This notice is being posted as an avenue to provide Request for Quotes, W912HN-15-T-0020.

This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Subpart 12.6, as supplemented with additional information in this notice. THIS

ANNOUNCEMENT CONSTITUTES THE ONLY SOLICITATION; QUOTES ARE BEING

REQUESTED AND A WRITTEN SOLICITATION WILL NOT BE ISSUED. This will be an unrestricted procurement. The solicitation number is W912HN-15-T-0020, and the solicitation is issued as a Request for Quote (RFQ). The NAICS code is 325120 with a small business size standard of 1000 employees. This solicitation document incorporates provisions and clauses in effect through Federal Acquisition Circular 2005-81.

Description of Requirement: The Savannah District of the U.S. Army Corps of Engineers requests the supply of liquid oxygen to the Richard B. Russell Dam and Lake Project. The daily liquid oxygen requirement will gradually increase from approximately fifteen (15) tons/day in early summer to a maximum of approximately one hundred (100) tons/day in late summer or early fall. The demand then gradually decreases through late fall until the system is shut down in

November. The peak demand period will last between three (3) to six (6) weeks. During the peak demand, periodic daily “around the clock” deliveries, seven (7) days per week will be required. Bulk liquid oxygen shall comply with Compressed Gas Association (CGA) guidelines and shall be at least 99.5% oxygen.

BASE REQUIREMENT. The contractor shall furnish up to 5,000 tons of liquid oxygen from

June 1, 2015 thru December 15, 2015

OPTION 1. The contractor shall furnish an additional 1,000 tons of liquid oxygen anytime between July 1, 2015 and December 15, 2015

OPTION 2. The contractor shall furnish an additional 1,000 tons of liquid oxygen anytime between July 1, 2015 and December 15, 2015

Submission requirements: Quotes should be E-mailed to addison.g.layfield@usace.army.mil by 12:00 p.m. eastern time on May 7, 2015. Please CC, Mr. Bruce Helms at bruce.a.helms@usace.army.mil.

Performance period: The delivery period shall be 1 June 2015 to 15 December 2015.

Place of performance address:

Government storage facility at the Richard B. Russell Dam and Lake Project, Elberton, Georgia (The storage facilities are located at the end of Engineer Drive in Elberton, GA)

Section SF 1449 - CONTINUATION SHEET

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 5,000 Ton Liquid Oxygen for Richard B. RussellThe contractor shall furnish up to 5,000 tons of liquid oxygen from June 1, 2015 thru December 15, 2015. Only the actual quantities received will be paid.

FOB: Destination

NET AMT

0002 1,000 Ton OPTION Liquid Oxygen for Richard B. RussellThe contractor shall furnish an additional

1,000 tons of liquid oxygen anytime between July 1, 2015 and December 15, 2015.

Only the actual quantities received will be paid.

0003 1,000 Ton OPTION Liquid Oxygen for Richard B. RussellThe contractor shall furnish an additional

1,000 tons of liquid oxygen anytime between July 1, 2015 and December 15, 2015.

Only the actual quantities received will be paid.

QUOTE

Please complete the following:

Item No 0001 Unit Price Amount: ___________ Item No 0002 Unit Price Amount: ___________ Item No 0003 Unit Price Amount: ___________

Total Base (Item No 0001) Amount: ___________ Total Option (Items No 0001 & 0002) Amount: ___________ Total Base and Option (Items No 0001, 0002, & 0003) Amount: ___________

NOTES TO OFFEROR

Note 1: Quotes should be E-mailed to addison.g.layfield@usace.army.mil by 12:00 p.m. eastern time on May 7, 2015. Please CC, Mr. Bruce Helms at bruce.a.helms@usace.army.mil.

Note 2: Quotes shall meet the specifications in the Statement of Work to be eligible for an award. All work shall be performed in accordance with the Statement of Work.

Quotes must clearly identify the contractor’s name and address. Contractor shall provide DUNS, Cage Code, and NAICS numbers.

The contract award will be made to the lowest priced (Base & Options), responsible, responsive quote, with a responsibility determination. This is in accordance with Federal Acquisition Regulations (FAR) 52.212-2, Evaluation – Commercial Items, and FAR 9.1, specifically 9.104- 3(b), Satisfactory Performance Record.

Note 3: All questions are to be directed to Addison Layfield at (912) 652-5416 or addison.g.layfield@usace.army.mil. Please CC, Mr. Bruce Helms at bruce.a.helms@usace.army.mil.

Note 4: The Taxpayer Identification Number may be used by the Government to collect and report on any delinquent amounts arising out of the contractor’s relationship with the Government.

Note 5: The completed Offeror Representations and Certifications-Commercial Items (FAR 52.212-3) or Notation that company is registered in SAM (https://www.sam.gov) must be submitted along with each Quote.

Note 6: Options may be exercised in accordance with FAR 52.217-7 Option for Increased Quantity – Separately Priced Item.

Note 7: See Statement of Work for delivery information.

STATEMENT OF WORK

1. STATEMENT OF WORK. The work to be performed under this contract consists of supplying liquid oxygen, as described in paragraph 2 below, to the Richard B. Russell Dam and Lake Project. The period of this requirement is June 1, 2015 thru December 15, 2015.

2. LIQUID OXYGEN. The contractor shall furnish liquid oxygen as specified below.

a. SYSTEM REQUIREMENTS: The daily liquid oxygen requirement will gradually increase from approximately fifteen (15) tons/day in early summer to a maximum of approximately one hundred (100) tons/day in late summer or early fall. The demand then gradually decreases through late fall until the system is shut down in November. The peak demand period will last between three (3) to six (6) weeks. During the peak demand, periodic daily “around the clock” deliveries, seven (7) days per week will be required. Bulk liquid oxygen shall comply with Compressed Gas Association (CGA) guidelines and shall be at least 99.5% oxygen.

b. BASE REQUIREMENT. The contractor shall furnish up to 5,000 tons of liquid oxygen from June 1, 2015 thru December 15, 2015 as described in 2.a.above

c. OPTION 1. The contractor shall furnish an additional 1,000 tons of liquid oxygen anytime between July 1, 2015 and December 15, 2015 as described in 2.a.above.

d. OPTION 2. The contractor shall furnish an additional 1,000 tons of liquid oxygen anytime between July 1, 2015 and December 15, 2015 as described in 2.a.above.

3. DELIVERY SCHEDULE. The Contracting Officer’s Representative will advise the contractor in writing of the rate at which oxygen is being injected into the lake and of any change in this rate. It will be the contractor’s responsibility to ensure that the storage tanks are kept at a sufficient level to support uninterrupted system operation and to prevent system pressure drops. It will be the contractor’s responsibility to ensure that the storage tanks are filled at a rate that does not cause shutdown of the system due to high pressure. It will be the contractor’s responsibility to ensure proper operation of the valves when filling storage tanks. Storage facilities consist of two (2) twenty thousand (20,000) gallon storage tanks. The contractor shall be responsible for all hoses and adapters necessary to transfer the oxygen from the tanker truck to the liquid storage tanks. The contractor shall continue delivery of liquid oxygen until seasonal lake destratification occurs in the contract year.

4. PLACE OF DELIVERY. Oxygen will be delivered to the Government storage facility at the Richard B. Russell Dam and Lake Project, Elberton, Georgia. The facility can accommodate full size twenty (20) ton tankers. The storage facilities are located at the end of Engineer Drive in Elberton, GA (see Vicinity and Site Maps).

5. COORDINATION OF DELIVERIES. The contractor will be responsible for coordinating all deliveries with the Richard B. Russell Power Plant Shift Operator. Telephone Number (706) 213-3465. The driver will notify the Richard B. Russell Power Plant Shift Operator upon arrival at the LOx storage tank site before off loading of LOx and also notify Richard B. Russell Power Plant Shift Operator when leaving the storage facility.

The driver must provide the Richard B. Russell Power Plant Shift Operator his or her name.

6. GENERAL SAFETY REQUIREMENTS. Deliveries and liquid tank truck transfers will be in accordance with the Compressed Gas Association (CGA) P-12-2009. Safe Handling of Cryogenic Liquids.

a. The requirements stated herein are applicable to the contractor’s employees and to any contract carrier and its employees used by the Contractor.

b. Contractor should routinely inspect the roads to the USACE Richard B. Russell bulk

LOx storage tank site.

c. Contractor truck drivers shall be aware that USACE oxygen sites are operated remotely and automatically. Truck drivers shall remain alert for system operating changes that can affect LOx tank pressure and the tank filling operation.

d. USACE LOx tank pressures and levels are continuously monitored and the data is recorded. The data can be watched live or retrieved at any time to monitor what occurs during LOx tank filling.

e. USACE LOx tank fill pipes have a design pressure of 250 psig. Truck drivers shall monitor the off-loading pressure and ensure that it does not exceed 250 psig.

f. Unless noted otherwise, USACE LOx tanks shall be maintained at a pressure between 170 and 180 psig as shown on the tank’s electronic pressure transmitter digital readout during tank filling.

g. USACE LOx tanks shall never be filled above the full trycock level.

h. Truck drivers shall not depart with the LOx tank at a pressure over 190 psig.

i. Truck drivers shall not depart until the fill pipe has returned to ambient temperature and is no longer venting.

j. Truck drivers shall not depart with any LOx tank hose drain valve(s) open. LOx remaining in the fill pipe at the completion of off-loading shall be allowed to warm to gas that is vented. Afterwards, the valve(s) is closed.

k. Truck drivers shall not depart prior to properly closing valves on the LOx tank that were used for tank filling.

l. Truck drivers who unlock and open a gate(s) to access the LOx tank(s) shall close and lock the gate immediately after passing through it. This applies to traveling both to and from the tank(s).

m. In the event the truck driver observes a problem at the oxygen site, the driver shall call the Richard B. Russell Power Plant Shift Operator and advise them of the problem.

n. Truck drivers shall use all appropriate personnel protective equipment while working on USACE property.

7. SECURITY REQUIREMENTS.

a. All contractor and all associated sub-contractor employees shall comply with applicable, facility and the project site and or Savannah District’s local security policies and procedures. The contractor shall also provide all information required for national and local background checks to meet access requirements to be accomplished by Savannah District Security Office. Contractor workforce must comply with all personal identity verification requirements as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility change, the Government may require changes in contractor security matters or processes.

b. The contractor must pre-screen Candidates using the E-verify Program

(http://www.dhs.gov/E-Verify) website to meet the established employment eligibility requirements. The vendor must ensure that the Candidate has two valid forms of Government issued identification prior to ensure the correct information is entered into the E-verify system. An initial list of verified/eligible Candidates must be provided to the COR no later than 3 business days after the initial contract award.

Vicinity Map

W912HN-15-T-0020

Site Map

DELIVERY INFORMATION

CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC

0001 POP 01-JUN-2015 TO

15-DEC-2015

N/A N/A

0002 POP 15-JUL-2015 TO

15-DEC-2015

0003 POP 15-JUL-2015 TO

15-DEC-2015

CLAUSES INCORPORATED BY REFERENCE

52.203-12 Limitation On Payments To Influence Certain Federal

Transactions

OCT 2010

52.204-7 System for Award Management JUL 2013 52.204-9 Personal Identity Verification of Contractor Personnel JAN 2011 52.204-13 System for Award Management Maintenance JUL 2013 52.212-1 Instructions to Offerors--Commercial Items APR 2014 52.212-3 Offeror Representations and Certification--Commercial Items MAR 2015 52.212-4 Contract Terms and Conditions--Commercial Items DEC 2014 52.217-5 Evaluation Of Options JUL 1990 52.232-39 Unenforceability of Unauthorized Obligations JUN 2013 52.232-40 Providing Accelerated Payments to Small Business

Subcontractors

DEC 2013

52.247-34 F.O.B. Destination NOV 1991 252.203-7000 Requirements Relating to Compensation of Former DoD

Officials

SEP 2011

252.203-7002 Requirement to Inform Employees of Whistleblower Rights SEP 2013 252.204-7003 Control Of Government Personnel Work Product APR 1992 252.204-7004 Alt A System for Award Management Alternate A FEB 2014 252.204-7006 Billing Instructions OCT 2005 252.204-7012 Safeguarding of Unclassified Controlled Technical

Information

NOV 2013

252.209-7004 Subcontracting With Firms That Are Owned or Controlled By The Government of a Country that is a State Sponsor of Terrorism

DEC 2014

252.223-7008 Prohibition of Hexavalent Chromium JUN 2013 252.225-7001 Buy American And Balance Of Payments Program-- Basic

(Nov 2014)

NOV 2014

252.225-7002 Qualifying Country Sources As Subcontractors DEC 2012 252.225-7012 Preference For Certain Domestic Commodities FEB 2013 252.225-7048 Export-Controlled Items JUN 2013

252.232-7003 Electronic Submission of Payment Requests and Receiving Reports

JUN 2012

252.232-7010 Levies on Contract Payments DEC 2006 252.243-7001 Pricing Of Contract Modifications DEC 1991 252.244-7000 Subcontracts for Commercial Items JUN 2013 252.247-7023 Transportation of Supplies by Sea APR 2014

CLAUSES INCORPORATED BY FULL TEXT

52.212-2 EVALUATION--COMMERCIAL ITEMS (OCT 2014)

(a) The Government will award a contract resulting from this solicitation to the responsible offeror whose offer conforming to the solicitation will be most advantageous to the Government. The contract award will be made to the lowest priced Offeror determined to be responsible.

(b) Options. The Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. The Government may determine that an offer is unacceptable if the option prices are significantly unbalanced. Evaluation of options shall not obligate the Government to exercise the option(s).

(c) A written notice of award or acceptance of an offer, mailed or otherwise furnished to the successful offeror within the time for acceptance specified in the offer, shall result in a binding contract without further action by either party. Before the offer's specified expiration time, the Government may accept an offer (or part of an offer), whether or not there are negotiations after its receipt, unless a written notice of withdrawal is received before award.

(End of provision)

52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR

EXECUTIVE ORDERS--COMMERCIAL ITEMS (MAR 2015)

(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or Executive orders applicable to acquisitions of commercial items:

(1) 52.209-10, Prohibition on Contracting with Inverted Domestic Corporations (Dec 2014)

(2) 52.233-3, Protest After Award (AUG 1996) (31 U.S.C. 3553).

(3) 52.233-4, Applicable Law for Breach of Contract Claim (OCT 2004) (Public Laws 108-77 and 108-78 (19 U.S.C. 3805 note)).

(b) The Contractor shall comply with the FAR clauses in this paragraph (b) that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items: (Contracting Officer check as appropriate.)

X (1) 52.203-6, Restrictions on Subcontractor Sales to the Government (Sept 2006), with Alternate I (Oct 1995) (41 U.S.C. 4704 and 10 U.S.C. 2402).

X (2) 52.203-13, Contractor Code of Business Ethics and Conduct (Apr 2010) (41 U.S.C. 3509).

____ (3) 52.203-15, Whistleblower Protections under the American Recovery and Reinvestment Act of 2009 (June 2010) (Section 1553 of Pub. L. 111-5). (Applies to contracts funded by the American Recovery and Reinvestment Act of 2009.)

X (4) 52.204-10, Reporting Executive Compensation and First-Tier Subcontract Awards (July 2013) (Pub. L. 109-

282) (31 U.S.C. 6101 note).

___ (5) [Reserved]

___ (6) 52.204-14, Service Contract Reporting Requirements (JAN 2014) (Pub. L. 111-117, section 743 of Div. C).

___ (7) 52.204-15, Service Contract Reporting Requirements for Indefinite-Delivery Contracts (JAN 2014) (Pub. L.

111-117, section 743 of Div. C).

X (8) 52.209-6, Protecting the Government's Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment. (Aug, 2013) (31 U.S.C. 6101 note).

X (9) 52.209-9, Updates of Publicly Available Information Regarding Responsibility Matters (July 2013) (41 U.S.C. 2313).

____ (10) [Reserved]

____ (11)(i) 52.219-3, Notice of HUBZone Set-Aside or Sole-Source Award (NOV 2011) (15 U.S.C. 657a).

____ (ii) Alternate I (NOV 2011) of 52.219-3.

X (12) (i) 52.219-4, Notice of Price Evaluation Preference for HUBZone Small Business Concerns (OCT 2014) (if the offeror elects to waive the preference, it shall so indicate in its offer) (15 U.S.C. 657a).

____ (ii) Alternate I (JAN 2011) of 52.219-4.

____ (13) [Reserved]

____ (14)(i) 52.219-6, Notice of Total Small Business Set-Aside (NOV 2011) (15 U.S.C. 644).

____ (ii) Alternate I (NOV 2011).

____ (iii) Alternate II (NOV 2011).

____ (15)(i) 52.219-7, Notice of Partial Small Business Set-Aside (June 2003) (15 U.S.C. 644).

____ (ii) Alternate I (Oct 1995) of 52.219-7.

____ (iii) Alternate II (Mar 2004) of 52.219-7.

____ (16) 52.219-8, Utilization of Small Business Concerns (OCT 2014) (15 U.S.C. 637(d)(2) and (3)).

____ (17)(i) 52.219-9, Small Business Subcontracting Plan (OCT 2014) (15 U.S.C. 637(d)(4)).

____ (ii) Alternate I (Oct 2001) of 52.219-9.

____ (iii) Alternate II (Oct 2001) of 52.219-9.

____ (iv) Alternate III (OCT 2014) of 52.219-9.

____ (18) 52.219-13, Notice of Set-Aside of Orders (NOV 2011) (15 U.S.C. 644(r)).

____ (19) 52.219-14, Limitations on Subcontracting (NOV 2011) (15 U.S.C. 637(a)(14)).

____ (20) 52.219-16, Liquidated Damages—Subcon-tracting Plan (Jan 1999) (15 U.S.C. 637(d)(4)(F)(i)).

____ (21) 52.219-27, Notice of Service-Disabled Veteran-Owned Small Business Set-Aside (NOV 2011) (15 U.S.C.

657f).

X (22) 52.219-28, Post Award Small Business Program Rerepresentation (July 2013) (15 U.S.C. 632(a)(2)).

____ (23) 52.219-29, Notice of Set-Aside for Economically Disadvantaged Women-Owned Small Business (EDWOSB) Concerns (July 2013) (15 U.S.C. 637(m)).

____ (24) 52.219-30, Notice of Set-Aside for Women-Owned Small Business (WOSB) Concerns Eligible Under the WOSB Program (July 2013) (15 U.S.C. 637(m)).

X (25) 52.222-3, Convict Labor (June 2003) (E.O. 11755).

X (26) 52.222-19, Child Labor—Cooperation with Authorities and Remedies (JAN 2014) (E.O. 3126).

X (27) 52.222-21, Prohibition of Segregated Facilities (Feb 1999).

X (28) 52.222-26, Equal Opportunity (Mar 2007) (E.O. 11246).

X (29) 52.222-35, Equal Opportunity for Veterans (Jul 2014)(38 U.S.C. 4212).

X (30) 52.222-36, Equal Opportunity for Workers with Disabilities (July 2014) (29 U.S.C. 793).

X (31) 52.222-37, Employment Reports on Veterans (July 2014) (38 U.S.C. 4212).

X (32) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (Dec 2010) (E.O.

13496).

X (33)(i) 52.222-50, Combating Trafficking in Persons (March 2, 2015) (22 U.S.C. chapter 78 and E.O. 13627).

____ (ii) Alternate I (March 2, 2015) of 52.222-50 (22 U.S.C. chapter 78 and E.O. 13627).

X (34) 52.222-54, Employment Eligibility Verification (Aug 2013). (Executive Order 12989). (Not applicable to the acquisition of commercially available off-the-shelf items or certain other types of commercial items as prescribed in 22.1803.)

____ (35)(i) 52.223-9, Estimate of Percentage of Recovered Material Content for EPA–Designated Items (May 2008) (42 U.S.C. 6962(c)(3)(A)(ii)). (Not applicable to the acquisition of commercially available off-the-shelf items.)

____ (ii) Alternate I (May 2008) of 52.223-9 (42 U.S.C. 6962(i)(2)(C)). (Not applicable to the acquisition of commercially available off-the-shelf items.)

____ (36) (i) 52.223-13, Acquisition of EPEAT® Registered Imaging Equipment (Jun 2014)+(E.O.s 13423 and 13514).

____ (ii) Alternate I (Jun 2014) of 52.223-13.

____ (37)(i) 52.223-14, Acquisition of EPEAT® Registered Televisions (Jun 2014) (E.O.s 13423 and 13514).

____ (ii) Alternate I (Jun 2014) of 52.223-14.

____ (38) 52.223-15, Energy Efficiency in Energy-Consuming Products (Dec 2007) (42 U.S.C. 8259b).

____ (39)(i) (i) 52.223-16, Acquisition of EPEAT® -Registered Personal Computer Products (Jun 2014) (E.O.s 13423 and 13514).

____ (ii) Alternate I (Jun 2014) of 52.223-16.

X (40) 52.223-18, Encouraging Contractor Policies to Ban Text Messaging While Driving (Aug 2011) (E.O. 13513).

____ (41) 52.225-1, Buy American--Supplies (May 2014) (41 U.S.C. chapter 83).

____(42) (i) 52.225-3, Buy American--Free Trade Agreements--Israeli Trade Act (May 2014) (41 U.S.C. chapter 83, 19 U.S.C. 3301 note, 19 U.S.C. 2112 note, 19 U.S.C. 3805 note, 19 U.S.C. 4001 note, Pub. L.

103-182, 108-77, 108-78, 108-286, 108-302, 109-53, 109-169, 109-283, 110-138, 112-41, 112-42, and 112-43.

____ (ii) Alternate I (May 2014) of 52.225-3.

____ (iii) Alternate II (May 2014) of 52.225-3.

____ (iv) Alternate III (May 2014) of 52.225-3.

X (43) 52.225-5, Trade AgrXeements (Nov 2013) (19 U.S.C. 2501, et seq., 19 U.S.C. 3301 note).

X (44) 52.225-13, Restrictions on Certain Foreign Purchases (June 2008) (E.O.’s, proclamations, and statutes administered by the Office of Foreign Assets Control of the Department of the Treasury).

____ (45) 52.225-26, Contractors Performing Private Security Functions Outside the United States (Jul 2013) (Section 862, as amended, of the National Defense Authorization Act for Fiscal Year 2008; 10 U.S.C. 2302 Note).

____ (46) 52.226-4, Notice of Disaster or Emergency Area Set-Aside (Nov 2007) (42 U.S.C. 5150

____ (47) 52.226-5, Restrictions on Subcontracting Outside Disaster or Emergency Area (Nov 2007) (42 U.S.C.

5150).

____ (48) 52.232-29, Terms for Financing of Purchases of Commercial Items (Feb 2002) (41 U.S.C. 4505, 10 U.S.C. 2307(f)).

____ (49) 52.232-30, Installment Payments for Commercial Items (Oct 1995) (41 U.S.C. 4505, 10 U.S.C. 2307(f)).

X (50) 52.232-33, Payment by Electronic Funds Transfer—System for Award Management (July 2013) (31 U.S.C.

3332).

____ (51) 52.232-34, Payment by Electronic Funds Transfer—Other than System for Award Management (July 2013) (31 U.S.C. 3332).

____ (52) 52.232-36, Payment by Third Party (MAY 2014) (31 U.S.C. 3332).

____ (53) 52.239-1, Privacy or Security Safeguards (Aug 1996) (5 U.S.C. 552a).

____ (54)(i) 52.247-64, Preference for Privately Owned U.S.-Flag Commercial Vessels (Feb 2006) (46 U.S.C.

Appx. 1241(b) and 10 U.S.C. 2631).

____ (ii) Alternate I (Apr 2003) of 52.247-64.

(c) The Contractor shall comply with the FAR clauses in this paragraph (c), applicable to commercial services, that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items: (Contracting Officer check as appropriate.)

_____ (1) 52.222-41, Service Contract Labor Standards (MAY 2014) (41 U.S.C. chapter 67).

_____ (2) 52.222-42, Statement of Equivalent Rates for Federal Hires (MAY 2014) (29 U.S.C. 206 and 41 U.S.C.

chapter 67).

_____ (3) 52.222-43, Fair Labor Standards Act and Service Contract Labor Standards--Price Adjustment (Multiple Year and Option Contracts) (MAY 2014) (29 U.S.C. 206 and 41 U.S.C. chapter 67).

_____ (4) 52.222-44, Fair Labor Standards Act and Service Contract Labor Standards--Price Adjustment (MAY 2014) (29 U.S.C 206 and 41 U.S.C. chapter 67).

_____ (5) 52.222-51, Exemption from Application of the Service Contract Labor Standards to Contracts for Maintenance, Calibration, or Repair of Certain Equipment--Requirements (MAY 2014) (41 U.S.C. chapter 67).

_____ (6) 52.222-53, Exemption from Application of the Service Contract Labor Standards to Contracts for Certain Services--Requirements (MAY 2014) (41 U.S.C. chapter 67).

_____ (7) 52.222-17, Nondisplacement of Qualified Workers (MAY 2014) (E.O. 13495).

_____ (8) 52.226-6, Promoting Excess Food Donation to Nonprofit Organizations (MAY 2014) (42 U.S.C. 1792).

_____ (9) 52.237-11, Accepting and Dispensing of $1 Coin (Sept 2008) (31 U.S.C. 5112(p)(1)).

_____ (10) 52.222-55, Minimum Wages Under Executive Order 13658 (DEC 2014) (Executive Order 13658).

(d) Comptroller General Examination of Record. The Contractor shall comply with the provisions of this paragraph

(d) if this contract was awarded using other than sealed bid, is in excess of the simplified acquisition threshold, and does not contain the clause at 52.215-2, Audit and Records--Negotiation.

(1) The Comptroller General of the United States, or an authorized representative of the Comptroller General, shall have access to and right to examine any of the Contractor's directly pertinent records involving transactions related to this contract.

(2) The Contractor shall make available at its offices at all reasonable times the records, materials, and other evidence for examination, audit, or reproduction, until 3 years after final payment under this contract or for any shorter period specified in FAR Subpart 4.7, Contractor Records Retention, of the other clauses of this contract. If this contract is completely or partially terminated, the records relating to the work terminated shall be made available for 3 years after any resulting final termination settlement. Records relating to appeals under the disputes clause or to litigation or the settlement of claims arising under or relating to this contract shall be made available until such appeals, litigation, or claims are finally resolved.

(3) As used in this clause, records include books, documents, accounting procedures and practices, and other data, regardless of type and regardless of form. This does not require the Contractor to create or maintain any record that the Contractor does not maintain in the ordinary course of business or pursuant to a provision of law.

(e) (1) Notwithstanding the requirements of the clauses in paragraphs (a), (b), (c), and (d) of this clause, the Contractor is not required to flow down any FAR clause, other than those in this paragraph (e)(1)in a subcontract for commercial items. Unless otherwise indicated below, the extent of the flow down shall be as required by the clause—

(i) 52.203-13, Contractor Code of Business Ethics and Conduct (APR 2010) (41 U.S.C. 3509).

(ii) 52.219-8, Utilization of Small Business Concerns (OCT 2014) (15 U.S.C. 637(d)(2) and (3)), in all subcontracts that offer further subcontracting opportunities. If the subcontract (except subcontracts to small business concerns) exceeds $650,000 ($1.5 million for construction of any public facility), the subcontractor must include 52.219-8 in lower tier subcontracts that offer subcontracting opportunities.

(iii) 52.222-17, Nondisplacement of Qualified Workers (MAY 2014) (E.O. 13495). Flow down required in accordance with paragraph (l) of FAR clause 52.222-17.

(iv) 52.222-26, Equal Opportunity (MAR 2007) (E.O. 11246).

(v) 52.222-35, Equal Opportunity for Veterans (JUL 2014) (38 U.S.C. 4212).

(vi) 52.222-36, Equal Opportunity for Workers with Disabilities (Jul 2014) (29 U.S.C. 793).

(vii) 52.222-37, Employment Reports on Veterans (Jul 2014) (38 U.S.C. 4212).

(viii) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (Dec 2010) (E.O. 13496).

Flow down required in accordance with paragraph (f) of FAR clause 52.222-40.

(ix) 52.222-41, Service Contract Labor Standards (May 2014), (41 U.S.C. chapter 67).

(x) _____ (A) 52.222-50, Combating Trafficking in Persons (March 2, 2015) (22 U.S.C. chapter 78 and E.O.

13627).

_____ (B) Alternate I (March 2, 2015) of 52.222-50 (22 U.S.C. chapter 78 and E.O. 13627).

(xi) 52.222-51, Exemption from Application of the Service Contract Labor Standards to Contracts for Maintenance, Calibration, or Repair of Certain Equipment--Requirements (May 2014) (41 U.S.C. chapter 67.)

(xii) 52.222-53, Exemption from Application of the Service Contract Labor Standards to Contracts for Certain Services--Requirements (May 2014) (41 U.S.C. chapter 67)

(xiii) 52.222-54, Employment Eligibility Verification (Aug 2013).

(xiv) 52.225-26, Contractors Performing Private Security Functions Outside the United States (Jul 2013) (Section 862, as amended, of the National Defense Authorization Act for Fiscal Year 2008; 10 U.S.C. 2302 Note).

(xv) 52.226-6, Promoting Excess Food Donation to Nonprofit Organizations. (May 2014) (42 U.S.C. 1792). Flow down required in accordance with paragraph (e) of FAR clause 52.226-6.

(xvi) 52.247-64, Preference for Privately-Owned U.S. Flag Commercial Vessels (Feb 2006) (46 U.S.C. Appx 1241(b) and 10 U.S.C. 2631). Flow down required in accordance with paragraph (d) of FAR clause 52.247-64.

(xvii) 52.222-55, Minimum Wages Under Executive Order 13658 (DEC 2014) (Executive Order 13658).

(2) While not required, the contractor May include in its subcontracts for commercial items a minimal number of additional clauses necessary to satisfy its contractual obligations.

(End of clause)

52.217-7 OPTION FOR INCREASED QUANTITY--SEPARATELY PRICED LINE ITEM (MAR 1989)

The Government may require the delivery of the numbered line item, identified in the Schedule as an option item, in the quantity and at the price stated in the Schedule. The Contracting Officer may exercise the option by written notice to the Contractor within 01 July 2015 – 30 September 2015. Delivery of added items shall continue at the same rate that like items are called for under the contract, unless the parties otherwise agree.

52.232-4003 INVOICES

Invoices should be mailed to:

Invoices should be mailed to:

Russell Project Office (CESAS-OP-SR - Mr. Sykes) 4144 Russell Dam Drive Elberton, GA 30635-9271

52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

http://farsite.hill.af.mil http://www.aquisition.gov

52.252-6 AUTHORIZED DEVIATIONS IN CLAUSES (APR 1984)

(a) The use in this solicitation or contract of any Federal Acquisition Regulation (48 CFR Chapter 1) clause with an authorized deviation is indicated by the addition of "(DEVIATION)" after the date of the clause.

(b) The use in this solicitation or contract of any DFARS (48 CFR Chapter 2) clause with an authorized deviation is indicated by the addition of "(DEVIATION)" after the name of the regulation.

File details come from the government source that posted it. Updated .