W912HN-12-B-0007_Bid_Abstract.pdf
PDF 59 KB Posted
- Solicitation number
- W912HN12B0007
About this file
Public posting of the bid abtract.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amd2.pdf | ||
| W912HN_12_B_0007_AMD2.PDF | ||
| W912HN_12_B_0007.PDF | ||
| W912HN_12_B_0007_AMD1.PDF | ||
| W912HN_12_B_0007.PDF | ||
| Amd01.pdf | ||
| W912HN_12_B_0007.PDF | ||
| 12B07.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Item Number Description Quantity Unit Unit Price Total Price
0001 Mobilization and Demobilization
0001AA Mobilization and Demobilization 1 Lump Sum 700,130.00$ 700,130.00$
0001AB Mobilization and Demobilization 1 Lump Sum 490,000.00$ 490,000.00$
Maintenance Dredging, Tybee Cut/Jones Island/ Bloody Point Range, Station 0+00 to ‐30+000B
0002AA First 81,000 Cubic Yards 81,000 Cubic Yard 4.90$ 396,900.00$
0002AB All over 81,000 Cubic Yards 150,000 Cubic Yard 4.90$ 735,000.00$
Maintenance Dredging, Bloody Point Range, Station ‐30+000B to ‐
40+000B
0003AA First 100,000 cubic yards 100,000 Cubic Yard 3.50$ 350,000.00$
0003AB All over 100,000 Cubic Yards 198,000 Cubic Yard 3.50$ 693,000.00$
0004 Maintenance Dredging, Tybee Range, Station ‐40+000B to ‐60+000B
0004AA First 100,000 cubic yards 100,000 Cubic Yard 3.45$ 345,000.00$
0004AB All over 100,000 Cubic Yards 178,000 Cubic Yard 3.45$ 614,100.00$
Maintenance Dredging, Cedar Hammock/Brunswick Point Cut, Plantation Creek Range, Station 21 +835 to ‐8+000B
0005AA First 20,000 cubic yards 20,000 Cubic Yard 8.75$ 175,000.00$
0005AB All over 20,000 cubic yards 120,000 Cubic Yard 8.75$ 1,050,000.00$
0006 Maintenance Dredging, Brunswick Harbor, Station ‐8+000B to ‐30+000B
0006AA First 225,000 cubic yards 225,000 Cubic Yard 3.50$ 787,500.00$
0006AB All over 225,000 cubic yards 1,208,000 Cubic Yard 3.50$ 4,228,000.00$
Maintenance Dredging, Brunswick Harbor, Station ‐30+000B to ‐
56+500B
0007AA First 280,000 cubic yards 280,000 Cubic Yard 3.10$ 868,000.00$
0007AB All over 280,000 cubic yards 615,000 Cubic Yard 3.10$ 1,906,500.00$
0008 Buoy Removal 1 Each 30,000.00$ 30,000.00$
0009 Stand By Time/Savannah Harbor 1 Day 50,000.00$ 50,000.00$
0001 Stand by Time/Brunswick Harbor 1 Day 50,000.00$ 50,000.00$
0011 Trawling Requirements (non‐capture)
0011AA First 5 days 5 Day 4,500.00$ 22,500.00$
0011AB All over 5 days 10 Day 4,500.00$ 45,000.00$
Mobilization and Demobilization for Bed Leveling including attendant plant for Savannah and Brunswick Harbor
0012AA Mobilization and Demobilization 1 Lump Sum 35,000.00$ 35,000.00$
0012AB Mobilization and Demobilization 1 Lump Sum 35,000.00$ 35,000.00$
Bed Leveling including attendant plant for Savannah and Brunswick
Harbor
0013AA First 5 days 5 Day 12,500.00$ 62,500.00$
0013AB All over 5 days 10 Day 12,500.00$ 125,000.00$
Closed Net Capture and Relocation Trawling to Include Turtle
Relocation
0014AA First 5 days 5 Day 6,000.00$ 30,000.00$
0014AB All over 5 days 10 Day 6,000.00$ 60,000.00$
Total Base Bid (Items 0001 thru 0011AB) 13,536,630.00$
Total Options (0012 thru 0014AB) 347,500.00$
Total Base Bid Plus Options (Items 0001 thru 0014AB) 13,884,130.00$
IGE
BASE
OPTIONS
Item Number Description Quantity Unit
0001AA Mobilization and Demobilization 1 Lump Sum
0001AB Mobilization and Demobilization 1 Lump Sum
Maintenance Dredging, Tybee Cut/Jones Island/ Bloody Point Range, Station 0+00 to ‐30+000B
0002AA First 81,000 Cubic Yards 81,000 Cubic Yard
0002AB All over 81,000 Cubic Yards 150,000 Cubic Yard
Maintenance Dredging, Bloody Point Range, Station ‐30+000B to ‐
40+000B
0003AA First 100,000 cubic yards 100,000 Cubic Yard
0003AB All over 100,000 Cubic Yards 198,000 Cubic Yard
0004 Maintenance Dredging, Tybee Range, Station ‐40+000B to ‐60+000B
0004AA First 100,000 cubic yards 100,000 Cubic Yard
0004AB All over 100,000 Cubic Yards 178,000 Cubic Yard
Maintenance Dredging, Cedar Hammock/Brunswick Point Cut, Plantation Creek Range, Station 21 +835 to ‐8+000B
0005AA First 20,000 cubic yards 20,000 Cubic Yard
0005AB All over 20,000 cubic yards 120,000 Cubic Yard
0006 Maintenance Dredging, Brunswick Harbor, Station ‐8+000B to ‐30+000B
0006AA First 225,000 cubic yards 225,000 Cubic Yard
0006AB All over 225,000 cubic yards 1,208,000 Cubic Yard
Maintenance Dredging, Brunswick Harbor, Station ‐30+000B to ‐
56+500B
0007AA First 280,000 cubic yards 280,000 Cubic Yard
0007AB All over 280,000 cubic yards 615,000 Cubic Yard
0008 Buoy Removal 1 Each
0009 Stand By Time/Savannah Harbor 1 Day
0001 Stand by Time/Brunswick Harbor 1 Day
0011 Trawling Requirements (non‐capture)
0011AA First 5 days 5 Day
0011AB All over 5 days 10 Day
Mobilization and Demobilization for Bed Leveling including attendant plant for Savannah and Brunswick Harbor
0012AA Mobilization and Demobilization 1 Lump Sum
0012AB Mobilization and Demobilization 1 Lump Sum
Bed Leveling including attendant plant for Savannah and Brunswick
Harbor
0013AA First 5 days 5 Day
0013AB All over 5 days 10 Day
Closed Net Capture and Relocation Trawling to Include Turtle
Relocation
0014AA First 5 days 5 Day
0014AB All over 5 days 10 Day
Total Base Bid (Items 0001 thru 0011AB)
Total Options (0012 thru 0014AB)
Total Base Bid Plus Options (Items 0001 thru 0014AB)
BASE
OPTIONS
Unit Price Total Price $ Delta from IGE % Delta from IGE
1,925,000.00$ 1,925,000.00$ 1,224,870.00$ 175%
400,000.00$ 400,000.00$ (90,000.00)$ ‐18%
7.00$ 567,000.00$ 170,100.00$ 43%
4.10$ 615,000.00$ (120,000.00)$ ‐16%
7.20$ 720,000.00$ 370,000.00$ 106%
4.50$ 891,000.00$ 198,000.00$ 29%
6.70$ 670,000.00$ 325,000.00$ 94%
4.10$ 729,800.00$ 115,700.00$ 19%
14.00$ 280,000.00$ 105,000.00$ 60%
12.15$ 1,458,000.00$ 408,000.00$ 39%
3.80$ 855,000.00$ 67,500.00$ 9%
2.35$ 2,838,800.00$ (1,389,200.00)$ ‐33%
3.20$ 896,000.00$ 28,000.00$ 3%
1.95$ 1,199,250.00$ (707,250.00)$ ‐37%
60,000.00$ 60,000.00$ 30,000.00$ 100%
98,000.00$ 98,000.00$ 48,000.00$ 96%
98,000.00$ 98,000.00$ 48,000.00$ 96%
6,500.00$ 32,500.00$ 10,000.00$ 44%
6,400.00$ 64,000.00$ 19,000.00$ 42%
235,000.00$ 235,000.00$ 200,000.00$ 571%
180,000.00$ 180,000.00$ 145,000.00$ 414%
19,400.00$ 97,000.00$ 34,500.00$ 55%
19,400.00$ 194,000.00$ 69,000.00$ 55%
7,000.00$ 35,000.00$ 5,000.00$ 17%
6,500.00$ 65,000.00$ 5,000.00$ 8%
14,397,350.00$ 860,720.00$ 6%
806,000.00$ 458,500.00$ 132%
15,203,350.00$ 1,319,220.00$ 10%
Great Lakes
Item Number Description Quantity Unit
0001AA Mobilization and Demobilization 1 Lump Sum
0001AB Mobilization and Demobilization 1 Lump Sum
Maintenance Dredging, Tybee Cut/Jones Island/ Bloody Point Range, Station 0+00 to ‐30+000B
0002AA First 81,000 Cubic Yards 81,000 Cubic Yard
0002AB All over 81,000 Cubic Yards 150,000 Cubic Yard
Maintenance Dredging, Bloody Point Range, Station ‐30+000B to ‐
40+000B
0003AA First 100,000 cubic yards 100,000 Cubic Yard
0003AB All over 100,000 Cubic Yards 198,000 Cubic Yard
0004 Maintenance Dredging, Tybee Range, Station ‐40+000B to ‐60+000B
0004AA First 100,000 cubic yards 100,000 Cubic Yard
0004AB All over 100,000 Cubic Yards 178,000 Cubic Yard
Maintenance Dredging, Cedar Hammock/Brunswick Point Cut, Plantation Creek Range, Station 21 +835 to ‐8+000B
0005AA First 20,000 cubic yards 20,000 Cubic Yard
0005AB All over 20,000 cubic yards 120,000 Cubic Yard
0006 Maintenance Dredging, Brunswick Harbor, Station ‐8+000B to ‐30+000B
0006AA First 225,000 cubic yards 225,000 Cubic Yard
0006AB All over 225,000 cubic yards 1,208,000 Cubic Yard
Maintenance Dredging, Brunswick Harbor, Station ‐30+000B to ‐
56+500B
0007AA First 280,000 cubic yards 280,000 Cubic Yard
0007AB All over 280,000 cubic yards 615,000 Cubic Yard
0008 Buoy Removal 1 Each
0009 Stand By Time/Savannah Harbor 1 Day
0001 Stand by Time/Brunswick Harbor 1 Day
0011 Trawling Requirements (non‐capture)
0011AA First 5 days 5 Day
0011AB All over 5 days 10 Day
Mobilization and Demobilization for Bed Leveling including attendant plant for Savannah and Brunswick Harbor
0012AA Mobilization and Demobilization 1 Lump Sum
0012AB Mobilization and Demobilization 1 Lump Sum
Bed Leveling including attendant plant for Savannah and Brunswick
Harbor
0013AA First 5 days 5 Day
0013AB All over 5 days 10 Day
Closed Net Capture and Relocation Trawling to Include Turtle
Relocation
0014AA First 5 days 5 Day
0014AB All over 5 days 10 Day
Total Base Bid (Items 0001 thru 0011AB)
Total Options (0012 thru 0014AB)
Total Base Bid Plus Options (Items 0001 thru 0014AB)
BASE
OPTIONS
Unit Price Total Price $ Delta from IGE % Delta from IGE
27,850,000.00$ 27,850,000.00$ 27,149,870.00$ 3878%
210,000.00$ 210,000.00$ (280,000.00)$ ‐57%
3.12$ 252,720.00$ (144,180.00)$ ‐36%
3.12$ 468,000.00$ (267,000.00)$ ‐36%
2.50$ 250,000.00$ (100,000.00)$ ‐29%
2.50$ 495,000.00$ (198,000.00)$ ‐29%
2.07$ 207,000.00$ (138,000.00)$ ‐40%
2.07$ 368,460.00$ (245,640.00)$ ‐40%
6.65$ 133,000.00$ (42,000.00)$ ‐24%
6.65$ 798,000.00$ (252,000.00)$ ‐24%
6.23$ 1,401,750.00$ 614,250.00$ 78%
6.23$ 7,525,840.00$ 3,297,840.00$ 78%
6.13$ 1,716,400.00$ 848,400.00$ 98%
6.13$ 3,769,950.00$ 1,863,450.00$ 98%
101,685.00$ 101,685.00$ 71,685.00$ 239%
97,555.00$ 97,555.00$ 47,555.00$ 95%
97,555.00$ 97,555.00$ 47,555.00$ 95%
4,200.00$ 21,000.00$ (1,500.00)$ ‐7%
4,200.00$ 42,000.00$ (3,000.00)$ ‐7%
163,465.00$ 163,465.00$ 128,465.00$ 367%
169,500.00$ 169,500.00$ 134,500.00$ 384%
33,895.00$ 169,475.00$ 106,975.00$ 171%
33,895.00$ 338,950.00$ 213,950.00$ 171%
4,200.00$ 21,000.00$ (9,000.00)$ ‐30%
4,200.00$ 42,000.00$ (18,000.00)$ ‐30%
45,805,915.00$ 32,269,285.00$ 238%
904,390.00$ 556,890.00$ 160%
46,710,305.00$ 32,826,175.00$ 236%
The Dutra Group
File details come from the government source that posted it. Updated .