15R03vol1.pdf
PDF 8 MB Posted
- Solicitation number
- W912HN-15-R-0003
About this file
SPEC Vol 1 Amd 2
View the file
Other files
| File | Type | Posted |
|---|---|---|
| amd5.pdf | ||
| 15R03vol1.pdf | ||
| 15R03vol1.pdf | ||
| amd4.pdf | ||
| 15R03vol1.pdf | ||
| amd3.pdf | ||
| 15R03vol2.pdf | ||
| W912HN-15-R-0003_AMD3.PDF | ||
| Amd2.pdf | ||
| 15R03vol2.pdf | ||
| 15R03vol1.pdf | ||
| amd1.pdf | ||
| W912HN-15-R-0003_AMD1.PDF |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Robins AFB, Georgia
Solicitation Number
W912HN-15-R-0003
Replace Hydrant Fuel System Volume 1 of 2: Procurement and Contracting Requirements and Specification Division 01 March 2015
This project is being solicited on an unrestricted basis and offered as full and open competition, but contains Hubzone Price Evaluation Preference.
U.S. ARMY ENGINEER DISTRICT, SAVANNAH
CORPS OF ENGINEERS
100 WEST OGLETHORPE AVENUE
SAVANNAH, GEORGIA 31401-3640
US Army Corps of Engineers Savannah District
Replace Hydrant Fuel System 15R03 Robins AFB, GA
PROJECT TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00 SUMMARY OF WORK
01 32 01.00 10 PROJECT SCHEDULE
01 33 00 SUBMITTAL PROCEDURES
01 33 23.33 AVIATION FUEL SYSTEM SPECIFIC SUBMITTAL REQUIREMENTS
01 35 13 SPECIAL PROJECT PROCEDURES
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00.00 10 QUALITY CONTROL
01 45 00.10 10 QUALITY CONTROL SYSTEM (QCS)
01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS
01 57 20.00 10 ENVIRONMENTAL PROTECTION
01 57 23 TEMPORARY STORM WATER POLLUTION CONTROL
01 62 35 RECYCLED/RECOVERED/BIOBASED MATERIALS
01 74 19 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT
01 78 00 CLOSEOUT SUBMITTALS
01 78 23.33 OPERATION AND MAINTENANCE MANUALS FOR AVIATION FUEL
SYSTEMS
01 78 23 OPERATION AND MAINTENANCE DATA
DIVISION 02 - EXISTING CONDITIONS
02 41 00 DEMOLITION
DIVISION 03 - CONCRETE
03 30 53 MISCELLANEOUS CAST-IN-PLACE CONCRETE
DIVISION 05 - METALS
05 50 13 MISCELLANEOUS METAL FABRICATIONS
05 59 10 ROLLING COVER FOR AVIATION REFUELING VAULTS
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 84 00 FIRESTOPPING
DIVISION 09 - FINISHES
09 97 13.27 EXTERIOR COATING OF STEEL STRUCTURES
DIVISION 26 - ELECTRICAL
26 20 00 INTERIOR DISTRIBUTION SYSTEM
26 42 17.00 10 CATHODIC PROTECTION SYSTEM (IMPRESSED CURRENT)
DIVISION 31 - EARTHWORK
31 00 00 EARTHWORK
31 32 11 SOIL SURFACE EROSION CONTROL
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 01 19 FIELD MOLDED SEALANTS FOR SEALING JOINTS IN RIGID
PAVEMENTS
32 05 33 LANDSCAPE ESTABLISHMENT
PROJECT TABLE OF CONTENTS Page 1
Replace Hydrant Fuel System 15R03
32 11 23 AGGREGATE BASE COURSE
32 11 36.13 LEAN CONCRETE BASE COURSE
32 12 10 BITUMINOUS TACK AND PRIME COATS
32 12 15.13 HOT-MIX ASPHALT AIRFIELD PAVING
32 13 11 CONCRETE PAVEMENT FOR AIRFIELDS AND OTHER HEAVY-DUTY
PAVEMENTS
32 13 73 COMPRESSION JOINT SEALS FOR CONCRETE PAVEMENTS
32 17 24.00 10 PAVEMENT MARKINGS
32 92 19 SEEDING
32 92 23 SODDING
DIVISION 33 - UTILITIES
33 01 50.01 CLEANING FUEL STORAGE TANKS
33 05 23.13 UTILITY HORIZONTAL DIRECTIONAL DRILLING
33 08 53 AVIATION FUEL DISTRIBUTION SYSTEM START-UP
33 09 53 AVIATION FUEL PUMP CONTROL AND ANNUNCIATION SYSTEM
33 52 43.11 AVIATION FUEL MECHANICAL EQUIPMENT
33 52 43.13 AVIATION FUEL PIPING
33 52 43.14 AVIATION FUEL CONTROL VALVES
33 52 43.23 AVIATION FUEL PUMPS
33 52 43.28 FILTER SEPARATOR, AVIATION FUELING SYSTEM
33 52 80 LIQUID FUELS PIPELINE COATING SYSTEMS
33 58 00 LEAK DETECTION FOR FUELING SYSTEMS
33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 2
W912HN-15-R-0003-0002
DLA Replace Hydrant Fuel System Project# DESC1353 Robins AFB, GA
Claxton Fallen claxton.t.fallen@usace.army.mil
(912) 652-6046
This project is being solicited on an unrestricted basis and offered as full and open competition, but contains Hubzone Price Evaluation Preference.
This procurement is being solicited and procured utilizing the Best Value Trade-Off methodology in accordance w ith FAR Part 15.101-1.
The proposal of the successful Offeror shall be incorporated by reference upon aw ard of the contract.
The magnitude of construction is more than $10M-$25M.
CLAXTON T FALLEN 912-652-6046
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
12-Mar-2015
(RFP)
(IFB)
X
CALL:
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
See Item 7
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________720 calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
X YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________0 copies to perform the w ork required are due at the place specified in Item 8 by ___________ local time ______________17 Apr 2015 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee X is, is not required.
C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______90 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
U.S. ARMY ENGINEER DISTRICT, SAVANNAH
100 WEST OGLETHORPE AVE
SAVANNAH GA 31401-3640
W912HN
PAGE OF PAGES
1 OF
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
02:00 PM (hour)
Sealed envelopes containing offers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
8. ADDRESS OFFER TO (If Other Than Item 7)
FAX:TEL: TEL: FAX:
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .
gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(M ust be fully completed by offeror)OFFER
Section 00 10 00 - Solicitation, Contract Line Item Number (CLIN) Schedule
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Job Base Bid: Replace Hydrant,FFP
Loop Piping Including Vents and Drains, Complete FOB: Destination
NET AMT
0002 1 Job Base Bid: Construct 12 Hydrant Pits,FFP
Complete
0003 1 Job Base Bid: Pumphouse 2089 ModificationsFFP
Complete
0004 1 Job Base Bid: Airfield Pavement RemovalFFP
And Replacement, Complete
0005 911 Cubic
Yard
Base Bid: Removal and Off-Site DisposalFFP Contaminated Soils
0006 1 Job Base Bid: Site Preparation & DevelopmentFFP
Including Demolition, Complete All Other Work Required to Complete Base Project
0007 1 Job OPTION Option 1: Construct 3 Additional HydrantFFP
Pits (Positions 27, 36, 37), Complete
0008 1 Job OPTION Option 2: Construct 1 Additional HydrantFFP
Pit (Position 32), Complete
0009 850 Cubic
Yard
OPTION Option 3: Removal and Off-SiteFFP Disposal of Contaminated Soils
0010 100,000 Gallon OPTION Option 4: Storage and Off-SiteFFP
Disposal of Contaminated Groundwater
DLA Replace Hydrant Fuel System, Project No. DESC1353, Robins Air Force Base, GA
Section 00 20 00 - Instructions for Procurement
INSTRUCTIONS FOR PROCUREMENT
ADDITIONAL NOTES TO OFFERORS:
1. Offerors must insert a price on all numbered items of the CLIN Schedule. Failure to do so may result in the offer being unacceptable.
2. General Decision Number: GA85 – Dated 02/06/2015 applies to this contract. The Wage Decision may be subject to change prior to award. All proposed pricing shall include the most current wage rates. All Offerors are encouraged to review wage rates established by the Department of Labor prior to submitting proposals.
3. QUALITY CONTROL SYSTEM (QCS): Any contract award resulting from this solicitation will require the mandatory use of the automated Quality Control System.
4. SECURITY REQUIREMENTS: Increased security at military installations may require vehicle and personnel registration, as well as 100% ID checks and random vehicle searches.
5. TECHNICAL MATTERS:
Technical inquiries are to be submitted via Bidder Inquiry in ProjNet at www.projnet.org/projnet. All questions regarding this Request for Proposal (RFP) must be submitted in writing via Bidder Inquiry in ProjNet within no less than 10 calendar days prior to the date established in the RFP for receipt of proposals. The Government reserves the right to decline addressing questions received less than 10 calendar days prior to receipt of proposals.
If an Offeror believes the requirements in this Request for Proposal contain an error, omission, or are otherwise unsound, the Offeror shall immediately notify the Contract Specialist in writing with supporting rationale. The Offer is reminded that the Government reserves the right to award this Request for Proposal based on the initial proposal, as received, without discussion.
To submit and review bid inquiry items, Offerors will need to be a current registered user or self-register into the system. To self-register, go to web page, click BID tab, select Bidder Inquiry, select agency USACE, enter Key for this solicitation listed below, your e-mail address, and click login. Fill in all required information and click create user. Verify all information on the next screen is correct and click continue. From this page you may view all bidder inquiries or add inquiry.
Offerors will receive an acknowledgement of their question via e-mail, followed by an answer to their question after it has been processed by our technical team.
W912HN-15-R-0003
Replace Hydrant Fuel
Project No. DESC1353
Bidder Inquiry Key: 76Y7X6-I3XJKB
Section 00 21 00 - Instructions
INSTRUCTIONS
PROPOSAL SUBMISSION REQUIREMENTS AND INSTRUCTIONS
1. OVERVIEW.
1.1 This Request for Proposal (RFP) solicits for construction to Replace Hydrant Fuel System – Bldg 2089 @ Robins Air Force Base, Georgia. This will be a Firm-Fixed Price (FFP) contract.
1.2 The purpose of the Source Selection Plan is to establish a uniform evaluation procedure for the technical evaluation of proposals by the Source Selection Evaluation Board (SSEB) and the development of the Best Value Decision by the Procuring Contracting Officer (PCO) using the Trade-Off Process (See Federal Acquisition Regulation 15.101-1). Inasmuch as the proposal shall describe the capability of the Offeror to perform any resulting contract, the proposal should be specific and complete in every detail, as well as, be prepared simply and economically providing a straightforward and concise description of capabilities to satisfactorily perform the contract issued thereafter.
1.3 For the purposes of this solicitation, the Government will utilize a Best Value Trade-off Process. In this process, interested Offerors submit certain specified performance and capability proposals in conjunction with a pricing schedule for review and consideration by the Government. The Government will evaluate these performance capability proposals in accordance with the criteria described herein.
2. GENERAL INSTRUCTIONS
2.1 Who May Submit: Any legally organized firm may submit a proposal.
2.2 Contractor Team Arrangements. Contractor Team Arrangements are considered an arrangement in which (1) two or more companies form a partnership or joint venture to act as a potential prime contractor; or (2) a potential prime contractor agrees with one or more other companies to have them act as its subcontractors under a specified Government contract or acquisition program. In accordance with FAR Subpart 9.6, the Government will recognize the integrity and validity of contractor team arrangements; provided, the arrangements are identified and company relationships are fully disclosed in the offer. The Offeror shall identify the major or critical aspects of the requirement to be performed by those identified in the Contractor Team Arrangement. The submission must contain a narrative that clearly explains the relevance to a particular factor of information concerning a company that is part of a Contractor Team Arrangement. The Government will consider the adequacy of this explanation in deciding the relevance of the information to this procurement. Any narrative provided should be incorporated into the Offeror’s proposal at Tab H.
2.3 Notwithstanding the specific requirements of any other area of the RFP, information submitted about any company other than the Offeror, whether a predecessor company, affiliated company, subsidiary (including wholly owned subsidiaries), or subcontractors that will perform major or critical aspects of this requirement, or other associated business, WILL NOT be evaluated for any factor unless the proposal contains a detailed narrative explaining why this submitted information is relevant to this acquisition. The Government will consider the adequacy of this explanation in deciding the relevance and weight, if any, of the information to this procurement. Where information about a subcontractor is properly submitted and given significant weight during the evaluation, the failure of the Offeror to actually perform with that subcontractor may be grounds for termination for default. Any narrative provided should be incorporated into the Offerors proposal at Tab H.
2.4 Offerors shall submit their proposal in accordance with paragraph 3.
2.5 Proposals are due no later than the time and date specified in paragraph 3.
3. PROPOSALS
ELECTRONIC PROPOSAL SUBMISSION IS REQUIRED THROUGH THE WEBSITE
LISTED BELOW. ELECTRONIC SUBMISSION SENT VIA EMAIL OR FACSIMILE WILL
NOT BE ACCEPTED. HAND CARRIED PROPOSAL SUBMISSION IS NOT
AUTHORIZED.
DIRECTIONS FOR SUBMITTING PROPOSALS
In an effort to reduce paperwork and reduce cost, all proposals shall be submitted electronically.
All submissions shall be in Adobe PDF format. The Price Proposal and Technical Proposal shall be submitted as “separate” single files. Offerors may use compressions utility software such as WinZip or PKZip to reduce file size and facilitate transmission.
Title the file(s) in the following format:
W912HN-15-R-0003_COMPANY NAME_VOLUME I
W912HN-15-R-0003_COMPANY NAME_VOLUME II
Submit the Price and Technical proposals electronically via the AMRDEC SAFE website at:
https://safe.amrdec.army.mil/safe/.At the AMRDEC SAFE website select the link: I do not have a CAC or this machine is not configured to read my CAC and I would like to access SAFE as a Guest User, to register, access the site and submit your proposal(s). [Note: It has been reported that documents are more quickly uploaded into the AMRDEC SAFE website when using a Firefox web browser. The Government cannot verify that this is true and offers no guarantee that Offerors will have more success utilizing any particular browser.]
When your proposal is submitted via the AMRDEC SAFE website, the website will provide notification of the submittal to the Government recipients. When completing the information for transmittal at the AMRDEC SAFE website, you will be required to enter e-mail addresses for the recipients. For this solicitation, the recipients will be the Contracting Officer and Contract Specialist. The Contract Specialist for this project is MAJ Claxton T. Fallen, whose e-mail address is claxton.t.fallen@usace.army.mil. The Contracting Officer for this project is Ms. Nina
Crow, whose e-mail address is nina.g.crow@usace.army.mil. These e-mail addresses are the ones you will enter as recipients.
In addition, after uploading your documents, you will be required to verify your email address before AMRDEC will send notification to the Government recipients. This is a very important step – even if you successfully upload your proposal to AMRDEC SAFE, notification will not be sent to the Government until you verify your email address, which may result in the rejection of your proposal for lateness. Follow the instructions on the AMRDEC website and the confirmation emails you receive from AMRDEC.
Proposal Due Date and Time:
Request For Proposal No: W912HN-15-R-0003 Due Date of Proposal: 22 April 2015 Time by which Proposals are Due: 2:00 P.M. (Eastern Time)
Title of Project: Replace Hydrant Fuel System Bldg 2089 Robins Air Force Base, GA
The date and time of delivery will be established by the time of receipt of the e-mail notification to the Contract Specialist and Contracting Officer by the AMRDEC SAFE website, not by the date and time of uploading of the proposal into the AMRDEC SAFE website. Do not assume that electronic communication is instantaneous – in fact, it can take several minutes or even hours in some cases. Please make allowances for delays in transmittal. If an electronic submission is uploaded minutes before the deadline but notification is not actually received in the recipients’ e-mail inboxes until after the deadline, the submission will be considered late.
The Government will not be responsible for proposals delivered to any location or to anyone other than those designated to receive proposals on its behalf. Offerors are responsible for ensuring that proposals are submitted so as to reach the designated recipient of proposals.
Offerors are responsible for allowing sufficient time for the proposal to be received in accordance with the instructions provided.
3.2 Tabs. Proposal shall be organized and tabbed as follows:
VOLUME I: Price Proposal
TAB A – Standard Form 1442, completed and signed by authorized individual(s) of the Offeror.
Offers submitted in the name of a Joint Venture must be signed in accordance with the terms and conditions specified in the joint venture agreement as evidenced in the proposal.
TAB B – Section 00 10 00 – Proposal Pricing Schedule
TAB C - Section 00 45 00 – Representations and Certifications. For Offerors interested in submitting proposals as a Service Disabled Veteran Owned Small Businesses, you are requested to submit the Department of Veteran Affairs Verification Letter verifying that your business has been approved as such and added to the verified Veteran business database at www.VetBiz.gov.
The Government reserves the right to rely on other sources to confirm SDVOSB status if the Offeror has not been approved through the VA.
TAB D – Proposal Data Sheet – See Attachment 1 provided at the end of this section. Offerors should ensure telephone number, fax number, e-mail address and DUNS number are all included. The DUNS number provided will be used to access Past Performance Information Retrieval System (PPIRS) data. Offerors should also provide any other assigned number that identifies them in the PPIRS database. If a separate DUNS has been created for a joint venture (J-V) it must be submitted. A DUNS number shall also be provided for each company identified in any other proposed association of firms or Contractor Team Arrangement. The Offeror should also submit their Tax ID number on the proposal data sheet.
TAB E – Bid Bond – In accordance with FAR Clause 52.228-1, Bid Guarantee, Offerors are required to submit an original bid bond, in accordance with these instructions and by the time and date established for the receipt of proposals. The Bid Guarantee shall be 20% of the bid price or $3 Million, whichever is less. Bid bonds must be submitted in original form and contain original signatures. Photocopied, facsimile, scanned or otherwise mechanically reproduced bid bonds will not be accepted. Failure to submit a proper bid bond shall be cause for rejection of an Offeror's proposal.
ELECTRONIC BID BOND SUBMISSION, TO INCLUDE E-MAIL AND FACSIMILE
TRANSMISSIONS IS NOT AUTHORIZED.
HANDCARRIED BID BOND SUBMISSIONS, except for delivery by Federal Express and United Parcel Service, IS NOT AUTHORIZED.
Bid Bonds must be delivered by U.S. Mail, including U.S. Express Mail, Federal Express or United Parcel Service. All Bid Bonds must be clearly identified with the contractor's name and address. To ensure timely and proper handling, the lower left corner of the outermost wrapper should indicate the following:
Request For Proposal No: W912HN-15-R-0003 Due Date of Proposal: 22 April 2015 Time by which Proposals are Due: 2:00 P.M. (Eastern time) Title of Project: Replace Hydrant Fuel System - Bldg 2089
Robins Air Force Base, GA
The original bid bond must be addressed to:
U.S. ARMY ENGINEER DISTRICT, SAVANNAH
ATTN: CECT-SAS-E (MAJ Claxton Fallen)
100 WEST OGLETHORPE AVE.
SAVANNAH, GA 31401
The date and time of delivery established by commercial carriers is not the official time of receipt by the Government. Security Guards posted at the loading dock entry for the building do not receive bid bonds and will contact Mailroom personnel. Once Mailroom personnel are available, the bid bonds will be processed by the Security Guards using established security procedures and subsequently picked up by Mailroom personnel. After receipt by the Mailroom personnel, a record will be made of the receipt of the bid bonds. Completion of these actions will constitute delivery of the bid bonds by the date and time designated for receipt of the bid bonds.
Offerors that use U.S. Mail or U.S. Express Mail must allow sufficient time for the bid bonds to be received by Mailroom personnel by the time specified. Offerors are responsible for allowing sufficient time for the bid bonds to be processed for receipt and are cautioned that sufficient time may be as much as 24 hours prior to the date and time designated. The Government will not be responsible for bid bonds delivered to any location or to anyone other than those designated.
Offerors are responsible for ensuring that bid bonds are submitted so as to reach the office designated for receipt. Offerors are responsible for allowing sufficient time for the bid bonds to be physically received and processed by Mailroom personnel in accordance with the information provided.
TAB F – Financial Information (e.g. the last three years financial statement, Annual Reports, Dun and Bradstreet ratings and/or number, etc.), a bank reference, and a letter from your company on company letterhead authorizing the release of financial information from your bank, with point of contact and telephone numbers for verification. Provide a list of all current contracts held, total dollar value, award date, anticipated completion, performance and payment bond amount.
TAB G – Subcontracting Plan – FOR LARGE BUSINESS OFFERORS ONLY. Subcontracting Plan shall be prepared in accordance with FAR 52.219-9, and SBA’s Electronic Subcontracting Reporting System (eSRS) located at http://esrs.gov . Instructions for completion of requisite forms, as well as guidance on coordinating and preparing for all compliance reviews by Federal agencies can be found at this website. Offerors are to ensure subcontractors agree to submit to ESRS. Savannah District’s assigned subcontracting goals are as reflected in Local Clause, Subcontracting Plan for Small Business.
TAB H – Teaming Agreements and Narratives, if applicable (See paragraph 2.2 and 2.3).
VOLUME II: Technical Proposal
TAB H –Teaming Agreement (Duplicate of Volume I)
TAB I– FACTOR 1 Past Performance
TAB J – FACTOR 2 Relevant Specialized Experience
TAB K – FACTOR 3 Small Business Participation Plan
4. TAB I - FACTOR 1 – PAST PERFORMANCE
4.1 SUBMISSION REQUIREMENTS.
4.1.1 The Offeror shall demonstrate a record of performance on recent relevant projects using the Past Performance Questionnaire Summary Sheet, Attachment 2 and the Past Performance Questionnaire, Attachment 3 at the end of this section. The Past Performance Questionnaire (PPQ) is provided for the Offeror or its team members to submit to the client (Point of Contact) for each relevant project submitted. Offeror must ensure correct phone numbers and email addresses are provided for the client. Completed PPQs must be submitted with your proposal by the specified closing date and time. Offerors should follow-up with clients/references to ensure timely submittal of questionnaires. If the Offeror is unable to obtain a completed PPQ from a point of contact for a project(s) before proposal closing date, the Offeror shall complete blocks 1-5 of the PPQ and submit the first page of the PPQ with the proposal which will provide contract and client information and must contain sufficient information for the government to determine the relevancy of the project. The Government may call and confirm information provided by the Offeror on the PPQs with the points of contact, to the extent necessary to verify the information in the PPQ or to obtain additional information.
The Government reserves the right to interview other individuals if the point of contact is not available. By exception, the client may request to submit questionnaires directly to the Government’s point of contact, MAJ Claxton T. Fallen via email at claxton.t.fallen@usace.army.mil, prior to proposal closing date. This request must be coordinated by the client in advance not later than 5 business days before the proposal due date.
PPQ’s submitted directly to the Contract Specialist shall be mailed via traceable means (certified US Mail, FedEx, or UPS). If the PPQ fails to arrive before the closing date and time, or if the information on the PPQ is insufficient to determine the Offeror name and appropriate solicitation number, it will not be considered. Project Information submitted in a format other than or in lieu of the PPQ will not be considered. If there is insufficient space on the PPQ form to provide the information required by section 4.2.2. below, Offerors may attach a single 8 ½” x 11” continuation page with no less than 1” margins and no smaller than 12 point font to each PPQ, to list the required information. Offerors shall not incorporate by reference into their proposal PPQs previously submitted for other RFPs. However, this does not preclude the Government from utilizing previously submitted PPQ information in the past performance evaluation.
Offerors may submit PPQ’s submitted on other procurements.
In addition to the PPQ, the Offeror’s proposal shall include the Past Performance Questionnaire Summary Sheet (Attachment 2) to provide a summary of the PPQs included and/or submitted to clients. The summary sheet at a minimum shall include the following: 1) Project name; 2) Team member submitting the project; 3) Contract Number; 4) % Completion at the time of solicitation;
and 5) Completion date.
Offerors should identify state and local government and private contracts that are similar to the Government’s requirements described in 4.2.2. If the Offeror is a joint venture, each firm shall provide information, demonstrating experience relevant to their expected role on this contract. If any firm has multiple functions or divisions, limit the project examples to those performed by the division, unit or team member submitting the offer.
4.1.2. Offerors shall submit no more than five (5) PPQs (Attachment 3). Project information shall be limited to the PPQ (and continuation sheets attached in accordance with paragraph 4.1.1 above, if utilized). Where a project was awarded as a task order or delivery order under an IDIQ type contract, Offerors are cautioned to submit information specific to the instant task or delivery order considered relevant to the requirements of this RFP, rather than the umbrella contract. For purposes of this Request for Proposal, if the Offeror represents the combining of two or more companies in a Contract Team Arrangement as defined in paragraph
2.2 above, no more than five (5) total project examples may be submitted for the entire team. If an Offeror submits more than five (5) total project examples, only the first five (5) will be evaluated. Offerors are advised to submit projects wherein the Offeror, or proposed team members, played a significant role and to clearly define those roles.
4.1.3 If any firm has multiple functions or divisions, limit the project examples to those performed by the division, unit or team member submitting the offer.
4.1.4 While the Government may elect to consider data from other sources, the offeror must provide detailed, current, accurate and complete past performance information for evaluation by the Government.
4.1.5 See section 4.2.2 below for additional Submission Requirements.
4.2 EVALUATION CRITERIA.
4.2.1 Past Performance Evaluation. The past performance evaluation results in an assessment of the Government’s confidence in the ability of the Offeror to meet the solicitation requirements.
The past performance evaluation considers each Offeror’s demonstrated record of performance on recent and relevant projects that involve a similar scope and magnitude of effort and complexities as this solicitation requires. One performance confidence assessment rating is assigned for each Offeror after evaluating the Offeror’s recent past performance, focusing on performance that is relevant to the contract requirements.
4.2.2 Relevancy Evaluation: Aspects of relevant projects include similarity of scope, type of work, complexity, contract type, and the degree of subcontracting or teaming proposed by the Offeror. Projects will be evaluated using, but not limited to, the characteristics identified below.
The characteristics identified are not intended to be a comprehensive list. The project description in block 4 of the PPQ shall include the characteristics of the projects.
4.2.2.1 Project Characteristics: Project will include constructing a pressurized Type III hydrant fuel system with 16 hydrant outlets, pumphouse modification to provide roughly 151 liter-per-second (2,400 gallon per minute) pumping capacity, fuel filter separators, upgraded electrical system and automatic controls, and emergency generator. It will contain hydrant loop piping system with leak detection, cathodic protection, and pigging system. Work includes site preparation and improvements, airfield pavements, drainage control, supporting utilities, and physical security measures. Demolish or decommission the existing hydrant system outlets, lateral control pits, piping and supporting infrastructure. Project includes remediation of fuel contaminated soil funded by other appropriations.
4.2.2.2 Offerors should demonstrate experience similar to the work described in paragraph
4.2.2.1. In the project descriptions on the PPQs, Offerors should clearly demonstrate relevant experience on projects that are similar in function, size, scope and complexity to the project under this solicitation. Similar types of experience areas that are considered especially relevant include Replacing Hydrant Fuel System, Purge and Abandon existing fuel lines, Installation/Removal of concrete/asphalt for airfields, utilities, Hydrant Loop Piping, Installation of hydrant pits, electrical system and automatic controls, fuel filter separators, pumphouse construction/renovation, high point vent assembly, low point drain assembly, and site improvements includes removal/replace of pavements concrete and asphalt, provide all support facilities (utilities, and grounding) for Type III Fuel Systems or facilities similar to those noted above. Each project cited shall have a construction dollar value greater than $10.0 Million and have been completed, or at least 80% complete, within five (5) years from the date the proposal is due.
Failure to include all the requested information may hinder the evaluation board’s ability to determine the relevance of the project and, consequently, lead to a lower confidence rating in this factor.
4.2.3 The Government will not consider multiple projects, such as individual task orders, combined to meet the minimum value.
4.2.4 Relevancy Ratings. Using the criteria described in paragraph 4.2.2 above, the Government will determine the relevancy of the projects submitted and assign one of the following relevancy ratings to each project.
Past Performance Relevancy Ratings.
Ratings Definitions Very Relevant Present/past performance effort involved essentially the same scope and magnitude of effort and complexities this solicitation requires.
Relevant Present/past performance effort involved similar scope and magnitude of effort and complexities this solicitation requires.
Somewhat Relevant
Present/past performance effort involved some of the scope and magnitude of effort and complexities this solicitation requires.
Not Relevant Present/past performance effort involved little or none of the scope and magnitude of effort and complexities this solicitation requires.
4.2.5 Confidence Assessment. The past performance record will be evaluated to determine how well the contractor performed on past projects, focusing on performance that is relevant to the contract requirements.
4.2.6 The Government will evaluate the Offeror’s past performance using the sources available to it including, but not limited to, the example projects identified by the Offeror and submitted on the PPQs and any additional information received from references and CPARS or other sources. Offerors may be provided an opportunity to address any negative past performance information about which the Offeror has not previously had an opportunity to respond if such information is determined to impact the rating to be assessed.
4.2.7 Evaluation of the Offeror and Its Proposed Team Members.
4.2.7.1 The Government will consider past performance of the prime construction contractor. If a firm has multiple functions or divisions, the Government will only evaluate the past performance of the unit or division submitting the offer.
4.2.7.2 The Government may also consider the past performance information submitted on any other team member, depending on the adequacy of the proposal in describing the role the proposed team member performed in projects submitted, and the role the proposed team member will perform in the contract resulting from this solicitation (see paragraphs 2.2 and 2.3).
4.2.7.2.1 The consideration and weight given to past performance information for team members other than the prime contractor will be based on the extent of involvement of the team member in the projects submitted and the adequacy of the description of such involvement in the proposal. Past performance information submitted for a team member who did not perform a significant role on the projects submitted or whose role has not been clearly or adequately described may be given little weight or possibly, not even considered.
4.2.7.2.2 If it is not clear that the team member will perform a significant role in the performance of this contract, past performance information for that team member may be given less consideration and weight. Where the Government views an Offeror’s role, or that of its team members, if any, as not significant or as not clearly defined, the Government reserves the right to view this lack of involvement, or clarity, as affecting the determination of relevancy and the usefulness of the information in determining a confidence rating despite the quality of recent, relevant past performance information.
4.2.7.3 Offerors are advised that if projects by team members are submitted for evaluation under this factor, Blocks 2 and 4 of the PPQ (and any continuation page, as allowed by paragraph 4.1.1 above) should describe, in detail, the roles and work performed by those team members.
Offerors are further advised to utilize narratives to describe, in detail, the roles that will be performed by team members on the project being solicited (see paragraph 2.2 and 2.3).
4.2.8 Other Sources. In addition to the above, the Government may review any sources other than those provided by the Offeror for evaluating past performance. These other sources may include, but are not limited to, past performance information retrieved through the Past Performance Information Retrieval System (PPIRS), including Contractor Performance Assessment Reporting System (CPARS), using all CAGE/DUNS numbers of team members
(partnership, joint venture, teaming arrangement, or parent company/subsidiary/affiliate) identified in the proposal on the Proposal Data Sheet, inquiries of owner representative(s), Federal Awardee Performance and Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), and any other known sources not provided by the offeror.
The Government will also consider available CPARS ratings on relevant projects submitted by the Offeror under this factor and may consider up to five (5) additional CPARS ratings on recent, relevant projects as needed to evaluate past performance for any team member.
4.2.9 Rating Methodology for Factor 1. The Government will consider the relevant past performance information, source of this information, context of the data, and general trends in contractor performance on recent projects to reach a performance confidence assessment using the ratings in 4.2.11.
4.2.10 If no recent/relevant performance record is available, or the Offeror’s performance record is so sparse that no meaningful confidence assessment rating can be reasonably assigned, this factor will be assigned a rating of “Unknown Confidence (Neutral).
4.2.11 Past Performance Confidence Ratings
4.2.11.1 SUBSTANTIAL CONFIDENCE - Based on the Offeror’s recent/relevant performance record, the Government has a high expectation that the Offeror will successfully perform the required effort.
4.2.11.2 SATISFACTORY CONFIDENCE - Based on the Offeror’s recent/relevant performance record, the Government has a reasonable expectation that the Offeror will successfully perform the required effort.
4.2.11.3 LIMITED CONFIDENCE - Based on the Offeror’s recent/relevant performance record, the Government has a low expectation that the Offeror will successfully perform the required effort.
4.2.11.4 NO CONFIDENCE - Based on the Offeror’s recent/relevant performance record, the Government has no expectation that the Offeror will successfully perform the required effort.
4.2.11.5 UNKNOWN CONFIDENCE (NEUTRAL) - No recent/relevant performance record is available or the Offeror’s performance record is so sparse that no meaningful confidence assessment rating can be reasonably assigned.
5. TAB J—FACTOR 2- RELEVANT SPECIALIZED EXPERIENCE
5.1 REQUIREMENTS:
5.1.1 The Government will review the projects submitted by the Offeror in Factor 1 to evaluate and rate the recent, relevant specialized experience of the Offeror in performing similar projects.
Specialized experience is considered construction of fuel/POL system projects which include work such as or similar to replacing hydrant fuel systems to include Carbon coated or Stainless Steel hydrant loop piping, including excavation and backfill, plot and frame, pipe testing, x-rays welds, construction of hydrant pits which includes concrete pits with waterproofing, walls and slab, rebar reinforcing, aggregate base course placement, high point vent assembly, low point drain assembly, utilities, cathodic protection, emergency generators, leak detection, fuel filter separators, gauging systems, pressurized hydrant fuel systems, placement of concrete and asphalt pavement, demolition of all necessary items for construction, purging and abandoning fuel lines, and ability to stockpile soil for contamination testing and possible disposal, and sodding. The experience requirement may be satisfied by demonstrating that any intended subcontractor with a significant role in performing the contract requirements has the requisite experience, provided that: (1) the proposal adequately describes the role(s) the subcontractor(s) will perform in meeting the Government’s requirements (see paragraphs 2.2, 2.3 and section 4.2.7), and (2) there is a signed teaming agreement with the subcontractor(s) who will perform the significant role(s).
5.1.2 Submission Requirements
5.1.2.1 The Government will evaluate those projects submitted for Factor 1 and any other projects considered in the evaluation of Factor 1. The relevancy and submission guidelines set forth in Factor 1 apply to Factor 2.
5.2 EVALUATION
5.2.1 The Government will evaluate whether the Offeror has performed projects similar to those described in 4.2 and its sub paragraphs and 5.1.1. The Government will review the construction projects provided by the Offeror for Factor 1 to evaluate the experience of the Offeror with similar projects. Projects will be evaluated for this factor only if they have been determined to be at least "Somewhat Relevant" as defined in paragraph 4.2.4. This will include the experience of team members, subject to paragraph 5.1.1 above. The Government will evaluate the relevance, quality and amount of the Offeror’s experience. The quantity of relevant experience demonstrated by the Offeror will affect the rating for this Factor. If the Offeror cannot demonstrate relevant experience or the offeror has no relevant experience, the offeror may receive a rating of “unacceptable.”
5.2.2 Rating Methodology for Factor 2. Factor 2 will be rated using the following adjectival descriptions.
5.2.2.1 OUTSTANDING - Proposal meets requirements and indicates an exceptional approach and understanding of the requirements. Strengths far outweigh any weaknesses. Risk of unsuccessful performance is very low.
5.2.2.2 GOOD - Proposal meets requirements and indicates a thorough approach and understanding of the requirements. Proposal contains strengths which outweigh any weaknesses.
Risk of unsuccessful performance is low.
5.2.2.3 ACCEPTABLE - Proposal meets requirements and indicates an adequate approach and understanding of the requirements. Strengths and weaknesses are offsetting or will have little or no impact on contract performance. Risk of unsuccessful performance is no worse than moderate.
5.4.2.4 MARGINAL - Proposal does not clearly meet requirements and has not demonstrated an adequate approach and understanding of the requirements. The proposal has one or more weaknesses which are not offset by strengths. Risk of unsuccessful performance is high.
5.4.2.5 UNACCEPTABLE - Proposal does not meet requirements and contains one or more deficiencies. Proposal is ineligible for award.
6. TAB K – FACTOR 3 – SMALL BUSINESS PARTICIPATION PLAN
6.1 SUBMISSION REQUIREMENTS:
6.1.1 Small Business Participation Plan: ALL Offerors, regardless of size status, are required to address two elements: (1) planned small and small disadvantaged business usage for this procurement, and (2) past history of using small and small disadvantaged businesses on projects during the last 3 years.
6.1.2 Planned Small and Small Disadvantaged Business Usage for this Procurement. All Offerors are required to provide a narrative discussion of no more than two (2) pages addressing their corporate approach and methodology for acquiring, soliciting and using small and small disadvantaged businesses in the performance of this contract. All narratives should address the Offeror's commitment to providing subcontracting opportunities, as well as evidence of planned and /or continued outreach efforts to encourage and use small and small disadvantaged businesses.
6.1.2.1 All Offerors (both large and small businesses) will be evaluated on the level of proposed participation of U.S. small businesses in the performance of the proposed acquisition (as small business prime Offerors or small business subcontractors) relative to the objectives and goals established herein. The government will evaluate the extent to which Small Businesses (SBs) Veteran-Owned Small Businesses (VOSBs), Service-Disabled Veteran-Owned Small Businesses (SDVOSBs) HUBZone Small Businesses, Small Disadvantaged Businesses (SDBs), Woman- Owned Small Businesses (WOSBs) and, when applicable, Historically Black Colleges/ Universities/Minority Institutions (HBCU/MIs) have been identified for participation as part of the Offeror's team. This should include a general description of the type of work, product or service anticipated to be supplied via a small business concern along with the estimated percentage each subcontracted portion is in relation to the overall project. Identification of the names of specific subcontractors is not required for the small business utilization evaluation;
however, successful Offerors will ultimately be required to name subcontractors as a part of their subcontracting plan submission. Using the template provided in Attachment 4, provide the above stated information. The Offeror with higher percentages for Small Business participation will receive a higher rating from the Offeror who has lower percentages. Submission shall be limited to the Attachment 4, in addition to the two (2) page narrative.
(Example: Demolition Work- 10% of total work effort- SDVOSB identified)
6.1.3 Past History of Using Small and Small Disadvantaged Businesses as Subcontractors.
Provide a description of the Offeror’s demonstrated small business achievements in the various small and small disadvantaged businesses areas on no more than five (5) completed projects during the past three (3) years. Information about each project shall be limited to one (1) page.
For each project, Offerors should provide a brief project description, dollar magnitude of the project, location, and the percentage of total work that was subcontracted to small businesses, identifying specific Small Business categories used on each project. For this submission, large businesses may submit no more than one (1) page of information pertaining to their goals and actual accomplishments under approved Small Business Subcontracting Plans.
6.2 EVALUATION CRITERIA:
6.2.1 All Offerors, regardless of size, will be evaluated in these two elements and must submit the information requested. In element (1), all Offerors will be evaluated on the extent to which the Offeror identifies and commits to small business participation in the performance of Task Orders under this IDIQ. The Offeror’s percentage of work committed to small business will be evaluated. The minimum Goals for this procurement are: Small Business:20% of the total contract value; Small Disadvantaged Business (SDB):2% of the total contract value; Woman- Owned Small Business (WOSB):2% of the total contract value; Historically Underutilized Business Zone (HUBZone) Small Business:2% of the total contract value; Veteran Owned Small Business (VOSB):2%of the total contract value; Service Disabled Veteran Owned Small Business (SDVOSB):1% of the total contract value.
In element (2), the Offerors will be evaluated on past utilization of small businesses by assessment of their records and other information. The work performed directly by a small business prime contractor (Offeror) will be considered as small business participation under element (1) and as small business past utilization under element (2). An Offeror must demonstrate a good faith effort and past commitment to the utilization of small business concerns.
6.2.2 The Government will evaluate the narrative provided as part of Paragraph 6.1.2, in conjunction with the information submitted on Attachment 4. The Government will also evaluate the narrative provided as part of Paragraph 6.1.3. Those narratives with greater detail and specificity will be given greater credit than general statements and commitments provided said details clearly demonstrate Offeror’s historical achievement of proposed goals. The utilization of small businesses in the performance of relevant projects submitted for Factor 1, Past Performance, will be given more weight in the evaluation of this factor.
6.2.3. Factor 3 Evaluation Ratings: Factor 3 will be rated using the same adjectival descriptions utilized for Factor 2 above.
7.1 NON-COST FACTORS:
FACTOR 1: PAST PERFORMANCE: This factor is less important than FACTOR 2.
FACTOR 2: RELEVANT SPECIALIZED EXPERIENCE: This factor is more important than
FACTOR 1.
FACTOR 3: SMALL BUSINESS PARTICIPATION…
This is the start of the file's text. The full file is on GovTribe.