14R05_Phase_2.pdf

PDF 2 MB Posted

Attached to
Increase Contract Capacity Southeast Georgia/Fort Gordon General Construction SATOC
Solicitation number
W912HN-14-R-0005
Issued by

About this file

SPECS Phase 2 Amd 5

View the file

Other files

File Type Posted
SAS_Approved_Justification_and_Approval_Increase_Capacity_W912HN-15-D-0001_Redacted.pdf PDF
amd5.pdf PDF
W912HN-14-R-0005_Sample_Project.pdf PDF
AMD3.pdf PDF
14R05_Phase_2.pdf PDF
Phase_II_Contractors.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Southeast Georgia/ Fort Gordon, GA

Solicitation Number

W912HN-14-R-0005

SATOC for Design-Build and/or Construction for General Construction Sections 00010 through 00800 and Technical Provisions August 2014

PHASE TWO OF TWO PHASE DESIGN/BUILD

SUBMITTAL PROCEDURE

This acquisition is being offered as a Small Business Set- Aside. For this procurement, only a Small Business is eligible to submit offers.

U.S. ARMY ENGINEER DISTRICT, SAVANNAH

CORPS OF ENGINEERS

100 WEST OGLETHORPE AVENUE

SAVANNAH, GEORGIA 31401-3640

US Army Corps of Engineers Savannah District

W912HN-14-R-0005-0005

TWO PHASE DESIGN/BUILD GENERAL CONSTRUCTION SINGLE AWARD TASK ORDER CONTRACT (SATOC) PRIMARILY IN SOUTHEAST GEORGIA; how ever, performance of w ork may be required w ithin the Sout Atlantic Division Area of Operations (North Carolina, South Carolina, Georgia, Florida, Alabama and Mississippi).

This aquisition is being offered as a Small Business Set-Aside. For this procurement, only a Small Business is eligible to submit offers.

This solicitation is Firm Fixed Price using Tw o-Phase Design/Build Selection Procedures in accordance w ith Federal Acquisition Regulation (FAR) 36.303. The proposal of the successful Offeror shall be incorporated by reference upon aw ard of the contract. The Government w ill evaluate the Phase 1 performance capability proposals in accordance w ith the criteria described herein and w ill select up to f ive (5) of the highest rated Offerors to participate in Phase 2.

The total capacity of the contract is $95,000,000. The aw arded contract w ill be for a base period of tw o (2) years w ith three (3) one-year option periods.

The North American Industry System (NAICS) Code is 236220.

MARK A HISCOX 912/652-5030

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

29-Nov-2013

(RFP)

(IFB)

X

CALL:

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

See Item 7

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________ calendar days after receiving aw ard, X notice to proceed. This performance period is mandatory, negotiable. (See _________________________

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

X YES NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________0 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________21 Mar 2014 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee X is, is not required.

C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______233 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

U.S. ARMY ENGINEER DISTRICT SAVANNAH

ATTN: CT/MARK HISCOX

100 W. OGLETHORPE AVE

SAVANNAH GA 31401

W912HN

PAGE OF PAGES

1 OF

CODE

(Title, identifying no., date):

12B. CALENDAR DAYS

02:00 PM (hour) Sealed envelopes containing offers

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

8. ADDRESS OFFER TO (If Other Than Item 7)

FAX:TEL: 912/652-5030 TEL: FAX:

20B. SIGNATURE

(REV. 4-85)STANDARD FORM 1442 BACK

TO SIGN

NSN 7540-01-155-3212

SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)

CODE FACILITY CODE

17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.

the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

(4 copies unless otherwise specified)

CODE

(Insert any number equal to or greater than

20C. OFFER DATE

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY

(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)

See Item 14

(Include only if different than Item 14)16. REMITTANCE ADDRESS

30B. SIGNATURE

29. AWARD (Contractor is not required to sign this document.)

document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .

gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)

30C. DATE

(Type or print)

TEL: EMAIL:

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this28. NEGOTIATED AGREEMENT

(M ust be fully completed by offeror)OFFER

W912HN-14-R-0005

Section 00010 - Solicitation Contract Form

SCHEDULE A

SE GA/FORT GORDON

GENERAL CONSTRUCTION SATOC

SCHEDULE A CAPACITY/COEFFICIENT

BID SCHEDULE

**NOTE: Total contract capacity for base and all option periods is $95,000,000.00. Total capacity may be used in the Base Period, Option Period 1, 2 or 3 or any combination thereof.

ITEM NO SUPPLIES SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 SE GA/Fort Gordon SATOC $95,000,000 LS

COEFFICIENT** SEE SCHEDULE A NOTES**

Location Estimated Capacity

Value Coefficient*** Calculated Amount

Fort Bragg/Pope AF $19,000,000.00 X __________ = _______________ Seymour Johnson $1,900,000.00 X __________ = _______________ Camp MacKall $1,900,000.00 X __________ = _______________

MOTSU $2,850,000.00 X __________ = _______________

Fort Jackson $9,500,000.00 X __________ = _______________ Fort Gordon $38,000,000.00 X __________ = _______________ Fort Benning $11,400,000.00 X __________ = _______________ Fort Stewart $1,900,000.00 X __________ = _______________ Hunter AAF $1,900,000.00 X __________ = _______________ Gillem Enclave $1,900,000.00 X __________ = _______________ Warner Robins

AFB $1,900,000.00

X

Moody AFB $1,900,000.00 X __________ = _______________ Dobbins AFB $950,000.00 X __________ = _______________

Total Calculated Amount _______________

These coefficients are to be used on all task orders and modifications written during the life of the contract.

*** Proposed Area Coefficient(s) shall be represented in decimal format (e.g. 4.0, 0.20, 8.0 or 0.08)

HOME OFFICE OVERHEAD (HOOH): The following will be used for the 2 year base period:

Home Office Overhead – 2 Year Base Period ____________% TOTAL FOR ITEM 0001 (Total Calculated Amount X HOOH) = ____________________

ITEM NO SUPPLIES SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0002 Option Period 1 1 LS

COEFFICIENT: **Coefficients awarded in CLIN 0001 WILL NOT change and will remain in full effect**

Home Office Overhead – Option Period 1: ____________%

0003 Option Period 2 1 LS

COEFFICIENT **Coefficients awarded in CLIN 0001 WILL NOT change and will remain in full effect**

Home Office Overhead – Option Period 2: ____________%

0004 Option Period 3 1 LS

COEFFICIENT **Coefficients awarded in CLIN 0001 WILL NOT change and will remain in full effect**

Home Office Overhead – Option Period 3: ____________%

NON-PRICED ITEMS: The following percentages will be used throughout the life of the contract:

Field Office Overhead ____________________% Home Office Overhead ____________________% Bond Premium ____________________%

PROFIT will be computed for non-priced items using the weighted guideline method.

EXAMPLE PRICE EVALUATION PROCEDURE

Base Est Capacity Value

Proposed Area

Coefficient*

Appied Area Coeffcient Total

Home Office OH @ 8.50%** Evaluated Total

Fort Bragg/Pope AF $19,000,000.00 1.10 $20,900,000.00 $1,776,500.00 $22,676,500.00 Seymour Johnson $1,900,000.00 0.84 $1,596,000.00 $135,660.00 $1,731,660.00 Camp MacKall $1,900,000.00 1.00 $1,900,000.00 $161,500.00 $2,061,500.00

MOTSU $2,850,000.00 1.05 $2,992,500.00 $254,362.50 $3,246,862.50

Fort Jackson $9,500,000.00 0.96 $9,120,000.00 $775,200.00 $9,895,200.00 Fort Gordon $38,000,000.00 0.87 $33,060,000.00 $2,810,100.00 $35,870,100.00 Fort Benning $11,400,000.00 1.10 $12,540,000.00 $1,065,900.00 $13,605,900.00 Fort Stewart $1,900,000.00 1.20 $2,280,000.00 $193,800.00 $2,473,800.00 Hunter AAF $1,900,000.00 0.97 $1,843,000.00 $156,655.00 $1,999,655.00 Gillem Enclave $1,900,000.00 1.00 $1,900,000.00 $161,500.00 $2,061,500.00 Warner Robins AFB $1,900,000.00 1.00 $1,900,000.00 $161,500.00 $2,061,500.00 Moody AFB $1,900,000.00 0.95 $1,805,000.00 $153,425.00 $1,958,425.00 Dobbins AFB $950,000.00 0.82 $779,000.00 $66,215.00 $845,215.00

$100,487,817.50

AREA COEFFICIENTS

TOTAL EVALUATED PRICE SCHEDULE A

DESCRIPTION/SPECS/WORK STATEMENT

1. DESCRIPTION OF WORK:

1.1 Single Award Task Order Contract (SATOC) for General Construction and Design/Build Construction is intended to provide rapid response for: new construction, upgrades, maintenance or repair of situations relating, but not limited to, site work, interior/exterior finishes, architectural woodwork, electrical, mechanical, plumbing, structural and fire suppression system of Government facilities in a cost effective manner. Work requiring the use of civil funds is not allowed. Work may include, but not be limited to:

1.2. General Construction:

1.2.1. New construction, renovation, repair and/or upgrades of all permanent structures to include but not be limited to: interior/exterior finishes (floors, ceilings, doors, windows, paint, siding, etc.), architectural woodwork (molding, cabinets, etc.), electrical systems (conduit, wire, breakers, panels, transformers, emergency generators, interior/exterior high and low voltage electrical power lines, interior/exterior lights, emergency shut offs, lighting protection, etc.), mechanical systems (HVAC instrumentation & controls, HVAC control systems, commissioning, decommissioning, retro-commissioning, total building commissioning, gas lines, insulation, acoustical systems, underground high temperature lines, boilers, chillers & chilled water distribution systems, variable frequency controls on HVAC systems, etc.), plumbing systems (sanitary sewer, domestic water lines, backflow preventers, pumps, water coolers, etc.), fire suppression systems (fire alarm systems, sprinkler system, etc.), communication systems (mass notification system, IT lines, telephone & data lines, etc.), renewable energy systems (solar panels, ground source heat pumps, etc.), roofing systems (various roof types, gutters, downspouts, flashing, fascia, soffit, etc.), structural systems, fencing, gates, conduit and cables for security systems, Anti-Terrorism Force Protection systems (site layout, security design, building construction, threat development, level of protection, design constraints and communications, etc.) and the necessary appurtenances to consider the structure complete and usable.

1.3. Other Construction:

1.3.1. New construction, renovation, repairs and/or upgrades of highways, roads, streets, airport runways, concrete aprons & pads, sidewalks, decorative pavers, athletic/recreational surfaces, landscaping & irrigations systems, seeding/sodding, detection loops, pedestrian bridges, highway bridges (bridges that do not span over major waterways), parking lots, traffic lines/markings/signs. Work can also include the following, but not be limited to: site preparation, earthwork, grading, excavation & filling, clearing & grubbing, surveying, traffic & signalization and traffic studies. Storm water management, storm drainage systems and erosion control.

1.4. Incidental Work:

1.4.1. Work incidental to the tasks performed in any of the above paragraphs shall be include, but is not limited to demolition, carpentry, lighting, and similar minor electrical work that may be required to provide a complete, safe and usable facility during and after the course of roofing, mechanical, plumbing or painting services.

1.4.1.1. Damage such as ceiling replacement, painting and carpet cleaning as a result of roof leaks.

1.4.1.2. Lead, asbestos and mold remediation work incidental to renovation work.

1.4.1.3. Surface deterioration incidental to interior/exterior repairs such as patching drywall, replacing siding, trim work, etc.

1.4.1.4. Relocating furniture, workstations, etc incidental to construction.

1.4.1.5. Testing, reports and surveys associated with new construction, renovation, repairs and/or upgrades and additions to buildings (including lead and asbestos), structures, roads (including traffic/pedestrian patterns).

1.5. Restrictions: Task orders for design only or demolition only shall not be placed against the contract.

SCHEDULE A NOTES TO OFFERORS

For Information Only

(This information is provide in advance to assist Offerors with pricing information for Phase II)

2. COEFFICIENT

2.1. The current year edition of the R.S. Means Construction Cost Data is hereby incorporated by reference and the current edition at the beginning of each calendar year will be incorporated into the contract for the duration of this contract including option periods. The Offeror shall use the Electronic Version of R. S. Means Building Professional’s Package which includes Building Construction Cost Data, Mechanical Cost Data, Plumbing Cost Data, Electric Cost Data and the Square Foot Cost. Offeror must purchase “Assemblies Cost Data” separately. For renovation projects, the offeror shall use the Repair and Remodeling Cost Data. The Offeror may use the quarterly pricing updates to the R.S. Means. Offeror shall use Means Cost Works Estimator to prepare and submit task order proposals. These items may be obtained from the R.S. Means Company at www.rsmeans.reedconstructiondata.com or 1-800-334-3509.

2.2. Area Coefficient: The Offeror’s coefficients shall be represented as a percentage “increase” or “decrease” to the R.S. Means, without home office & field office overhead and profit. The “Total Bare Costs” column in the R.S. Means will be used. The Offeror’s coefficient SHALL contain all allowable costs EXCEPT PROFIT, HOME AND FIELD OFFICE OVERHEAD. Home Office Overhead will be set by this contract. Profit and field office overhead will be negotiated for each task order. Profit will be computed using the weighted guideline method specified in Specification Section 01 08 00.

2.3. Items Included in Area Coefficient:

2.3.1. There will be NO allowances for any additional costs beyond what the Area Coefficients covers; therefore the coefficients must be all inclusive of costs incurred.

2.3.1.1 The following items from R.S. Means will not be paid separately and shall be included in the Area Coefficient:

Cost Division 1 – General Requirements

• 01 11 31.20 - Construction Management Fees

• 01 21 16.50 - Contingencies

• 01 21 55.50 0010 thru 01 21 55.50 0010 1200 - Job Condition Allowances

• 01 21 57 – Overtime Allowances

• 01 21 61 – Cost Indexes

• 01 21 63 – Taxes (See paragraph 2.3.4 for exceptions)

• 01 31 13.30 - Insurance

• 01 31 13.50 – General Contractor’s Mark-up

• 01 31 13.90 – Performance Bond

• 01 41 26 – Permits

• 01 74 13.20 0050 (Daily clean-up)

• 01 74 13.20 0020 & 40 - After job completion Min & Max

• 01 54 39 70 0020 – Construction Equipment Small Tools

• Specification Section 01 50 00 – The Project Sign Only and The Safety Signs

Only

2.3.2. Offeror WILL NOT be allowed to use the following items from the R.S. Means.

• 01 31 13.40 – Main Office Expense. This item should be taken into consideration when proposing the Home Office Overhead rate.

• 01 31 13.60 – Installing Contractor’s Main Office Overhead. Overhead will be negotiated and itemized for each individual task order.

• 01 31 13.80 – Overhead and Profit. Profit will be computed using the Weighted

Guidelines.

http://www.rsmeans.reedconstructiondata.com/

2.3.3. The following line items will only apply after completion of a new facility or interior facility rehabilitation:

• 01 74 13.20 0100 – Final by GC at end of the job

2.3.4. Taxes. For the state of North Carolina, the Government will pay sales taxes for material cost only. The appropriate sales tax will be calculated on the material bare cost after applying the area coefficient.

2.4. Non-Priced Items. Items of work not covered in the R.S. Means, will be considered Non- Priced Items, if agreed upon by both the government and the contractor.

2.4.1. All proposed non-priced items shall be separately identified and priced. Proposed non- priced items must be documented by supporting information as specified below:

(a) A minimum of THREE (3) competitive contractor quotes

(or) if requested and approved by the Contracting Officer,

(b) A complete breakout of material, labor, and other direct or indirect costs required to complete the specific item. Costs shall be segregated and proposed on a DA Form 5413-R, “Construction Cost Breakdown’, or other format approved by the contracting officer.

2.4.1.1. Offeror shall provide a written justification for price/subcontractor/vendor selected.

2.4.2. Non-priced items proposed by the offeror will be fully negotiated prior to award.

2.4.3. The Area Coefficient SHALL NOT be applied to non-priced items. However, the Home Office Overhead rate fixed in the contract will be used and will not change. Home Office Overhead rate and Non-Priced mark-ups fixed in the contract shall be used and will not change.

2.4.3.1. Offeror shall be prepared to allow for negotiating area coefficients for locations outside of SAD.

2.5. Work to be performed by the prime contractor and subcontractor(s) shall be priced using the “BARE COSTS TOTAL” column in R.S. Means. The appropriate area coefficient will then be applied to the total of these costs. Work performed by the Professional Consultant (designer (s)) shall be priced using the “TOTAL INCL O&P” column in R.S. Means. The appropriate area coefficient will then be applied to the total of these costs.

2.6. Union Rates will be used for pricing Labor. Offeror shall consider any Davis Bacon wage rate increases in their proposed area coefficient.

2.7. The Area Coefficient will apply for the two (2) year base period and three (3) option periods of the contract or up to the maximum capacity of $95,000,000.00

3. TASK ORDER PROPOSALS.

3.1. The offeror shall prepare a detailed proposal by identifying tasks, refining quantities of both pre-priced and non-priced items, pricing non-priced items, developing performance times and preparing a completed proposal document for submission to the contracting officer. The offeror shall field verify all available as-builts as well as existing field conditions.

3.2. Where square foot costs are provided in the R.S. Means, those costs shall take precedence over cost for assembly cost and individual cost. Likewise, where assembly costs are provided in the R.S. Means, those costs shall take precedence over costs for individual items unless otherwise approved by the contracting officer.

3.3. Quantities used on individual task order proposals shall be taken from field measurements or design plan, as appropriate, without allowance for waste unless the R.S. Means authorizes under individual items. Waste of excessive material quantities is an incidental cost and is included in the coefficient.

3.4. Costs of expendable supplies, lubricants, wear and tear on tools, are included in the installation/construction cost in the R.S. Means cost of construction and will not be paid separately.

3.5. Equipment Rental may be considered only if the required item is not included in the crew descriptions for the R.S. Means line item that describe the work, unless approved by the contracting officer.

4. TASK ORDER CALCULATIONS.

4.1 . Calculating Total Cost.

4.1.1. In calculating the total cost, R.S. Means, the area coefficient (AC), U.S. National Averages (USNA), Home Office Overhead (HOOH), Field Office Overhead (FOOH) and Profit are all considered. When applicable, design costs and NC state taxes are also considered.

4.1.2. Using R.S. Means Database:

4.1.2.1. The offeror shall use the electronic version in developing a proposal. Each proposal will be generated from CostWorks using a CSI Number: The R.S. Means database consists of a MasterFormat System of classifications and numbering developed by the Construction Specification Institute (CSI). Each line item in the database has its own unique CSI identifier.

The offeror shall use the electronic version in developing a proposal, selecting the appropriate CSI number(s) in the RS Means Cost works program for each individual item. R.S. Means is updated quarterly each year. The offeror must select the location. Typically, the City Cost

Indexes are electronically applied to the CSI items. However, for this contract, the offeror is required to use the USNA. The example shown below is for informational purposes only:

4.1.2.2. Example: Design and construct a 10,000 SF Building: Combination Warehouse & Offices (typical for 10 locations): 125’x 80’x20’H, masonry structure.

A. Install a 8’x8’ (Commercial) wood Overhead Door in each building; including trim, hardware, and painting. Doors shall also have electric openers (including hardware) installed.

B. Install 10 Exterior wood doors (3’x6’-8”), frames, trim and hardware in each structure. Doors shall be weatherstripped, stained and finished.

C. Each building (10) shall have its front face (125’x20’) painted (2 coats exterior latex)

D. Install 10 Wrought iron security Doors, including hardware, in same opening as exterior wood doors.

NOTE: Example provided is only a small representation of all items needed for a complete Task Order Proposal.

Using the appropriate electronic version of R.S. Means the offeror shall select the appropriate CSI line item number. Below shows the CSI numbers utilizing the “Bare Costs”:

CSI Number Description Unit Bare Material

Bare Labor

Bare Equip

Bare Total

50 17 0010 Warehouse & Office Combination, complete with HVAC & plumbing

SF ---- ---- ---- $79.50

B2030 410

Wood overhead door, commercial sectional, including track, door, hardware and trim electrically operated

EA

$1,577.2

$1,006.6 4 $0 $2,583.9

B2030 240

Single solid wood colonial door, 6 panel fir, 6’-8” X 3’-0” with food frame and trim. Stained & finished including hardware and weatherstripping

EA $783.96 $376.66 $0 $1,160.6

09 91 13.90 0580 & 0590

Painting Exterior CMU Walls:

Spray 2 coats exterior latex SF $0.10 $0.23 $0 $0.33

NOTE: Square Foot Costs were used for Warehouse Building and Assembly Costs were used for both the Overhead and Exterior Doors

Once the CSI number is selected, the offeror will input the appropriate quantity. See below.

Qty CSI Number Description Unit Bare Material

Bare Labor

Bare Equip Bare Total

100,00

50 17 0010 Warehouse & Office Combination, complete with HVAC & plumbing

(25 @ 10,000 SF each)

SF ---- ---- ---- $7,950,000.00

10 B2030 410

Wood overhead door, commercial sectional, including track, door, hardware and trim electrically operated

EA $15,772.8

$10,066.4 0 $0 $25,839.20

10 B2030 240

Single solid wood colonial door, 6 panel fir, 6’-8” X 3’-0” with food frame and trim. Stained & finished including hardware and weatherstripping

EA $7,839.60 $3766.60 $0 $11,606.20

25,000 09 91 13.90 0580 & 0590

Painting Exterior CMU Walls: Spray 2 coats exterior latex (125’X20’)

SF $2,500.00 $5,750.00 $0 $8,250.00

4.1.3. Applying the Area Coefficient:

4.1.3.1. Next sum all of the Bare Cost Totals for all of the CSI items to get a total direct cost.

Then apply the Area Coefficient to get the Area Coefficient Total for the task order.

Net Sum of all Bare Cost Totals = $7,950,000.00 (Warehouse) + $25,839.20 (Overhead Door) + $11,606.20 (Exterior Doors) + $8,250.00 (Painting) = $7,995,695.40 Then the proposed Area Coefficient is applied.

Area Coefficient Total = Net Sum of all Bare Cost Totals X Area Coefficient

For Example A: If your Area Coefficient is a net decrease of 0.95, your Area Coefficient Total would be: $7,995,695.40 X 0.95 = $7,595,910.63

Or

For Example B: If your Area Coefficient is a net increase of 1.20, your Area Coefficient Total would be: $8,095,774.90 X 1.20 = $9,594,834.48

4.1.4. Applying Sales Taxes (where applicable):

4.1.4.1. Only for projects in North Carolina, offeror will apply state taxes pertinent to that city/county to material costs only. Taxes will be calculated and added to the Area Coefficient Total to calculate the Adjusted Area Coefficient Subtotal:

For example Sales Taxes are 7%:

Description Bare Material

Sales Tax (7%)

Wood overhead door, commercial sectional, including track, door, hardware and trim electrically operated $15,772.80 $1,104.10

Single solid wood colonial door, 6 panel fir, 6’-8” X 3’-0” with food frame and trim. Stained & finished including hardware and weatherstripping

$7,839.60 $548.77

Spray painting siding: Primer & 2 coats exterior latex $2,500.00 $175.00

Total Taxes $1,827.87

Adjusted Area Coefficient Subtotal = Area Coefficient Total + Total Taxes Example A: $7,595,910.63 + $1,827.87 = $7,597,738.50

Example B: $9,594,834.48 + $1,827.87 = $9,596,662.35

4.1.5. Including Non-Priced Item:

4.1.5.1. Next offeror will submit three (3) itemized quotes list for items not located in R.S. Means.

Non-Priced Items will be negotiated and added to the Adjusted Area Coefficient Subtotal to calculate the Adjusted Area Coefficient Total:

The Wrought Iron Screen was not found in R.S. Means, therefore, three quotes were submitted.

Quote Description Qty Unit Materials Installation Unit Cost Total

Wrought Iron Security Doors, hardware not included in cost

10 EA $333.00 $89.00 $422.00 $4,220.00

(3’X6’8”) Wrought Iron Security Doors, installed; including hardware

10 EA $540.00 $129.00 $669.00 $6,690.00

Wrought Iron Security

Doors, (3’X 6’-8”) including hardware

10 EA $718.00 $119.00 $837.00 $8,370.00

Quote Number 1 was not selected because the price did not include hardware; Quote Number 2 was selected because all scope requirements were met; Quote Number 3 was not selected, although the scope requirements were met, the price was higher than Quote Number 2.

Adjusted Area Coefficient Total = Adjusted Area Coefficient Subtotal + Non-Priced Item(s) Example A: $7,597,738.50 + $6,690.00 = $7,604,428.50

Example B: $9,596,662.35 + $6,690.00 = $9,603,352.35

4.1.6. Applying Field Office Overhead (FOOH):

4.1.6.1. Next offeror will submit an itemized list of FOOH expenses utilizing R.S. Means. FOOH will be negotiated and added to the Adjusted Area Coefficient Total to calculate the Prime Total Direct Cost (PTDC):

For example if your (negotiated) FOOH is $5,000:

PTDC = Adjusted Area Coefficient Total + FOOH Example A: $7,604,428.50 + $5,000 = $7,609,428.50 Example B: $9,603,352.35 + $5,000 = $9,608,352.35

4.1.7. Applying Home Office Overhead (HOOH):

4.1.7.1. After calculating the Subtotal, the (fixed) HOOH will be calculated.

For this Example if your HOOH is 5%:

Construction Subtotal = PTDC x HOOH

Example A: $7,609,428.50 x 5% = ($380,471.42) + $7,609,428.50 = $7,989,899.92 Example B: $9,608,352.35 x 5% = ($480,417.62) + $9,608,352.35 = $10,088,769.97

4.1.8. Applying Profit:

4.1.8.1. After calculating the Construction Subtotal the (negotiated) Profit will be applied to achieve the Construction Total for the Task Order.

For this Example if your Profit is 8%:

Construction Total = (Construction Subtotal x Profit) Example A: $7,989,899.92 x 8% = ($639,191.99) + $7,989,899.92 = $8,629,091.92

[$8,629,092]* Example B: $10,088,769.97 x 8% = ($807,101.60) + $10,088,769.97 = $10,895,871.56

[$10,895,872]*

*For ease of calculations, please round final numbers.

4.1.9. Calculating Design Fee:

4.1.9.1. After achieving the Construction Total for the Task Order, Design Fee will be calculated as a percentage of the Construction Total. Design Fees are located in R.S. Means and are based on a percentage of the construction cost. These fees will be negotiated for each Task Order and added as a separate line item on the Offerors proposal.

For this Example if your Design Fee is 4% of the construction cost then the design cost is calculated as:

Design Costs = Construction Total x Fee % Example A: $8,629,091.92 x 4% = $345,163.68 [$345,164]*

Example B: $10,895,871.56 x 4% = $435,834.86 [$435,835]*

*For ease of calculations, please round final numbers.

5. HOME OFFICE OVERHEAD

5.1. Home Office Overhead shall be represented as a percentage increase to the Applied Coefficient Total. The proposed rate will apply to ALL task orders issued under this contract.

5.2. Offeror’s shall propose a Home Office Overhead rate for the two (2) year base period and the three 1 year option periods. The rates awarded will be locked-in for the life of the contract and will not change.

6. PRICE EVALUATION PROCEDURE

6.1. Area Coefficient Estimated Capacity Values are identified for each location in the following table. The Estimated Capacity Value will be multiplied by the corresponding proposed area coefficient to determine a total for each location. These Applied Area Coefficient Totals will then be multiplied by the Home Office Overhead Rate for the Base Period only. These Evaluated Totals will then be added together to obtain the total evaluated price for Schedule A.

6.2. The Home Office Overhead Rates proposed for Option Periods 1, 2 a n d 3 WILL NOT be included in the evaluated price, but will be evaluated to ensure REASONABLENESS

ONLY.

6.3. An EXAMPLE price evaluation chart for Schedule A follows:

EXAMPLE PRICE EVALUATION PROCEDURE

Base Est Capacity Value

Proposed Area

Coefficient*

Appied Area Coeffcient Total

Home Office OH @ 8.50%** Evaluated Total

Fort Bragg/Pope AF $19,000,000.00 1.10 $20,900,000.00 $1,776,500.00 $22,676,500.00 Seymour Johnson $1,900,000.00 0.84 $1,596,000.00 $135,660.00 $1,731,660.00 Camp MacKall $1,900,000.00 1.00 $1,900,000.00 $161,500.00 $2,061,500.00

MOTSU $2,850,000.00 1.05 $2,992,500.00 $254,362.50 $3,246,862.50

Fort Jackson $9,500,000.00 0.96 $9,120,000.00 $775,200.00 $9,895,200.00 Fort Gordon $38,000,000.00 0.87 $33,060,000.00 $2,810,100.00 $35,870,100.00 Fort Benning $11,400,000.00 1.10 $12,540,000.00 $1,065,900.00 $13,605,900.00 Fort Stewart $1,900,000.00 1.20 $2,280,000.00 $193,800.00 $2,473,800.00 Hunter AAF $1,900,000.00 0.97 $1,843,000.00 $156,655.00 $1,999,655.00 Gillem Enclave $1,900,000.00 1.00 $1,900,000.00 $161,500.00 $2,061,500.00 Warner Robins AFB $1,900,000.00 1.00 $1,900,000.00 $161,500.00 $2,061,500.00 Moody AFB $1,900,000.00 0.95 $1,805,000.00 $153,425.00 $1,958,425.00 Dobbins AFB $950,000.00 0.82 $779,000.00 $66,215.00 $845,215.00

$100,487,817.50

AREA COEFFICIENTS

TOTAL EVALUATED PRICE SCHEDULE A

* The Coefficients and Home Office Overhead Rate in this chart are EXAMPLES ONLY.

‘Proposed Area Coefficient(s)’ shall be represented in decimal format.

** ‘Home Office OH’ shall be represented as a percentage.

SAMPLE RFP

BID SCHEDULE (Total with Mark-ups)

Summary Total With Mark-ups

CLIN 0001 Base: Construct Admin Facility $

CLIN 0002 Base: Design $

Total Proposed Fee: $

Item Number Item Description TOTAL Base:

Sitework/Concrete $

General Requirements $

Architectural $

Metal Building $

Plumbing $

Mechanical $

Electrical $

Communications $

Fire Alarm System $

COST BREAKDOWN (GENERAL CONSTRUCTION)

Admin Facility

Prime Total Cost Direct Cost (DC) w/o Mark-ups $

Total Cost with Mark-ups (DC + HOOH + Profit) $

Profit ((DC + HOOH) X % Profit)

Total Proposed Fee (Total Cost with Mark-ups + Design Fee)

Total Direct Cost ((Prime Work + Sub Work) X Coefficient) ______% Coefficient

______% Design

Home Office Overhead (Total DC + Non-Priced + FOOH) X % HOOH

Design Fee

Total Non Priced Items (Provide Quotes)

Field Office Overhead (Provide Break Out on Separate Sheet)

Notes to the Contractor:

1) Contractor shall submit all supporting documents: cost works, non-priced, competitive bids, etc.)

SCOPE OF WORK

JULY 2014

1. TASK ORDER FOR CONSTRUCTION OF ADMIN FACILITY, FORT GORDON, GA

2. DESCRIPTION OF WORK: Furnish all labor, material, equipment, incidentals, supervision and transportation for work necessary to provide admin facility. All work shall be performed in accordance with the contract specifications, manufacturer’s recommendations, and state building codes. Reference Specification Section 01 08 00, Paragraph 16. Work performed under this task order shall comply with the latest edition of the publications dated at the time of the task order award. When a required publication is not referenced in the list found in paragraph 16 the contractor shall utilize one that has national applications. Where conflicts arise between publications, the most stringent requirements shall apply.

BASE BID: Admin Facility

FUNDING:

A. Project is currently:

Funded Subject to availability of funds

B. Funding Type:

MILCON

Sustainment Restoration *Modernization

(* Statutory Limit is $750,000)

3. PERFORMANCE PERIOD:

A. Base Bid – Admin Facility: Duration is 360 Calendar Days after receipt of Notice to Proceed (NTP). Offeror’s offer may be accepted by the Government within 90 Calendar days after the offer is due.

2. LIQUIDATED DAMAGES: The contractor shall be assessed liquidated damages in the amount of $550 per calendar day for failure to complete the prescribed work within the performance period stated in paragraph 3 of the SOW.

3. WAGE DETERMINATION: Please note that the most current Wage Determination (General

Decision Number GA140165, dated January 17, 2014 will be used for this project. It is your responsibility to check for updates prior to negotiations and prior to award. The Government will ensure the most current wage rates are included in the task order award.

4. NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL

EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION IN ACCORDANCE WITH FAR

CLAUSE 52.222-23:

Goals for Participation for Each Trade

Percentages

Females 6.9%

Minority 27.2%

5. MONTHLY ANTICIPATED ADVERSE WEATHER DELAY:

Workdays Based on 5-Day Work Week

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

8 6 6 4 5 6 8 6 5 3 4 7

6. INTERFACE WITH GOVERNMENT PERSONNEL: Access to and from the site – N/A

7. DESIGNATED BILLING/INVOICE OFFICE:

U. S. Army Corps of Engineers

8. CONTRACTOR REQUIREMENTS:

A. Project Involves Handling of Asbestos or Lead Base Paint: (Reference Specifications 01 08 00, 01 08 50, 01 35 13 and 01 35 29)

B. Occupancy During Construction: (Reference Specifications 01 08 00, 01 35 13, and

01 50 00)

C. Phasing of Work: (Reference Specifications 01 08 00, 01 32 01, 01 35 13 and 01 50 00)

D. CQC System Requirements: Reference Specifications 01 45 01 CQC Manager CQC Personnel

Civil Mechanical Electrical Structural

Architectural Environmental Submittal Clerk Concrete, Pavements & Soils TAB Personnel (TAB) – Testing, Adjusting and Balancing Personnel Design Quality Control Manager

E. Quality Control System (QCS) Required: Reference Specification 01 45 01.10

F. Project Sign Required: Reference Specification 01 35 13; (Reference Attachment 1 to

Specification Section 0800 for sign layout.)

G. Digital Site Records: (Specification 01 08 00) Video Tape Digital Pictures

H. Submittals are required on the following materials: (Specification 01 33 00)

All Materials

I. After task order award:

Site Safety and Health Plan (Specification 01 35 29) Quality Control Program (Specification 01 45 01) Work Plan – (Specification 01 08 50). The design requirements are:

1. Complex Submittal – Contractor will submit Full Design (60%, 90%, 100%, and Corrected Final submittals); specifications, rendering, erosion control plan and permits.

2. Medium Submittal - Contractor will submit Full Design (90%, 100%, and Corrected Final submittals); abridge set of specifications with project data, erosion control plan and permits.

3. Light Submittal – Contractor will submit Full Design (100% and Corrected Final submittals); specifications on the drawings, erosion control plan and permits.

4. Distribution of Submittals:

Number Item

½ Size Drawings Full Size Drawings Specifications CDs

Construction Schedule (Specification 01 32 01.00 10)

Bar Chart

CPM

Weekly Progress Report (Specification 01 08 00 & 01 35 13) Telephone Conversation/Correspondence Records (Specification 01 08 50)

Site/Project Specific Remediation Report (Specification 01 35 13) As-Built/In Progress Drawings (Specification 01 08 00, 01 08 50, 01 33 16, 01 70 00, 01 78 00)

J. After construction completion, prior to final payment:

System/Equipment Testing Operation and Maintenance Manuals/Training Videos (Specification 01 70 00) Training Equipment and Construction Warranties List of Standard Equipment and Service Organizations As-Built/Final Drawings

9. GOVERNMENT FURNISHED ITEMS/WORK: (Reference Specification Section and itemize list here, if applicable)

10. APPLICABLE SPECIFICATIONS: Check the additional appropriate Spec Section and/or (Uncheck Spec Sections that are N/A)

01 34 00 – Survey, Layout, and Other Data 01 35 13 – Special Contract Requirements 01 35 29 – Safety & Occupational Health Requirements 01 42 00 – Sources For Reference Publications 01 50 00 – Temporary Construction Facilities 01 57 20 – Environmental Protection 01 57 23.00 10 – Storm Water Pollution Prevention Measures 01 62 35 – Recycled/Recovered Materials 01 70 00 – Contract Closeout 01 74 19 – Construction & Demolition Waste Management 01 78 02 – Closeout Submittals 01 78 23 – Operation & Maintenance Data Others Specifications:

11. SCOPE OF WORK:

A. General Work: Furnish all labor, material, equipment, incidentals, supervision and transportation for work necessary to construct/design Admin Building.

1) Provide survey services, as required to construct new building with necessary setbacks, etc.

2) Provide all site improvements necessary to support the new building facility to include final landscaping.

3) All fire protection and life safety features for the facilities shall be in accordance with the latest UFC 3-600-01 and NFPA 13 (2010).

4) Ensure termiticides are applied as required by Georgia code.

5) Comply with Installation Design Guide (IDG) for finishes and colors.

6) Utilities will terminate at the 5-foot line.

7) Provide carpet tiles in office areas. Provide VCT in Break room, Restrooms, and

Receptionist Area.

8) Room 106 - provide break area with a sink, countertop, water and electrical outlets for the refrigerator. Allow space for future table and chairs (Not in Contract).

9) Room 102, Reception Area, half walls from column line B to column line C, a pass through area and a countertop. Provide power and communication drops for two desks immediately behind countertop.

10) Door 102 - Double Door. Door 102A - a case opening entrance.

11) Conference Room - provide data, power, and bracing for a future projector.

12) Provide Exhaust fans in Restrooms.

13) Provide one exterior hose bib on the facility.

14) Gypsum walls shall be full height for the following rooms: Mechanical, Communications, and Restrooms. Contractor shall provide a minimum of two weeks’ notice to the Contracting Officer Representative (COR) to allow for proper coordination for utility work.

15) Facility includes eight windows of approximate size 32” x 52” which are DoD Minimum Antiterrorism Standards for Buildings, Unified Facilities Criteria (UFC) 4-010-01.

16) Label Offices and room.

B. Mechanical Work:

1) See ASHRAE 90.1 requirements in General scope.

C. Electrical Work:

1) Provide electrical service cabling and panel(s) to exterior transformer for building

D. Communications Work

1) All data drops for offices and reception will be three ports (2 NIPR, and 1 telephone) to accommodate unique MMD requirements

2) All communication infrastructure work will be accomplished in accordance with the most current version of the I3A the IDG criteria.

3) Contractor shall have a minimum of 3 years experience in the application, installation and testing of the specified systems and equipment to be installed. All Communication System Design will shall be performed and stamped by a Registered Communications Distribution Designer (RCDD) certified by Building Consulting Services International

(BICSI).

4) Network Enterprise Center (NEC) will provide duct tie-in locations and cable service delivery points for copper and fiber cabling. This information is for informational purposes only and does not constitute an Outside Plant Design. The Contractor must design the infrastructure and submit for approval.

5) All supervisors assigned to the installation of this system or any of its components shall have a minimum Level 2 Installer certification from BICSI and installers assigned to the installation of this system or any of its components shall have a minimum Level 1 Installer certification from BICSI. All supervisors and installers shall have factory certification from each equipment manufacturer that they are qualified to install and test the provided products.

6) The Contractor shall submit Communication Test Reports and Communication As- Built drawings to the ACO as detailed below:

a) Outside Plant under 100 pair Copper/Fiber- CCD minus 45 days.

b) Outside Plant over 100 pair Copper/Fiber- CCD minus 60 days.

c) Inside Plant under 60 data outlets- CCD minus 30 days.

d) Inside Plant 61 to 100 data outlets- CCD minus 45 days.

E. Fire Protection Work. The following Communications activities are required surrounding the Fire Alarm Control Panel.

1) Submit MAC address at CCD minus 30 days to DPW and NEC so that the Fire Alarm Control Panel can be programmed into the Emergency Services system.

2) Conduct Fire Alarm, Fire Sprinkler, and Mass Notification Systems occupancy inspection for the Fire Department at CCD minus 10 days. Allocate one day for testing Fire Alarm and MNS and a separate day for Wet Pipe Sprinkler testing.

3) Provide fire protection and life safety features for the facility in accordance with UFC 3-600-01.

12. ADDITIONAL ENCLOSURES

A. Drawings: Plate G-001 thru E603

B. Specifications:

13. SITE VISIT: N/A.

14. EXCAVATION PERMIT: The contractor shall have a completed and approved Excavation Permit prior to any excavation, to include sign or fence-post holes. The Contractor shall schedule an appointment to locate utility lines at least 24 hours prior to any excavation with the (DPW). Reference Specifications 01 35 13 & 01 50 00.

15. DISPOSAL PERMITS: A permit is required to use the installation land clearing and inert debris and demolition landfills. Landfill permits shall be processed with the Environmental Compliance Branch of the DPW Environmental & Natural Resources Division. Permits are issued for the life of the specific contract only. Only materials produced on the project for which the permits are issued may be disposed of in the land clearing and inert debris and demolition landfills. The Contractor shall keep a copy of the completed permit with the vehicle throughout the contract disposal operation. Copies of the disposal permit forms will be provided at the Prework

Conference.

16. BORROW PERMITS: A permit is required to use the base borrow material pits.

Borrow pit permits shall be processed with the Environmental Compliance Branch of the DPW Environmental & Natural Resources Division. Permits are issued for the life of the specific contract only. Borrow materials may only be used on the project for which the permits are issued. The Contractor shall keep a copy of the completed permit with the vehicle throughout the contract borrow operation.

17. HAUL ROUTES: The Contractor is required to obtain approval from the Resident Office for the routes he intends to use for transportation of borrow materials, construction debris, or demolition materials unless otherwise permitted in writing by the Resident. The axle load of earth-hauling equipment operating on paved streets shall not exceed 12,000 pounds. Reference Specifications 01 35 13 & 01 50 00.

18. UTILITY OUTAGES AND ROAD CLOSURES: Utility, road and railroad closures require a minimum 10 working days advance written notice and will be subject to Resident Office approval. In the case of a road closures, a sketch shall be provided showing the closure location and all necessary signs and barricades. Necessary signage, barricades, flag persons, lights (including temporary traffic control lights), and markings for the safe movement of the public during construction shall be in accordance with the Manual on Uniform Traffic Control Devices, and shall be provided at no additional expense to the Government. Reference Specifications 01 35 29, 01 50 00 & 01 35 13.

19. AVAILABILITY AND USE OF UTILITY SERVICES:

Utility services required on the job site for the accomplishment of the work

Will be furnished at no cost to the Contractor

Will be furnished at an additional cost to the Contractor

However, the Government will make no connections or alterations to the existing utility systems for the Contractor. Utilities for offices and/or storage buildings or areas will be billed to the Contractor monthly and will not be furnished free of charge.

The Contractor shall be responsible for installing meters or other connections at no cost to the Government. At the conclusion of the contract, the Contractor shall remove all temporary connections, distribution lines, meters and associated paraphernalia unless otherwise directed by the Resident Office. Prior to installing any utility connections at an office/storage site, the plan will be approved by the Resident Office.

When utility meters are installed, the Contractor shall notify the Resident Office for the initial meter reading. Failure to obtain this initial reading will result in the Contractor being charged for the entire amount shown on the meter. Reference Specification 01 50 00.

20. CONTRACTOR STORAGE AND TRAILERS: The Contractor shall place or paint a sign on all of his storage trailer(s) and building(s) used on this contract. At a minimum, the sign shall contain the name of the Contractor and a telephone number at which the contractor can be reached. The trailer(s) and building(s) shall be completed with gates and/or doors which can be locked. Only material for this project shall be stored in the trailer(s) or building(s). The Contractor shall remove the storage trailer(s) or building(s) within 30 days after completion of the contract and prior to submitting his final invoice. The area around the storage trailer(s) and building(s) shall be kept clean.

21. SAFETY: Safety will be in compliance with the Corps of Engineers Safety Manual EM

385-1-1. Use of appropriate safety equipment is mandatory and not limited to hard hats and steel-toed shoes. Contractor is responsible for daily clean up and complete restoration of the area once the contract is complete.

22. HOURS OF WORK: Work shall be accomplished between the hours of 0730 thru 1630 hours daily, Monday through Friday on non-Government holidays. Legal holidays falling on Saturday are observed on the proceeding Friday and those falling on Sunday are observed on the following Monday. Work schedule and facility security to be coordinated with the Resident Office for facility access and security maintenance during duration of work. Contractor shall not work outside of the stated hours of work, without first obtaining approval from the Resident Office.

23. WARRANTY: The contractor shall provide a minimum of one (1) year warranty on all materials and workmanship from the date of the Government’s acceptance of the work.

END OF SCOPE

NOTES TO OFFERORS

SOUTHEAST GEORGIA/FORT GORDON SATOC

W912HN-14-R-0005

SECTION 00010 - NOTES TO OFFERORS

ELECTRONIC PROPOSAL SUBMISSION IS REQUIRED THROUGH THE WEBSITE

LISTED BELOW. ELECTRONIC SUBMISSION SENT VIA EMAIL OR FACSIMILE WILL

NOT BE ACCEPTED. HAND CARRIED PROPOSAL SUBMISSION IS NOT AUTHORIZED.

DIRECTIONS FOR SUBMITTING PROPOSALS

In an effort to reduce paperwork and reduce cost, all proposals shall be submitted electronically. All submissions shall be in Adobe PDF format. The Price Proposal and Technical Proposal shall be submitted as “separate” single files. Offerors may use compressions utility software such as WinZip or PKZip to reduce file size and facilitate transmission.

Title the file(s) in the following format:

W912HN-14-R-0005_COMPANY NAME_VOLUME I

W912HN-14-R-0005_COMPANY NAME_VOLUME II

Submit the Price and Technical proposals electronically via the AMRDEC SAFE website at:

https://safe.amrdec.army.mil/SAFE/. At the AMRDEC SAFE website select the link: I do not have a CAC or this machine is not configured to read my CAC and I would like to access SAFE as a Guest User, to register, access the site and submit your proposal(s). [Note: It has been reported that documents are more quickly uploaded into the AMRDEC SAFE website when using a Firefox web browser. The Government cannot verify that this is true and offers no guarantee that offerors will have more success utilizing any particular browser.]

When your proposal is submitted via the AMRDEC SAFE website, the…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .