W912HN-12-B-0007_Bid_Abstract.pdf

PDF 59 KB Posted

Attached to
Entrance Channel Maintenance Dredging Savannah and Brunswick Harbors.
Solicitation number
W912HN12B0007
Issued by

About this file

Public posting of the bid abtract.

View the file

Other files

File Type Posted
Amd2.pdf PDF
W912HN_12_B_0007_AMD2.PDF PDF
W912HN_12_B_0007.PDF PDF
W912HN_12_B_0007_AMD1.PDF PDF
W912HN_12_B_0007.PDF PDF
Amd01.pdf PDF
W912HN_12_B_0007.PDF PDF
12B07.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Item Number Description Quantity Unit Unit Price Total Price

0001 Mobilization and Demobilization

0001AA Mobilization and Demobilization 1 Lump Sum 700,130.00$ 700,130.00$

0001AB Mobilization and Demobilization 1 Lump Sum 490,000.00$ 490,000.00$

Maintenance Dredging, Tybee Cut/Jones Island/ Bloody Point Range, Station 0+00 to ‐30+000B

0002AA First 81,000 Cubic Yards 81,000 Cubic Yard 4.90$ 396,900.00$

0002AB All over 81,000 Cubic Yards 150,000 Cubic Yard 4.90$ 735,000.00$

Maintenance Dredging, Bloody Point Range, Station ‐30+000B to ‐

40+000B

0003AA First 100,000 cubic yards 100,000 Cubic Yard 3.50$ 350,000.00$

0003AB All over 100,000 Cubic Yards 198,000 Cubic Yard 3.50$ 693,000.00$

0004 Maintenance Dredging, Tybee Range, Station ‐40+000B to ‐60+000B

0004AA First 100,000 cubic yards 100,000 Cubic Yard 3.45$ 345,000.00$

0004AB All over 100,000 Cubic Yards 178,000 Cubic Yard 3.45$ 614,100.00$

Maintenance Dredging, Cedar Hammock/Brunswick Point Cut, Plantation Creek Range, Station 21 +835 to ‐8+000B

0005AA First 20,000 cubic yards 20,000 Cubic Yard 8.75$ 175,000.00$

0005AB All over 20,000 cubic yards 120,000 Cubic Yard 8.75$ 1,050,000.00$

0006 Maintenance Dredging, Brunswick Harbor, Station ‐8+000B to ‐30+000B

0006AA First 225,000 cubic yards 225,000 Cubic Yard 3.50$ 787,500.00$

0006AB All over 225,000 cubic yards 1,208,000 Cubic Yard 3.50$ 4,228,000.00$

Maintenance Dredging, Brunswick Harbor, Station ‐30+000B to ‐

56+500B

0007AA First 280,000 cubic yards 280,000 Cubic Yard 3.10$ 868,000.00$

0007AB All over 280,000 cubic yards 615,000 Cubic Yard 3.10$ 1,906,500.00$

0008 Buoy Removal 1 Each 30,000.00$ 30,000.00$

0009 Stand By Time/Savannah Harbor 1 Day 50,000.00$ 50,000.00$

0001 Stand by Time/Brunswick Harbor 1 Day 50,000.00$ 50,000.00$

0011 Trawling Requirements (non‐capture)

0011AA First 5 days 5 Day 4,500.00$ 22,500.00$

0011AB All over 5 days 10 Day 4,500.00$ 45,000.00$

Mobilization and Demobilization for Bed Leveling including attendant plant for Savannah and Brunswick Harbor

0012AA Mobilization and Demobilization 1 Lump Sum 35,000.00$ 35,000.00$

0012AB Mobilization and Demobilization 1 Lump Sum 35,000.00$ 35,000.00$

Bed Leveling including attendant plant for Savannah and Brunswick

Harbor

0013AA First 5 days 5 Day 12,500.00$ 62,500.00$

0013AB All over 5 days 10 Day 12,500.00$ 125,000.00$

Closed Net Capture and Relocation Trawling to Include Turtle

Relocation

0014AA First 5 days 5 Day 6,000.00$ 30,000.00$

0014AB All over 5 days 10 Day 6,000.00$ 60,000.00$

Total Base Bid (Items 0001 thru 0011AB) 13,536,630.00$

Total Options (0012 thru 0014AB) 347,500.00$

Total Base Bid Plus Options (Items 0001 thru 0014AB) 13,884,130.00$

IGE

BASE

OPTIONS

Item Number Description Quantity Unit

0001AA Mobilization and Demobilization 1 Lump Sum

0001AB Mobilization and Demobilization 1 Lump Sum

Maintenance Dredging, Tybee Cut/Jones Island/ Bloody Point Range, Station 0+00 to ‐30+000B

0002AA First 81,000 Cubic Yards 81,000 Cubic Yard

0002AB All over 81,000 Cubic Yards 150,000 Cubic Yard

Maintenance Dredging, Bloody Point Range, Station ‐30+000B to ‐

40+000B

0003AA First 100,000 cubic yards 100,000 Cubic Yard

0003AB All over 100,000 Cubic Yards 198,000 Cubic Yard

0004 Maintenance Dredging, Tybee Range, Station ‐40+000B to ‐60+000B

0004AA First 100,000 cubic yards 100,000 Cubic Yard

0004AB All over 100,000 Cubic Yards 178,000 Cubic Yard

Maintenance Dredging, Cedar Hammock/Brunswick Point Cut, Plantation Creek Range, Station 21 +835 to ‐8+000B

0005AA First 20,000 cubic yards 20,000 Cubic Yard

0005AB All over 20,000 cubic yards 120,000 Cubic Yard

0006 Maintenance Dredging, Brunswick Harbor, Station ‐8+000B to ‐30+000B

0006AA First 225,000 cubic yards 225,000 Cubic Yard

0006AB All over 225,000 cubic yards 1,208,000 Cubic Yard

Maintenance Dredging, Brunswick Harbor, Station ‐30+000B to ‐

56+500B

0007AA First 280,000 cubic yards 280,000 Cubic Yard

0007AB All over 280,000 cubic yards 615,000 Cubic Yard

0008 Buoy Removal 1 Each

0009 Stand By Time/Savannah Harbor 1 Day

0001 Stand by Time/Brunswick Harbor 1 Day

0011 Trawling Requirements (non‐capture)

0011AA First 5 days 5 Day

0011AB All over 5 days 10 Day

Mobilization and Demobilization for Bed Leveling including attendant plant for Savannah and Brunswick Harbor

0012AA Mobilization and Demobilization 1 Lump Sum

0012AB Mobilization and Demobilization 1 Lump Sum

Bed Leveling including attendant plant for Savannah and Brunswick

Harbor

0013AA First 5 days 5 Day

0013AB All over 5 days 10 Day

Closed Net Capture and Relocation Trawling to Include Turtle

Relocation

0014AA First 5 days 5 Day

0014AB All over 5 days 10 Day

Total Base Bid (Items 0001 thru 0011AB)

Total Options (0012 thru 0014AB)

Total Base Bid Plus Options (Items 0001 thru 0014AB)

BASE

OPTIONS

Unit Price Total Price $ Delta from IGE % Delta from IGE

1,925,000.00$ 1,925,000.00$ 1,224,870.00$ 175%

400,000.00$ 400,000.00$ (90,000.00)$ ‐18%

7.00$ 567,000.00$ 170,100.00$ 43%

4.10$ 615,000.00$ (120,000.00)$ ‐16%

7.20$ 720,000.00$ 370,000.00$ 106%

4.50$ 891,000.00$ 198,000.00$ 29%

6.70$ 670,000.00$ 325,000.00$ 94%

4.10$ 729,800.00$ 115,700.00$ 19%

14.00$ 280,000.00$ 105,000.00$ 60%

12.15$ 1,458,000.00$ 408,000.00$ 39%

3.80$ 855,000.00$ 67,500.00$ 9%

2.35$ 2,838,800.00$ (1,389,200.00)$ ‐33%

3.20$ 896,000.00$ 28,000.00$ 3%

1.95$ 1,199,250.00$ (707,250.00)$ ‐37%

60,000.00$ 60,000.00$ 30,000.00$ 100%

98,000.00$ 98,000.00$ 48,000.00$ 96%

98,000.00$ 98,000.00$ 48,000.00$ 96%

6,500.00$ 32,500.00$ 10,000.00$ 44%

6,400.00$ 64,000.00$ 19,000.00$ 42%

235,000.00$ 235,000.00$ 200,000.00$ 571%

180,000.00$ 180,000.00$ 145,000.00$ 414%

19,400.00$ 97,000.00$ 34,500.00$ 55%

19,400.00$ 194,000.00$ 69,000.00$ 55%

7,000.00$ 35,000.00$ 5,000.00$ 17%

6,500.00$ 65,000.00$ 5,000.00$ 8%

14,397,350.00$ 860,720.00$ 6%

806,000.00$ 458,500.00$ 132%

15,203,350.00$ 1,319,220.00$ 10%

Great Lakes

Item Number Description Quantity Unit

0001AA Mobilization and Demobilization 1 Lump Sum

0001AB Mobilization and Demobilization 1 Lump Sum

Maintenance Dredging, Tybee Cut/Jones Island/ Bloody Point Range, Station 0+00 to ‐30+000B

0002AA First 81,000 Cubic Yards 81,000 Cubic Yard

0002AB All over 81,000 Cubic Yards 150,000 Cubic Yard

Maintenance Dredging, Bloody Point Range, Station ‐30+000B to ‐

40+000B

0003AA First 100,000 cubic yards 100,000 Cubic Yard

0003AB All over 100,000 Cubic Yards 198,000 Cubic Yard

0004 Maintenance Dredging, Tybee Range, Station ‐40+000B to ‐60+000B

0004AA First 100,000 cubic yards 100,000 Cubic Yard

0004AB All over 100,000 Cubic Yards 178,000 Cubic Yard

Maintenance Dredging, Cedar Hammock/Brunswick Point Cut, Plantation Creek Range, Station 21 +835 to ‐8+000B

0005AA First 20,000 cubic yards 20,000 Cubic Yard

0005AB All over 20,000 cubic yards 120,000 Cubic Yard

0006 Maintenance Dredging, Brunswick Harbor, Station ‐8+000B to ‐30+000B

0006AA First 225,000 cubic yards 225,000 Cubic Yard

0006AB All over 225,000 cubic yards 1,208,000 Cubic Yard

Maintenance Dredging, Brunswick Harbor, Station ‐30+000B to ‐

56+500B

0007AA First 280,000 cubic yards 280,000 Cubic Yard

0007AB All over 280,000 cubic yards 615,000 Cubic Yard

0008 Buoy Removal 1 Each

0009 Stand By Time/Savannah Harbor 1 Day

0001 Stand by Time/Brunswick Harbor 1 Day

0011 Trawling Requirements (non‐capture)

0011AA First 5 days 5 Day

0011AB All over 5 days 10 Day

Mobilization and Demobilization for Bed Leveling including attendant plant for Savannah and Brunswick Harbor

0012AA Mobilization and Demobilization 1 Lump Sum

0012AB Mobilization and Demobilization 1 Lump Sum

Bed Leveling including attendant plant for Savannah and Brunswick

Harbor

0013AA First 5 days 5 Day

0013AB All over 5 days 10 Day

Closed Net Capture and Relocation Trawling to Include Turtle

Relocation

0014AA First 5 days 5 Day

0014AB All over 5 days 10 Day

Total Base Bid (Items 0001 thru 0011AB)

Total Options (0012 thru 0014AB)

Total Base Bid Plus Options (Items 0001 thru 0014AB)

BASE

OPTIONS

Unit Price Total Price $ Delta from IGE % Delta from IGE

27,850,000.00$ 27,850,000.00$ 27,149,870.00$ 3878%

210,000.00$ 210,000.00$ (280,000.00)$ ‐57%

3.12$ 252,720.00$ (144,180.00)$ ‐36%

3.12$ 468,000.00$ (267,000.00)$ ‐36%

2.50$ 250,000.00$ (100,000.00)$ ‐29%

2.50$ 495,000.00$ (198,000.00)$ ‐29%

2.07$ 207,000.00$ (138,000.00)$ ‐40%

2.07$ 368,460.00$ (245,640.00)$ ‐40%

6.65$ 133,000.00$ (42,000.00)$ ‐24%

6.65$ 798,000.00$ (252,000.00)$ ‐24%

6.23$ 1,401,750.00$ 614,250.00$ 78%

6.23$ 7,525,840.00$ 3,297,840.00$ 78%

6.13$ 1,716,400.00$ 848,400.00$ 98%

6.13$ 3,769,950.00$ 1,863,450.00$ 98%

101,685.00$ 101,685.00$ 71,685.00$ 239%

97,555.00$ 97,555.00$ 47,555.00$ 95%

97,555.00$ 97,555.00$ 47,555.00$ 95%

4,200.00$ 21,000.00$ (1,500.00)$ ‐7%

4,200.00$ 42,000.00$ (3,000.00)$ ‐7%

163,465.00$ 163,465.00$ 128,465.00$ 367%

169,500.00$ 169,500.00$ 134,500.00$ 384%

33,895.00$ 169,475.00$ 106,975.00$ 171%

33,895.00$ 338,950.00$ 213,950.00$ 171%

4,200.00$ 21,000.00$ (9,000.00)$ ‐30%

4,200.00$ 42,000.00$ (18,000.00)$ ‐30%

45,805,915.00$ 32,269,285.00$ 238%

904,390.00$ 556,890.00$ 160%

46,710,305.00$ 32,826,175.00$ 236%

The Dutra Group