W912HN-15-T-0007_Solicitation.pdf

PDF 1 MB Posted

Attached to
Removal and Recycling on Former Contamination Site located at Fort Bragg, North Carolina
Solicitation number
W912HN-15-T-0007
Issued by

About this file

W912HN-15-T-0007 Solicitation (Removal and Recycling on Former Contamination Site located at Fort Bragg North Carolina)

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SEE ADDENDUM

(No Collect Calls) W912HN-15-T-0007 12-Jan-2015

b. TELEPHONE NUMBER

912-652-5920

8. OFFER DUE DATE/LOCAL TIME

12:00 PM 20 Jan 2015

5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 2/2012)

Prescribed by GSA – FAR (48 CFR) 53.212

(TYPE OR PRINT)

(SIGNATURE OF CONTRACTING OFFICER)

ADDENDA ARE

26. TOTAL AWARD AMOUNT (For Govt. Use Only)

23.

CODE 10. THIS ACQUISITION IS

SUCH ADDRESS IN OFFER

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT

BELOW IS CHECKED

TELEPHONE NO.

W912HN 9. ISSUED BY

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME

MELVIN O SLOAN

2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER

(TYPE OR PRINT)

30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA

27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.

25. ACCOUNTING AND APPROPRIATION DATA

1. REQUISITION NUMBER

20.

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

ARE NOT ATTACHED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

. YOUR OFFER ON SOLICITATION

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

% FOR: SET ASIDE: UNRESTRICTED OR X

SMALL BUSINESS WOMEN-OWNED SMALL

BUSINESS (WOSB)

17a.CONTRACTOR/ CODE FACILITY

OFFEROR CODE

US ARMY ENGINEER DISTRICT, SAVANNAH

100 WEST OGLETHORPE AVE.

SAVANNAH GA 31401-3640

18a. PAYMENT WILL BE MADE BY CODE

RATED ORDER UNDER

DPAS (15 CFR 700)

13a. THIS CONTRACT IS A

13b. RATING

CODE 15. DELIVER TO CODE 16. ADMINISTERED BY

SEE SCHEDULE

12. DISCOUNT TERMS 11. DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

SEE SCHEDULE

14. METHOD OF SOLICITATION

RFQ IFB RFP X

FAX:

TEL: SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

8(A)

HUBZONE SMALL

BUSINESS X

ECONOMICALLY DISADVANTAGED

WOMEN-OWNED SMALL BUSINESS

(EDWOSB)

SIZE STANDARD:

NAICS:

113310

X

OFFER DATED

29. AWARD OF CONTRACT: REF.

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND

EMAIL:

TEL:

31c. DATE SIGNED

SEE SCHEDULE

SCHEDULE OF SUPPLIES/ SERVICES ITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT

24. 22. 21. 19.

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

(CONTINUED)

PAGE 2 OF104

ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

37. CHECK NUMBER

FINALPARTIALCOMPLETE

36. PAYMENT35. AMOUNT VERIFIED

CORRECT FOR

34. VOUCHER NUMBER

FINAL

33. SHIP NUMBER

PARTIAL

38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT

41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE

42a. RECEIVED BY (Print)

42b. RECEIVED AT (Location)

42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS

STANDARD FORM 1449 (REV. 2/2012) BACK

Prescribed by GSA – FAR (48 CFR) 53.212

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

SEE SCHEDULE

20.

SCHEDULE OF SUPPLIES/ SERVICES

21.

QUANTITY UNIT

22. 23.

UNIT PRICE

24.

AMOUNT

19.

ITEM NO.

Section SF 1449 - CONTINUATION SHEET

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 Job

Task 1: Project PlansFOB: Destination

NET AMT

0002 Job

Task 2: Contractor Manpower ReportingFOB: Destination

0003 Job

Task 3: Field ActivitiesFOB: Destination

0004 Job

Task 4: ReportingFOB: Destination

NOTES TO OFFERORS

Notes to Offerors:

Solicitation Number: W912HN-15-T-0007

Project Title and location: Removal and Recycling on Former Contamination Site located at Fort

Bragg, North Carolina

All quotations are due no later than 12:00 pm (EST) on 20 January 2015

Quotation packages can be emailed to the attention of Mr. Melvin Sloan, Contract Specialist at melvin.o.sloan@usace.army.mil.

Quotes can also be mailed to Mr. Melvin Sloan at:

U.S. Army Corps of Engineers, Savannah

ATTN: CESAS-CT-E (Melvin Sloan)

100 W. Oglethorpe Avenue

P.O. Box 889

Savannah, Georgia 31402-0889

All quotes must be clearly identified with the contractor’s name and address.

To ensure timely and proper handling, the lower left corner of the outermost wrapper should indicate the following:

Request for Quote: W912HN-15-T-0007

Due Date: 20 January 2015

Time by which quotes are due: 12:00 PM (Eastern Time)

Title of Project: Removal and Recycling on Former Contamination Site located at Fort Bragg, North Carolina

BASIS FOR AWARD: Contract award shall be made to the responsible Offeror whose quote provides the salient service characteristics identified in the Statement of Work and the responsible Offeror whose price/ cost quote meets the needs of the government.

All Requests for Quote Packages must include the following:

- Signed Form 1449 Solicitation/Contract/ Order for Commercial Items

- Point of Contact: Name, Address, e-mail address, Phone Number, DUNS

Number, Cage, Code, Tax ID Number mailto:melvin.o.sloan@usace.army.mil

PERFORMANCE WORK STATEMENT

REMOVAL AND RECYCLING ON FORMER CONTAMINATION SITE

At

Fort Bragg, North Carolina

By

Geotechnical & HTRW Branch

U.S. Army Engineer District, Savannah

W912HN-15-T-0007

Contents

1 OBJECTIVE

2 GENERAL REQUIREMENTS

2.1 Responsibility

2.2 Professional Judgment

2.3 Policies

2.4 Coordination with Other Contractors and Government Agencies

2.5 Release of Information

2.6 Regulatory Interface

3 DESCRIPTION OF SERVICES

3.1 Task 1 – Project Plans

3.1.1 Project Plans

3.1.2 Deliverables

3.2 Task 2 – Contractor Manpower Reporting

3.2.1 Reports

3.2.2 Deliverable

3.3 Task 3 – Field Activities

3.3.1 Field Work

3.3.2 Deliverables

3.4 Task 4-Reporting

4 MANAGEMENT AND SUBMITTALS

4.1 Project Management

4.1.1 Project Director

4.1.2 Project Manager

4.1.3 Project Team

4.1.4 Coordination and Points of Contact

4.1.5 Review of Progress and Technical Adequacy

4.1.6 Project Records

4.2 Schedule and Progress Reports

4.3 Submittals

4.3.1 General Requirements

4.3.2 Electronic Deliverables

4.3.3 Photographs

4.3.4 Submittal and Document Schedule

4.3.5 Document Distribution

5 TECHNICAL REQUIREMENTS

5.1 Health, Safety, and Emergency Response

5.1.1 General

5.1.2 Accident Prevention Plan and Site Safety and Health Plan

5.1.3 Regulatory Requirements

5.1.4 Unexploded Ordnance (UXO)

5.1.5 Health Risks

5.1.6 Fire Prevention and Protection

6 OPERATIONAL REQUIREMENTS

6.1 Antiterrorism/Operations Security

6 . 1 . 1 AT Level I Training

6.1.2 AT Awareness Training for Contractor Personnel Traveling Overseas

6.1.3 Access and General Protection/Security Policy and Procedures

6.1.4 iWATCH Training

6.1.5 Contractor Employees Who Require Access to Government Information Systems

6.1.6 For Contracts that Require an OPSEC Standing Operating Procedure/Plan

6.1.7 For Contracts that Require OPSEC Training

6.1.8 For Information assurance (IA)/information technology (IT) training

6.1.9 For information assurance (IA)/information technology (IT) certification

6.1.10 For Contractors Authorized to Accompany the Force

6.1.11 For Contract Requiring Performance or Delivery in a Foreign Country

6.1.12 For Contracts That Require Handling or Access to Classified Information

6.2 Work-Site Maintenance

6.3 Minimize Impacts to Existing Operations

6.4 Storage

6.5 Key Control

6.6 Damage to Government Property

6.7 Permits

6.8 Hazardous Materials and Pollution Prevention

6.8.1 Hazardous Materials

6.8.2 Hazardous Waste Management

6.8.3 Pollution Prevention

7 PERIOD OF PERFORMANCE

REMOVAL AND RECYCLING ON FORMER CONTAMINATION SITE

1 OBJECTIVE

The objective of this Performance Work Statement (PWS) is to provide Fort Bragg support for the Environmental Compliance Program through disposal and recycling of solid waste generated through other activities.

An approximately 5.3 acre lot, located at the intersection of Gruber Road and Butner Road, has primarily been clear cut with only underbrush, small trees (not suitable for harvesting), and stumps ranging in size from 12” to 36” remaining. All stumps will require grinding to a minimum of level with ground surface. All chips/grindings will remain on premise. The lot was a former area of concern due to heating oil and solvent contamination in the shallow aquifer due to numerous underground storage tanks from the surrounding lots. Potential underbrush, vegetative debris, concrete, fencing, and former water supply well components shall be moved and consolidated at a safe location for removal and recycling. The remaining material that is too large for on-site grinding and any of the aforementioned debris will be loaded onto trucks and hauled to the Fort Bragg Landfill, where it will be recycled or properly disposed of.

2 GENERAL REQUIREMENTS

2.1 Responsibility

The Contractor shall perform all services stated for the project in accordance with established criteria, standards, and instructions and shall assume all responsibility for the accuracy and completeness of the work. Quality of work accomplished under this contract will be a determining factor in consideration of the Contractor for future work. The Contractor and all his subcontractors must comply with statutes and regulations of the State of North Carolina

Department of Natural Resources (NCDNR). Should the Contractor receive any directions or instructions that are beyond the PWS, the Contractor shall not proceed with such directions or instructions, but shall notify the Contracting Officer (KO) or the Contracting Officer

Representative (COR) in writing describing the changes and impact on the effort within ten calendar days. The CO will then evaluate the need for a modification to the Contractor’s task order.

2.2 Professional Judgment

The Contractor shall continuously review the PWS, and all work during the progress of the delivery order, for potential changes that would be in the best interest of the Government. If changes are needed, the Contractor shall contact the COR to discuss the needs or recommendations and follow-up with a Confirmation Notice. The negotiated PWS is not to be viewed as an inflexible work order. The Contractor shall use their professional judgment to make suggestions to improve the quality of the work, reduce any unnecessary work (and associated cost), and improve the final product (workplan, design, report, etc.). The Contractor shall also ensure that the USACE meets all reporting requirements under applicable laws and regulations.

2.3 Policies

It is the policy of the Army to use innovative and sustainable approaches to environmental management and technology to accomplish its mission. Sustainable projects do not deplete resources, cause environmental degradation, or adverse impacts to human health, and may reduce the burden of compliance for the Army. Mission requirements are met while also balancing cost and environmental responsibility. The Contractor shall incorporate environmental pollution prevention and sustainability initiatives into all aspects of this delivery order.

The Contractor shall function as an integral team member in support of the Fort Bragg mission, to include sharing of information with other Fort Bragg contractors, and cooperation with communities, regulators, and other government entities.

This delivery order is to be efficiently managed. This includes accurate, on-time submittals of contract deliverables and timely identification and solution of impediments to successful project execution. Early involvement of all concerned parties fosters the development of the most cost-effective and technically sound solutions. The USACE and Fort Bragg will rely on the

Contractor’s expertise in recognizing and addressing problematic issues and successful execution of this delivery order.

2.4 Coordination with Other Contractors and Government Agencies

The Contractor shall be responsible for day-to-day interface with other government work agencies to include, but not limited to, civil engineering, transportation, communications, legal, operations, security forces, safety, and public affairs. Topics for interface include, but are not limited to: engineering design/construction and environmental compliance.

The Contractor shall cooperate fully with other contractors and government employees. The

Contractor shall not commit any act that will interfere with the performance of work by any other contractor or government employee. The KO will resolve work schedule conflicts between this delivery order and the additional work awarded to other contractor(s). The KO will provide written direction to the Contractor to reschedule work when required.

2.5 Release of Information

The Contractor shall neither publicize nor release in any manner information regarding projects on which they may be working or negotiating with this office, nor discuss prior to public release by this office, a project, any future design of the project, or any planning with anyone not directly concerned with the execution of the project. Any inquiries about the project shall be referred to the KO, COR, or the USACE, Savannah District, Corporate Communications Office

(CCO).

2.6 Regulatory Interface

The Contractor is not an employee of the government and shall not represent the government in an official or unofficial capacity without the express prior written permission from the KO. In the event that an unspecified regulatory representative approaches the Contractor with a stated intent to inspect the activities of the Contractor, the Contractor shall respectfully decline the inspection until the KO is properly notified and a duly appointed representative is present or other direction is issued by the KO. If this is not possible, due to project constraints, the

Contractor shall notify the KO, Contracting Officer Representative (COR), and base point of contact (POC) at the earliest possible time following the inspection.

3 DESCRIPTION OF SERVICES

The Contractor shall provide the services necessary to plan and execute the required tasks of this

PWS within the approved schedules. The work shall be completed in accordance with the PWS and all applicable federal, state, and local laws and regulations, and meet all project objectives. The

PWS consists of the following major tasks:

Task 1 Project Plans

Task 2 Contractor Manpower Reporting

Task 3 Field Activities

Task 4 Reporting

3.1 Task 1 – Project Plans

3.1.1 Project Plans

Within 15 calendar days of issuance of the delivery order, the Contractor shall submit to the

USACE a list of project milestones and projected date of completion for each milestone (in the form of a Gantt Chart or a Work Breakdown Structure). The Contractor shall identify the internal methods that will be used for schedule control.

Prior to field activities, the Contractor shall prepare and submit Draft and Final versions of a

Work Plan and an Accident Prevention Plan (APP) with a Site Safety and Health Plan (SSHP).

The APP/SSHP shall be suitable for use as a “stand alone” document; however, the APP/SSHP need not go to full detail on activities or procedures, i.e. as found in the Work Plan.

Certifications required by the APP/SSHP are to be consolidated in a separate addendum. The format of the APP is presented in Appendix A of EM 385-1-1. The Contractor shall prepare the work plan in accordance with the Uniform Federal Policy for Quality Assurance Project Plans

(UFP-QAPP). The UFP-QAPP Manual and associated tools may be found online at www.epa.gov/fedfac/documents/qualityassurance.html.

The Work Plan and SSHP shall also be prepared in accordance with operational and technical requirements in Sections 5 and 6. All copies of the Work Plan (Draft and Final) shall be certified by a Professional Geologist, Engineer, or other disciplines, as applicable; all copies of the SSHP shall be reviewed and signed by a Certified Industrial Hygienist (CIH) or Certified Safety

Professional (CSP).

The Contractor will submit monthly progress reports on the 20 th of each month until completion of delivery order (delivery of the first status report will be within 14 days after award of the delivery order). The report shall be sent to the USACE Project Manager and shall accompany the invoice. Invoices shall cover the same reporting period as monthly progress reports. The monthly report will be used for evaluating contract progress and as a basis for problem solving.

Each report will include project status, performance metrics, cost-to-date, percent complete, and projected milestone completion dates. The progress report shall also include a cost breakdown by task and subtask in relation to percentage complete as well as a summary of labor hours/expenses. The section on project status shall contain at a minimum brief discussion of the following:

Project name

Contract/Delivery Order Nos.

Progress made during this reporting period

Problem areas/recommended solutions/outstanding issues

Current activities (include subcontractor activities if applicable)

Anticipated activities for next reporting period

Deliverables submitted

Schedule update

Meetings/conference calls held

Each report shall address any problems encountered in completing the various tasks and any changes in scope or direction from the original proposal, including schedule impacts. The schedule submitted with the monthly reports shall address detailed program milestones and reflect the current project status.

3.1.2 Deliverables

The deliverables for this task are project Draft and Final versions of a Work Plan and an

Accident Prevention Plan (APP) with a Site Safety and Health Plan (SSHP), project milestones, and monthly progress reports in accordance with Army policies and applicable guidance with no more than one round of revisions. Approval will be gained through USACE by the COR. The plans must meet all requirements as dictated by this PWS, along with all associated documentation.

Failure to meet the minimum requirements will result in a poor Contractor Performance

Assessment Reporting System (CPARS) rating and/or re-performance of work at contactor’s expense.

3.2 Task 2 – Contractor Manpower Reporting

3.2.1 Reports

Accounting for Contract Services/Contractor Manpower Reporting (UNCLASSIFIED) The

Office of the Assistant Secretary of the Army (Manpower & Reserve Affairs) operates and maintains a secure Army data collection site where the contractor shall report ALL contractor manpower (including sub-contractor manpower) required for performance of this task order.

The contractor is required to completely fill in all the information in the format using the following web address https://contractormanpower.army.pentagon.mil.

Enter all required information and information below into CMRA:

Contracting Office, Contracting Officer, and Contracting Officer’s Representative.

Contract number, including task and delivery order number.

Beginning and ending dates covered by reporting period.

Contractor names, address, phone number, e-mail address, and identity of contractor employee entering data.

Estimated direct labor hours (including sub-contractors).

Estimated direct labor dollars paid this reporting period (including sub-contractors).

Total payments (including sub-contractors).

Predominant Federal Service Code (FSC) reflecting services provided by contractor (and separate predominant FSC for each sub-contractor if different).

Estimated data collection cost.

Organizational title associated with the Unit Identification Code (UIC) for the Army

Requiring Activity (the Army Requiring Activity is responsible for providing the contractor with its UIC for the purpose of reporting this information).

https://contractormanpower.army.pentagon.mil/

Locations where contractor and sub-contractors perform the work (specified by zip code in the United States and nearest city, country, when in an overseas location, using standardized nomenclature provided on website).

3.2.2 Deliverable

The deliverable for this task is the completion and approval of the Contractor Manpower Report with no more than one round of revisions. The report must meet all requirements as dictated by this PWS, along with all associated documentation. Approval will be gained through USACE by the COR. Failure to meet the minimum requirements will result in a poor CPARS rating and/or re-performance of work at contactor’s expense.

3.3 Task 3 – Field Activities

3.3.1 Field Work

The Contractor shall grind all stumps and large roots located on an approximately 5.3 acre lot at the intersection of Butner and Gruber Roads, Fort Bragg, North Carolina. Potential underbrush, vegetative debris, concrete, fencing, and former water supply well components shall be moved and consolidated at a safe location for removal and recycling. The remaining material that is too large for on-site grinding and any of the aforementioned debris will be loaded onto trucks and hauled to the Fort Bragg Landfill, where it will be recycled or properly disposed of.

The Contractor must obtain all permits necessary to perform the tasks required by this PWS, and copies of all permits must be submitted to the Government prior to conducting the tasks authorized under that permit. Prior to beginning any activity at the site, the Contractor must contact the appropriate agencies for delineating the presence of underground utilities.

3.3.2 Deliverables

The completion of all field work as defined in the PWS, along with all associated documentation.

3.4 Task 4-Reporting

3.4.1 Final Report

The Contractor shall prepare a Final Report after the completion of the stump and vegetation debris removal and disposal. The final report shall include, but is not limited to, the details of the project’s implementation, the amount of debris disposed of at the landfill, number of stumps that were ground, and any other post-completion details. The reports will be prepared and submitted in accordance with Section 4.3 of the PWS with no more than one round of revisions.

3.4.2 Deliverables

The deliverable for this task is the Contractor shall provide the final report that includes the final report with all other documentation included as appendices.

The requisite reports shall fulfill the objectives in a manner that is consistent with any applicable

NCDNR guidance, as well as USACE and Fort Bragg policies. Approval of the requisite reports shall be gained through USACE by the COR. Failure to meet the minimum requirements will result in a poor CPARS rating and/or re-performance of work at contractor’s expense.

4 MANAGEMENT AND SUBMITTALS

4.1 Project Management

The Contractor shall perform management and planning functions, as well as performance measurement and cost status reporting, during the course of this effort as specified in this delivery order. The Contractor shall prepare a Project Management Plan (PMP) as a sub plan to the Work Plan that shall include a discussion of the technical approach and schedules associated with this project. The PMP shall also include a description of personnel, including subcontractor personnel, required to complete this project. Information on specific elements of project management and related functions is provided below.

The Government shall evaluate the Contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan (QASP). This plan is a Government only document focused on what the Government shall do to assure that the Contractor has performed in accordance with the requirements of the contract. The QASP will be provided to the contractor who can expand upon or seek clarifications during the technical project planning process.

Prior to commencing work, the Contractor shall participate in a pre-performance conference call or on-site meeting. The date and time will be mutually agreed upon by the Contractor, Fort

Bragg personnel, the COR, and USACE. The purpose of this conference call or on-site meeting is to make an introduction of key personnel and arrange access to the site. Additional conference calls or meetings will be conducted as needed.

4.1.1 Project Director

The Contractor shall assign a Project Director (PD) with principal responsibility for overall management of this project. He/she is to be provided with appropriate and sufficient organizational support (in engineering, purchasing, logistics, reporting, etc.) to enable and ensure successful fulfillment of all project requirements and objectives. The PD is to serve as the primary director, coordinator and facilitator of the Contractor’s personnel and their efforts.

4.1.2 Project Manager

The Contractor shall assign a principal or key employee to serve as the Contractor's Project

Manager (PM). The Contractor's PM shall oversee the coordination and execution of the entire project and shall be capable of administering all instructions from the USACE and obtaining answers to all questions related to the project during the course of the Task Order period.

4.1.3 Project Team

The Contractor shall assemble a team composed of personnel experienced in appropriate disciplines to accomplish the specified work. A brief resume of key members of the project team, both Contractor and subcontractor personnel, shall be furnished in the Project Management

Plan. The Contractor shall also submit an organizational chart displaying key personnel involved in the effort and their respective labor categories as specified in this delivery order. The

Contractor shall immediately notify the COR of any changes in critical Contractor personnel.

The Contractor shall obtain COR approval of any proposed changes in project personnel along with the steps taken/proposed to ensure there are no impacts to the schedule or costs associated with individual tasks. The Contractor shall identify to the COR all subcontractors to be used pursuant to this PWS, prior to signing any contract or initiating any work. The Contractor shall provide subcontractor qualifications to the COR prior to subcontractor utilization.

4.1.4 Coordination and Points of Contact

During the execution of the work under this contract Task Order, the Contractor shall keep in close liaison with the Corps PM/COR and Fort Bragg personnel, who will coordinate the work at this site.

4.1.5 Review of Progress and Technical Adequacy

At appropriate times, representatives of the Contracting Officer may review the progress and technical adequacy of the work. Such review will not relieve the Contractor from performing all contract Task Order requirements.

4.1.6 Project Records

All material and information gathered and/or developed in the performance of the tasks listed in the contract shall be the property of the U.S. Government. Data gathered during the period of performance of this project shall not be used or distributed by the Contractor without specific written Government permission.

At the completion of the project, the Contractor shall provide to the USACE PM a complete set of project records including all correspondence, memorandums, trip reports, confirmation notices, submittals, photographs, and any other records or documents generated as a result of the project. The project records shall be submitted in both hard copies and in electronic file format.

All final text files generated by the Contractor shall be furnished to the USACE Project Manager in Adobe Acrobat compatible software and IBM PC compatible format. Discussion with the

Corps on the format for the electronic data is mandatory. However, a general guideline is that all photos should be ‘.jpg’ files, and text should be in ‘.pdf’ file formats (version 10.1 compatible).

4.2 Schedule and Progress Reports

The Contractor shall include with his proposal a tentative schedule for the completion of all work as outlined in this Scope of Work. Within 10 days of receipt of the notice to proceed, the

Contractor shall prepare a progress chart showing the project schedule for completion of the work. The schedule shall be prepared in reproducible form and submitted for approval. The review time for submittals shall be 30 days for USACE. The actual progress of the work shall be updated and submitted by the 5th day of each month and may be included with the request for payment. Progress charts must be revised to reflect modifications and other approved changes in scheduling. Along with the progress chart, a monthly progress report in letter format shall be provided to the USACE PM. The letter shall outline the progress during the past month and the projected work effort for the next month. All progress reports and schedules shall be submitted via electronic mail. Progress reports shall include exposure man-hours.

The Government shall evaluate the Contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan (QASP). This plan is a Government only document focused on what the Government shall do to assure that the Contractor has performed in accordance with the requirements of the contract. The QASP will be provided to the contractor who can expand upon or seek clarifications during the technical project planning process.

4.3 Submittals

4.3.1 General Requirements

All reports and documents will be completed in time for their thorough and complete review, appropriate revision to occur, and required delivery schedules to be observed. To facilitate attainment of this goal, the project deliverables schedule will be routinely and regularly updated.

Draft reports are considered “drafts” only in the sense that they have not been reviewed and approved by the government. In all respects draft reports shall be complete, free of grammatical/typographical errors, and in the proper format. It is not generally desirable however, for draft reports to be bound (except when their length makes in impractical) or in color. All reports shall be double-sided on recycled paper. The Contractor shall coordinate the cover letters with the USACE. Submittals to regulatory reviewers shall be shipped by registered mail or other method where a signed receipt indicating appropriate delivery is obtained.

4.3.2 Electronic Deliverables

The final (accepted) versions of the report shall be furnished to the USACE Project Manager in

Adobe Acrobat compatible software and IBM PC compatible format. Discussion with the Corps on the format for the electronic data is mandatory. However, a general guideline is that all photos should be ‘.jpg’ files, and text should be in ‘.pdf’ file formats. All drawings required for this work shall be created using a Computer Aided Design and Drafting (CADD) system.

Savannah District, along with most other USACE districts, has chosen to make Intergraph

MicroStation (and related products) the CADD system of record. Only one drawing should occupy a single file. Drawing files shall be created compliant with the Tri-Service Spatial Data

Standard. (Go to: http://tsc.wes.army.mil for more information).

4.3.3 Photographs

Photographs or slides of the site will not be taken without prior approval by USACE, security and other approving officials. All photographic products will be the property of the government.

The Contractor shall take photographs to document work and to be used by the Environmental

Office. All photographs shall be submitted in a digital format.

4.3.4 Submittal and Document Schedule

The Contractor shall submit to the appropriate USACE personnel the required number of draft and final copies of all deliverables by the deadlines established below.

REPORTING DELIVERABLES DAYS

NO DESCRIPTION

1 Project Milestones (Gantt/WBS) 15 days after Notice to Proceed

(NTP)

2 Draft Work Plan

Final Work Plan

45 days after NTP

Within 14 days of Comments http://tsc.wes.army.mil/

3 Draft APP /SSHP

Final APP /SSHP

45 days after NTP

Within 14 days of Comments

4 Monthly Progress Report Monthly by the 20 th

5 Draft Reports

Final Reports

In accordance with project schedule.

Within 14 days of Comments

4.3.5 Document Distribution

The Contractor shall submit to the appropriate USACE personnel the required number of draft and final copies of all deliverables established below. The Contractor shall submit these documents according to the schedule established in Section 4.3.4. The Contractor shall also submit an electronic copy of all final deliverables.

DELIVERABLE NO. OF

NO. DESCRIPTION COPIES RECIPIENT

1 Project Milestones (Gantt/WBS) 1 paper, 1 electronic

USACE Project Manager

2 Draft Work Plan

Final Work Plan

1 paper, 1 electronic

3 Draft APP/SSHP

Final APP/SSHP

4 Monthly Progress Report 1 paper, 1 electronic

5 Draft Reports

Final Reports

5 TECHNICAL REQUIREMENTS

5.1 Health, Safety, and Emergency Response

5.1.1 General

The Contractor shall be responsible for protecting the lives and health of employees and other persons on the work site; preventing damage to property, materials, supplies, and equipment;

avoiding work interruptions and complying with Occupational Safety and Health Administration

(OSHA) regulations and USACE Safety Manual EM 385-1-1. The Contractor shall perform all operations in a prudent, conscientious, safe, and professional manner and conform to the safety requirements contained in the contract for all activities related to the accomplishment of the work. The Contractor shall provide the KO copies of any OSHA report(s), regarding a project site, submitted during the duration of the delivery order.

The Contractor shall record and report promptly (within 1 hour) by telephone, facsimile or other direct means to the KO or COR, all available facts relating to each instance of damage to

Government property or injury to either Contractor or Government personnel. In the event of an accident/mishap, the Contractor shall take reasonable and prudent action to establish control of the accident/mishap scene, prevent further damage to persons or property, preserve evidence until released by the accident/mishap investigative authority through the KO, and immediately report the incident to the Fire Department at 911. If the government elects to conduct an investigation of the accident/mishap, the Contractor shall cooperate fully and assist government personnel in the conduct of the investigation until the investigation is completed.

The Contractor agrees their personnel and equipment are subject to safety inspections by government personnel while on federal property.

5.1.2 Accident Prevention Plan and Site Safety and Health Plan

The Contractor shall be fully responsible for the administration of health and safety requirements for the project. The Contractor shall prepare an Accident Prevention Plan (APP) and a Site

Safety and Health Plan (SSHP) in accordance with all local, state, and federal regulations. The

APP and SSHP shall be prepared in accordance with the most recent versions of EM 385-1-1, “Safety and Health Requirements Manual”. The APP shall identically follow the outline presented in EM 385-1-1. Any plans other than the SSHP that are required by the APP shall be included unless the information is already covered by the SSHP. The location of information covered in specific plans shall be noted in the APP.

The Contractor shall utilize the services of a Certified Industrial Hygienist (CIH) or Certified

Safety Professional (CSP) experienced in hazardous waste site operations to oversee the development and implementation of the health and safety documents required by this section.

The CIH/CSP shall review and sign all drafts, final, and revised final submittals of the SSHP. If the information made available is insufficient to allow the Contractor to develop these documents, a description of all additional information required shall be prepared and submitted to the USACE PM.

The Work Plan, the APP, and the SSHP shall be submitted for review and comment. Comments shall be provided to the Contractor for discussion and incorporation in the succeeding version(s) of the document. The Contractor shall ensure all necessary certifications and documentation is included in each submittal version and is valid, and shall annotate all comments, including location of any changes. Work shall not begin until the APP and SSHP are accepted. Worker certifications must be submitted no later than 2 weeks prior to initial fieldwork. The Contractor shall maintain documentation supporting training records on site and have the written APP/SSHP on site and available for workers and/or regulatory review.

Due to the possibility that USACE personnel may be visiting the site, the Contractor shall be prepared to provide personal protective equipment (PPE), with the exception of air purifying respirators and safety boots. A minimum of 3 sets of PPE shall be present on site for use by

USACE and Fort Bragg personnel.

5.1.3 Regulatory Requirements

All site investigation activities and health and safety documents required by this PWS shall comply with and reflect the following regulations and appropriate guidance publications, at a minimum:

a. Federal Acquisition Regulation, FAR Clause 52.236-13: Accident Prevention.

b. U.S. Army Corps of Engineers, Safety and Health Requirements Manual, EM 385-1-1, 15 September 2008.

c. U.S. Army Corps of Engineers Safety and Occupational Health Requirements for

Hazardous, Toxic, and Radioactive Waste (HTRW) Activities, ER 385-1-92, 1 May

2007.

d. Occupational Safety and Health Administration (OSHA) Construction Industry

Standards, 29 CFR 1926, General Industry Standards, 29 CFR 1910, especially 29 CFR

1910.120 - Hazardous Waste Site Operations and Emergency Response.

e. NIOSH/OSHA/USCG/EPA, “Occupational Safety and Health Guidance Manual for

Hazardous Waste Site Activities,” October 1985.

f. Other applicable federal, state, and local safety and health requirements.

g. TLVs - Threshold Limit Values and Biological Exposure Indices (current edition), ACGIH (American Conference of Governmental Industrial Hygienists).

h. OSHA, 29 CFR 1910, in general, and specifically Sections .20 and .21 (Health and

Safety Plan); Section .120 (Hazardous Waste Operations and Emergency Response);

Section .134 (Respiratory Protection); and Section .1200 (Hazard Communication

Standard).

5.1.4 Unexploded Ordnance (UXO)

If explosive or chemical agent contamination or unexploded ordnance (UXO) is discovered at any time during operations at any site, the Contractor shall immediately stop operations in the affected areas, mark the location, and notify the USACE PM. Additionally, the Contractor shall take action to secure the work site and protect unauthorized entry thereto. Such action may include, but is not limited to, notification of the security police who will then notify Explosive

Ordnance Disposal (EOD), and the fire department. Once the work has been halted due to the presence or suspected presence of UXO, work shall not commence until notified by the CO after clearance by Explosive Ordnance Disposal personnel. (CDRL A002a) The USACE PM will make arrangements for the evaluation and proper disposal of the device. It is anticipated that, in the unlikely event that such a condition arises, it will be overcome with only a slight delay to the

Contractor. It is the express intention of the USACE that the Contractor is not to drill, excavate, or otherwise disturb the subsurface in areas where ordnance, agent, or explosives may reasonably be suspected.

5.1.5 Health Risks

The Contractor shall immediately report to the KO or the COR, verbally by telephone or e-mail, any issues or incidents which may indicate potential imminent risk to contracted, federal, or local personnel; the public at large; or the environment. Following the verbal or e-mail notification, a written notice with supporting documentation, to include photographic documentation whenever appropriate, shall be prepared and delivered within three (3) working days to the KO.

5.1.6 Fire Prevention and Protection

The Contractor and their employees shall comply with local regulations relating to fire prevention and protection. The Contractor shall coordinate with the local fire department for hot permits (for welding or open flame operations), as required.

6 OPERATIONAL REQUIREMENTS

6.1 Antiterrorism/Operations Security

6 . 1 . 1 AT Level I Training

All contractor employees, to include subcontractor employees, requiring access to Army installations, facilities and controlled access areas shall complete AT Level I awareness training within 30 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee, to the COR or to the contracting officer, if a COR is not assigned, within 30 calendar days after completion of training by all employees and subcontractor personnel. Annual AT Level I

Training is based on the fiscal year as option years are exercised. AT Level I awareness training is available at the following website: https://atlevel1.dtic.mil/at.

6.1.2 AT Awareness Training for Contractor Personnel Traveling Overseas

US based contractor employees and associated sub-contractor employees to make available and to receive government provided area of responsibility (AOR) specific AT awareness training as directed by AR 525-13. Specific AOR training content is directed by the combatant commander with the Installation ATO being the local point of contact.

6.1.3 Access and General Protection/Security Policy and Procedures

Contractor and all associated sub-contractors employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative). The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or

Security Office. Contractor workforce must comply with all personal identity verification requirements as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection

Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.

6.1.4 iWATCH Training

The contractor and all associated sub-contractors shall brief all employees on the local iWATCH program (training standards provided by the requiring activity ATO). This local developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR. This training shall be completed within 30 https://atlevel1.dtic.mil/at calendar days of contract award and within 30 calendar days of new employees commencing performance with the results reported to the COR NLT 30 calendar days after contract award.

6.1.5 Contractor Employees Who Require Access to Government Information Systems

All contractor employees with access to a government info system must be registered in the

ATCTS (Army Training Certification Tracking System) at commencement of services, and must successfully complete the DOD Information Assurance Awareness prior to access to the information systems and then annually thereafter.

6.1.6 For Contracts that Require an OPSEC Standing Operating Procedure/Plan

The contractor shall develop an OPSEC Standing Operating Procedure (SOP)/Plan within 90 calendar days of contract award, to be reviewed and approved by the responsible Government

OPSEC officer, per AR 530-1, Operations Security. This SOP/Plan will include the government’s critical information, why it needs to be protected, where it is located, who is responsible for it, and how to protect it. In addition, the contractor shall identify an individual who will be an OPSEC Coordinator. The contractor will ensure this individual becomes OPSEC

Level II certified per AR 530-1.

6.1.7 For Contracts that Require OPSEC Training

Per AR 530-1, Operations Security, new contractor employees must complete Level I OPSEC training within 30 calendar days of their reporting for duty. All contractor employees must complete annual OPSEC awareness training.

6.1.8 For Information assurance (IA)/information technology (IT) training

All contractor employees and associated sub-contractor employees must complete the DoD IA awareness training before issuance of network access and annually thereafter. All contractor employees working IA/IT functions must comply with DoD and Army training requirements in

DoDD 8570.01, DoD 8570.01-M and AR 25-2 within six months of employment.

6.1.9 For information assurance (IA)/information technology (IT) certification

Per DoD 8570.01-M , DFARS 252.239.7001 and AR 25-2, the contractor employees supporting

IA/IT functions shall be appropriately certified upon contract award. The baseline certification as stipulated in DoD 8570.01-M must be completed upon contract award.

6.1.10 For Contractors Authorized to Accompany the Force

DFARS Clause 252.225-7040, Contractor Personnel Authorized to Accompany U.S. Armed

Forces Deployed Outside the United States. The clause shall be used in solicitations and contracts that authorize contractor personnel to accompany US Armed Forces deployed outside the US in contingency operations; humanitarian or peacekeeping operations; or other military operations or exercises, when designated by the combatant commander. The clause discusses the following AT/OPSEC related topics: required compliance with laws and regulations, pre-deployment requirements, required training (per combatant command guidance), and personnel data required.

6.1.11 For Contract Requiring Performance or Delivery in a Foreign Country

DFARS Clause 252.225-7043, Antiterrorism/Force Protection for Defense Contractors Outside the US. The clause shall be used in solicitations and contracts that require performance or delivery in a foreign country. This clause applies to both contingencies and non-contingency support. The key AT requirement is for non-local national contractor personnel to comply with theater clearance requirements and allows the combatant commander to exercise oversight to ensure the contractor’s compliance with combatant commander and subordinate task force commander policies and directives.

6.1.12 For Contracts That Require Handling or Access to Classified Information

Contractor shall comply with FAR 52.204-2, Security Requirements. This clause involves access to information classified “(Con)fidential,” “(Sec)ret,” or “Top (Sec)ret” and requires contractors to comply with— (1) The Security Agreement (DD Form 441), including the National Industrial

Security Program Operating Manual (DoD 5220.22-M); any revisions to DOD 5220.22-M, notice of which has been furnished to the contractor.

6.2 Work-Site Maintenance

The Contractor shall maintain the work site to prevent the spread of contamination, provide for the integrity of the samples obtained, provide for the safety of all individuals in the vicinity of the work site areas, and prevent the release of any contamination to the environment. The work site shall be well marked to prevent inadvertent entry into all work areas. Access to work areas shall be monitored and thoroughly controlled. Standard work zones and access points for controlled operations shall be established and maintained as the site conditions warrant. Ensure compliance with any federal, state, and local regulations and QA/QC protocols and procedures for decontaminating tools, equipment, or other materials, as required. At all times, keep the work area free from accumulation of waste and non-essential hazardous materials. Remove non-essential equipment from the work site when not in use. The work-site shall be maintained to present an orderly appearance and to maximize work efficiency. Before completing the work at each work location, remove, from the work premises, any rubbish, tools, equipment, and materials that are not the property of the government. Properly dispose of all investigation derived, construction debris, and other waste(s). Upon completing the work, leave the area clean, neat, orderly, and return the work site(s) to an appropriate condition.

6.3 Minimize Impacts to Existing Operations

The installation POC and the COR shall be consulted to minimize the disruption of installation activities and minimize disruption of natural and cultural resources. All necessary permits and coordination shall be completed prior to commencement of individual sampling operations.

Frequent communication and coordination with installation personnel shall be necessary to accomplish these goals.

6.4 Storage

The Contractor shall be responsible for security and weatherproofing of stored material and equipment. Equipment or materials used in the work, requiring storage on the installation, shall be placed at site(s) designated by the DPW. At the completion of the work, the Contractor shall remove all temporary fences and structures (used to protect materials and equipment) from the installation unless otherwise directed by the KO. The Contractor shall clean the storage area of all debris and material and perform repairs as required to return the site to its pre-use condition.

The Contractor shall be responsible for safeguarding all government property provided for

Contractor use. The Contractor shall maintain an inventory of government property, a copy of government property control procedures at the site, and dispose of government property as directed by the KO. All hazardous materials shall be handled, stored, labeled, and transferred in accordance with OSHA regulations and Ft. Bragg policies.

6.5 Key Control

The Contractor shall establish and implement methods of ensuring that all keys issued to the

Contractor by the government are not lost or misplaced and are not used by unauthorized persons. Keys issued shall not be duplicated.