W912HN-16-R-0022 AMD2 SPECS
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W912HN-16-R-0022_AMD2.pdf | ||
| amd2.pdf | ||
| 16R22.PDF | ||
| amd1.pdf | ||
| SF330.pdf | ||
| SF330.pdf | ||
| 16R22.PDF | ||
| W912HN-16-R-0022.pdf | ||
| Synopsis_-_W912HN-16-R-0022_-_13A_Dike_Raising.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Jasper County, South Carolina
Solicitation Number
W912HN-16-R-0022
DMCA 13A Dike Raising Procurement and Contracting Requirements and Specifications, Divisions 00 through 32 May 2016
U.S. ARMY ENGINEER DISTRICT, SAVANNAH
CORPS OF ENGINEERS
100 WEST OGLETHORPE AVENUE
SAVANNAH, GEORGIA 31401-3640
US Army Corps of Engineers Savannah District
DMCA 13A Dike Raising 16R22 Jasper County, SC
PROJECT TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00 SUMMARY OF WORK
01 32 16.00 20 SMALL PROJECT CONSTRUCTION PROGRESS SCHEDULES
01 33 00 SUBMITTAL PROCEDURES
01 35 26 GOVERNMENT SAFETY REQUIREMENTS
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00.00 10 CONTRACTOR QUALITY CONTROL
01 45 00.10 10 QUALITY CONTROL SYSTEM (QCS)
01 50 00 TEMPORARY CONSTRUCTION FACILITIES
01 57 20.00 10 ENVIRONMENTAL PROTECTION
DIVISION 05 - METALS
05 50 00 METAL: MISCELLANEOUS AND FABRICATIONS
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 73 01 FIBERGLASS REINFORCED PLASTIC (FRP) GRATING
DIVISION 26 - ELECTRICAL
26 05 00.00 40 COMMON WORK RESULTS FOR ELECTRICAL
DIVISION 31 - EARTHWORK
31 00 00 EARTHWORK
31 10 00 CLEARING AND GRUBBING FOR CIVIL WORKS
31 62 19 TIMBER PILES
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 92 19 SEEDING
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 1
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
A. CONTRACT CHANGES: Section 00 21 16 - Instruction to Proposers - has been updated to reflect the correct proposal due date of 30 June 2016. Section 00 73 00 - Supplementary Conditions - Additional Contract Requirements (9) Variation In Estimate Quantity has been updated to the proper CLINs. Section 01 00 00 - General Requirements has been updated removing DMCA 14A/14B cross dike w ork. Revised or added information is underlined and deleted information is struck out.
B. TECHNICAL SPECIFICATION CHANGES: The revised Sections listed below (revised by Amendment No. 0002) are hereby added to and made a part of the solicitation. Revised or added information is underlined and deleted information is struck out. Revisions can be located in the appropriate volume of specifications by searching for an asterisk and amendment number (i.e., *1).
Revised Sections 01 57 20.00 10 05 50 00 C. CONTRACT DRAWINGS: Sheet S-05A w ith Revision 1 dated 21 June 2016 is hereby added to and made a part of the Contract Draw ings.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 10
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 22-Jun-2016
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912HN-16-R-0022
X 9B. DATED (SEE ITEM 11)
24-May-2016
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
22-Jun-2016
CODE
US ARMY CORPS OF ENGINEERS
100 WEST OGLETHORPE AVE.
SAVANNAH GA 31401-3640
W912HN 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SECTION 00 00 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
SUMMARY OF CHANGES
SECTION 00 21 16 - INSTRUCTIONS TO PROPOSERS
The following have been modified:
DMCA 13A Dike Raising and Weir Improvements
Firm Fixed Priced Contract
This Acquisition is a 100% Small Business Set Aside. This is a Single Firm Fixed Price Contract for the Dredge Material Containment Area (DMCA) 13A Dike Raising
ELECTRONIC PROPOSAL SUBMISSION IS REQUIRED THROUGH THE WEBSITE
LISTED BELOW. ELECTRONIC SUBMISSION SENT VIA EMAIL OR FACSIMILE WILL
NOT BE ACCEPTED. HAND CARRIED PROPOSAL SUBMISSION IS NOT
AUTHORIZED EXCEPT TO SUBMIT A BID BOND AS DISCUSSED BELOW.
DIRECTIONS FOR SUBMITTING PROPOSALS
In an effort to reduce paperwork and reduce cost, all proposals shall be submitted electronically. All submissions shall be in Adobe PDF format. The Price Proposal and Technical Proposal shall be submitted as “separate” single files. Offerors may use compressions utility software such as WinZip or PKZip to reduce file size and facilitate transmission.
Title the file(s) in the following format:
W912HN-16-R-0022_COMPANY NAME_VOLUME I
W912HN-16-R-0022_COMPANY NAME_VOLUME II
Submit the Price and Technical proposals electronically via the AMRDEC SAFE website at: https://safe.amrdec.army.mil/SAFE/ . At the AMRDEC SAFE website select the link:
I do not have a CAC or this machine is not configured to read my CAC and I would like to access SAFE as a Guest User, to register, access the site and submit your proposal(s). [Note: It has been reported that documents are more quickly uploaded into the AMRDEC SAFE website when using a Firefox web browser. The Government cannot verify that this is true and offers no guarantee that offerors will have more success utilizing any particular browser.] AMRDEC restricts file size to 1GB, so multiple file upload may be necessary.
When your proposal is submitted via the AMRDEC SAFE website, the website will provide notification of the submittal to the Government recipients. When completing the information for transmittal at the AMRDEC SAFE website, you will be required to enter email addresses for the recipients. For this solicitation, the recipients will be the Contracting Officer and Contract Specialist. The Contracting Officer for this project is Bruce A. Helms, whose e-mail address is Bruce.A.Helms@usace.army.mil. The Contract Specialist for this project receipt of proposals is Addison Layfield Brent Ingram, whose e-mail address is addison.g.layfield@usace.army.mil Brent.W.Ingram@usace.army.mil. These e-mail addresses are the ones you will enter as recipients.
In addition, after uploading your documents, you will be required to verify your email address before AMRDEC will send notification to the Government recipients. This is a very important step – even if you successfully upload your proposal to AMRDEC SAFE, notification will not be sent to the Government until you verify your email address, which may result in the rejection of your proposal for lateness. Follow the instructions on the AMRDEC website and confirmation emails you receive from AMRDEC.
Proposal Due Date and Time:
Request For Proposal No: W912HN-16-R-0022 Due Date of Proposal: 23 30 June 2016 Time by which Proposals are Due: 01:00 P.M. (E.T.)
Title of Project: DMCA 13A Dike Raising and Weir Improvements
The date and time of delivery will be established by the time of receipt of the e-mail notification to the Contract Specialist and Contracting Officer by the AMRDEC SAFE website, not by the date and time of uploading of the proposal into the AMRDEC SAFE website. Do not assume that electronic communication is instantaneous. Please make allowances for delays in transmittal. If an electronic submission is uploaded minutes before the deadline but notification is not actually received in the recipients’ e-mail inboxes until after the deadline, the submission will be considered late.
The Government will not be responsible for proposals delivered to any location or to anyone other than those designated to receive proposals on its behalf. Offerors are responsible for ensuring that proposals are submitted so as to reach the designated recipient of proposals. Offerors are responsible for allowing sufficient time for the proposal to be received in accordance with the information provided.
BID BONDS: An original Bid Bond must be delivered by the Proposal Due Date and Time established above. Bid Bonds may be delivered by Federal Express, United Parcel Service, U.S. Mail, or U.S. Express Mail.
For Bid Bonds delivered by Federal Express and United Parcel Service, the date and time of delivery established by these carriers is not the official time of receipt by the Government. Security Guards posted at the loading dock entry for the building do not receive bonds and will contact Mailroom personnel. Once Mailroom personnel are available, the bonds will be processed by the Security Guards using established security procedures and subsequently picked up by Mailroom personnel. After receipt by the Mailroom personnel, a record will be made of the receipt of the bonds. Completion of these actions will constitute delivery of the bond by the date and time designated for receipt of bonds. Bidders are responsible for allowing sufficient time for the bid bond to be processed for receipt and are cautioned that sufficient time may be as much as 24 hours prior to the date and time designated for receipt of Bid Bonds. Bonds sent by U.S. Mail or U.S. Express Mail are required to be sent to 100 West Oglethorpe Avenue, Savannah, Georgia 31401. Bidders that use U.S Mail or U.S. Express Mail must allow sufficient time for bids to be received by Mailroom personnel by the time specified for receipt of bonds.
Bidders are responsible for allowing sufficient time for the bonds to be processed for receipt and are cautioned that sufficient time may be as much as 24 hours prior to the date and time designated for receipt of proposals.
Bidders are responsible for allowing sufficient time for the bonds to be physically received and processed by Mailroom personnel in accordance with the information provided.
The Government will not be responsible for bonds delivered to any location or to anyone other than those designated to receive bonds on its behalf. Bidders are responsible for ensuring bonds are submitted so as to reach the location designated for receipt of bonds.
WAGE DETERMINATIONS: The appropriate wage determination for this requirement is U.S. Department of Labor Wage Decision No. SC1 dated 01/08/2016. This wage determination can be found at http://www.wdol.gov.
TECHNICAL MATTERS: Submit technical inquiries and questions relating to this solicitation via Bidder Inquiry in ProjNet at (https://www.projnet.org) at least 10 calendar days prior to the date established in the RFP for receipt of proposals. The Government reserves the right to decline addressing questions received less than 10 calendar days prior to receipt of proposals.
If an Offeror believes that the requirements in this Request for Proposal contain an error, omission, or are otherwise unsound; immediately notify the Contract Specialist in writing with supporting rationale. The Government reserves the right to award a contract as a result of this Request for Proposal based on the initial proposal, as received, without discussions.
To submit and review inquiry items, prospective vendors will need to use the Bidder Inquiry Key presented below and follow the instructions listed below the key for access.
A prospective vendor who submits a comment or question will receive an acknowledgement via e-mail, followed by an answer after it has been processed by our technical team. All timely questions and approved answers will be made available through ProjNet. Approved answers to all timely questions will also be posted on the FedBizOps in the form of a report generated from ProjNet as soon as the comment/question entering period is over and answers are all finalized.
W912HN-16-R-0022
Dredge Material Containment Area (DMCA) 13A Dike Raising FY16 Single Firm Fixed Price Contract Bidder Inquiry Key: UN6NZQ-Z82FBX
Specific Instructions for Initial ProjNet Bid Inquiry Access:
1. From the ProjNet home page, click on Quick Add on the upper right side of the screen.
2. Identify the Agency as USACE.
3. Key. Enter the Bidder Inquiry Key listed above.
4. E-mail. Enter the e-mail address you would like to use for communication.
5. Click Continue. A page will then open saying that a user account was not found and will ask you to create one using the provided form.
6. Enter your First Name, Last Name, Company, City, State, Phone, E-mail, Secret
Question, Secret Answer, and Time Zone. Remember your Secret Question and Answer as they will be used from this point on to access the ProjNet system.
7. Click Add User. Once this is completed you are now registered within ProjNet and are currently logged into the system.
Specific Instructions for Future ProjNet Bid Inquiry Access:
Steps 1 through 3: same as above.
4. E-mail. Enter the e-mail address you used to register previously in ProjNet.
5. Click Continue. A page will then open asking for the answer to your Secret Question.
6. Enter your Secret Answer and click Login. Once this is completed, you are logged into the system.
SECTION 00 73 00 - SUPPLEMENTARY CONDITIONS
Additional Contract Requirements
1. U.S. ARMY CORPS OF ENGINEERS SAFETY AND HEALTH REQUIREMENTS MANUAL, EM
385-1-1
This paragraph applies to contracts and purchase orders that require the contractor to comply with EM 385-1-1 (e.g., contracts that include the Accident Prevention clause at FAR 52.236-13 and/or other safety provisions). EM 385-1-1 and its changes are available at http://www.publications.usace.army.mil/usacepublications/engineermanuals.aspx . The Contractor shall be responsible for complying with the current edition and all changes posted on the web through the date that is 10 calendar days prior to the date offers are due. If the solicitation is amended to extend the time set for receipt of offers, the 10 calendar days rule stated above shall be applied against the amended date. (For example, if offers are due on 10 April, all changes posted on or before 31 March shall apply to the contract. If the time for receipt of offers is extended from 10 April to 20 April, all changes posted on or before 10 April shall apply to the contract.)
2. DESIGNATED BILLING OFFICE
Invoices will be mailed to:
U.S. Army Corps of Engineers, USACE SAS District Attn: CESAS-OP-NN Burton Moore 100 West Oglethorpe Avenue Savannah, GA 31401-3640
3. DESIGNATED PAYMENT OFFICE
Payment will be made by:
U.S. Army Corps of Engineers Finance Center
ATTN: CEFC-AO-P
5720 Integrity Drive Millington, TN 38054-5005
4. CONTRACTOR-PREPARED NETWORK ANALYSIS SYSTEM
The progress chart to be prepared by the contractor pursuant to FAR 52.236-15, Schedules for Construction Contracts, shall utilize the Critical Path Method (CPM) of network calculation.
5. EQUIPMENT OWNERSHIP AND OPERATING EXPENSE SCHEDULE
(a) This clause does not apply to terminations. See 52.249-5000, Basis for Settlement of Proposals and FAR Part
49.
(b) Allowable cost for construction and marine plant and equipment in sound workable condition owned or controlled and furnished by a contractor or subcontractor at any tier shall be based on actual cost data for each piece of equipment or groups of similar serial and series for which the Government can determine both ownership and operating costs from the contractor's accounting records. When both ownership and operating costs cannot be determined for any piece of equipment or groups of similar serial or series equipment from the contractor's accounting records, costs for that equipment shall be based upon the applicable provisions of EP 1110-1-8, Construction Equipment Ownership and Operating Expense Schedule, Region III. Working conditions shall be considered to be average for determining equipment rates using the schedule unless specified otherwise by the contracting officer. For equipment not included in the schedule, rates for comparable pieces of equipment may be used or a rate may be developed using the formula provided in the schedule. For forward pricing, the schedule in effect at the time of negotiations shall apply. For retroactive pricing, the schedule in effect at the time the work was performed shall apply.
(c) Equipment rental costs are allowable, subject to the provisions of FAR 31.105(d)(ii) and FAR 31.205-36. Rates for equipment rented from an organization under common control, lease-purchase arrangements, and sale-leaseback arrangements, will be determined using the schedule, except that actual rates will be used for equipment leased from an organization under common control that has an established practice of leasing the same or similar equipment to unaffiliated lessees.
(d) When actual equipment costs are proposed and the total amount of the pricing action exceeds the small purchase threshold, the contracting officer shall request the contractor to submit either certified cost or pricing data, or partial/limited data, as appropriate. The data shall be submitted on Standard Form 1411, Contract Pricing Proposal Cover Sheet.
6. BASIS FOR SETTLEMENT OF PROPOSALS
Actual costs will be used to determine equipment costs for a settlement proposal submitted on the total cost basis under FAR 49.206-2(b). In evaluating a terminations settlement proposal using the total cost basis, the following principles will be applied to determine allowable equipment costs:
(1) Actual costs for each piece of equipment, or groups of similar serial or series equipment, need not be available in the contractor's accounting records to determine total actual equipment costs.
(2) If equipment costs have been allocated to a contract using predetermined rates, those charges will be adjusted to actual costs.
(3) Recorded job costs adjusted for unallowable expenses will be used to determine equipment operating expenses.
(4) Ownership costs (depreciation) will be determined using the contractor's depreciation schedule (subject to the provisions of FAR 31.205-11).
(5) License, taxes, storage and insurance costs are normally recovered as an indirect expense and unless the contractor charges these costs directly to contracts, they will be recovered through the indirect expense rate.
7. TIME EXTENSIONS FOR UNUSUALLY SEVERE WEATHER
(a) This provision specifies the procedure for the determination of time extensions for unusually severe weather in accordance with the contract clause entitled DEFAULT (FIXED PRICE CONSTRUCTION). In order for the Contracting Officer to award a time extension under this clause, the following conditions must be satisfied:
(1) The weather experienced at the project site during the contract period must be found to be unusually severe, that is, more severe than the adverse weather anticipated for the project location during any given month.
(2) The unusually severe weather must actually cause a delay to the completion of the project. The delay must be beyond the control and without the fault or negligence of the Contractor.
(b) The following schedule of monthly anticipated adverse weather delays is based on National Oceanic and Atmospheric Administration (NOAA) or similar data for the project location and will constitute the base line for monthly weather time evaluations. The Contractor's progress schedule must reflect these anticipated adverse weather delays in all weather dependent activities.
MONTHLY ANTICIPATED ADVERSE WEATHER DELAY
WORKDAYS BASED ON 5-DAY WORK WEEK
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
6 6 5 4 5 7 7 8 5 2 3 6
(c) Upon acknowledgment of the Notice to Proceed and continuing through-out the contract, the Contractor will record on the daily Contractor Quality Control report the occurrence of adverse weather and resultant impact to normally scheduled work. Actual adverse weather delay days must prevent work on critical activities for 50 percent or more of the Contractor's scheduled workday. The number of actual adverse weather delay days shall include days impacted by actual adverse weather (even if adverse weather occurred in previous month), be calculated chronologically from the first to the last day in each month, and be recorded as full days. If the number of actual adverse weather delay days exceeds the number of days anticipated in paragraph (b) above, the Contracting Officer will convert any qualifying delays to calendar days, giving full consideration for equivalent fair weather workdays, and issue a modification in accordance with the contract clause entitled
DEFAULT (FIXED PRICE CONSTRUCTION).
8. UNAUTHORIZED INSTRUCTIONS FROM GOVERNMENT OR OTHER PERSONNEL
The Contractor shall not accept any instructions issued by any person, employed by the Government or otherwise, other than the Contracting Officer or the Contracting Officer’s Representative (COR) acting within the limits of the COR’s Authority. See the Contracting Officer’s Representative clause of this contract.
9. VARIATIONS IN ESTIMATED QUANTITIES — SUBDIVIDED ITEMS (MAR 1995)
This variation in estimated quantities clause is applicable only to Items Nos.0001AA, 0001AB, 0002AA, 0002AB, 0003AA, 0003AB, 0004AA, 0004AB, 0005AA, 0005AB, 0008AA, 0008AB, 0011AA, and 0011AB 0001, 0002, 0003, 0004, 0005, 0008, and 0011.
(a) Variation from the estimated quantity in the actual work performed under any second or subsequent sub-item or elimination of all work under such a second or subsequent sub-item will not be the basis for an adjustment in contract unit price.
(b) Where the actual quantity of work performed for items Nos. 0001AA, 0002AA, 0003AA, 0004AA, 0005AA, 0008AA, and 0011AA 0001, 0002, 0003, 0004, 0005, 0008, and 0011 is less than 85% of the quantity of the first sub-item listed under such item, the contractor will be paid at the contract unit price for that sub-item for the actual quantity of work performed and, in addition, an equitable adjustment shall be made in accordance with the clause FAR 52.212-11, Variation in Estimated Quantities.
(c) If the actual quantity of work performed under Items Nos. 0001AA, 0002AA, 0003AA, 0004AA, 0005AA, 0008AA, or 0011AA 0001, 0002, 0003, 0004, 0005, 0008, and 0011 exceeds 115% or is less than 85% of the total estimated quantity of the sub-item under that item and/or if the quantity of the work performed under the second sub-item or any subsequent sub-item under Items Nos. 0001AB, 0002AB, 0003AB, 0004AB, 0005AB, 0008AB, or 0011AB exceeds 115% or is less than 85% of the estimated quantity of any such sub-item, and if such variation causes an increase or a decrease in the time required for performance of this contract the contract completion time will be adjusted in accordance with the clause FAR 52.211-18, Variation in Estimated Quantities.
10. Veterans Employment Emphasis for U.S. Army Corps of Engineers Contracts
In addition to complying with the requirements outlined in FAR Part 22.13, FAR Provision 52.222- 38, FAR Clause 52.222-35, FAR Clause 52.222-37, DFARS 222.13 and Department of Labor regulations, U.S. Army Corps of Engineers (USACE) contractors and subcontractors at all tiers are encouraged to promote the training and employment of U.S. veterans while performing under a USACE contract. While no set-aside, evaluation preference, or incentive applies to the solicitation or performance under the resultant contract, USACE contractors are encouraged to seek out highly qualified veterans to perform services under this contract. The following resources are available to assist USACE contractors in their outreach efforts:
Federal Veteran employment information at http://www.fedshirevets.gov/index.aspx Department of Labor Veterans Employment Assistance http://www.dol.gov/vets/ Department of Veterans Affairs–VOW to Hire Heros Act http://benefits.va.gov/vow/ Army Wounded Warrior Program – http://wtc.army.mil/modules/employers/index.html U.S. Chamber of Commerce Foundation–Hiring Our Heros http://www.hiringourheroes.org/ Guide to Hiring Veterans – Reference Material http://www.whitehouse.gov/sites/default/files/docs/white_house_business_council_- _guide_to_hiring_veterans_0.pdf
(End of special contract requirement)
11. ANTITERRORISM / OPERATIONS SECURITY
(a) Access and General Protection /Security Policy and Procedures: All contractor and all associated sub-contractors employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative).
The contractor shall also provide all information required for background checks to meet installation/facility access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any installation or facility change, the Government may require changes in contractor security matters or processes.
(b) Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist
Screening Database (TSDB) (Army Directive 2014-05 / AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative, as NCIC and TSDB are available), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.
(c) Suspicious Activity Reporting Training: The contractor and all associated sub-contractors shall receive a brief/training (provided by the RA) on the local suspicious activity reporting program. This locally developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the project manager, security representative or law enforcement entity. This training shall be completed within 30 calendar days of contract award and within 30 calendar days of new employees commencing performance with the results reported to the COR NLT 5 calendar days after the completion of the training.
(d) Pre-screen candidates using E-Verify Program: The Contractor must pre-screen Candidates using the E-verify
Program (http://www.dhs.gov/E-Verify) website to meet the established employment eligibility requirements.
The Vendor must ensure that the Candidate has two valid forms of Government issued identification prior to ensure the correct information is entered into the E-verify system. An initial list of verified/eligible Candidates must be provided to the COR no later than 3 business days after the initial contract award.
SECTION 01 00 00 - GENERAL REQUIREMENTS
SCOPE OF WORK
Savannah Harbor Dredge Material Containment Area (DMCA) 13A parallels the north edge of the Savannah River Back River in Jasper County, South Carolina. The containment area, which is roughly 1375 acres in size, is one of nine confined dredge material containment areas used for dredging the Savannah River channel. To increase the dredge material storage capacity of DMCA 13A, the scope of work for this project will consist of raising the crest elevation of the perimeter dike by as much as six feet and clearing/grubbing the interior. Also included are repairs and modifications to the six existing weir/water control structures across the back (marsh-side) dike. re-locate and install two of the existing weir structures within the DMCA 14A/14B cross dike and raising the elevation of and re-shaping the existing bird island in the northeast portion of the DMCA.
(End of Summary of Changes)
ATTACHMENT 1 TO SECTION 00800
LIST OF ATTACHMENTS
Attachment 1 - 1
Project Sign
Project Sign Legend Defined
Project Sign Erection Detail
Safety Performance Sign
Corps of Engineers Logo
Minimum Basic Outline for Accident Prevention Plans (EM 385-1-1, App A)
Construction Quality Control Report
Small and Disadvantaged Business Subcontracting Plan
Weekly Temporary Electrical Inspection
Minimum Standard for Temporary Electrical Service (Ref. FAR 52.236-14)
SAS Form 9 - Activity Hazard Analysis
SAD Form 1437a-R - Safety Checklist for Floating Plant (Civil Works)
SAD Form 1437b-R - Safety Checklist for Launches, Motorboats, and Skiffs
SAD Form 1666a-R - Safety Checklist for Crawler, Truck & Wheel Mounted Cranes
SAD Form 1666d-R Safety Checklist for Control of Hazardous Energy
(Lockout/Tagout)
SAD Form 1666d-R Safety Checklist for Motor Vehicles, Trailers, and Trucks
SAD Form 1666d-R Safety Checklist for Safe Access and Fall Protection
SAD Form 1666d-R Safety Checklist for Scaffolds - Other Types
SAD Form 1666e-R Safety Checklist for Contract Diving Operations
SAD Form 1666e-R Safety Checklist for Crawler Tractors and Dozers
SAD Form 1666e-R Safety Checklist for Cutting/Welding Operations
SAD Form 1666e-R Safety Checklist for Demolition Operations
SAD Form 1666e-R Safety Checklist for Forms, Falsework, and Concrete
Operations
SAD Form 1666e-R Safety Checklist for Marine Safety Inspections
SAD Form 1666e-R Safety Checklist for Permit Required Confined Spaces (PRCS)
SAD Form 1666e-R Safety Checklist for Personal Protective Equipment
SAD Form 1666e-R Safety Checklist for Portable Ladders
SAD Form 1666e-R- Safety Checklist for Portal, Tower, and Pillar Cranes
Attachment 1 - 2
SAD Form 1666e-R Safety Checklist for Rigging
SAD Form 1666e-R Safety Checklist for Sanitation/Housekeeping
SAD Form 1666e-R Safety Checklist for Scaffolds - Metal Frame
SAD Form 1666f-R - Safety Checklist for Scrapers, Motor Graders, and Other
Mobile Equipment
SAD Form 1666e-R Safety Checklist for Structural Steel Erection
SAD Form 1666e-R Safety Checklist for Tree Work, Maintenance, or Removal
Operations
SAD Form 1666e-R Safety Checklist for Trenching and Excavation Competent
Person
SAD Form 1666e-R Safety Checklist for Trenching and Excavation Operations
SAD Form 1666f-R Safety Checklist for Crane Inspections
SAD Form 1666g-R - Safety Checklist for Material Hoists
SAD Form 1666h-R - Safety Checklist for Earth Drilling Equipment
SAD FL 198 – Report of Safety Meeting
DA Form 5418-R - Cost Estimate Analysis
DHS Form I-9 - Employment Eligibility Verification
ENG Form 27 - Report of Operations -- Hopper Dredges
ENG Form 2454 - Construction Progress Chart
ENG Form 3394 – Accident Investigation Report
ENG Form 4025 - Transmittal of Shop Drawings, Equipment Data, Material
Samples, or Manufacturer's Certificates of Compliance
ENG Form 4267 - Report of Operations - Pipeline, Dipper or Bucket Dredges
ENG Form 4794 - Riprap Gradation Curves
Endangered Species Protection And Awareness Program
Endangered Species Data
Contractor's Plant Data
Hydrographic Survey Certification
Manatee Habitat/Construction Area Sign Details
Standard Form LLL-A - Disclosure of Lobbying Activities
Attachment 1 - 3
Form PPQ - Past Performance Questionnaire
PROJECT SIGN LEGEND DEFINED
Legend Group 1: The words:
"Construction or "Design and Construction Supervised by:" Supervised by:"
shall be placed on two lines using black, 1.25" Helvetica regular typeface.
Maximum line length is 19".
10.5" Reverse Signature: The Corps symbol shall be a 10.5" white reverse signature using a 6" castle on a red background. The castle and surrounding border lines shall be white. The castle windows, door, and logo background are to be red. The words "U.S. Army Corps of Engineers" shall be black.
Legend Group 2: The words:
"Savannah District South Atlantic Division" shall be placed on two lines below the 10.5" reverse signature, using black, 1.25" Helvetica regular typeface.
Legend Group 3: The "Name of Project" shall be placed on one to three lines using white 3" Helvetica bold typeface. Maximum line length is 42".
Legend Group 4: The "Army Installation" shall be a one or two line identification of the facility or name of the sponsoring department.
Lettering is to be white, 1.5" Helvetica regular typeface. Maximum line length is 42".
NOTE: Cross-align the first line of legend group 4 with the first line of the Corps signature (U.S. Army Corps) as shown.
Legend Group 5a: The words:
"Architects:" or "Engineers:" or "Architect-Engineers:"
shall be a one to five line identification of the prime architect or engineering corporate or firm name, city, and State. Lettering shall be white, 1.25" Helvetica regular typeface. Maximum line length is 21".
Legend Group 5b: The "Contractor:" shall be a one to five line identification of the prime Contractor corporate or firm name, city, and State. Include type of Contractor, i.e. General Contractor, etc. Lettering shall be white, 1.25" Helvetica regular typeface. Maximum line length is 21".
NOTE: All typography shall be flush left and rag right, upper and lower case with initial capitals only as shown.
Safety Performance Sign EP 310-1-6a 01 Jun 06
16-3
Each contractor’s safety record is to be posted on Corps managed or supervised construction projects and mounted with the Construction Project Identification sign specified on page 16-2.
The graphic format, color, size and type-faces used on the sign are to be repro-duced exactly as specified below. The title with First Aid logo in the top section of the sign, and the performance record captions are standard for all signs of this type. Legend groups 2 and 3 below identify the project and the contractor and are to be placed on the sign as shown.
Safety record numbers are mounted on individual metal plates and are screw-mounted to the background to allow for daily revisions to posted safety perfor-mance record.
Special applications or situations not covered in these guidelines should be referred to the district Sign Program Manager.
Legend Group 1: Standard two-line title “Safety is a Job Requirement” with 8” (outside diameter) Safety Green first aid logo.
Color: To match Pantone system 347 Typeface: 3" Helvetica Bold Color: Black
Legend Group 2: One- to two-line project title legend describes the work being done under this contract and name of host project.
Color: Black Typeface: 1.5" Helvetica Regular Maximum line length: 42"
Legend Group 3: One- to two-line identifica-tion: name of prime contractor and city, state address. Color: Black Typeface: 1.5" Helvetica Regular Maximum line length: 42"
Legend Group 4: Standard safety record captions as shown.
Color: Black Typeface: 1.25” Helvetica Regular
Replaceable numbers are to be mounted on white .060 aluminum plates and screw-mounted to background.
Color: Black Typeface: 3" Helvetica Regular Plate size: 2.5" x 4.5"
All typography is flush left and rag right, upper and lower case with initial capitals only as shown. Letter- and word-spacing to follow Corps standards as specified in Appendix D.
3” 33.030” eq. 8” eq.
6”
4.5”
10.5”
2.25” 3”
2.25” 3”
4.875”
4.875”
6.75”
4.875” .75” 4.875”
4.5”
3”
3” 42” 3”
2.25” 2.25” 2.25” 2.25”
.75”
3”
.75”
Sign Legend Panel Post Specification Mounting Color Type Size (A) Size Size Code Height Bkg/Lgd
CID-02 various 4’x4’ 4”x4” HDO-3 48” WH/BK-SG
CORPS OF ENGINEERS LOGO
HALF SIZE
CONTRACTOR'S NAME
(Address)
DAILY CONTRACTOR QUALITY CONTROL REPORT
Date: ______________ Report No. _____
Contract No. _____________________________
Description and Location of Work: ___________________________________________
Weather: (Clear) (P. Cloudy) (Cloudy); Temperature: ___ Min. ___ Max; ___
Rainfall ______ inches
Contractor/Subcontractors and Area of Responsibility
1. Work Performed Today: (Indicate location and description of work performed. Refer to work performed by prime and/or subcontractors by letter in table above.)
2. Results of Surveillance: (Include satisfactory work completed, or deficiencies with action to be taken.)
3. Tests required by Plans and/or Specifications Performed and Results of tests:
4. Verbal Instructions Received: (List any instructions given by Government personnel on construction deficiencies, retesting required, etc., with action to be taken.)
5. Remarks: (Cover delays and any conflicts in plans, specifications, or instructions.)
6. Safety Inspection: (Report violations noted; corrective instructions given; and corrective actions taken.)
7. Equipment Data: (Indicate items of construction equipment, other than hand tools, at jobsite, and whether or not used.)
CONTRACTOR'S VERIFICATION: The above report is complete and correct and all material and equipment used and work performed during this reporting period are in compliance with the contract plans and specifications except as noted above.
Contractor's Approved Authorized Representative
SAMPLE SMALL BUSINESS SUBCONTRACTING PLAN
Mar 2003, Revised Nov 2004
DATE: __________
CONTRACTOR: ______________________________________________________________
ADDRESS: ___________________________________________________________________
SOLICITATION/CONTRACT NO: _______________________ CONTRACT AMOUNT $_________________
DESCRIPTION: ______________________________________________________________
Our firm has established a policy to afford Small Business concerns (SB), Small Disadvantaged Business concerns (SDB), Women-Owned Small Business concerns (WOSB), Veteran-Owned Small Business concerns (VOSB), Service Disabled Veteran-Owned Small Business concerns (SDVOSB), Historically Black Colleges and Universities/Minority Institutions (HBCU/MI) and HUBZone Small Business (HSB) concerns opportunities to participate in all contracts with the Department of Defense or other entities, both public and private. In most instances, HBCU/MI are not applicable to construction contracts, but will be included throughout this plan with the intent to involve them whenever possible. The following, together with any attachments, is hereby submitted as a Small Business Subcontracting Plan to satisfy the applicable requirements of Public Law 95-507, Public Law 99- 661, Section 1207, and Public Law 100-180, Section 806.
1. (a) BASE BID ONLY: The following percentage goals (expressed in terms of a percentage of total planned subcontracting dollars) and dollar amounts are applicable to the contract cited above or to the contract awarded under the solicitation cited. Total Base Bid is $______________________.
(i) Total Planned Subcontracting Dollars $_____________________
(ii) Small Business concerns (SB): ______% or $___________ of total planned subcontracting dollars under this contract will be awarded to subcontractors who are SB.
(iii) Small Disadvantaged Business concerns (SDB): ______% or $_____________ of total planned subcontracting dollars under this contract will be awarded to subcontractors who are small concerns owned and controlled by socially and economically disadvantaged individuals and appear on the Small Business Administration’s list (accessed through www.CCR.Gov. Select “Dynamic Small Business Search” to access the SBA small business source system.) This percentage is included in the percentage shown under 1 (a)(i) above, as a subset.
(iv) Women-Owned Small Business concerns (WOSB): ______% or $_____________ of total planned subcontracting dollars under this contract will be awarded to subcontractors who are WOSB. This percentage is included in the percentage shown under 1.(a)(i) above, as a subset.
(v) Veteran-Owned Small Business concerns (VOSB): ______% or $____________ of total planned subcontracting dollars under this contract will be awarded to subcontractors who are VOSB. This percentage is included in the percentage shown under 1 (a) (i) above, as a subset.
(vi) Service-Disabled Veteran-Owned Small Business concerns (SDVOSB): ______% or $_____________ of total planned subcontracting dollars under this contract will be awarded to subcontractors who are SDVOSB. This percentage is included in the percentage shown under 1 (a) (i) above.)
(vii) Historically Black Colleges and Universities/Minority Institutions (HBCU/MI):
______% or $_____________ of total planned subcontracting dollars under this contract will go to HBCU’s who are an institution determined by the Secretary of Education to meet the requirements of 34 CFR 608.2, the term also includes any nonprofit research institution that was an integral part of such a college or university before November 14, 1986; or MI’s who are an institution of higher education meeting the requirements of Section 1046(3) of the Higher Education Act of 1965 (20 U.S.C. 1135d-5(3)) which, includes a Hispanic-serving institution of higher education as defined in Section 316(b)(1) of the Act (20 U.S.C. 1059c(b)(1)). This percentage is included in the percentage shown under 1.(a)(i) above, as a subset.
(viii) HUBZone Small Business concerns: ______% or $______________ of total planned subcontracting dollars under this contract will go to subcontractors who are small business concerns located in a historically underutilized business zone which is an area located within one or more qualified census tracts, qualified non-metropolitan counties, or lands within the external boundaries of an Indian reservation and appear on the Small Business Administration’s HUBZONE web site at www.SBA.Gov/HUBZONE. This percentage is included in the percentage shown under 1.(a)(i) above, as a subset.
The following principal products and/or services will be subcontracted under the Base Bid of this contract, and the distribution among Large Business, Small Business, Small Disadvantaged Business, Woman-Owned Small Business, Veteran-Owned Small Business, Service Disabled Veteran-Owned Small Business Historically Black Colleges and Universities/Minority Institutions, and HUBZone Small Business is as follows: (Check all that apply)
Subcontractor Name
Product or Service
Large Business
Small
SDB
WOSB
VOSB
SDVOSB
HBCU/
MI
HSB
(ATTACHMENT MAY BE USED IF ADDITIONAL SPACE IS REQUIRED)
The above-named SB and SDB firms denoted by * are performing a significant portion of the effort or are providing a major service or component of this project. In accordance with Section 00800, the above-named firms will be utilized on the contract.
(b) OPTIONS: You must include a separate goal for each option. See the attached Continuation Sheets for Paragraph 1(a) for each option)
(c) The following method was used in developing subcontract goals (i.e., Statement explaining how the product and service areas to be subcontracted were established, how the areas to be subcontracted to small business, veteran-owned small business, service-disabled veteran-owned small business, HUBZone small business, small disadvantaged business, and women-owned small business concerns were determined, and how small business, veteran-owned small business, HUBZone small business, small disadvantaged business and women-owned small business concerns' capabilities were determined, to include identification of source lists utilized in making those determinations. Also a statement as to what efforts will be taken to improve on past goals and how SB and SDB firms will be included in areas without previous SB/SDB involvement).
(d) Indirect and overhead costs (check one): ____ have been _____ have not been included in the goals specified in 1(a) and 1(b).
(e) If "have been" is checked, explain the method used in determining the proportionate share of indirect and overhead cost to be allocated as subcontracts to small business, veteran-owned small business, service-disabled veteran-owned small business, HUBZone small business, small disadvantaged business, and women-owned small business concerns.
2. The following individual will administer the subcontracting program:
Name & Title: _____________________________________________________________
Address & Telephone: _______________________________________________________
This individual's specific duties, as they relate to the firm's subcontracting program, are as follows:
General overall responsibility for this company's Small Business Program, the development, preparation and execution of individual subcontracting plans and for monitoring performance relative to contractual subcontracting requirements contained in this plan, including but not limited to:
(a) Developing and maintaining offerors/bidders lists of small business, veteran-owned small business, service-disabled veteran-owned small business, HUBZone small business, small disadvantaged business, and women-owned small business concerns from all possible sources. Our firm may rely on the information contained in the SBA Small Business Source System, as an accurate representation of a concern’s size and ownership characteristics for the purposes of maintaining a small business, veteran-owned small, service-disabled veteran-owned small, HUBZone small, small disadvantaged and women-owned small business source list. The Small Business Administration’s (SBA’s) list of Small Disadvantaged Businesses and small HUBZone businesses can be accessed through www.CCR.Gov. Select “Dynamic Small Business Search” to access the SBA small business source system.
(b) Ensuring that procurement packages are structured to permit small business, veteran-owned small business, service-disabled veteran-owned small business, HUBZone small business, small disadvantaged business, and women-owned small business concerns to participate to the maximum extent possible.
(c) Assuring inclusion of small business, veteran-owned small business, service-disabled veteran-owned small business, HUBZone small business, small disadvantaged business, and women-owned small business concerns in all solicitations for products or services that they are capable of providing.
(d) Reviewing solicitations to remove statements, clauses, etc., which may tend to restrict or prohibit small business, veteran-owned small business, service-disabled veteran-owned small business, HUBZone small business, small disadvantaged business, and women-owned small business participation, including recommendations to set aside competitions for SDB’s
(e) Ensuring periodic rotation of potential subcontractors on bidders’ lists.
(f) Ensuring that the bid proposal review board documents its reasons for not selecting low bids submitted by small business, veteran-owned small business, service-disabled veteran-owned small business, HUBZone small business, small disadvantaged business, and women-owned small business concerns.
(g) Ensuring the establishment and maintenance of records of solicitations and subcontract award activity.
(h) Attending or arranging for attendance of company counselors at Business Opportunity Workshops, Minority Business Enterprise Seminars, Trade Fairs, etc.
(i) Conducting or arranging for conduct of motivational training for purchasing personnel pursuant to the intent of Public Laws 95-507, 99-661, and 100-180.
(j) Monitoring attainment of proposed goals.
(k) Preparing and submitting periodic subcontracting reports required, which will include Standard Form (SF) 294, Subcontracting Report for Individual Contracts, and SF 295, Summary Subcontract Report, in accordance with the instructions on the forms.
(l) Coordinating contractor's activities during the conduct of compliance reviews by Federal agencies.
(m) Coordinating the conduct of contractor's activities involving its small business, veteran-owned small business, service-disabled veteran-owned small business, HUBZone small business, small disadvantaged business, and women-owned small business subcontracting program.
(n) Notifying the Contracting Officer or his representative in writing of any substitutions of firms that are not small business, veteran-owned small business, service-disabled veteran-owned small business, HUBZone small business, small disadvantaged business, or women-owned small business for the firms listed in the subcontracting plan.
(o) Additions to (or deletions from) the duties specified above are as follows:
3. The following efforts will be taken to assure that small business, veteran-owned small business, service-disabled veteran-owned small business, HUBZone small business, small disadvantaged business, and women-owned small business concerns will have an equitable opportunity to compete for subcontracts, including items not traditionally awarded to SB or SDB firms:
(a) Outreach efforts will be made by:
(i) Contacts with minority and small business trade associations such as veterans service organizations, the National Minority Purchasing Council Vendor Information Service, the Research and Information Division of the Minority Business Development Agency in the Department of Commerce.
(ii) Contacts with business…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .