Addendum_to_Appendix_A.pdf

PDF 1 MB Posted

Attached to
MCC and Switchgear Installation Federal contract opportunity
Solicitation number
W912HN-16-R-0023
Issued by
Department of the Army Corps of Engineers Engineering District Savannah

About this file

Addendum to Appendix A

View the file

Other files for this federal contract opportunity

Other files attached to MCC and Switchgear Installation, newest first.
File Type Posted
W912HN-16-R-0023-0002.pdf PDF
W912HN-16-R-0023_Amendment_1.pdf PDF
W912HN-16-R-0023_APPENDIX_A.pdf PDF
W912HN-16-R-0023_ATTACHMENT_1.pdf PDF
W912HN-16-R-0023.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Thurmond Existing Station Service Control Board, 120VAC Switchboard, and 125 VDC Switchboard front and rear panel view

Schematic and one-line diagram for the existing 120VAC and 125VDC plant systems

Control diagram for the existing 125 VDC battery chargers and motor generator sets

Conductors Cable NO. NO. Size (AWG)Length (FT. Volts Function From To

2 12 250 600 Station Service Panel Recpt. & Terminal Block 120 VAC Switchboard

2 12 225 600 Benchboard Recpt. & Terminal Block 120 VAC Switchboard

2 12 225 600

I&R Board Pnl 7 Recpt. & Terminal Block (Clock)

120 VAC Switchboard

2 12 200 600 H&R Board Recpt. & Terminal Block 120 VAC Switchboard

2 12 225 600 Operators Desk - SC side

120 VAC Switchboard

2 12 200 600 Operators Desk - GA side

120 VAC Switchboard

2 12 225 600 Comm/Phone Rm. Rack 1

120 VAC Switchboard

2 12 225 600 Comm/Phone Rm. Rack 2

120 VAC Switchboard

2 12 225 600 TMS Equip. - Downstream Tunnel 120 VAC Switchboard

2 12 225 600 I&R Board Pnl 1 Meters 120 VAC Switchboard

2 12 225 600 I&R Board Synch. Scope

120 VAC Switchboard

2 12 200 600

Waterview Equipment - Stainless Steel Cabinet in Spread room 120 VAC Switchboard

2 12 220 600 Spreadroom Recpt.

Mounted on Column 120 VAC Switchboard

2 12 200 600 Annunciator Tetragenics Power Supply 120 VAC Switchboard

2 12 225 600 Comm/Phone Rm. Code Call Power Supply 120 VAC Switchboard

2 12 200 600 Spreadroom Recpt.- Tetragenics Computer 120 VAC Switchboard

2 12 100 600 Secure Server Rm - SCADA Circuit 1 120 VAC Switchboard

2 12 100 600 Secure Server Rm - SCADA Circuit 2 120 VAC Switchboard

2 12 100 600 Secure Server Rm - SCADA Circuit 3 120 VAC Switchboard

2 12 100 600 Secure Server Rm - SCADA Circuit 4 120 VAC Switchboard

2 12 100 600 Secure Server Rm - SCADA Circuit 5 120 VAC Switchboard

2 12 100 600 Secure Server Rm - SCADA Circuit 6 120 VAC Switchboard

2 12 100 600 Secure Server Rm - SCADA Circuit 7 120 VAC Switchboard

2 12 225 600

DUKE PWR. - RTU

Cabinet in Comm/Phone Rm. 120 VAC Switchboard

2 12 225 600 I&R Board Pnl 8 - Panel Meters (Lines) 120 VAC Switchboard

2 12 225 600 SEPA RTU - Spreadroom

120 VAC Switchboard

2 12 250 600

SCI-PAR RTU SCADA

Cabinets Power Supply 120 VAC Switchboard

2 12 225 600 UPS Control Room 120 VAC Switchboard

2 12 225 600 Comm/Telephone Rm. - Recpt. Rack 3 120 VAC Switchboard

2 12 225 600 Comm/ Telephone Rm. - Recpt. Security System 120 VAC Switchboard

2 12 150' 600 U1 Gov 120 VAC Switchboard

120 VAC Board

120 VAC cable schedule for install

Conductors Cable NO. NO. Size (AWG)Length (FT. Volts Function From To

2 12 150' 600 U1 Gov O2 sys 120 VAC Switchboard 2 12 200' 600 U2 Gov 120 VAC Switchboard 2 12 200' 600 U2 Gov O2 sys 120 VAC Switchboard 2 12 200' 600 U3 Gov 120 VAC Switchboard 2 12 200' 600 U3 Gov O2 sys 120 VAC Switchboard 2 12 425' 600 U4 Gov 120 VAC Switchboard 2 12 425' 600 U4 Gov O2 sys 120 VAC Switchboard 2 12 425' 600 U5 Gov 120 VAC Switchboard 2 12 425' 600 U5 Gov O2 sys 120 VAC Switchboard 2 12 450' 600 U6 Gov 120 VAC Switchboard 2 12 450' 600 U6 Gov O2 sys 120 VAC Switchboard 2 12 450' 600 U7 Gov 120 VAC Switchboard 2 12 450' 600 U7 Gov O2 sys 120 VAC Switchboard 2 12 250' 600 Main Unit 1 120 VAC Switchboard Instrument Panel 7 2 12 250' 600 Main Unit 2 120 VAC Switchboard Instrument Panel 6 2 12 250' 600 Main Unit 3 120 VAC Switchboard Instrument Panel 5 2 12 250' 600 Main Unit 4 120 VAC Switchboard Instrument Panel 4 2 12 250' 600 Main Unit 5 120 VAC Switchboard Instrument Panel 3 2 12 250' 600 Main Unit 6 120 VAC Switchboard Instrument Panel 2 2 12 250' 600 Main Unit 7 120 VAC Switchboard Instrument Panel 1

2 12 250' 600 Water Level selsyns Forebay 120 VAC Switchboard

2 12 250' 600 Water Level selsyns Tailrace 120 VAC Switchboard

2 12 250' 600 Carrier Current 120 VAC Switchboard Carrier Phone 2 12 250' 600 Telemeter 120 VAC Switchboard Line Telemeter

2 12 250' 600 Station Clocks 120 VAC Switchboard

2 12 250' 600

120 volt essential power supply 120 VAC Switchboard

120 VAC Board

5V

D C ca bl e sc he du le fo r i ns ta ll

Thurmond Existing Station Service Control and 120 VAC and 125 VDC Switchmboards
DC Essential AC Schematic and One Line Diagram
Existing 125 VDC Battery Charger MG Sets and 125 VDC Control Diagram
2016-6-22 Thurmond 120 VAC Install Cable Sched for Package
125 VDC Cable Schedule