12B01.pdf
PDF 3 MB Posted
- Solicitation number
- W912HN-12-B-0001
About this file
W912HN-12-B-0001 Specifications
View the file
Other files
| File | Type | Posted |
|---|---|---|
| AMD1.pdf | ||
| W912HN_12_B_0001.pdf | ||
| 12B01.pdf | ||
| W912HN_12_B_0001.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Brunswick and Savannah Harbors, Georgia
Solicitation Number
W912HN-12-B-0001
Maintenance of Dredged Material Containment Areas Sections 00010 through 00800 and Technical Provisions - Divisions 01 through 35 April 2012
HUBZONE SET-ASIDE: Competition will be 100% Set-Aside for Historically Underutilized Businesses (HUBZone) Certified Construction Firms.
U.S. ARMY ENGINEER DISTRICT, SAVANNAH
CORPS OF ENGINEERS
100 WEST OGLETHORPE AVENUE
SAVANNAH, GEORGIA 31401-3640
US Army Corps of Engineers Savannah District
This page was intentionally left blank for duplex printing.
Contract Specialist: Crystal North (912) 652-5183 E-mail: crystal.e.north@usace.army.mil
Indefinite Delivery Indefinite Quantity Contract for Maintenance of Dredged Material Containment Areas for Savannah and Brunsw ick Harbors, Georgia.
HUBZONE SET-ASIDE: Competition w ill be 100% Set-Aside for Historically Underutilized Busnisses (HUBZone) Certif ied Construction Firms.
Bids from other than HUBZone Small Business Concerns w ill not be considered. Bidders must be eligible as determined by the Small Business Administration and appear on the List of Qualif ied HUBZone Small Business concerns located on the SBA's w ebsite: w w w .sba.gov/hubzone.
The magnitude of construction in accordance w ith FAR 36.204 and DFARS 236.204 is betw een $5M and $10M for the base and tw o option periods.
X
CRYSTAL E NORTH 912-652-5183
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
11-Apr-2012
(RFP)
(IFB)
CALL:
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA
FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________ calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________Section 00800*
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
X YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specified in Item 8 by ___________ local time ______________11 May 2012 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee X is, is not required.
C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______60 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
US ARMY ENGINEER DISTRICT, SAVANNAH
100 WEST OGLETHORPE AVE.
SAVANNAH GA 31401-3640
W912HN
PAGE OF PAGES
1 OF
CODE W912HN
(Title, identifying no., date):
12B. CALENDAR DAYS
02:00 PM (hour)
Sealed envelopes containing offers
U.S. ARMY ENGINEER DISTRICT SAVANNAH
ATTN: CT/CRYSTAL NORTH
100 W. OGLETHORPE AVE
SAVANNAH GA 31401
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
8. ADDRESS OFFER TO (If Other Than Item 7)
FAX:TEL: TEL: 912-652-5183 FAX:
W912HN-12-B-0001 223
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .
gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(M ust be fully completed by offeror)OFFER
Section 00010 - Solicitation Contract Form
NOTICE TO OFFERORS
SECTION 00010 - NOTES TO BIDDERS
SUBMISSION OF BIDS
ELECTRONIC SUBMISSION OF BIDS, TO INCLUDE E-MAIL AND FACSIMILE
TRANSMISSIONS, IS NOT AUTHORIZED.
The Government will not be responsible for bids delivered to any location or to anyone other than those designated to receive bids on its behalf as indicated below.
Bids delivered prior to one hour before bid opening must be delivered only by U.S. Mail, including U.S. Express Mail, Federal Express or United Parcel Service to the address as indicated below. Bids shall not be addressed to any specific person. Any bids delivered between 1:00pm and 2:00pm on the due date shall only be delivered to the bid opening room.
U.S. Army Engineer District, Savannah
ATTN: CECT-SAS-E
100 West Oglethorpe Avenue Savannah, Georgia 31401-3640
All bids must be clearly identified with the bidder’s name and address. To ensure timely and proper handling, the lower left corner of the outermost wrapper should indicate the following:
Invitation for Bid No: W912HN-12-B-0001 Due Date of Bids: 11 May 2012 Time by which Bids are due: 2:00 P.M. (E.T.)
Title of Project: Maintenance of Savannah Harbor and Brunswick Harbor Dredged Materials Containment Areas
For bids delivered by Federal Express and United Parcel Service, the date and time of delivery established by these carriers is not the official time of receipt by the Government. Security Guards posted at the loading dock entry for the building do not receive bids and will contact Mailroom personnel. Once Mailroom personnel are available, the bid will be processed by the Security Guards using established security procedures and subsequently picked up by Mailroom personnel. After receipt by the Mailroom personnel, a record will be made of the receipt of the bid. Completion of these actions will constitute delivery of the bid by the date and time designated for receipt of bids. Bidders are responsible for allowing sufficient time for the bid to be processed for receipt and are cautioned that sufficient time may be as much as 24 hours prior to the date and time designated for receipt of bids.
Bids sent by U.S. Mail or U.S. Express Mail are required to be sent to the 100 West Oglethorpe Avenue address. Bidders that use U.S Mail or U.S. Express Mail must allow sufficient time for bids to be received by Mailroom personnel by the time specified for receipt of bids. Bidders are responsible for allowing sufficient time for the bids to be processed for receipt and are cautioned that sufficient time may be as much as 24 hours prior to the date and time designated for receipt of proposals.
Bidders are responsible for allowing sufficient time for the proposal to be physically received and processed by Mailroom personnel in accordance with the information provided.
Hand-carried bids, including bids delivered by Federal Express and United Parcel Service, delivered within an hour of bid opening shall only be delivered to the bid opening room at:
U.S. Army Engineer District Savannah 100 West Oglethorpe Ave, 2nd Floor Bid Room Savannah, Georgia 31401
Bidders must allow sufficient time to complete security screening to gain admittance to the J.G.
Low Federal Building address 100 West Oglethorpe Ave., Savannah, GA 31401, 2nd Floor Bid Opening room.
The Government will not be responsible for bids delivered to any location or to anyone other than those designated to receive bids on its behalf. Bidders are responsible for ensuring bids are submitted so as to reach the location designated for receipt of bids.
QUALITY CONTROL SYSTEM (QCS): Any contract award resulting from this solicitation will require the mandatory use of the automated Quality Control System. Please see Section 014501 for additional information.
TECHNICAL MATTERS: Technical inquiries are to be submitted via Bidder Inquiry in ProjNet at www.projnet.org\projnet
All questions regarding this Invitation for Bid (IFB) must be submitted in writing via Bidder Inquiry in ProjNet at least 10 calendar days prior to the date established in the IFB for receipt of bids. The Government reserves the right to decline addressing questions received less than 10 calendar days prior to receipt of bids.
If an Offeror believes that the requirements in this Invitation for Bid contain an error, omission, or are otherwise unsound; the offeror shall immediately notify the Contract Specialist in writing with supporting rationale. The Offeror is reminded that the Government reserves the right to award this Invitation for Bid based on the initial proposal, as received, without discussion.
To submit and review bid inquiry items, bidders will need to be a current registered user or self-register into system. To self-register go to web page, click BID tab select Bidder Inquiry, select agency USACE, enter Key for this solicitation listed below, and your e-mail address, click login.
Fill in all required information and click create user. Verify that information on next screen is correct and click continue.
From this page you may view all bidder inquiries or add inquiry.
Bidders will receive an acknowledgement of their question via email, followed by an answer to their question after it has been reviewed and response approved by the Contracting Officer.
W912HN-12-B-0001
Maintenance of Savannah Harbor and Brunswick Harbor Dredged Materials Containment Areas, Georgia
Bidder Inquiry Key M6GFC8-3M7I8T
NOTE: Issuance of Task Orders. As the requirements of the Corps of Engineers are defined, the Contracting Officer will notify the Contractor of a requirement through the issuance of a Request for Proposal (RFP) Letter.
The RFP Letter will provide the Contractor with a description of the services to be provided for the prospective task order. The Corps of Engineers will then negotiate with the Contractor the proposed effort and the time period for performing the work. The Task Order price will be negotiated utilizing the Contract Rate Schedule in Section 00010.
Work will only be ordered through the issuance of individual task orders. All task orders issued will be for the services specified therein, and will be in accordance with the fixed rates established in Section 00010 of the Schedule.
The Contracting Officer’s Representative does not have authority to modify any provision of this contract. Any request for deviation from the terms of this contract or any task orders issued hereunder must be submitted to the Contracting Officer for contractual action.
A DD Form 1155 will be issued for each task order. Each task order will include:
(1) Date of task order; contract number; task order number; task order price or performance data accounting and appropriation data; and any other pertinent information. Delivery or performance shall be specified in each task order issued hereunder.
(2) The specific Scope of Work related to the work covered by the task order and any other special technical requirements, instructions, or clearances.
NOTES:
a. Quantities are estimated and are to be used for evaluation purposes only.
b. The contract will be a firm fixed price Indefinite Delivery Indefinite Quantity type contract consisting of a base year period and two one-year option periods. The contract maximum amount per year is $2,000,000.00 for the base year period and a maximum of $2,000,000.00 for each two one-year option periods.
c. The contract minimum guaranteed amount is $5,000.00 for the base year period.
d. All prices listed herein are to include all materials and labor required to provide a complete furnished product.
e. Sizes listed for equipment are the minimum acceptable sizes to be used in performing the work for this contract.
The Government does not guarantee that the sizes listed will be most efficient to complete the required work or that the sizes listed will be large enough to perform required work in task orders.
f. An hour is defined as an hour of satisfactory performance of work meeting specified requirements as determined by the Contracting Officer.
g. NOTE: Section 700 - Contract Clauses includes 52.228-13 “ALTERNATIVE PAYMENT PROTECTIONS (Jul 2000)”, and 52.228-15 “PERFORMANCE & PAYMENT BONDS – CONSTRUCTION (Jul 2000)”. Bonding requirements shall be applied at the individual task order level. For task orders between $30,000 and $150,000, FAR Clause 52.228-13 shall apply. For task orders exceeding $150,000, FAR 52.228-15 shall apply.
h. All prices listed herein are to include all materials and labor required to provide a complete finished product
The work includes maintenance activities for the nine confined dredged material areas in Savannah Harbor and Brunswick Harbor, including accesses or support parts such as bank work, under drains, boat ramps, and bird islands. The work to be accomplished includes maintaining disposal areas that are not being operated and maintained as part of a dredging contract or dike raising contract. The solicitation will be issued as a Firm Fixed Price Indefinite Delivery Indefinite Quantity (IDIQ) Invitation for Bids (IFB) with a base year and two one-year option periods. Construction duration and specific scope of work will be determined with each task order. Work will be assigned by task orders and may be performed in any or all of the disposal areas 2A, 12A, 13A and B, 14A and B, and Jones/Oysterbed Island at Savannah Harbor and Andrews Island at Brunswick Harbor.
ALL BIDDERS ARE ADVISED THAT MATERIALLY UNBALANCED BIDS MAY BE REJECTED AS
NONRESPONSIVE. SEE SECTION 00100 – 52.214-19.
ESTIMATED LINE ITEMS SHALL NOT EXCEED THE ESTIMATED AMOUNT WITHOUT PRIOR
APPROVAL OF THE CONTRACTING OFFICER
CONDITIONS GOVERNING EVALUATIONS OF BIDS
Offerors must quote on all items of the schedule, Section 00010.
SPECIAL NOTE: SEE SECTION 0800, CONTRACTOR QUALIFICATIONS. ALL BIDDERS SHALL
PROVIDE QUALIFICATIONS, IF QUALIFICATIONS ARE NOT RECEIVED WITH THEIR BID,
THEIR BIDS SHALL BE REJECTED AS NONRESPONSIVE.
Total Base Period (CLIN 0001 THRU 0085) -------------------$________________
Total Option Period 1 (CLIN 0086 THRU 0170) ---------------$________________
Total Option Period 2 (CLIN 0171 THRU 0255) ---------------$________________
TOTAL (CLIN 0001 THRU 0255 ) -----------------------------$________________
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 20 Trips ____________ _________________ Mobilization/Demobilization to Savannah Harbor (to include Interior Bird Islands when a temporary haul road is not required)(Base Period)
0002 5 Trips ____________ _________________ Mobilization/Demobilization to Jones/Oysterbed Island to include Interior Bird
Islands on Jones/Oysterbed Island(Base Period)
0003 5 Trips ____________ _________________ Mobilization/Demobilization to Disposal Area 2A (Base Period)
0004 3 Trips ____________ _________________ Mobilization/Demobilization to Andrews Island in Brunswick Harbor (Base
Period)
0005 3 Trips ____________ _________________ Mobilization/Demobilization to interior bird islands in Disposal Areas (12A, 13A, 14A, and 14B) when a temporary haul road is required (Base Period)
0006 3 Trips ____________ _________________ Mobilization/Demobilization to “Tomkins Island” Bird Island between the
Savannah Harbor North Jetty and Daufuskie Island(Base Period)
0007 3 Trips ____________ _________________ Mobilization/Demobilization to Offshore Bird Island in St Simons Sound, Brunswick Harbor (Base Period)
0008 3 Trips ____________ _________________ Mobilization/Demobilization for every flat bed load of 10 or more mats for task(9 mats or less incidental to the piece of equipment needed for task) (Base Period)
0009 500 Hours ____________ _________________ Pontoon Rotary Ditcher With Winch Truck - Furnish all Labor, Materials, and
Equipment to Operate Equipment (Base Period)
0010 745 Acre ____________ _________________ Mowing-
Furnish all Labor, Materials, and Equipment to Perform Mowing (Base Period)
0011 265 Acre ____________ _________________ Environmental Mowing- Furnish all Labor, Materials, and Equipment to Perform
Mowing (Base Period)
0012 200 Acre ____________ _________________ Mowing- On slopes with a Boom Mower
Furnish all Labor, Materials, and Equipment to Perform Mowing (Base Period)
0013 100 Acre _____________ _________________ Tractor with Tree Cutter (able to cut trees up to 6" diameter) (Minimum of 120
HP) with disc harrows (minimum 16’ cutting width) Furnish all Labor, Materials and Equipment to Perform Tree Cutting (Base Period)
0014 600 Hours ____________ _________________ Tractor Dozer (D5 or equivalent)-Furnish all Labor, Materials and Equipment to
Operate Dozer (Base Period)
0015 200 Hours ____________ _________________ Front-End Loader (Minimum 2 Cubic Yards)
Furnish all Labor, Materials and Equipment to Operate Loader (Base Period)
0016 200 Hours ____________ _________________ Highway Dump Truck (Minimum 12 Cubic Yards) - Furnish all Labor, Materials and Equipment to Operate Truck (Base Period)
0017 200 Hours ____________ _________________ Off Road Dump Truck ( maximum 25-ton) - Furnish all Labor, Materials and
Equipment to Operate Truck (Base Period)
0018 600 Hours ____________ _________________ Excavator (Minimum 1.5 Cubic Yard Bucket with Thumb Attachment with Heavy
Duty Tree Cutter, etc.) (Minimum 175 HP) Furnish all Labor, Materials and Equipment to Operate Excavator (Base Period)
0019 300 Hours ____________ _________________ Long-Reach Excavator (Minimum 0.5 Cubic Yards) with 6' Root Rake and
Minimum 0.5 Cubic Yard Ditching Bucket - Furnish all Labor, Materials and Equipment to Operate Excavator (Base Period)
0020 100 Hours ___________ _________________ Motor Grader (Minimum 150 HP) Furnish All Labor, Materials and Equipment to
Operate Motor Grader (Base Period)
0021 1,200 Hours ____________ _________________ Tractor (Minimum 230 HP) with Pan (Minimum 15 Cubic Yard) Furnish all
Labor, Materials and Equipment to Operate Tractor w/Pan (Base Period)
0022 100 Hours ____________ _________________ Rubber Tired Backhoe/Loader (Minimum 75 HP) (Minimum 24" Backhoe Bucket and 2 Cubic Yard Loader Bucket) - Furnish all Labor, Materials and Equipment to Operate Tractor w/Backhoe/Loader (Base Period)
0023 100 Hours ____________ _________________ Bobcat or equivalent with all attachments - Furnish all Labor, Materials and
Equipment to operate Bobcat or equivalent (Base Period)
0024 500 Acre ____________ _________________ Stripping - Furnish all Labor, Materials, and equipment to perform Stripping
Operations (Base Period)
0025 500 Acre ____________ _________________ Furnish all Labor, Materials, and Equipment for Clearing and Burning the areas within and surrounding the disposal areas which includes the area between the toe of the outside dike down to the MLLW tide line - Complete (Base Period)
0026 500 Acre ____________ _________________ Furnish all Labor, Materials, and Equipment for Clearing, Grubbing and Burning of the areas within and surrounding the disposal areas which includes the area between the toe of the outside dike down to the MLLW tide line - Complete (Base Period)
0027 20 Acre ____________ _________________ Furnish all Labor, Materials and Equipment for Permanent Grassing (Base Period)
0028 20 Acre ____________ _________________ Furnish all Labor, Materials and Equipment for Temporary Grassing (Base
ITEM NO SUPPLIES/SERVICES
Furnish all Labor, Materials and Equipment for Marsh Grass (Spartina alterniflora)
Planting (Base Period)
0029AA 10 Acre ____________ _________________ Planting with stakes and mats (Base Period)
0029AB 10 Acre ____________ _________________ Planting without stakes and mats (Base Period)
0030 10 Acre ___________ _________________ Furnish all Labor, Materials and Equipment for Marsh Grass (Juncus roemerianus)
Planting (Base Period)
Furnish all Labor, Materials and Equipment for Marsh Grass (Spartina cynusoiroides) Planting (Base Period)
0031AA 10 Acre ____________ _________________ Planting with stakes and mats (Base Period)
0031AB 10 Acre ____________ _________________ Planting without stakes and mats (Base Period)
0032 250 Linear
Foot
Furnish all Labor, Materials and Equipment to Install and remove Silt Fence (GA DOT Type A) (Base Period)
0033 250 Linear
Foot
Furnish all Labor, Materials and Equipment to Install and remove Silt Fence (GA DOT Type C) (Base Period)
0034 50 Ton ____________ _________________ Furnish all Labor and Equipment for template placement for Armor Stone (Base
0035 50 Ton ____________ _________________ Furnish all Labor and Equipment for template placement for GA DOT Type #1
Rip Rap (Base Period)
0036 50 Ton ____________ _________________ Furnish all Labor and Equipment for template placement for GA DOT Type #3
Rip Rap (Base Period)
0037 50 Ton ____________ _________________ Furnish all Labor and Equipment for template placement for GA DOT Size #4
Coarse Aggregate (Base Period)
0038 10 Cubic
Yard
Furnish all Labor, Materials and Equipment for Concrete Grout (Base Period)
0039 50 Ton ____________ _________________ Armor Stone, Materials Only (Base Period)
0040 50 Ton ____________ _________________ GA DOT Type #1 Rip Rap, Materials Only (Base Period)
0041 50 Ton ____________ _________________ GA DOT Type #3 Rip Rap, Materials Only (Base Period)
0042 50 Ton ____________ _________________ GA DOT Size #4 Coarse Aggregate, Materials Only (Base Period)
0043 50 Linear
Foot
Furnish all Labor, Materials, and Equipment to install Hay bales with stakes (Base
0044 50 Bag ____________ _________________ Furnish all Labor, Materials, and Equipment to install Culch Oysters (Base Period)
0045 50 Square
Yard
Furnish all Labor, Materials, and Equipment to install Excelsior green dyed Erosion Control blankets or equivalent with regular netting and biodegradeable stakes (Base Period)
0046 120 Linear
Foot
Furnish all Labor, Materials, and Equipment to install Weir Stoplogs (Base Period)
0047 10 Linear
Foot
Repair Weir Riser(metal components to include ladder, safety climb, center stop log support, side channels, pipe structures, angle bracing, etc), Complete, Labor, Materials and Equipment (Base Period)
0048 10 Linear
Foot
Metal Catwalk Repair, Complete, Labor, Materials and Equipment (Base Period)
0049 10 Linear
Foot
Metal Catwalk Extensions, Complete, Labor, Materials and Equipment (Base
0050 5 Each ____________ _________________ Install New Weir, Complete, Labor, Materials and Equipment (Base Period)
0051 5 5 Linear Ft
Section
Install New Weir Riser Unit Extensions, Complete, Labor, Materials and Equipment (Base Period)
0052 10 Linear
Foot
Install New Weir Catwalk, Complete, Labor, Materials and Equipment (Base
0053 50 Square
Foot
Install New Vinyl Sheet piles, Complete, Labor, Materials and Equipment (Base
0054 2 Each ____________ _________________ Install New Safety Climb, Complete, Labor, Materials and Equipment (Base
0055 2 Each ____________ _________________ Install New Weir Foundation-Concrete Slab with Pilings, Complete, Labor, 0056 2 Each ____________ _________________ Install New Flange and Galvanized Ring, Complete, Labor, Materials and
0057 2 Each ____________ _________________ Install New Elbow with Flanges and Galvanized Rings, Complete, Labor, 0058 5 Each ____________ _________________ Install Gussets (4 each weir) Complete, Labor, Materials and Equipment (Base
0059 100 Linear
Foot
Extrusion welding of the HDPE pipe using a hand gun on all parts of the weir to include outfall pipe, riser, joints, elbows, flanges, etc., Complete, Labor, Materials and Equipment (Base Period)
0060 400 Linear
Foot
Removal and Replacement of 48" HDPE Outfall Pipes, Complete, Labor, 0061 10 Hours ____________ _________________ Tamping , Complete, Labor, Materials, and Equipment (Base Period)
0062 10 Cubic
Yard
Removal of Unstable Material and Replacement with Select Granular Material for installation of 48" HDPE Outfall Pipes, Complete, Labor, Materials and
0063 10 Hours ____________ _________________ Furnish all Labor, Materials, and Equipment for installation and maintenance of
6" Sump Pump (Base Period)
0064 6 Days ____________ _________________ Furnish all Labor, Materials, and Equipment for installation and maintenance of well point system including 6" Pump (Base Period)
Furnish all Labor, Materials, and Equipment for installation and maintenance of
Premier1 Pos/Neg Electrostop 42” electric fence or equivalent(to include chargers, posts, mesh, and fence) (Base Period)
0065AA 500 Linear
Foot
Fencing with posts and chargers (Base Period)
0065AB 200 Linear
Foot
Maintenance and Repair (Base Period)
0066 50 Days ____________ _________________ Burning - Furnish all Labor, Materials, and Equipment for Burning (Base Period)
0067 20 Days ___________ _________________ Forced Air Burner/Air Curtain Furnish all Labor, Materials, and Equipment to execute (Base Period)
0068 100 Linear
Foot
48" Polyethylene Pipe, Materials Only (Base Period)
0069 100 Linear
Foot
42” Polyethylene Pipe, Materials Only (Base Period)
0070 100 Linear
Foot
36” Polyethylene Pipe , Materials Only (Base Period)
0071 100 Linear
Foot
30” Polyethylene Pipe, Materials Only (Base Period)
0072 2 Each ____________ _________________ 30” to 48”Polyethylene Pipe Fusing - Furnish all Labor, Materials, and Equipment to perform Polyethylene Pipe Fusing Operations (per joint) (Base Period)
0073 100 Square
Yard
Geotextile Fabric - Furnish all Labor, Materials, and Equipment to install Geotextile Fabric (Base Period)
0074 50 Ton ____________ _________________ Lime (Base Period)
0075 2 Ton ___________ _________________ Fertilizer (Base Period)
0076 100 Acre ____________ _________________ Herbicide/Rodeo or equivalent - Ground Application Including Labor, Materials and Equipment (Base Period)
0077 30 Acre ____________ _________________ Herbicide/ Rodeo or other approved herbicide or pre-emergent equivalent - Aerial
(Helicopter) Application Including Labor, Materials and Equipment (Base Period)
0078 550 Acre ___________ _________________ Application of a non-selective pre-emergent approved for aquatic use to include all
Labor, Materials and Equipment (Base Period)
0079 30 Pound ____________ _________________ Furnish all Labor, Materials, and Equipment for installation of Amdro/Advion
(Base Period)
0080 10 Pound ____________ _________________ Furnish all Labor, Materials, and Equipment for installation of Orthene (Base
0081 500 Acre ____________ _________________ Herbiciding with Boom Sprayer -Furnish all Labor, Materials, and Equipment to
Herbicide Disposal Areas including Slopes (Base Period)
0082 100 Hours ____________ _________________ Welding, Burning and Cutting, Labor, Equipment and Materials (Base Period)
0083 80 Hours ____________ _________________ Laborer (Base Period)
0084 25 Days ____________ _________________ Crane Barge, Inland (capable of placing up to 10,000 lb rock 60 feet from barge), including mobilization/demobilization, labor, and attendant plants (tugboat and minimum 30”x120” material barge with spuds) (Base Period)
0085 36 Acre ____________ _________________ Maintain Bird Islands including all labor, materials and equipment, clearing and burning (Base Period)
0086 20 Trips ____________ _________________ OPTION Mobilization/Demobilization to Savannah Harbor (to include Interior Bird Islands when a temporary haul road is not required) (Option Period 1)
0087 5 Trips ____________ _________________ OPTION Mobilization/Demobilization to Jones/Oysterbed Island to include Interior Bird
Islands on Jones/Oysterbed Island (Option Period 1)
0088 5 Trips ____________ _________________ OPTION Mobilization/Demobilization to Disposal Area 2A (Option Period 1)
0089 3 Trips ____________ _________________ OPTION Mobilization/Demobilization to Andrews Island - Brunswick Harbor (Option
Period 1)
0090 3 Trips ____________ _________________ OPTION Mobilization/Demobilization to interior bird islands in Disposal Areas (12A, 13A, 14A, and 14B) when a temporary haul road is required (Option Period 1)
0091 3 Trips ____________ _________________ OPTION Mobilization/Demobilization to “Tomkins Island” Bird Island between the
Savannah Harbor North Jetty and Daufuskie Island (Option Period 1)
0092 3 Trips ____________ _________________ OPTION Mobilization/Demobilization to Offshore Bird Island in St Simons Sound, Brunswick Harbor (Option Period 1)
0093 3 Trips ____________ _________________ OPTION Mobilization/Demobilization for every flat bed load of 10 or more mats for task(9 mats or less incidental to the piece of equipment needed for task) (Option Period 1)
0094 500 Hours ____________ _________________ OPTION Pontoon Rotary Ditcher With Winch Truck - Furnish all Labor, Materials, and
Equipment to Operate Equipment (Option Period 1)
0095 745 Acre ____________ _________________ OPTION Mowing-
Furnish all Labor, Materials, and Equipment to Perform Mowing (Option Period 1)
0096 265 Acre ___________ _________________ OPTION Environmental Mowing- Furnish all Labor, Materials, and Equipment to Perform
Mowing (Option Period 1)
0097 200 Acre ____________ _________________ OPTION Mowing- On slopes with a Boom Mower
Furnish all Labor, Materials, and Equipment to Perform Mowing (Option Period 1)
0098 100 Hours ____________ _________________ OPTION Tractor with Tree Cutter (able to cut trees up to 6" diameter) (Minimum of 120
HP) with disc harrows (minimum 16’ cutting width) Furnish all Labor, Materials and Equipment to Perform Tree Cutting and Operate Tractor w/ disc harrows (Option Period 1)
0099 600 Hours ____________ _________________ OPTION Tractor Dozer (D5 or equivalent)-Furnish all Labor, Materials and Equipment to
Operate Dozer (Option Period 1)
0100 200 Hours ____________ _________________ OPTION Front-End Loader (Minimum 2 Cubic Yards)
Furnish all Labor, Materials and Equipment to Operate Loader (Option Period 1)
0101 200 Hours ____________ _________________ OPTION Highway Dump Truck (Minimum 12 Cubic Yards) - Furnish all Labor, Materials and Equipment to Operate Truck (Option Period 1)
0102 200 Hours ____________ _________________ OPTION Off Road Dump Truck ( maximum 25-ton) - Furnish all Labor, Materials and
Equipment to Operate Truck (Option Period 1)
0103 600 Hours ____________ _________________ OPTION Excavator (Minimum 1.5 Cubic Yard Bucket with Thumb Attachment with Heavy
Equipment to Operate Excavator (Option Period 1)
0104 300 Hours ____________ _________________ OPTION Long-Reach Excavator (Minimum 0.5 Cubic Yards) with 6' Root Rake and
Equipment to Operate Excavator (Option Period 1)
0105 100 Hours ____________ _________________ OPTION Motor Grader (Minimum 150 HP) Furnish All Labor, Materials and Equipment to
Operate Motor Grader (Option Period 1)
0106 1,200 Hours ____________ _________________ OPTION Tractor (Minimum 230 HP) with Pan (Minimum 15 Cubic Yard) Furnish all
Labor, Materials and Equipment to Operate Tractor w/Pan (Option Period 1)
0107 100 Hours ____________ _________________ OPTION Rubber Tired Backhoe/Loader (Minimum 75 HP) (Minimum 24" Backhoe Bucket
Operate Tractor w/Backhoe/Loader (Option Period 1)
0108 100 Hours ____________ _________________ OPTION Bobcat or equivalent with all attachments - Furnish all Labor, Materials and
Equipment to operate Bobcat or equivalent (Option Period 1)
0109 500 Acre ____________ _________________ OPTION Stripping - Furnish all Labor, Materials, and equipment to perform Stripping
Operations (Option Period 1)
0110 500 Acre ___________ _________________ OPTION Furnish all Labor, Materials, and Equipment for Clearing and Burning the areas of the outside dike down to the MLLW tide line - Complete (Option Period 1)
0111 500 Acre ____________ _________________ OPTION Furnish all Labor, Materials, and Equipment for Clearing, Grubbing and Burning of the areas within and surrounding the disposal areas which includes the area
0112 20 Acre ____________ _________________ OPTION Furnish all Labor, Materials and Equipment for Permanent Grassing (Option
0113 20 Acre ____________ _________________ OPTION Furnish all Labor, Materials and Equipment for Temporary Grassing (Option
OPTION Furnish all Labor, Materials and Equipment for Marsh Grass (Spartina alterniflora)
Planting (Option Period 1)
0114AA 10 Acre ____________ _________________ OPTION Planting with stakes and mats (Option Period 1)
0114AB 10 Acre ____________ _________________ OPTION Planting without stakes and mats (Option Period 1)
0115 10 Acre ____________ _________________ OPTION Furnish all Labor, Materials and Equipment for Marsh Grass (Juncus roemerianus)
Planting (Option Period 1)
OPTION Furnish all Labor, Materials and Equipment for Marsh Grass (Spartina cynosuroides) Planting (Option Period 1)
0116AA 10 Acre ____________ _________________ OPTION Planting with stakes and mats (Option Period 1)
0116AB 10 Acre ____________ _________________ OPTION Planting without stakes and mats (Option Period 1)
0117 250 Linear
Foot
OPTION Furnish all Labor, Materials and Equipment to Install and remove Silt Fence (GA DOT Type A) (Option Period 1)
0118 250 Linear
Foot
DOT Type C) (Option Period 1)
0119 50 Ton ____________ _________________ OPTION Furnish all Labor and Equipment for template placement for Armor Stone (Option
0120 50 Ton ____________ _________________ OPTION Furnish all Labor and Equipment for template placement for GA DOT Type #1
Rip Rap (Option Period 1)
0121 50 Ton ____________ _________________ OPTION Furnish all Labor and Equipment for template placement for GA DOT Type #3
Rip Rap (Option Period 1)
0122 50 Ton ____________ _________________ OPTION Furnish all Labor and Equipment for template placement for GA DOT Size #4
Coarse Aggregate (Option Period 1)
0123 10 Ton ____________ _________________ OPTION Furnish all Labor, Materials and Equipment for Concrete Grout (Option Period 1)
0124 50 Ton ____________ _________________ OPTION Armor Stone, Materials Only (Option Period 1)
0125 50 Ton ____________ _________________ OPTION GA DOT Type #1 Rip Rap, Materials Only (Option Period 1)
0126 50 Ton ____________ _________________ OPTION GA DOT Type #3 Rip Rap, Materials Only (Option Period 1)
0127 50 Ton ____________ _________________ OPTION GA DOT Size #4 Coarse Aggregate, Materials Only (Option Period 1)
0128 50 Linear
Foot
OPTION Furnish all Labor, Materials, and Equipment to install Hay bales with stakes
0129 50 Bag ____________ _________________ OPTION Furnish all Labor, Materials, and Equipment to install Culch Oysters (Option
0130 50 Square
Yard
OPTION Furnish all Labor, Materials, and Equipment to install Excelsior green dyed stakes (Option Period 1)
0131 120 Linear
Foot
OPTION Furnish all Labor, Materials, and Equipment to install Weir Stoplogs (Option
0132 10 Linear
Foot
OPTION Repair Weir Riser(metal components to include ladder, safety climb, center stop
Materials and Equipment (Option Period 1)
0133 10 Linear
Foot
OPTION Metal Catwalk Repair, Complete, Labor, Materials and Equipment (Option
0134 10 Linear
Foot
OPTION Metal Catwalk Extensions, Complete, Labor, Materials and Equipment (Option
0135 5 Each ____________ _________________ OPTION Install New Weir, Complete, Labor, Materials and Equipment (Option Period 1)
0136 5 5 Linear Ft
Section
OPTION Install New Weir Riser Unit Extensions, Complete, Labor, Materials and Equipment (Option Period 1)
0137 10 Linear
Foot
OPTION Install New Weir Catwalk, Complete, Labor, Materials and Equipment (Option
0138 50 Square
Foot
OPTION Install New Vinyl Sheet piles, Complete, Labor, Materials and Equipment (Option
0139 2 Each ____________ _________________ OPTION Install New Safety Climb, Complete, Labor, Materials and Equipment (Option
0140 2 Each ____________ _________________ OPTION Install New Weir Foundation-Concrete Slab with Pilings, Complete, Labor, 0141 2 Each ____________ _________________ OPTION Install New Flange and Galvanized Ring, Complete, Labor, Materials and
0142 2 Each ____________ _________________ OPTION Install New Elbow with Flanges and Galvanized Rings, Complete, Labor, 0143 5 Each ____________ _________________ OPTION Install Gussets (4 each weir), Complete, Labor, Materials and Equipment (Option
Period 1
0144 100 Linear
Foot
OPTION Extrusion welding of the HDPE pipe using a hand gun on all parts of the weir to and Equipment (Option Period 1)
0145 400 Linear
Foot
OPTION Removal and Replacement of 48" HDPE Outfall Pipes, Complete, Labor, 0146 10 Hours ____________ _________________ OPTION Tamping , Complete, Labor, Materials, and Equipment (Option Period 1)
0147 10 Cubic
Yard
OPTION Removal of Unstable Material and Replacement with Select Granular Material for
0148 10 Hours ____________ _________________ OPTION Furnish all Labor, Materials, and Equipment for installation and maintenance of
6" Sump Pump (Option Period 1)
0149 6 Days ____________ _________________ well point system including 6" Pump (Option Period 1)
OPTION Furnish all Labor, Materials, and Equipment for installation and maintenance of
Premier1 Pos/Neg Electrostop 42” electric fence or equivalent (to include chargers, posts, mesh, and fence) (Option Period 1)
0150AA 500 Linear
Foot
OPTION Fencing with posts and chargers (Option Period 1)
0150AB 200 Linear
Foot
OPTION Maintenance and Repair (Option Period 1)
0151 50 Days ____________ _________________ OPTION Burning - Furnish all Labor, Materials, and Equipment for Burning (Option Period
1)
0152 20 Days ____________ _________________ OPTION Forced Air Burner/Air Curtain Furnish all Labor, Materials, and Equipment to execute (Option Period 1)
0153 100 Linear
Foot
OPTION 48” Polyethylene Pipe, Materials Only (Option Period 1)
0154 100 Linear
Foot
OPTION 42” Polyethylene Pipe, Materials Only (Option Period 1)
0155 100 Linear
Foot
OPTION 36” Polyethylene Pipe , Materials Only (Option Period 1)
0156 100 Linear
Foot
OPTION 30” Polyethylene Pipe, Materials Only (Option Period 1)
0157 2 Each ____________ _________________ OPTION 30” to 48” Polyethylene Pipe Fusing. Furnish all Labor, Materials, and Equipment to perform Polyethylene Pipe Fusing Operations (per joint) (Option Period 1)
0158 100 Square
Yard
OPTION Geotextile Fabric - Furnish all Labor, Materials, and Equipment to install Geotextile Fabric (Option Period 1)
0159 50 Ton ____________ _________________ OPTION Lime (Option Period 1)
0160 2 Ton ____________ _________________ OPTION Fertilizer (Option Period 1)
0161 30 Acre ____________ _________________ OPTION Herbicide/Rodeo or equivalent - Ground Application Including Labor, Materials and Equipment (Option Period 1)
0162 30 Acre ____________ _________________ OPTION Herbicide/ Rodeo or other approved herbicide or pre-emergent equivalent - Aerial
(Helicopter) Application Including Labor, Materials and Equipment (Option
0163 550 Acre ____________ _________________ OPTION Application of a non-selective pre-emergent approved for aquatic use to include all
Labor, Materials and Equipment (Option Period 1)
0164 30 Pound ____________ _________________ OPTION Furnish all Labor, Materials, and Equipment for installation of Amdro/Advion
0165 10 Pound ____________ _________________ OPTION Furnish all Labor, Materials, and Equipment for installation of Orthene (Option
0166 500 Acre ____________ _________________ OPTION Herbiciding with Boom Sprayer - Furnish all Labor, Materials, and Equipment to
Herbicide Disposal Areas including Slopes (Option Period 1)
0167 100 Hours ____________ _________________ OPTION Welding, Burning and Cutting, Labor, Equipment and Materials (Option Period 1)
0168 80 Hours ____________ _________________ OPTION Laborer (Option Period 1)
0169 25 Days ____________ _________________ OPTION Crane Barge, Inland (capable of placing up to 10,000 lb rock 60 feet from barge), minimum 30”x 120” material barge with spuds) (Option Period 1)
0170 36 Acre ____________ _________________ OPTION Maintain Bird Islands including all labor, materials and equipment, clearing and burning (Option Period 1)
0171 20 Trips ____________ _________________ OPTION Mobilization/Demobilization to Savannah Harbor (to include Interior Bird Islands when a temporary haul road is not required) (Option Period 2)
0172 5 Trips ____________ _________________ OPTION Mobilization/Demobilization to Jones/Oysterbed Island to include Interior Bird
Islands on Jones/Oysterbed Island (Option Period 2)
0173 5 Trips ____________ _________________ OPTION Mobilization/Demobilization to Disposal Area 2A (Option Period 2)
0174 3 Trips ____________ _________________ OPTION Mobilization/Demobilization to Andrews Island - Brunswick Harbor (Option
Period 2)
0175 3 Trips ____________ _________________ OPTION Mobilization/Demobilization to interior bird islands in Disposal Areas (12A, 13A, 14A, and 14B) when a temporary haul road is required (Option Period 2)
0176 3 Trips ____________ _________________ OPTION Mobilization/Demobilization to -Tomkins Island†Bird Island between the
Savannah Harbor North Jetty and Daufuskie Island (Option Period 2)
0177 3 Trips ____________ _________________ OPTION Mobilization/Demobilization to Offshore Bird Island in St Simons Sound, Brunswick Harbor (Option Period 2)
0178 3 Ton ____________ _________________ OPTION Mobilization/Demobilization for every flat bed load of 10 or more mats for task (9 mats or less incidental to the piece of equipment needed for task) (Option Period 2)
0179 500 Hours ____________ _________________ OPTION Pontoon Rotary Ditcher With Winch Truck - Furnish all Labor, Materials, and
Equipment to Operate Equipment (Option Period 2)
0180 745 Acre ____________ _________________ OPTION Mowing-
Furnish all Labor, Materials, and Equipment to Perform Mowing (Option Period 2)
0181 265 Acre ____________ _________________ OPTION Environmental Mowing- Furnish all Labor, Materials, and Equipment to Perform
Mowing (Option Period 2)
0182 200 Acre ____________ _________________ OPTION Mowing- On slopes with a Boom Mower
Furnish all Labor, Materials, and Equipment to Perform Mowing (Option Period 2)
0183 100 Hours ____________ _________________ OPTION Tractor with Tree Cutter (able to cut trees up to 6" diameter) (Minimum of 120
HP) with disc harrows (minimum 16’ cutting width) Furnish all Labor, Materials and Equipment to Perform Tree Cutting and Operate Tractor w/ disc harrows (Option Period 2)
0184 600 Hours ____________ _________________ OPTION Tractor Dozer (D5 or equivalent)-Furnish all Labor, Materials and Equipment to
Operate Dozer (Option Period 2)
0185 200 Hours ____________ _________________ OPTION Front-End Loader (Minimum 2 Cubic Yards)
Furnish all Labor, Materials and Equipment to Operate Loader (Option Period 2)
0186 200 Hours ____________ _________________ OPTION Highway Dump Truck (Minimum 12 Cubic Yards) - Furnish all Labor, Materials and Equipment to Operate Truck (Option Period 2)
0187 200 Hours ____________ _________________ OPTION Off Road Dump Truck ( maximum 25-ton) - Furnish all Labor, Materials and
Equipment to Operate Truck (Option Period 2)
0188 600 Hours ____________ _________________ OPTION Excavator (Minimum 1.5 Cubic Yard Bucket with Thumb Attachment with Heavy
Equipment to Operate Excavator (Option Period 2)
0189 300 Hours ____________ _________________ OPTION Long-Reach Excavator (Minimum 0.5 Cubic Yards) with 6' Root Rake and
Equipment to Operate Excavator (Option Period 2)
0190 100 Hours ____________ _________________ OPTION Motor Grader (Minimum 150 HP) Furnish All Labor, Materials and Equipment to
Operate Motor Grader (Option Period 2)
0191 1,200 Hours ____________ _________________ OPTION Tractor (Minimum 230 HP) with Pan (Minimum 15 Cubic Yard) Furnish all
Labor, Materials and Equipment to Operate Tractor w/Pan (Option Period 2)
0192 100 Hours ____________ _________________ OPTION Rubber Tired Backhoe/Loader (Minimum 75 HP) (Minimum 24" Backhoe Bucket
Operate Tractor w/Backhoe/Loader (Option Period 2)
0193 100 Hours ____________ _________________ OPTION Bobcat or equivalent with all attachments - Furnish all Labor, Materials and
Equipment to operate Bobcat or equivalent (Option Period 2)
0194 500 Acre ____________ _________________ OPTION Stripping - Furnish all Labor, Materials, and equipment to perform Stripping
Operations (Option Period 2)
0195 500 Acre ____________ _________________ OPTION Furnish all Labor, Materials, and Equipment for Clearing and Burning the areas of the outside dike down to the MLLW tide line - Complete (Option Period 2)
0196 500 Acre ____________ _________________ OPTION Furnish all Labor, Materials, and Equipment for Clearing, Grubbing and Burning of the areas within and surrounding the disposal areas which includes the area
0197 20 Acre ____________ _________________ OPTION Furnish all Labor, Materials and Equipment for Permanent Grassing (Option
0198 20 Acre ____________ _________________ OPTION Furnish all Labor, Materials and Equipment for Temporary Grassing (Option
OPTION Furnish all Labor, Materials and Equipment for Marsh Grass (Spartina alterniflora)
Planting (Option Period 2)
0199AA 10 Acre ____________ _________________ OPTION Planting with stakes and mats (Option Period 2)
0199AB 10 Acre ____________ _________________ OPTION Planting without stakes and mats (Option Period 2)
0200 10 Acre ____________ _________________ OPTION Furnish all Labor, Materials and Equipment for Marsh Grass (Juncus roemerianus)
Planting (Option Period 2)
OPTION Furnish all Labor, Materials and Equipment for Marsh Grass (Spartina cynosuroides) Planting (Option Period 2)
0201AA 10 Acre ____________ _________________ OPTION Planting with stakes and mats (Option Period 2)
0201AB 10 Acre ____________ _________________ OPTION Planting without stakes and mats (Option Period 2)
0202 250 Linear
Foot
DOT Type A) (Option Period 2)
0203 250 Linear
Foot
DOT Type C) (Option Period 2)
0204 50 Ton ____________ _________________ OPTION Furnish all Labor and Equipment for template placement for Armor Stone (Option
0205 50 Ton ____________ _________________ OPTION Furnish all Labor and Equipment for template placement for GA DOT Type #1
Rip Rap (Option Period 2)
0206 50 Ton ____________ _________________ OPTION Furnish all Labor and Equipment for template placement for GA DOT Type #3
Rip Rap (Option Period 2)
0207 50 Ton ____________ _________________ OPTION Furnish all Labor and Equipment for template placement for GA DOT Size #4
Coarse Aggregate (Option Period 2)
0208 10 Cubic
Yard
OPTION Furnish all Labor, Materials and Equipment for Concrete Grout (Option Period 2)
0209 50 Ton ___________ _________________ OPTION Armor Stone, Materials Only(Option Period 2)
0210 50 Ton ____________ _________________ OPTION GA DOT Type #1 Rip Rap, Materials Only (Option Period 2)
0211 50 Ton ____________ _________________ OPTION GA DOT Type #3 Rip Rap, Materials Only (Option Period 2)
0212 50 Ton ____________ _________________ OPTION GA DOT Size #4 Coarse Aggregate, Materials Only (Option Period 2)
0213 50 Linear
Foot
OPTION Furnish all Labor, Materials, and Equipment to install Hay bales with stakes
0214 50 Bag ____________ _________________ OPTION Furnish all Labor, Materials, and Equipment to install Culch Oysters (Option
0215 50 Square
Yard
OPTION Furnish all Labor, Materials, and Equipment to install Excelsior green dyed stakes (Option Period 2)
0216 120 Linear
Foot
OPTION Furnish all Labor, Materials, and Equipment to install Weir Stoplogs (Option
0217 10 Linear
Foot
OPTION Repair Weir Riser(metal components to include ladder, safety climb, center stop
Materials and Equipment (Option Period 2)
0218 10 Linear
Foot
OPTION Metal Catwalk Repair, Complete, Labor, Materials and Equipment (Option
0219 10 Linear
Foot
OPTION Metal Catwalk Extensions, Complete, Labor, Materials and Equipment (Option
0220 5 Each ____________ _________________ OPTION Install New Weir, Complete, Labor, Materials and Equipment (Option Period 2)
0221 5 5 Linear Ft
Section
OPTION Install New Weir Riser Unit Extensions, Complete, Labor, Materials and Equipment (Option Period 2)
0222 10 Linear
Foot
OPTION Install New Weir Catwalk, Complete, Labor, Materials and Equipment (Option
0223 50 Square
Foot
OPTION Install New Vinyl Sheet piles, Complete, Labor, Materials and Equipment (Option
0224 2 Each ____________ _________________ OPTION Install New Safety Climb, Complete, Labor, Materials…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .