Fort Gordon, Georgia

Request for Technical Proposals

W912HN-16-B-0002

Army Cyber Command Headquarters (ARCYBER HQ), Step 1 Procurement and Contracting Requirements PNs 85811/85818 February 2016

U.S. ARMY ENGINEER DISTRICT, SAVANNAH

CORPS OF ENGINEERS

100 WEST OGLETHORPE AVENUE

SAVANNAH, GEORGIA 31401-3640

US Army Corps of Engineers Savannah District

DEPARTMENT OF THE ARMY

SAVANNAH DISTRICT, CORPS OF ENGINEERS

100 W. OGLETHORPE AVENUE

SAVANNAH, GEORGIA 31401-3640 REPLY TO

ATTENTION OF:

February 12, 2016

Contracting Division Execution Branch

SUBJECT: Request for Technical Proposals (RFTP), W912HN-16-B-0002, Army Cyber Command Headquarters (ARCYBER HQ) Command and Control Facility with Cyber Protection Team Operations Facility, Fort Gordon, GA (PN85811 and PN85818)

1. This acquisition will be awarded in accordance with FAR Subpart 14.5 (Two-Step Sealed Bidding). This acquisition is being solicited on an unrestricted basis as full and open competition. This will be a Firm-Fixed Price (FFP) contract.

2. Step One, Request for Technical Proposals:

This Request for Technical Proposals solicits for the construction of the PN85811 ARCYBER Headquarters and the PN85818 Cyber Protection Team Operations Facility, Fort Gordon, GA.

PN 85811: Construct a Command and Control Facility (C2F). The project is a non-standard C2F to accommodate the Army CYBER (ARCYBER) Command/Joint Forces Headquarters. The entire facility is to be constructed to Sensitive Compartmented Information Facility (SCIF) standards. Project includes an administrative area divided into specified security zones and various operations areas. Construction includes redundant mechanical and electrical systems with generator and uninterruptible power supply (UPS) backup power to critical areas, secure organizational vehicle parking, loading/service areas, information systems, fire detection, protection and alarm systems, Intrusion Detection System (IDS) installation and Closed Circuit TV (CCTV) installation, and Energy Monitoring Control Systems (EMCS) connection. Facilities are designed to a minimum life of 50 years in accordance with DoD's Unified Facilities Code (UFC 1-200-02) including energy efficiencies, building envelope and integrated building systems performance. Sustainability and energy enhancement measures are included.

Supporting facilities include site development, utilities and connections, lighting, paving, POV parking, walks, curbs and gutters, storm drainage, information systems, landscaping and signage. Heating and air conditioning will be provided by expanding the capacity and connecting to the existing energy plant. Measures in accordance with the Department of Defense (DoD) Minimum Antiterrorism for Buildings standards will be provided. Access for individuals with disabilities will be provided. LEED-NC Silver certification is required.

PN 85818: Construct a Command and Control Facility (C2F). The project is a non-standard C2F to be constructed using Sensitive Compartmented Information Facility (SCIF) standards. Project includes an administrative area that includes special use space for a SCIF. Construction includes redundant mechanical and electrical systems

SUBJECT: Request for Technical Proposals, W912HN-16-B-0002, Army Cyber Command Headquarters (ARCYBER HQ) Command and Control Facility with Cyber Protection Team Operations Facility, Fort Gordon, GA (PN85811 and PN85818) with generator and uninterruptible power supply (UPS) backup power to critical areas, secure organizational vehicle parking, information systems, fire detection, protection and alarm systems, Intrusion Detection System (IDS) and Closed Circuit TV (CCTV) installation, and Energy Monitoring Control Systems (EMCS) connection. Facilities are designed to a minimum life of 50 years in accordance with DoD's Unified Facilities Code (UFC 1-200-02) including energy efficiencies, building envelope and integrated building systems performance. Sustainability and energy enhancement measures are included.

Project includes a food service/café and a physical fitness area. Supporting facilities include site development, utilities and connections, lighting, paving, POV parking, walks, curbs and gutters, storm drainage, information systems, landscaping and signage.

Heating and air conditioning will be provided by expanding the capacity and connection to the existing energy plant. Measures in accordance with the Department of Defense (DoD) Minimum Antiterrorism for Buildings standards will be provided. Access for individuals with disabilities will be provided. LEED-NC Silver certification is required.

The contract duration is anticipated at 720 calendar days.

In accordance with DFARS 236.204 Disclosure of the magnitude of construction projects, the price range for this project is between $100M-$250M.

2.1 Offerors shall submit a technical proposal that meet the following criteria.

Technical proposal must be completed and signed by authorized individual(s) of the Offeror.

Offers submitted in the name of a Joint Venture must be signed in accordance with the terms and conditions specified in the joint venture agreement as evidenced in the proposal.

Offerors must complete the Proposal Data Sheet – See Attachment 1 provided at the end of this section.

2.2 Factors

FACTOR 1 – CORPORATE RELEVANT SPECIALIZED EXPERIENCE

Offerors shall submit at a minimum three (3), but no more than six (6) projects for Factor 1.

Project information shall be limited to two (2) pages per project. Information shall be on size 8½” x 11” size pages in no less than a 10 pitch or 10 font. Pages in excess of the limitations shall not be evaluated.

Offerors shall demonstrate experience and quality of performance information on projects similar in scope, type of work, and complexity as this solicitation requires.

Offeror shall submit projects meeting the following requirements:

Three (3) projects that have a minimum contract value of no less than $80 million each and that demonstrate experience similar to the various requirements described in PN85811 and PN85818. Relevant projects include new construction in a single undertaking or contract of large administrative multi-functional or multi-organizational facilities or large office complexes that contain facilities with administrative and conference room spaces. The Government will not consider multiple projects, such as individual task orders, combined to meet the minimum contract value. Offerors may identify federal, state and local government and private contracts that meet the Government’s requirements described in this paragraph.

One (1) project that contains Sensitive Compartmentalized Information Facility (SCIF) space and extensive building network/communication infrastructures built on a Department of Defense property/installation or other Federal Government location.

One (1) project that was built on a Department of Defense property/installation or other Federal Government location that required all of the following: controlled access to the property or the Installation; background checks or clearances by the Government of contractor and subcontractor personnel; and controlled access to a secured construction site.

It is permissible for a project to count toward each set of requirements as long as the entity that performed the work meeting each set of requirements will be performing that work under this solicitation.

Submitted projects must be successfully completed, or fully designed and at least 80% construction progress completed, within ten (10) years preceding the date of this solicitation. The project description shall clearly describe the characteristics of the projects, as well as provide a Point of Contact. The Government will not assume any project characteristics that are not specifically identified and described. If the Government is unable to verify the information provided on the project narratives with the client Point of Contact, or by other sources available (e.g. CPARS), the Government reserves the right to disregard that project when evaluating the Offeror’s experience.

Where a project was awarded as a task order or delivery order under an IDIQ type contract, Offerors shall submit information specific to the task or delivery order considered relevant to the requirements of this RFTP, rather than the umbrella contract.

For purposes of this RFTP, if the technical proposal represents the combining of two or more companies in a Contract Team Arrangement, no more than six (6) total project examples may be submitted for the entire team. If an Offeror submits more than six (6) total project examples, only the first six (6) will be evaluated. Offerors are advised to submit projects wherein the Offeror, or proposed team members, played a significant role and to clearly define those roles. If the Offeror is a joint venture, each firm shall provide information, demonstrating experience relevant to their expected role on this contract.

If any firm has multiple functions or divisions, limit the project examples to those performed by the division, unit or team member submitting the offer.

While the Government may elect to consider data from other sources, the Offeror must provide detailed, current, accurate and complete information for evaluation by the Government.

The experience of team members, but not key personnel, will be considered under this factor. The experience requirement may be satisfied by demonstrating that entities directly responsible for performing the contract requirements have the requisite experience or by demonstrating that any intended primary subcontractor with a significant role in performing the contract requirements has the requisite experience. If the Offeror is relying on team members to satisfy any experience, Offerors must provide some evidence that those team members are committed to performing under this contract (e.g. signed teaming agreement).

FACTOR 2 – PAST PERFORMANCE

The Offeror shall demonstrate a record of performance on recent relevant projects using the Past Performance Questionnaire Summary Sheet (Attachment 2) and the Past Performance Questionnaire (PPQ) (Attachment 3). The summary sheet at a minimum shall include the following: 1) Project name; 2) Contractor/Team member submitting the project; 3) Contract Number; 4) % Completion at the time of solicitation; and 5) Completion date; and 6) Type of contract (Design-Build, Design-Bid-Build, Construction Management at Risk). Offerors are not required to submit additional information for this factor. Projects submitted under this Factor shall be the same as submitted under Factor 1.

The PPQ is provided for the Offeror or its team members to submit to the client (Point of Contact) for each relevant project submitted. Offeror must ensure correct phone numbers and email addresses are provided for the client Point of Contact. Completed PPQs must be submitted with your proposal by the specified closing date and time.

It is important for Offerors to provide accurate, up-to-date, client Point of Contact information on the project PPQs. If the Government is unable to verify the information provided on the PPQs with the client Point of Contact, or by other sources available (e.g. CPARS), the Government reserves the right to disregard that project when evaluating the Offeror’s past performance. Similarly, it is important for the PPQs to be signed by the client Point of Contact. If PPQs are not signed by the client, the Government reserves the right to disregard the past performance ratings for that particular project. Unverifiable and/or unsigned PPQs may result in a rating of Unacceptable for this Factor.

The past performance of team members, but not key personnel, will be considered under this factor. If the Offeror is relying on team members to satisfy any past performance requirement, Offerors must provide some evidence that those team members are committed to performing under this contract (e.g. signed teaming agreement).

Other Sources. In addition to the above, the Government may review any other sources other than those provided by the Offeror for evaluating past performance. These other sources may include but are not limited to, past performance information retrieved through the Past Performance Information Retrieval System (PPIRS), including Contractor Performance Assessment Reporting System (CPARS), using all CAGE/DUNS numbers of team members (partnership, joint venture, teaming arrangement, or parent company/subsidiary/affiliate) identified in the proposal on the Proposal Data Sheet, inquiries of owner representative(s), Federal Awardee Performance and Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), and any other known sources not provided by the Offeror.

The Government will consider past performance of the prime construction contractor.

The Government may also consider the past performance information submitted on any other team member. However, the consideration given to past performance information concerning other than the prime contractor will be based on the extent of involvement of the team member in the project and the adequacy of the proposal in identifying and addressing such arrangements and roles. Past performance information submitted on a team member who does not perform a major or critical role on the project or whose role has not been clearly or adequately described as required will not be considered. In addition, the Government will consider the adequacy of the proposal in describing the roles and responsibilities of the team members in meeting the Governments requirements under this solicitation in determining the relevancy of any projects performed by those team members.

2.3 EVALUATION:

Proposal Evaluation:

Proposal evaluation shall be based on the criteria in the Request for Technical Proposals. Proposals shall be categorized as –

-Acceptable;

-Reasonably susceptible of being made acceptable; or -Unacceptable

Any proposal which modifies, or fails to conform to the requirements of the Request for Technical Proposals shall be considered nonresponsive and categorized as unacceptable.

To be rated “Acceptable” in Factor 1, Offerors must meet the requirements outlined in the previous paragraphs.

To be rated “Acceptable” in Factor 2, Offerors’ recent, relevant projects must have verifiable performance ratings of Overall Satisfactory or better; or if no Overall Rating exists for the particular project rating, all rated categories must have a verifiable performance rating of Satisfactory or higher.

2.4 Statement of Affiliation (SOA) – Each Offeror shall submit a Statement of Affiliation (Attachment 4). In addition, as part of the Offeror’s Step 1 submittal, each Offeror shall also submit a SOA for any subcontractor or team member that will require access to drawings or specifications during Step 2 of the bidding process. Offerors shall only issue drawings and specifications to subcontractors that submit a SOA and are notified during Step 2 by the government that the subcontractor is approved to access drawings and specifications. No other subcontractor or other entity shall be provided drawing and specifications by the Offeror. After contract award, the eventual awarded contractor may submit additional SOA forms for subcontractors not previously approved by the government during bidding.

No award will be made to an entity effectively owned or controlled by a foreign government. The Offeror shall disclose any interest a foreign government has in the Offeror when that interest constitutes control by a foreign government as defined in DFARS 252.209-7002 (Disclosure of Ownership of Control by a Foreign Government). If the Offeror is a subsidiary, it shall also disclose any reportable interest a foreign government has in any entity that owns or controls the subsidiary, including reportable interest concerning the Offeror’s immediate parent, intermediate parents, and the ultimate parent. Offerors shall report foreign interests on Attachment 4 Statement of Affiliation (SOA) on reporting of foreign interests. SOA forms for all Offerors will be reviewed by the Government. Offerors determined by the Government to have unacceptable foreign interests shall not be eligible for award.

2.5 Teaming Agreements and Narratives, if applicable:

Contractor Team Arrangements. Contractor Team Arrangements are considered an arrangement in which (1) two or more companies form a partnership or joint venture to act as a potential prime contractor; or (2) a potential prime contractor agrees with one or more other companies to have them act as its subcontractors under a specified Government contract or acquisition program. In accordance with FAR Subpart 9.6, the Government will recognize the integrity and validity of Contractor Team Arrangements;

provided, the arrangements are identified and company relationships are fully disclosed in the offer. The Offeror shall identify the major or critical aspects of the requirement to be performed by those identified in the Contractor Team Arrangement. The submission must contain a narrative that clearly explains the relevance to a particular factor of information concerning a company that is part of a Contractor Team Arrangement. The Government will consider the adequacy of this explanation in deciding the relevance of the information to this procurement.

Notwithstanding the specific requirements of any other area of the RFTP, information submitted about any company other than the Offeror, whether a predecessor company, affiliated company, subsidiary (including wholly owned subsidiaries), or subcontractors that will perform major or critical aspects of this requirement, or other associated business, WILL NOT be evaluated for any factor unless the proposal contains a detailed narrative explaining why this submitted information is relevant to this acquisition. The Government will consider the adequacy of this explanation in deciding the relevance and weight, if any, of the information to this procurement. Where information about a subcontractor is properly submitted and relied upon by the Government in evaluating proposals, the failure of the Offeror to actually perform with that subcontractor may be grounds for termination for default.

3. Technical Inquiries:

Technical inquiries are to be submitted via Bidder Inquiry in ProjNet at www.projnet.org\projnet Bidder Inquiry Key: NSKURT-GAAY76 All questions regarding this RFTP must be submitted in writing through ProjNet no later than 10 calendar days prior to the date established for receipt of proposals as shown in this RFTP letter. The Government reserves the right to not respond to questions/inquiries received after this date.

To submit and review proposal inquiry items, bidders will need to be a current registered user or self-register in the system. To self-register, go to the web page, click proposal tab, select bidder inquiry, select agency USACE, enter the key for this solicitation above, and your email address, then click login. Fill in all required information and click create user. Verify that information on next screen is correct and click continue.

4. If an Offeror believes the requirements in this RFTP contain an error, omission, or are otherwise unsound, the Offeror shall immediately notify the Contracting Officer in writing, to include supporting rationale. Such communication may be submitted to the Contracting Officer through the POC identified in this RFTP letter.

5. ELECTRONIC PROPOSAL SUBMISSION IS REQUIRED THROUGH THE

WEBSITE LISTED BELOW. ELECTRONIC SUBMISSION SENT VIA EMAIL OR

FACSIMILE WILL NOT BE ACCEPTED. HAND CARRIED OR MAILED PROPOSAL

SUBMISSION IS NOT AUTHORIZED.

DIRECTIONS FOR SUBMITTING PROPOSALS

In an effort to reduce paperwork and reduce cost, all proposals shall be submitted electronically. All submissions should be in Adobe PDF format. Offerors may use compressions utility software such as WinZip or PKZip to reduce file size and facilitate transmission.

Title the file(s) in the following format:

W912HN-16-B-0002 _Step1_Technical Proposal

Submit electronically via the AMRDEC SAFE website at:

https://safe.amrdec.army.mil/SAFE/. At the AMRDEC SAFE website select the link: I do not have a CAC or this machine is not configured to read my CAC and I would like to access SAFE as a Guest User, to register, access the site and submit your proposal(s).

When your proposal is submitted via the AMRDEC SAFE website, the website will provide notification of the submittal to the Government recipients. When completing the information for transmittal at the AMRDEC SAFE website, you will be required to enter email addresses for the recipients. For this solicitation, the recipients will be the Contracting Officer and Contract Specialist. The Contract Specialist for this project is Mr. Andrew Page, whose email address is Andrew.K.Page@usace.army.mil. The Contracting Officer for this project is LTC Jim A. Lee, whose email address is jim.a.lee@usace.army.mil. These email addresses are the ones you will enter as recipients.

In addition, after uploading your documents, you will be required to verify your email address before AMRDEC will send notification to the Government recipients. This is a very important step – even if you successfully upload your proposal to AMRDEC SAFE, notification will not be sent to the Government until you verify your email address, which may result in the rejection of your proposal for lateness. Follow the instructions on the AMRDEC website and confirmation emails you receive from AMRDEC.

Request For Proposal No: W912HN-16-B-0002 Due Date of Proposal: 14 March 2016 Time by which Proposals are Due: 2:00 P.M. (EST) Title of Project: ARCYBER HQs and CPT Facility, Fort Gordon, GA

The date and time of delivery will be established by the time of receipt of the email notification to the Contract Specialist and Contracting Officer by the AMRDEC SAFE website, not by the date and time of uploading of the proposal into the AMRDEC SAFE website. Do not assume that electronic communication is instantaneous - in fact, it can take several minutes or even hours in some cases. Please make allowances for delays in transmittal. If an electronic submission is uploaded minutes before the deadline but notification is not actually received in the recipients' email inboxes until after the deadline, the submission will be considered late.

The Government will not be responsible for proposals delivered to any location or to anyone other than those designated to receive proposals on its behalf. Offerors are responsible for ensuring that proposals are submitted so as to reach the designated recipient of proposals. Offerors are responsible for allowing sufficient time for the proposal to be received in accordance with the instructions provided.

6. Offerors shall acknowledge all revisions to the RFTP issued prior to the due date for the submission of proposals in writing accompanying the proposal, unless instructed to do otherwise by the Contracting Officer.

For all revisions to the RFTP issued after the submission of proposals, the Offerors shall acknowledge the revision in writing at the time and place directed by the Contracting Officer in the revision letter.

7. Only one technical proposal may be submitted by each Offeror. Multiple technical proposals are prohibited. Technical proposals shall not include prices or pricing information. Offerors should submit proposals that are acceptable without additional explanation or information. The Government may make a final determination regarding a proposal’s acceptability solely on the basis of the proposal as submitted. A notice of unacceptability will be forwarded to the offeror upon completion of the proposal evaluation and final determination of unacceptability. The Government may proceed with the second step without requesting further information from any Offeror;

however, the Government may request additional information from Offerors of proposals that it considers reasonable susceptible of being made acceptable, and may discuss proposals with their Offerors.

8. Step Two. In the second step, only bids based on upon technical proposals determined to be acceptable, either initially or as a result of discussions, will be considered for award. These Offerors will receive a formal Invitation for Bid. Each bid in the second step must be based on the bidder’s own technical proposal.

9. If you have any questions, please contact Andrew K. Page at (912) 652-5900 or Andrew.K.Page@usace.army.mil.

Sincerely, Jim A. Lee

LTC, AD

Contracting Officer

Attachments:

1. Proposal Data Sheet

2. Past Performance Questionnaire Summary Sheet

3. Past Performance Questionnaire (PPQ)

4. Statement of Affiliation (SOA

LEE.JIM.ANTHON

Y.1095557402

Digitally signed by

LEE.JIM.ANTHONY.1095557402

DN: c=US, o=U.S. Government, ou=DoD, ou=PKI, ou=USA, cn=LEE.JIM.ANTHONY.1095557402 Date: 2016.02.12 09:38:50 -05'00'

ATTACHMENT 1

PROPOSAL DATA SHEET

PROJECT TITLE: ARCYBER Headquarters and CPT Facility, W912HN-16-B-0002

PROJECT LOCATION: Fort Gordon, GA.

1. Name of Firm:

Address:

Phone: Fax:

E-mail:

DUNS # (used for accessing CCASS)

TAX ID #

If a joint venture, contractor team agreement, or contractor-subcontractor association of firms, list the individual firms and briefly describe the nature of the association and provide a DUNS number for each firm. If a separate DUNS has been created for a joint venture (J-V) it must be submitted.

Firm 1:

Firm 2:

Firm 3:

Nature of Association:

2. AUTHORIZED NEGOTIATORS. FAR 52.215-11

The Offeror represents that the following persons are authorized to negotiate on its behalf with the Government in connection with this Request for Technical Proposals (RFTP).

Name of Person Authorized to Negotiate:

Negotiator’s Address:

Negotiator’s Telephone:

Negotiator’s E-mail:

ATTACHMENT 2

PAST PERFORMANCE QUESTIONNAIRE ASSESSMENT SUMMARY

SHEET

W912HN-16-B-0002

The Offeror’s proposal shall include the Past Performance Questionnaire Summary Sheet to provide a summary of the PPQs included and/or submitted to clients. The summary sheet at a minimum shall include the following:

1) Project name; 2) Team member submitting the project; 3) Contract Number, 4) Construction percent completed at the time of the solicitation, 5) Scheduled completion date; and 6) D/B, D/B/B or CMS @ Risk.

No.

Project Name

Contractor

Contract #

Construction % Complete @ Time of Solicitation

Scheduled

Completion Date

D/B, D/B/B or CMS @ Risk

ATTACHMENT 3

Past Performance Questionnaire

W912HN-16-B-0002

NAVFAC/USACE PAST PERFORMANCE QUESTIONNAIRE (Form PPQ-0) CONTRACT INFORMATION (Contractor to complete Blocks 1-4)

1. Contractor Information Firm Name: CAGE Code:

Address: DUNs Number:

Phone Number:

Email Address:

Point of Contact: Contact Phone Number:

2. Work Performed as: Prime Contractor Sub Contractor Joint Venture

Other (Explain) Percent of project work performed:

If subcontractor, who was the prime (Name/Phone #):

3. Contract Information Contract Number:

Delivery/Task Order Number (if applicable):

Contract Type: Firm Fixed Price Cost Reimbursement Other (Please specify):

Contract Title:

Contract Location:

Award Date (mm/dd/yy):

Contract Completion Date (mm/dd/yyyy):

Actual Completion Date (mm/dd/yyyy):

Explain Differences:

Original Contract Price (Award Amount):

Final Contract Price (to include all modifications, if applicable):

Explain Differences:

4. Project Description:

Complexity of Work High Med Routine How is this project relevant to project of submission? (Please provide details such as similar equipment, requirements, conditions, etc.)

CLIENT INFORMATION (Client to complete Blocks 5-8)

5. Client Information Name:

Title:

Phone Number:

Email Address:

6. Describe the client’s role in the project:

7. Date Questionnaire was completed (mm/dd/yyyy):

8. Client’s Signature:

NOTE: NAVFAC/USACE REQUESTS THAT THE CLIENT COMPLETES THIS QUESTIONNAIRE AND

SUBMITS DIRECTLY BACK TO THE OFFEROR. THE OFFEROR WILL SUBMIT THE COMPLETED

QUESTIONNAIRE TO USACE WITH THEIR PROPOSAL, AND MAY DUPLICATE THIS QUESTIONNAIRE

FOR FUTURE SUBMISSION ON USACE SOLICITATIONS. CLIENTS ARE HIGHLY ENCOURAGED TO

SUBMIT QUESTIONNAIRES DIRECTLY TO THE OFFEROR. HOWEVER, QUESTIONNAIRES MAY BE

SUBMITTED DIRECTLY TO USACE. PLEASE CONTACT THE OFFEROR FOR USACE POC

INFORMATION. THE GOVERNMENT RESERVES THE RIGHT TO VERIFY ANY AND ALL

INFORMATION ON THIS FORM.

ADJECTIVE RATINGS AND DEFINITIONS TO BE USED TO BEST REFLECT

YOUR EVALUATION OF THE CONTRACTOR’S PERFORMANCE

RATING DEFINITION NOTE

(E) Exceptional Performance meets contractual requirements and exceeds many to the Government/Owner’s benefit.

The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor was highly effective.

An Exceptional rating is appropriate when the Contractor successfully performed multiple significant events that were of benefit to the Government/Owner. A singular benefit, however, could be of such magnitude that it alone constitutes an Exceptional rating.

Also, there should have been NO significant weaknesses identified.

(VG) Very Good Performance meets contractual requirements and exceeds some to the Government’s/Owner’s benefit.

The contractual performance of the element or sub-element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.

A Very Good rating is appropriate when the Contractor successfully performed a significant event that was a benefit to the Government/Owner. There should have been no significant weaknesses identified.

(S) Satisfactory Performance meets minimum contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.

A Satisfactory rating is appropriate when there were only minor problems, or major problems that the contractor recovered from without impact to the contract. There should have been NO significant weaknesses identified. Per DOD policy, a fundamental principle of assigning ratings is that contractors will not be assessed a rating lower than Satisfactory solely for not performing beyond the requirements of the contract.

(M) Marginal Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor's proposed actions appear only marginally effective or were not fully implemented.

A Marginal is appropriate when a significant event occurred that the contractor had trouble overcoming which impacted the Government/Owner.

(U) Unsatisfactory

Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains serious problem(s) for which the contractor's corrective actions appear or were ineffective.

An Unsatisfactory rating is appropriate when multiple significant events occurred that the contractor had trouble overcoming and which impacted the Government/Owner. A singular problem, however, could be of such serious magnitude that it alone constitutes an unsatisfactory rating.

(N) Not Applicable

No information or did not apply to your contract

Rating will be neither positive nor negative.

TO BE COMPLETED BY CLIENT

PLEASE CIRCLE THE ADJECTIVE RATING WHICH BEST REFLECTS

YOUR EVALUATION OF THE CONTRACTOR’S PERFORMANCE.

1. QUALITY:

a) Quality of technical data/report preparation efforts E VG S M U N

b) Ability to meet quality standards specified for technical performance E VG S M U N

c) Timeliness/effectiveness of contract problem resolution without extensive customer guidance

E VG S M U N

d) Adequacy/effectiveness of quality control program and adherence to contract quality assurance requirements (without adverse effect on performance)

E VG S M U N

2. SCHEDULE/TIMELINESS OF PERFORMANCE:

a) Compliance with contract delivery/completion schedules including any significant intermediate milestones. (If liquidated damages were assessed or the schedule was not met, please address below)

E VG S M U N

b) Rate the contractor’s use of available resources to accomplish tasks identified in the contract

E VG S M U N

3. CUSTOMER SATISFACTION:

a) To what extent were the end users satisfied with the project? E VG S M U N

b) Contractor was reasonable and cooperative in dealing with your staff (including the ability to successfully resolve disagreements/disputes; responsiveness to administrative reports, businesslike and communication)

E VG S M U N

c) To what extent was the contractor cooperative, businesslike, and concerned with the interests of the customer?

E VG S M U N

d) Overall customer satisfaction E VG S M U N

4. MANAGEMENT/ PERSONNEL/LABOR

a) Effectiveness of on-site management, including management of subcontractors, suppliers, materials, and/or labor force?

E VG S M U N

b) Ability to hire, apply, and retain a qualified workforce to this effort

E VG S M U N

c) Government Property Control E VG S M U N

d) Knowledge/expertise demonstrated by contractor personnel E VG S M U N

e) Utilization of Small Business concerns E VG S M U N

f) Ability to simultaneously manage multiple projects with multiple disciplines

E VG S M U N

g) Ability to assimilate and incorporate changes in requirements and/or priority, including planning, execution and response to Government changes

E VG S M U N

h) Effectiveness of overall management (including ability to effectively lead, manage and control the program)

E VG S M U N

5. COST/FINANCIAL MANAGEMENT

a) Ability to meet the terms and conditions within the contractually agreed price(s)?

E VG S M U N

b) Contractor proposed innovative alternative methods/processes that reduced cost, improved maintainability or other factors that benefited the client

E VG S M U N

c) If this is/was a Government cost type contract, please rate the Contractor’s timeliness and accuracy in submitting monthly invoices with appropriate back-up documentation, monthly status reports/budget variance reports, compliance with established budgets and avoidance of significant and/or unexplained variances (under runs or overruns)

E VG S M U N

d) Is the Contractor’s accounting system adequate for management and tracking of costs? If no, please explain in Remarks section.

Yes No

e) If this is/was a Government contract, has/was this contract been partially or completely terminated for default or convenience or are there any pending terminations? Indicate if show cause or cure notices were issued, or any default action in comment section below.

Yes No

f) Have there been any indications that the contractor has had any financial problems? If yes, please explain below.

Yes No

6. SAFETY/SECURITY

a) To what extent was the contractor able to maintain an environment of safety, adhere to its approved safety plan, and respond to safety issues? (Includes: following the users rules, regulations, and requirements regarding housekeeping, safety, correction of noted deficiencies, etc.)

b) Contractor complied with all security requirements for the project and personnel security requirements.

E VG S M U N

7. GENERAL

a) Ability to successfully respond to emergency and/or surge situations (including notifying COR, PM or Contracting Officer in a timely manner regarding urgent contractual issues).

E VG S M U N

b) Compliance with contractual terms/provisions (explain if specific issues)

E VG S M U N

c) Would you hire or work with this firm again? (If no, please explain below) Yes No

d) In summary, provide an overall rating for the work performed by this contractor.

Please provide responses to the questions above (if applicable) and/or additional remarks.

Furthermore, please provide a brief narrative addressing specific strengths, weaknesses, deficiencies, or other comments which may assist our office in evaluating performance risk (please attach additional pages if necessary):

ATTACHMENT 4

Offeror shall copy the text of this form and place onto a company letterhead.

Statement of Affiliation (SOA)

Company Name: ________________________________________

Section A:

1. Does the offeror hold an active DoD Facility Security Clearance (FSC)?

Yes____, No____ (Answer “No” if the clearance was issued under a Special Security Agreement or a Security Control Agreement (See DoD5220.22-M sec. 2-306).

If Yes, provide FSC/CAGE Code Number ________________; the remainder of this provision shall not be applicable to the offeror. (No requirement to complete the remainder of Section A or complete Section B)

2. At any time within the calendar year preceding the due date for proposals, has the contractor submitted to the National Security Agency/Central Security Service a completed Statement of Affiliation set forth below?

Yes:____ No:____

If the offeror answered “No”, the contractor must complete Section B of the Statement of Affiliation form and submit it to National Security Agency/Central Security Service through the USACE if applicable.

If the offeror answered “Yes”, does the contractor state that all the information on the previously submitted form is correct?

Yes:____ No:____

(If Yes to both parts of Question 2, then no requirement to complete Section B. If No to either parts of Question 2, then Section B shall be completed).

Section B

STATEMENT OF AFFILIATION

For the purpose of this form, a foreign interest is defined as any of the following:

1. A foreign government or foreign government agency;

2. Any form of business enterprise or legal entity organized, chartered, or incorporated under the laws of any foreign country other than the United States or its possessions.

3. Any individual who is not a U.S. Citizen; or

4. Any form of business enterprise organized or incorporated under the laws of the U.S., or a state or other jurisdiction within the U.S. that is owned, controlled, or influenced by one of the other entities described in 1, 2, or 3, above.

1. (Answer 1a. or 1b.)

a. (for entities which issue stock) Does a foreign interest own, or have beneficial ownership in 5% or more of your organization’s equity securities?

If yes:

i) Identify the percentage of any class of stock or other securities issued, which are owned by foreign interests, broken down by country. Include indirect ownership through one or more intermediate level(s) or subsidiaries. Indicate voting of each class of stock.

ii) Are there shareholder agreements? If yes, attach a copy (or copies), and if none, so state.

iii) Indicate whether a copy of SEC schedule 13D/13G report has been received from any investor. If yes, attach a copy (or copies)

NOTE: Ownership of less than 5% should be included if the holder is entitled to control the appointment and tenure of any management position.

b. (for entities which do not issue stock) Has a foreign interest subscribed 5% or more of your organization’s total capital commitment?

i) Identify the percentage of total capital commitment that I subscribed by foreign interests.

ii) Is there an agreement(s) with the subscriber(s)? If yes, attach a copy (or copies), and if none, so state.

2. Does your organization directly, or indirectly through your subsidiaries, or affiliates, own 10% or more of any foreign interest?

i) Identify the foreign interest by name, country, percentage owned, and individuals who occupy management positions with the organization.

ii) If there are individuals from your organizations who occupy management positions with the foreign interest, identify the names(s) title, and extent of involvement in the operations of the organizations (to include access to classified information).

3. Do any foreign interests serve as members of your organization’s board of directors (or similar governing body), or as officers executive personnel, general partners, regents, trustees or senior management officials in your organizations?

i) Identify the foreign interest by name, title, citizenship, immigration status and clearance, or exclusion status.

ii) Attach a copy of applicable by-laws or articles of incorporation, which describe the affected position(s). However, if you have already provided such copies to the National Security Agency Industrial Representative, so state.

4. Does any foreign interest have the power, direct or indirect, to control the election, appointment, or tenure of members of your organization’s board of directors (or similar governing body) or other management positions of your organization, or have the power to control or influence other decisions or activities of your organization?

i) Identify the foreign interest by name, title, citizenship, and all details concerning the control or influence.

NOTE: If any foreign interests have such power, this question shall also be answered in the affirmation, even if such power has not been exercised. Also, state whether or not it can be exercised through ownership of your organization’s securities or if such power may be invoked by contractual arrangements or by any other means.

5. a. Does your organization have any contracts, agreements, understandings, or arrangements with a foreign interest(s) that cumulatively represent 10% or more of your organization’s annual gross income?

i) For each instance, provide the name of the foreign interest, country, percentage of gross income derived, and nature of involvement, including:

(a) Whether defense/nuclear related or not

(b) Involvement with classified or export controlled technology

(c) Compliance with export control requirements

Where the organization has a number of involvements and where these involvements are not defense/nuclear related and represent a small percentage of gross income less than 5%, the explanations can be a generalized statement addressing the total by country.

NOTE: We do not expect and will not require the contractor to ask every customer if he/she falls within the definition of a foreign interest. We will ask the contractor to provide ongoing security education to those individuals who negotiate and/or administer such agreements regarding their responsibilities to report agreement with a foreign interest to the best of their knowledge. The contractor shall state the response to this question to “the best of his/her knowledge” or “through his/her best efforts”.

b. For this procurement, provide names and corporate addresses of all vendors from which you will acquire components or parts to be integrated into the end item. For each vendor listed that is a foreign interest controlled by a foreign interest, state the nature of the foreign interest.

6. Does your organization, whether as borrower, surety, guarantor, or otherwise, have any indebtedness, liabilities, or obligations to a foreign interest?

i) Provide your overall debt-to-equity ratio in percentage.

ii) With respect to indebtedness or liability to a foreign interest indicate to whom indebted or liable, what collateral has been furnished or pledged, and any conditions or covenants of the loan agreement. If stock or assets have been furnished or pledged as collateral, provide a copy of the loan agreement or pertinent extracts thereof (to include procedures to be followed in the event of default.)

iii) If any debentures are convertible, provide specifics.

iv) If loan payments are in default, provide details.

v) This question should be answered in the affirmative if this debt is with a U.S. entity that is owned or controlled either directly or indirectly by a foreign interest. If unknown, so state.

NOTE: As stated above, we do not expect and will not require the contractor to ask every customer if he/she falls within the definition of a foreign interest. We will ask the contractor to provide ongoing security education to those individuals who negotiate and/or administer such agreements regarding their responsibilities to report agreement with a foreign interest to the best of their knowledge. The contractor shall state the response to this question to “the best of his/her knowledge” or “through his/her best efforts.”

7. During your last fiscal year, did your organization derive:

a. 5% or more of its total revenues or net income from any single foreign interest?

b. In the aggregate 30% or more of its total revenues or net income from foreign interests?

If yes to either part of the question:

i) Provide overall percentage of income derived from foreign interest by country, nature of involvement, and type or services or products.

ii) Indicate if any single foreign interest represents in excess of 5% of total revenue or net income.

iii) Indicate whether any classified information is involved.

iv) State whether facility is in compliance with applicable export control requirements.

NOTE: As stated above, we do not expect and will not require the contractor to ask every customer if he/she falls within the definition of a foreign interest. We will ask the contractor to provide ongoing security education to those individuals who negotiate and/or administer such agreements regarding their responsibilities to report agreement with a foreign interest to the best of their knowledge. The contractor shall state the response to this question to “the best of his/her knowledge” or “through his/her best efforts.”

8. Is 10% or more of any class of your organization’s voting securities held in “nominee” shares, in “street names” or by some other method that does not identify the beneficial owner?

i) Identify each foreign institutional investor holding 10% or more of the voting stick by name and address and the percentage of stock held.

ii) Indicate whether any investor has attempted to, or has exerted any control or influence over appointment to management positions or influenced the policies of the organization.

iii) Include copies of the SEC Schedule 13D/13G.

9. Do any of the members of your organization’s board of directors (or similar governing body,) or officers, executive personnel, general partners, regents, trustees, or senior management officials of your organization hold any positions with, or serve as consultants for, any foreign interest?

i) Provide the name, title, citizenship, immigration status and clearance, or exclusion status on all such persons.

ii) Identify by name and address each foreign interest with which such persons serve and indicate the capacity in which he/she is serving.

iii) Include a Statement of Full Disclosure of Foreign Affiliations for every cleared individual who is a representative of a foreign interest.

10. Is there any other factor that indicates or demonstrates a capability of a foreign interest to control or influence the operations or management of your organization?

i) Describe the foreign involvement in detail, including why the involvement would not be reportable in the preceding questions.

By signing below, the undersigned does hereby agree that the information contained in this document is accurate and complete.

Signed: _____________________________

Printed Name: _______________________

Title: _______________________________

Date: _______________________________

Company Information

Company Name: _____________________

Address: ____________________________

Telephone: __________________________

Website: ____________________________

File details come from the government source that posted it. Updated .