to Application up to 3.5 acres..
CLIN 0022
CLIN 0027
CLIN 0029
CLIN 0034
DELIVERIES AND PERFORMANCE
The following Delivery Schedule Item has been deleted from CLIN 0001:
DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC
POP 01-JUN-2016 TO
31-DEC-2016
N/A RICHARD B. RUSSELL POWERHOUSE
GLENN KOWALSKI
4144 RUSSELL DAM DRIVE
ELBERTON GA 30635
706-213-3402
FOB: Destination
W912HN
The following Delivery Schedule item for CLIN 0002 has been changed from:
POP 01-MAY-2016 TO
N/A RICHARD B. RUSSELL POWERHOUSE
GLENN KOWALSKI
4144 RUSSELL DAM DRIVE
ELBERTON GA 30635
706-213-3402
To:
POP 15-SEP-2016 TO
N/A RICHARD B. RUSSELL POWERHOUSE
GLENN KOWALSKI
4144 RUSSELL DAM DRIVE
ELBERTON GA 30635
706-213-3402
The following Delivery Schedule item for CLIN 0003 has been changed from:
N/A RICHARD B. RUSSELL POWERHOUSE
GLENN KOWALSKI
4144 RUSSELL DAM DRIVE
ELBERTON GA 30635
706-213-3402
N/A RICHARD B. RUSSELL POWERHOUSE
GLENN KOWALSKI
4144 RUSSELL DAM DRIVE
ELBERTON GA 30635
706-213-3402
The following Delivery Schedule item for CLIN 0004 has been changed from:
N/A RICHARD B. RUSSELL POWERHOUSE
GLENN KOWALSKI
4144 RUSSELL DAM DRIVE
ELBERTON GA 30635
706-213-3402
N/A RICHARD B. RUSSELL POWERHOUSE
GLENN KOWALSKI
4144 RUSSELL DAM DRIVE
ELBERTON GA 30635
706-213-3402
The following Delivery Schedule item for CLIN 0005 has been changed from:
N/A RICHARD B. RUSSELL POWERHOUSE
GLENN KOWALSKI
4144 RUSSELL DAM DRIVE
ELBERTON GA 30635
706-213-3402
N/A RICHARD B. RUSSELL POWERHOUSE
GLENN KOWALSKI
4144 RUSSELL DAM DRIVE
ELBERTON GA 30635
706-213-3402
The following Delivery Schedule item for CLIN 0006 has been changed from:
N/A RICHARD B. RUSSELL POWERHOUSE
GLENN KOWALSKI
4144 RUSSELL DAM DRIVE
ELBERTON GA 30635
706-213-3402
N/A RICHARD B. RUSSELL POWERHOUSE
GLENN KOWALSKI
4144 RUSSELL DAM DRIVE
ELBERTON GA 30635
706-213-3402
The following Delivery Schedule item for CLIN 0007 has been changed from:
N/A RICHARD B. RUSSELL POWERHOUSE
GLENN KOWALSKI
4144 RUSSELL DAM DRIVE
ELBERTON GA 30635
706-213-3402
N/A RICHARD B. RUSSELL POWERHOUSE
GLENN KOWALSKI
4144 RUSSELL DAM DRIVE
ELBERTON GA 30635
706-213-3402
The following Delivery Schedule Item has been deleted from CLIN 0008:
POP 01-JAN-2017 TO
31-DEC-2017
N/A RICHARD B. RUSSELL POWERHOUSE
GLENN KOWALSKI
4144 RUSSELL DAM DRIVE
ELBERTON GA 30635
706-213-3402
The following Delivery Schedule item has been added to CLIN 0013:
POP 01-JAN-2017 TO
31-DEC-2017
N/A RICHARD B. RUSSELL POWERHOUSE
GLENN KOWALSKI
4144 RUSSELL DAM DRIVE
ELBERTON GA 30635
706-213-3402
The following Delivery Schedule Item has been deleted from CLIN 0015:
POP 01-JAN-2018 TO
31-DEC-2018
N/A RICHARD B. RUSSELL POWERHOUSE
GLENN KOWALSKI
4144 RUSSELL DAM DRIVE
ELBERTON GA 30635
706-213-3402
The following Delivery Schedule item for CLIN 0020 has been changed from:
N/A RICHARD B. RUSSELL POWERHOUSE
GLENN KOWALSKI
4144 RUSSELL DAM DRIVE
ELBERTON GA 30635
706-213-3402
N/A RICHARD B. RUSSELL POWERHOUSE
GLENN KOWALSKI
4144 RUSSELL DAM DRIVE
ELBERTON GA 30635
706-213-3402
The following Delivery Schedule Item has been deleted from CLIN 0022:
POP 01-JAN-2019 TO
31-DEC-2019
N/A RICHARD B. RUSSELL POWERHOUSE
GLENN KOWALSKI
4144 RUSSELL DAM DRIVE
ELBERTON GA 30635
706-213-3402
The following Delivery Schedule item for CLIN 0027 has been changed from:
N/A RICHARD B. RUSSELL POWERHOUSE
GLENN KOWALSKI
4144 RUSSELL DAM DRIVE
ELBERTON GA 30635
706-213-3402
N/A RICHARD B. RUSSELL POWERHOUSE
GLENN KOWALSKI
4144 RUSSELL DAM DRIVE
ELBERTON GA 30635
706-213-3402
The following Delivery Schedule Item has been deleted from CLIN 0029:
POP 01-JAN-2020 TO
31-DEC-2020
N/A RICHARD B. RUSSELL POWERHOUSE
GLENN KOWALSKI
4144 RUSSELL DAM DRIVE
ELBERTON GA 30635
706-213-3402
The following Delivery Schedule item for CLIN 0034 has been changed from:
N/A RICHARD B. RUSSELL POWERHOUSE
GLENN KOWALSKI
4144 RUSSELL DAM DRIVE
ELBERTON GA 30635
706-213-3402
N/A RICHARD B. RUSSELL POWERHOUSE
GLENN KOWALSKI
4144 RUSSELL DAM DRIVE
ELBERTON GA 30635
706-213-3402
The following have been modified:
BID SCHEDULE
Please complete the following in addition to filling in the above individual CLINS (both the Unit Price and Amount
Total for each CLIN)
Total of Base Period (CLINS 0002 – 0007) $___________________
Total of Option Period 1 (CLINS 0009 – 0014) $___________________
Total of Option Period 2 (CLINS 0016 – 0021) $___________________
Total of Option Period 3 (CLINS 0023 – 0028) $___________________
Total of Option Period 4 (CLINS 0030 – 0035) $___________________
Total of all CLINS $___________________
All items must be filled in completely. Any offers received that are not completely filled out may be rejected.
CONTRACTOR INFORMATION
REQUEST FOR QUOTE (RFQ)
US Army Corps of Engineers – Savannah District
POC: Amy L. Collins Email: Amy.L.Collins@usace.army.mil
QUOTES DUE BY: 18 August 2016 at 12:00 p.m. Eastern
CONTRACTOR: ______________________________________________________
DUNS NO.: ______________________________________________________
CAGE CODE: ______________________________________________________
TAX ID NO.: ______________________________________________________
E-MAIL: ______________________________________________________
PHONE NO.: ______________________________________________________
DATE OF PROPOSAL: ______________________________________________________
PROPOSAL PREPARED BY:
(Printed Name and Title) (Signature)
The Contractor, by signing this document, understands and complies with the requirements listed in the Statement of Work (SOW) and shall provide services meeting the requirements.
mailto:Amy.L.Collins@usace.army.mil
NOTES TO OFFEROR
Note 1: Quotes shall meet the evaluation/submittal requirements located below in FAR 52.212-2, Evaluation – Commercial Items, to be eligible for an award. All work shall be performed in accordance with the Performance Work Statement.
The contract award will be made to the lowest priced (total of all items), responsible, responsive quote, deemed technically acceptable. This is in accordance with Federal Acquisition Regulations (FAR) 52.212-2, Evaluation – Commercial Items, and FAR 9.104.
Note 2: The Taxpayer Identification Number may be used by the Government to collect and report on any delinquent amounts arising out of the contractor’s relationship with the Government.
Note 3: The completed Offeror Representations and Certifications-Commercial Items (FAR 52.212-3) or Notation that company is registered in SAM (https://www.sam.gov) must be submitted along with each Quote.
Note 4: A site visit will be held on the 11 August 2016 at 10:00 a.m. at the address below. All interested parties are encouraged to attend. The site visit POC, Mr. Glen Kowalski, can be reach at (706) 988-0824, or Mr. Zachary Baldwin at (706) 213-3407.
RBR Visitor Center 4144 Russell Dam Drive Elberton, Ga. 30635
Note 5: Previously submitted quotes are no longer being considered for award. Any offerors who previously submitted a quote must submit a complete and full quote based on this amendment to be considered eligible for award.
STATEMENT OF WORK
RICHARD B. RUSSELL PROJECT
HERBICIDE/NUISANCE PLANT CONTROL FY 2016-2020
SCOPE OF WORK
1. General Information
The contractor shall furnish all labor, equipment, materials, and tools to provide herbicide application and nuisance plant control services for specific areas in Elbert County, GA and
Abbeville County, SC at the US Army Corps of Engineers Richard B. Russell Project. The period of service will be from 15 September 2016 until 31 December 2020, if all options are exercised. Nuisance plants will be controlled in various areas that may require different control techniques including (but not necessarily limited to) spot application of herbicides, broadcast application of herbicides over large areas, and mechanical removal of vegetation. All application rates must be in compliance with parameters of compound label. Application of 2,4-D based herbicide, glyphosate-based herbicide, triclopyr-based herbicide, imazapyr-based herbicide and Monsanto Outrider will be required by the contractor. If circumstances dictate, the contractor may be authorized to additional compounds if approved by the COR. Types of areas that will require nuisance vegetation control include: riprapped areas, walkways / trails, graveled
& paved parking and other areas, graveled & paved roads, fences, fields, drainage ditches, aquatic habitats and other areas specified herein.
2. Methods of Control
a. Initial application of all herbicides will be between 15 September and 15 October of the base year. Initial mechanical control of vegetation can be conducted throughout the performance period of the base year and option years, if exercised. Initial application of herbicides will be between 01 April and 01 May of the option years, if exercised. Inspection and treatment of nuisance vegetation shall be performed at least monthly after the initial application and end in
October of each year include the base year. The contractor shall apply appropriate herbicides(s) as often as necessary to achieve control of nuisance weeds and plants.
b. A glyphosate based herbicide (Roundup or similar) of sufficient strength and formulation to kill all vegetation growing in treatment areas shall be used in most areas with the exception of johnsongrass control areas and in areas where predominantly woody or broadleaf vegetation control is desired. Johnsongrass control areas shall be treated with Monsanto Outrider or equivalent as early as 1 April of the option years based on seed head stage determined by the
Contracting Officer’s Representative (COR). In areas where predominately woody or broadleaf vegetation control is desired, 2,4-D and or triclopyr-based herbicide (Garlon or similar) may be used. Approval to use different herbicides may be granted by the COR on a case-by-case basis for certain areas for the purpose of more effective vegetation control.
c. The following areas shall be treated for nuisance vegetation control. The desired methods of control are listed. Any substantial deviation from these methods shall require approval of the
COR. Approximate measurements of these areas can be found on the attached maps. Note that all areas, lengths, and other measurements listed are estimated by using satellite photos and are not exact. The contractor may visit the areas by appointment prior to bidding to verify measurements and requirements.
Chain link fence maintenance will be accomplished by herbicide application and/or weed eating two feet on each side of the fence and by removing any vegetation from the fence.
All paved (concrete or asphalt) areas including roads, parking areas, and sidewalks shall be kept free of vegetation by spot treating with herbicide any vegetation growing in the cracks and seams as needed or by mechanical removal of the entire plant, including root structure.
Ditches along the earthen embankments shall be spot treated with herbicide as necessary to kill all vegetation growing within them.
Rip rap, graveled areas (including walkways, roadways, solar panels, parking areas, and the area around the Project Manager’s Office (PMO), and maintained trails (whether graveled or not) will be treated by spot spraying or broadcast spraying with herbicide all vegetation growing in these areas as needed. Note that most of the rip rapped areas will need very little herbicide treatment, but some areas along the interpretive nature trail and most of the gravel roads will probably necessitate broadcast treatment with herbicide due to the amount of vegetation growing on them.
In the groin/dam safety and other areas, woody vegetation is the primary concern. In some of these areas, at the direction of the COR, it may be desirable to leave grassy vegetation for erosion control, so spot treatment by a triclopyr-based herbicide may be necessary. These areas may also have nuisance trees that will need to be cut down and stump treated.
In fields identified specifically for johnsongrass control, other wildlife crops may be growing also. Herbicide may be applied over the existing crop. Monsanto Outrider (or equivalent) shall be applied to areas in the specified fields that contain actively growing johnsongrass. Application will be made when johnsongrass is at least 18-24 inches in height but before the heading stage. The specific date will be determined by coordination between the contractor and the government. The Outrider herbicide shall be sprayed per industry specifications and of sufficient strength and formulation (including proper mixing with a nonionic surfactant) to kill johnsongrass. Fields identified in the included maps may not need to be treated in their entirety for johnsongrass, as some of them do not have johnsongrass growing throughout the entire field area; however, up to 2 additional acres of areas not identified in the included maps may be identified for johnsongrass treatment with Outrider by the government after the award of the contract.
Johnsongrass control areas will need only an initial treatment as long as successful control of johnsongrass is achieved. If a follow-up treatment is needed, it will be made no sooner than 40 days after the initial treatment and shall be made only after coordination with the COR.
The ~ 5 acre dove field near Waterfowl Drive, the ~7 acre dove field in the waterfowl management area, and the ~15 acre dove field at Middleton are identified in the attached maps for johnsongrass control will be planted in wheat. Any wheat that is not killed by the application of Outrider for the purpose of johnsongrass control will need to be treated once at a later date with a glyphosate-based herbicide at a time directed by the COR to insure that the wheat is killed and dry in time to burn before dove season.
Use of airboat or other approved application method for 3 acres of aquatic weeds
(Alligator Weed, Parrot Feather) will be treated in the lower duck pond area and beaver ponds.
Up to 6 additional acres of other areas not identified in the enclosed maps may be designated by the COR for general herbicide treatment by a glyphosate-based or triclopyr-based herbicide after the award of the contract if needed, and the contractor shall treat these areas also.
3. Certifications, Safety, and Reporting Requirements
a. Any person applying herbicide shall be licensed and certified for commercial herbicide application as required by applicable regulatory agencies. All work shall be in accordance with industry standards and all appropriate Federal, State, and local laws and regulations and with the
U.S. Army Corps of Engineers “Safety and Health Requirements Manuals”, http://www.publications.usace.army.mil/USACE-Publications/Engineer-
Manuals/u43544q/454D20333835/. Hard copies of EM 385-1-1 are available at the Project
Manager’s Office.
b. The contractor shall provide Material Safety Data Sheets (MSDS) or Safety Data Sheets
(SDS) for all chemicals used on the project prior to their application. The contractor shall complete and submit a post-application document after each application that includes but is not limited to the following information: date of application, name of person applying herbicide, location of application, method of application, type or types of herbicide used, total volume of herbicide applied, amount of active ingredient applied, and pertinent weather information (wind, rain, etc.). This document shall be given to the COR or his representative no more than 7 days after the day of application.
4. Compensation and Bidding
a. No payment shall be made by the government until all the contractor’s work has been inspected and approved by the COR or Corps quality assurance personnel. Work will be inspected periodically, and the contractor will be advised as soon as possible of any deficiencies found. Upon being advised of a deficiency, the contractor shall take immediate action to correct the deficiency at no cost to the government and insure that the deficiency does not recur, however, the contractor is responsible for satisfactory performance of all work and the inspection thereof and neither the presence nor absence of a Government inspector will relieve the contractor of any requirements of the contract.
b. The bid price shall be full compensation for performance of all work specified herein. The government, at its sole discretion, may award option years for continuation of the contract to complete additional herbicide treatment to designated areas; however, potential contractors should take note that option years beyond the base year of the contract are at the sole discretion of the government and are not guaranteed. Bidders, therefore, should bid accordingly.
5. Period of Performance
The contractor shall complete the required work with respective period of performances:
Base Year (15 September – 31 December 2016)
Option Year 1 (01 January – 31 December 2017)
Option Year 2 (01 January – 31 December 2018)
Option Year 3 (01 January – 31 December 2019)
Option Year 4 (01 January – 31 December 2020)
The Contracting Officer may allow the contractor an extension based upon extraordinarily long periods of bad weather or other unforeseen circumstances; however, this will be at the sole discretion of the Contracting Officer. The contractor shall render the services described in paragraph 1, continuously or intermittently, until completion of work described. The contractor will notify COR of schedule of work that is not continuous.
6. Access to Certain Areas
a. The contractor shall not enter into the fenced area of the switchyard and O2 Plant without someone from the Power-plant being with him/her to provide safety and security instructions.
Any specific safety or security instructions shall be followed at all times. The contractor may also have to be escorted by Corps personnel in other areas at times due to current security or safety concerns. Some areas requiring treatment are in areas closed to the public and are behind locked fences or gates. The contractor should coordinate with the COR or his representative at least 24 hours prior to needing access to these areas.
-For contractors who do not require CAC, but require access to a DoD facility or installation. Proposed language: Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center
Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army
Directive 2014-05 / AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative, as NCIC and TSDB are available), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.
-Pre-screen candidates using E-Verify Program. Proposed language: "The Contractor must pre-screen Candidates using the E-verify Program (http://www.uscis.gov/e-verify) website to meet the established employment eligibility requirements. The Vendor must ensure that the
Candidate has two valid forms of Government issued identification prior to enrollment to ensure the correct information is entered into the E-verify system. An initial list of verified/eligible
Candidates must be provided to the COR no later than 3 business days after the initial contract award." *When contracts are with individuals, the individuals will be required to complete a
Form I-9, Employment Eligibility Verification, with the designated Government representative.
This Form will be provided to the Contracting Officer and shall become part of the official contract file.
http://www.uscis.gov/e-verify)
b. The COR, at his sole discretion, may allow a key to be temporarily issued to the contractor for access to some areas. If the contractor is issued a key, it must be returned upon request or at the end of the contract performance period. The contractor shall notify the COR within 24 hours after discovery that the key is lost, stolen, or missing. If the contractor cannot return this key due to loss, theft, or any other reason, a $50.00 deduction may be made from contract payment to help offset the government’s cost of rekeying.
7. Other Contract Specifications
a. The contractor shall meet with the COR or technical point of contact prior to commencement of the work periodically thereafter to discuss the performance requirements, administration, and progress of the contract. The frequency and timing of these meetings shall be determined by the
COR. These meetings are part of the contract specifications; therefore, the bid price of the contract shall be considered full compensation to the contractor for attendance to these meetings.
The COR shall give at least 24 hour notice prior to requiring the contractor to meet.
b. Work will be inspected periodically by the COR or his delegated quality assurance inspector and the contractor will be advised as soon as possible of any deficiencies found. Upon being advised of a deficiency, the contractor shall take immediate action to correct the deficiency at no cost to the government and insure that the deficiency does not recur, however, the contractor is responsible for satisfactory performance of all work and the inspection thereof and neither the presence nor absence of a Government inspector will relieve the contractor of any requirements of the contract.
c. Work performed as prescribed by these specifications shall be paid for as a lump sum price bid for the completion of the contract. Upon completion of the contract, the contractor shall notify the COR that work is completed and shall submit an invoice. Upon approval of work by the
COR, requests for payment will be processed. This price shall be full compensation for performance of all work specified herein.
d. The Contractor will be responsible for all damages to public property or private property, including but not limited to unintended damage to non-targeted vegetation that is caused by the work described. Care should be taken to avoid spraying herbicides on windy days.
e. The contractor shall clean up the job site and shall remove all trash and debris resulting from the work. No contractor equipment or materials shall be stored overnight on government property without prior consent from the COR. Any accidental spills of herbicides or other hazardous materials on government property shall be immediately reported to the COR and to the Richard B. Russell Project Environmental Compliance Coordinator (ECC). The contractor shall be responsible for the proper cleanup and any associated costs or damages from spills of herbicide or other hazardous materials on government property.
8. Maps
The attached maps show areas for treatment and approximate measurements of these areas. All areas, lengths, and other measurements listed are estimated by using satellite photos and are not exact. The contractor may visit the areas by appointment prior to bidding to verify measurements and requirements.
(End of Summary of Changes)