11R45.PDF
PDF 4 MB Posted
- Attached to
- Main Circuit Breakers/Static Frequency Converter Installation and Excitation System Replacement Federal contract opportunity
- Solicitation number
- W912HN-11-R-0045
About this file
W912HN-11-R-0045 AMD1 SPECS
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W912HN-11-B-0002 SAV-BRUNS - Dredging Bid Abstract with Unit Costs.pdf | ||
| amd1.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Richard B. Russell Dam Georgia
Solicitation Number
W912HN-11-R-0045
Main Circuit Breaker/SFC installation Sections 00010 through 00800 and Technical Provisions - Divisions 1 through 26 September 2011
U.S. ARMY ENGINEER DISTRICT, SAVANNAH
CORPS OF ENGINEERS
100 WEST OGLETHORPE AVENUE
SAVANNAH, GEORGIA 31401-3640
US Army Corps of Engineers Savannah District
Main Circuit Breaker/SFC installation 11R45 Richard B. Russell Dam, GA
PROJECT TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
01 10 10.00 25 CONTRACTOR'S SITE OPERATIONS
01 11 10 SUMMARY OF WORK
01 30 70 AS-BUILT DRAWINGS
01 32 01.00 10 PROJECT SCHEDULE
01 33 00 SUBMITTAL PROCEDURES
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00.00 10 QUALITY CONTROL
01 45 00.10 10 QUALITY CONTROL SYSTEM (QCS)
01 57 20.00 10 ENVIRONMENTAL PROTECTION
01 78 23 OPERATION AND MAINTENANCE DATA
DIVISION 02 - EXISTING CONDITIONS
02 26 00 HAZARDOUS MATERIALS
DIVISION 03 - CONCRETE
03 20 00 RESIN SYSTEMS FOR CONCRETE BONDING; DRILLING AND GROUTING
REINFORCING STEEL
03 60 00 CONCRETE REMOVAL
03 70 00 CONCRETE
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 61 14.00 20 STEEL STANDING SEAM ROOFING
DIVISION 09 - FINISHES
09 91 00 PAINTING
09 97 00 TRANSFORMER DECK COATING
DIVISION 13 - SPECIAL CONSTRUCTION
13 48 00 SEISMIC RESTRAINT FOR MECHANICAL AND ELECTRICAL EQUIPMENT
DIVISION 26 - ELECTRICAL
26 05 00.00 26 ELECTRICAL EQUIPMENT AND WORK
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 1
CODE
(Hour)
PAGE(S)
until 02:00 PM local time 07 Nov 2011
X
A X B X C
D
EX
X G F 176 - 187
188 - 200 X H 201 - 214 jara.n.tartt@usace.army.mil
RATING PAGE OF PAGES
7. ISSUED BY
(Date)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)
Prescribed by GSA FAR (48 CFR) 53.214(c)
1 214
(If other than Item 7)
15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO
AND
ADDRESS
SIGN OFFER (Type or print)
OF
OFFEROR
AMENDMENT NO. DATE
15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS
IS DIFFERENT FROM ABOVE - ENTER
SUCH ADDRESS IN SCHEDULE.
18. OFFER DATE
1. THIS CONTRACT IS A RATED ORDER
UNDER DPAS (15 CFR 700)
2. CONTRACT NO.
W912HN 8. ADDRESS OFFER TO
See Item 7
9. Sealed offers in original and 8 copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in
CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and
Reference Section L conditions contained in this solicitation.
10. FOR INFORMATION
CALL:
A. NAME (NO COLLECT CALLS)
JARA TARTT 912-652-5078
11. TABLE OF CONTENTS
SOLICITATION/ CONTRACT FORM
SUPPLIES OR SERVICES AND PRICES/ COSTS
2 - 28
X I CONTRACT CLAUSES
DESCRIPTION/ SPECS./ WORK STATEMENT X
PACKAGING AND MARKING
29 J LIST OF ATTACHMENTS
INSPECTION AND ACCEPTANCE
DELIVERIES OR PERFORMANCE
X K
REPRESENTATIONS, CERTIFICATIONS AND
OTHER STATEMENTS OF OFFERORS
CONTRACT ADMINISTRATION DATA 32 X
SPECIAL CONTRACT REQUIREMENTS
OFFER (Must be fully completed by offeror) 33 - 35 X M
L INSTRS., CONDS., AND NOTICES TO OFFERORS
EVALUATION FACTORS FOR AWARD
NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. DISCOUNT FOR PROMPT PAYMENT
(See Section I, Clause No. 52.232-8)
14. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments
AMENDMENT NO. DATE
to the SOLICITATION for offerors and related documents numbered and dated):
FACILITY
12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period
SOLICITATION, OFFER AND AWARD
X
(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)
PART I - THE SCHEDULE
26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE
EMAIL:TEL: (Signature of Contracting Officer)
CODE CODE
B. TELEPHONE (Include area code) C. E-MAIL ADDRESS
AWARD (To be completed by Government)
19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION
22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)
23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE
PART IV - REPRESENTATIONS AND INSTRUCTIONS
PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
36 - 171
PART II - CONTRACT CLAUSES
US ARMY ENGINEER DISTRICT, SAVANNAH
100 WEST OGLETHORPE AVE.
SAVANNAH GA 31401-3640
FAX:
TEL:
FAX:
TEL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SOLICITATION
172 - 175
6. REQUISITION/PURCHASE NO.5. DATE ISSUED
23 Sep 2011
4. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
[ X ]
3. SOLICITATION NO.
Section B - Supplies or Services and Prices
PRE-BID CONFERENCE ATTENDEES
MEMORANDUM FOR RECORD
CECT-SAS 25 October 2011
MEMORANDUM FOR RECORD
SUBJECT: Minutes of Pre-proposal Conference held for Main Circuit Breaker/Static Frequency Converter Installation and Excitation System Replacement, Richard B. Russell Power Plant, Elberton County, Georgia
1. On Tuesday October 18, 2011, a pre proposal conference was conducted for the subject project. The list of attendees is included in Amendment 0001 to the solicitation.
Attending the pre proposal conference on behalf of the Government were representatives from Contracting Division, Construction Division Fort Gordon Area Office, Russell Project, Hydropower Technical Center, and the Hydroelectric Design Center.
2. At 0900 the contractors and Government personnel met at the Russell power plant, introductions were made, and the Contractors were asked to submit on paper any questions they had brought with them regarding the project.
3. Attendees then broke up into three groups and toured the equipment and installation locations of the powerhouse. Contractors were instructed to write down any questions that came up during the walk through and submit them when we returned to the conference room. During the walk through, the group(s) had several questions with the most significant being the isophase bus supply. Not everyone understood that this solicitation required the contractor to supply new isophase bus, rather than providing the option to refurbish the existing bus in our warehouse.
4. The groups reconvened at 1145 at the project office where several additional questions from the groups were received. After collecting all of the contractor questions in writing, Government personnel addressed the questions and advised the group that the official questions and answers would be posted in an amendment to the solicitation. There were three significant questions brought up by the contractors:
a. Clarification of the isophase bus supply. We had removed the option to refurbish the existing isophase bus from this project however all references to this were not deleted in the specifications. This resulted in some confusion among the contractors.
However, this was clarified on Projnet last week and will be clarified in the Amendment 0001 to the solicitation.
b. The contract duration was not clear to several contractors. Although the maximum duration of 533 days is referenced in Section M, Factor 2 – Contract Duration and Summary Schedule of the solicitation, the duration is also being added to Section L in FAR clause 52.211-10 – Commencement, Prosecution and Completion of Work through Amendment 0001.
c. At least one contractor expressed concern over the bonding requirements of this project. Specifically, the Corps is requiring bonding for only the construction portion of the work which pertains to CLINS 0012, 0013 & 0024 of the bid schedule and is relatively minor compared to the entire project requirement. The issue brought up by the contractor was that their bonding firm would not allow bonding for only part of the contract and they were going to have to bond the full amount of their proposal. It has been determined by the Contracting Officer there will be no change to this requirement. Any contractor interested in submitting a proposal for this proposal may either (1) submit the REQUIRED bonding for the construction CLINS 0012, 0013 & 0024, or (2) may submit bonding for the entire amount of their proposal if required by their bonding company. Also see FAR 52.228-1 - Bid Guarantee, and 52.228-15 Performance & Payment Bonds Clause of the solicitation.
d. During the question/answer period several of the contractor expressed concern over the proposal due date of November 7, 2011. The primary concern was that the information provided by the contract drawings was not detailed enough to develop an accurate proposal for some elements of the job (mainly isophase bus supply), and that they would need to make further measurements to develop their proposals. Beyond this concern several contractors stated that additional time may be required to develop accurate bids due to the unique nature of this project and the equipment being installed. Approximately half of the contractors present voiced concerns over the proposal due date. As a result the proposal due date has been extended to December 1, 2011.
5. The final item covered in the pre-proposal conference meeting was a quick run through of important submission requirements, contract clauses, and other contract administration items by the Contracting Officer.
6. The site visit was concluded at approximately 1330.
7. Written questions and answers from the conference are as follows:
Q1. Eaton Corporation: Please confirm that the project is requiring complete “new purchase” of all isophase bus. When will the specification be changed?
A1. This project requires new contractor furnished isophase bus. The option to refurbish existing government furnished isophase bus has been deleted. However, several references to refurbishment of existing isophase bus were unintentionally left in the specifications. The government is working to remove all references to refurbishment under an amendment to this solicitation.
Q2. Crowder Construction Company: Reference section 01 11 10 pages 4 and 5 “Government furnished equipment” paragraph 1.8.1 and “Government furnished cable and raceway” paragraph 1.8.2. a. Are we to use this equipment, cable, and raceway? b.
Is all other equipment, cable, and raceway not on this list provided by the contractor?
A2. a. The equipment, cable, and raceway listed in Section 01 11 10 paragraphs 1.8.1 and
1.8.2 is available for use by the contractor but the government is not mandating its use.
Q3. J.L. Malone: Who provides the crane operator? The specifications indicate that the government does but this is unusual.
A3: The contractor shall provide the crane operator. The contractor's crane operator shall be certified in operation of the type of crane at Russell and will be required to demonstrate proficiency to government prior to initially operating the crane. The specifications will be updated to include this language.
Q4 J.L. Malone: There is specification for seismic restraint design. The types of anchors are specified for floor, wall, and ceiling anchors. In order for an engineer to design seismic restraints the structural drawings will need to be made available pre-bid. Or can we install the same restraints in the field that are existing?
A4: It is the responsibility of the contractor to limit the design of seismic restraints to the equipment, bus work and supports, conduit, and cable tray being installed.
Considerations for seismic design of the powerhouse structure are not required and are not necessary for anchoring equipment.
Q5: J.L. Malone: Are there any floor loading restraints to be aware of when moving some of the heavy equipment?
A5: On EL 350, there is a load restraint between the parking curbs at service bays and the powerhouse (120 psf). Otherwise there is no loading restraint for moving the breakers and isophase bus. Note, there were restraints on moving the input and output transformers but since they are already installed this should not be an issue.
Q6: Has the government completed 100% of the interface design for the government furnished equipment?
A6: The government has provided point-to-point interface drawings as part of the solicitation. It is the contractor’s responsibility to field verify this information.
Q7: CE Power: To protect from rust and corrosion have the space heaters been in operation in the excitation systems and excitation transformers?
A7: No. However, the excitation equipment has been stored in the climate controlled powerhouse since it was delivered. The government believes that the equipment is in excellent condition with no rust or corrosion.
Q8: J.L. Malone: According to conversation in our group it seems that the IPB is to be all new and the contractor will not be responsible for hauling off GFE IPB in warehouses or on the floor. Is this correct?
A8: This is correct. The contractor will provide new isolated phase bus for this contract and is not responsible for hauling off the existing GFE IPB that the government initially purchased for this work. However, the contractor is responsible for disposing of any of the existing in service IPB that is removed as part of the breaker and SFC installation.
The government will update the language in the specifications to clarify this.
Q9: Warranty on government furnished equipment.
A9: There is no warranty associated with the government furnished equipment.
However, the contractor is responsible for workmanship and the equipment the contractor provides.
Q10: Are the switches and relays used back?
A10: Yes, the current switches and relays in the main control board are to be used where indicated on the contract drawings. Additionally, the contractor will have to add new switches and relays where none currently exist as indicated in the specifications.
Q11: Insulating, burden and accuracy rating on the CTs?
A11: There are no CTs to be provided in this contract. All CTs are existing and/or government-furnished in the equipment.
Q12: Will they be allowed to have outage when working around overhead powerhouse lines?
A12: Outages on the powerhouse line will be allowed when required to safely accomplish portions of the work. These outages must be scheduled in advance and kept to a minimal duration since each powerhouse line serves multiple generating units. Note that Powerhouse Line 3 is shared by Transformer 3 and 4. Each of these transformers can be isolated from the powerhouse line so we do not foresee any outages being necessary for Powerhouse Line 3.
Q13: Do the OCBs contain PCBs?
A13: No, random samples have been taken and test results are onsite. No PCBs were found.
Q14: Can the contractor return to the plant for bus work measurements?
A14: Yes, please contact J. Palmer to schedule an appointment.
SPECIFICATION CHANGES
Russell MCB/SFC Specification Changes
01 10 10.00 25 Replace
1.14.5 Use of Powerhouse Crane
1.14.5.1 General
The powerhouse crane will be made available, upon request, on an as-needed basis for work under this Contract. The Contractor shall provide a crane operator, crane riggers, and rigging.
Crane operators shall meet the requirements of SECTION 01 35 26, subpart 1.5.1.3 “Crane Operators.” Use of the crane will require 48-hour advance notice to the COR. The Government will determine the availability and duration of use for the crane.
01 11 10
1.3 MISCELLANEOUS WORK
Remove
f. Recycle or dispose of any unused government furnished iso-phase bus and associated hardware.
01 11 10 Replace
1.8.1 Government-Furnished Bus and Switchgear
Line Item Quantity. Tot. Line Item Value SF6 Circuit Breaker, 15kV, 6300A 8 EA 2,173,672.00
Static Frequency Control System 1 LS 626,776.00 Input/Output Transformers, 15kV 4 EA 427,644.00 Input/Output Circuit Breakers, 15kV 3 EA 137,610.00 Current-Limiting Reactors, 3-Phase, 15kV 2 EA 47,927.00 TOTAL VALUE of GOVERNMENT-FURNISHED
BUS AND SWITCHGEAR: $3,413,629.00
01 35 26
1.5.1.3 Crane Operators
Crane operators shall meet the requirements in EM 385-1-1, Section 16 and Appendix I. In addition, for mobile cranes with Original Equipment Manufacturer (OEM) rated capacitates of 50,000 pounds or greater, crane operators shall be designated as qualified by a source that qualifies crane operators (i.e., union, a government agency, or an organization that tests and qualifies crane operators). Proof of current qualification shall be provided.
01 45 00.00 10
3.4.2 CQC System Manager
Identify as CQC System Manager an individual within the onsite work organization who is responsible for overall management of CQC and have the authority to act in all CQC matters for the Contractor. The CQC System Manager must be a graduate engineer, graduate architect, or a graduate of construction management, with a minimum of 5 years construction experience on construction similar to this contract or a construction person with a minimum of 10 years in related work. This CQC System Manager must be on the site at all times during construction and be employed by the prime Contractor. The CQC System Manager must be assigned as System Manager but may have duties in addition to quality control. Identify in the plan an alternate to serve in the event of the CQC System Manager's absence. The requirements for the alternate are the same as the CQC System Manager.
26 05 00. 00 26
1.1 GENERAL INFORMATION
This Section specifies the electrical equipment and work required to install, test and make ready for operation four (4) Government furnished excitation systems and to connect and complete the replacement of the existing main unit circuit breakers and installation of the Static Frequency
Controller (SFC) system. The Richard B. Russell Powerhouse contains eight circuit breakers, one for each of the 13.8 kV main unit generators, units 1-8. The Contractor shall furnish all labor, equipment and materials to perform the work. Work includes, but is not limited to:
removal of the seven (7) main unit circuit breakers (MUBs) (Unit 8 already removed), four (4) disconnects on units 1-4 (units 5-8 breakers contain the disconnect switches and Unit 8 is already removed), control equipment and enclosures; removal of control cables to the Generator Actuator cabinets and Excitation cubicles in the Generator Bays and Switchgear Rooms and to the Main Control Panels in the Powerhouse Control Room; partial removal of isolated-phase bus and supports; removal of the air compressor; installation of eight (8) Government-furnished SF6 circuit breakers, control cabinets and isolated-phase bus (IPB) and supports, including cable;
installation of eight (8) new three-phase disconnect switches for MUBs, installation of two (2) new three-phase disconnect switches for in isolated-phase bus to the SFC current limiting reactors, installation of six (6) new vacuum breakers for start bus system; complete the installation of the Government-furnished static frequency controller (SFC) system, SFC input and output circuit breakers and transformers, two (2) current-limiting reactors, and isolated-phase bus; conduits; medium voltage cables and control cables and terminations; and the miscellaneous electrical accessories defined herein. A portion of the Government-furnished equipment is already partially installed: the SFC system, SFC input and output circuit breakers, SFC transformers, one (1) current-limiting reactor, medium voltage cable and conduit (Note: one
(1) current-limiting reactor requires relocation and replacement of the associated medium voltage cables and conduit).
2.14.1 General
The following requirements apply equally to new isolated-phase bus. The bus structures shall conform to the applicable requirements of ANSI C37.23. Housing for the bus conductors shall be constructed of sheet metal, not less than 1/8-inch thick or No. 11 MSG. Bus conductors shall be of aluminum bars or shapes. All splices in aluminum bus for shop and field assembly shall be welded. Welding shall conform to AWS D1.1/D1.1M, AWS D1.2/D1.2M, and AWS D10.7/D10.7M. Welders shall meet the requirements of AWS QC1 unless otherwise noted.
3.20.1 General
f. Furnishing and installation of 15 kV power cables between the exciter power potential transformer, exciter disconnects, and existing connecting 15kV iso-phase bus.
3.22 GOVERNMENT COMMISSIONING AND TESTING
After the Contractor has completed all testing required under these specifications, the Government will conduct an independent verification of the results and a system commissioning procedure. The Contractor shall participate in these activities by reviewing and becoming familiar with the Government commissioning plan, and by participating in the commissioning process. The Contractor shall provide one or more fully qualified craftsmen to assist in the testing, by taking readings, observing equipment, verifying settings, and making adjustments as instructed by the Government's Commissioning Engineer. This commissioning effort will be 24 hours for the SFC system, 80 hours for the SF6 breakers, 40 hours for the excitation system, and 24 hours for other installed equipment.
MAIN CIRCUIT BREAKER/STATIC FREQUENCY CONVERTER INSTALLATION AND EXCITATION
SYSTEM REPLACEMENT
Richard B. Russell Power Plant
Elbert County, Georgia
TOTAL ( Item 0001 through 0001AB) . . . . . . . . . . . . . . . . . . . . . . . . . . $___________________________
TOTAL ( Item 0002 through 0002AB) . . . . . . . . . . . . . . . . . . . . . . . . . . $___________________________
TOTAL ( Item 0003) . …………………. . . . . . . . . . . . . . . . . . . . . . . . . $___________________________
TOTAL ( Item 0004) . …………………. . . . . . . . . . . . . . . . . . . . . . . . . $___________________________
TOTAL ( Item 0005) . …………………. . . . . . . . . . . . . . . . . . . . . . . . . $___________________________
TOTAL ( Item 0006 through 0006AB) . . . . . . . . . . . . . . . . . . . . . . . . . . $___________________________
TOTAL ( Item 0007 through 0007AB) . . . . . . . . . . . . . . . . . . . . . . . . . . $___________________________
TOTAL ( Item 0008 through 0008AH) . . . . . . . . . . . . . . . . . . . . . . . . . . $___________________________
TOTAL ( Item 0009) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $___________________________
TOTAL ( Item 0010 through 0010AB) . . . . . . . . . . . . . . . . . . . . . . . . . . $___________________________
TOTAL ( Item 0011) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $___________________________
TOTAL ( Item 0012) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $___________________________
TOTAL ( Item 0013) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $___________________________
TOTAL ( Item 0014 through 0014AB) . . . . . . . . . . . . . . . . . . . . . . . . . . $___________________________
TOTAL ( Item 0015 through 0015AB) . . . . . . . . . . . . . . . . . . . . . . . . . . $___________________________
TOTAL ( Item 0016 through 0016AB) . . . . . . . . . . . . . . . . . . . . . . . . . . $___________________________
TOTAL ( Item 0017 through 0017AB) . . . . . . . . . . . . . . . . . . . . . . . . . . $___________________________
TOTAL ( Item 0018) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $___________________________
TOTAL ( Item 0019) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $___________________________
TOTAL ( Item 0020) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $___________________________
TOTAL ( Item 0021) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $___________________________
TOTAL ( Item 0022) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $___________________________
TOTAL ( Item 0023, Option) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $___________________________
TOTAL ( Item 0024, Option through 0024AH). . . . . . . . . . . . . . . . . . . . $___________________________
TOTAL ( Item 0001 through 0024AH) . . . . . . . . . . . . . . . . . . . . . . . . . . $___________________________
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 Mobilization
(Units 1-8)
0001AA Units 1-4
1 Lump Sum
0001AB Units 5-8
0002 Demobilization
(Units 1-8)
0002AA Units 1-4
0002AB Units 5-8
0003 Remove existing air blast circuit breakers and isolated-phase bus (Units 5-7)
Section 26 05 00.00 26, paragrapgh 3.3.1
3 Each
0004 Remove Air Blast
Circuit Breaker Compressor (ABCB) air compressor (Units 5-8)
Section 26 05 00.00 26, paragraph 1.1
0005 Remove existing oil-filled circuit breakers and isolated-phase bus (Units 1-4) paragraph 3.3.1
4 Each
0006 Remove existing conduits and install new conduits and cable trays (Units 1-8)
Section 26 05 00.00 26, paragraph 3.3.1 (removal)
Section 26 05 00.00 26, paragraph 3.3.2, 3.3.3, and 3.7 (install)
Section 26 05 00.00 26, paragraph 2.1 and 2.6 (general)
0006AA Units 1-4
0006AB Units 5-8
0007 Remove existing cables and install and terminate new cables (Units 1-8)
Section 26 05 00.00 26, paragraph 3.3.1 (removal)
Section 26 05 00.00 26, paragraph 3.3.2, 3.3.3, and 3.8 (install)
Section 26 05 00.00 26, paragraph 2.2 (general)
0007AA Units 1-4
0007AB Units 5-8 4 Each
0008 Design, weatherize, install, and test eight (8) new Government-furnished SF6 Main Unit Breakers (MUBs) and contractor furnished isolated-phase bus (Units 1-8) to include required engineering services
Section 26 05 00.00 26, paragraph 3.3 (breakers), paragraph
2.14 and 3.4 (isolated phase bus);
Section 26 05 00.00 26, paragraph 3.3.18 (Required Engineering services for MUBs)
Section 26 05 00.00 26, paragraph 3.4.3 (Required Engineering services for isolated phase bus)
0008AA Unit 1
1 Each
0008AB Unit 2
0008AC Unit 3
0008AD Unit 4
0008AE Unit 5
0008AF Unit 6
0008AG Unit 7
0008AH Unit 8
0009 Complete installation, to include testing and commissioning, of new Government-furnished Static Frequency Controller (SFC) System and appurtenances, including input/output circuit breakers, transformers, reactors, and isolated-phase bus to include required engineering services (Units 5-8)
Section 26 05 00.00 26, paragraph 3.6
Section 26 05 00.00 26, paragraph 3.6.8 (required engineering)
0010 Miscellaneous electrical equipment and accessories and modifications to the main control room switchboard panels and annunciator relay cabinets (Units 1-8) paragraph 2 and 3
0010AA Units 1-4
0010AB Units 5-8 1 Lump Sum
0011 Refurbish and install
Unit 8 surge cubicle paragraph 3.5 and 2.11
0012 Concrete removal, placement, bonding, drilling, and grouting (Units 1-4)
Section 26 05 00.00 26 paragraph 2 and 3
Section 03 20 00.00, 03 60 00, and 03 70 00 (general concrete sections)
Requires bonding (see 52.228-1 & 52.228-15)
0013 Concrete removal, placement, bonding, drilling, and grouting (Units 5-8)
Section 26 05 00.00 26 paragraph 2 and 3
Section 03 20 00.00, 03 60 00, and 03 70 00 (general concrete sections)
0014 Transformer deck coating repair (Units 1-8)
Section 26 05 00.00 26, paragraph 3.3
Section 09 97 00.00
0014AA Units 1-4
0014AB Units 5-8
0015 Furnish as-built drawings (corrections to the contract drawings) (Units 1-8)
Section 26 05 00.00 26 paragraph 1.6
Section 01 30 70.00
0015AA Units 1-4
0015AB Units 5-8
0016 Miscellaneous touch-up painting (Generator Unit Breaker Cabinets, isolated-phase bus, touch-up, and other miscellaneous) (Units 1-8)
Section 09 91 00.00 paragraph 3
0016AA Units 1-4
0016AB Units 5-8 1 Lump Sum
0017 Furnish and install eight (8) three-phase disconnect switches for Main Unit Breakers (MUBs) (Units 1-8)
Section 26 05 00.00 26, paragraph 2.15 and 3.13
0017AA Units 1-4 4 Each
0017AB Units 5-8
0018 Furnish and install two
(2) three-phase disconnect switches in isolated-phase bus to the SFC Current Limiting Reactors (CLR) (Units 6-7)
Section 26 05 00.00 26, paragraph 2.15 and 3.14
2 Each
0019 Furnish and install four
(4) vacuum circcuit breakers and associated non-segregated bus to replace Motor Operated Disconnects (MODs), (Units 5-8)
Section 26 05 00.00 26, paragraph 2.17 and 3.16
0020 Furnish and install two
(2) vacuum circuit breakers to replace start bus input breakers (Units 2-3)
Section 26 05 00.00 26, paragraph 2.17 and 3.18
0021 Furnish SF6 gas analyzer paragraph 2.18
0022 Install four (4) new
Government-furnished exciters (Units 5-8) paragraph 3.20
OPTION
OPTION 0001:
Provide and install new insulating bellows for the Low Voltage (LV) connections at main power for transformers #3 and #4
Section 26 05 00.00 26, paragraph 2.16 and 3.15
OPTION
OPTION 0002:
Provide contractor-designed metal roof over main, Unit Breakers 1-8
Section 26 05 00.00 26, paragraph 3.12
Section 07 61 14.00 20
0024AA Unit 1
0024AB Unit 2
0024AC Unit 3
0024AD Unit 4 1 Each
0024AE Unit 5
0024AF Unit 6
0024AG Unit 7
0024AH Unit 8
Section C - Descriptions and Specifications
STATEMENT OF WORK
STATEMENT OF WORK
This acquisition is a Supply/Construction Procurement with Minor Services and will be solicited as a Total Small Business Set-Aside. The NAICS Code for this contract is 237130 – Power and Communication Line and Related Structures Construction. The government is using the Performance Price Trade-Off Process. The magnitude is approximately $10M - $25M. The resultant contract will be firm fixed-price.
Description of Work: The scope of this project is to perform the work required for the replacement of the existing main unit circuit breakers (MCBs) for Units 1-8 with new Government-Furnished SF6 15 kV MCBs, replacement of the existing static excitation systems for Units 5-8 with new Government-Furnished static excitation systems, and to complete installation of a new Government-furnished static frequency converter (SFC) system at the Richard B. Russell Powerhouse.
The Richard B. Russell Powerhouse contains four Westinghouse 4000 ampere oil circuit breakers one for each of the 13.8 kV main unit generators 1-4, four ABB 5000 ampere air blast circuit breakers one for each of the 13.8 kV main unit generators 5-8, and four Westinghouse WTA300 static excitation systems one for each of the 13.8 kV main unit generators 5-8. Work includes, but is not limited to: removal of the eight (8) main unit circuit breakers (MCBs), eight
(8) disconnects, control equipment and enclosures; removal of control cables to the Generator Actuator cabinets and Excitation cubicles in the Generator Bays and Switchgear Rooms and to the Main Control Panels in the Powerhouse Control Room; partial removal of isolated-phase bus and supports; removal of the air compressor; removal of four (4) static excitation systems;
installation of eight (8) Government-furnished ABB Type HGC3 SF6 circuit breakers, control cabinets and isolated-phase bus (IPB) and supports, including cable; installation of four (4) Government-furnished Cutler Hammer ES2100 digital static excitation systems; complete the installation of the Government-furnished ASI Robicon static frequency controller (SFC) system, input and output circuit breakers and transformers, two (2) current-limiting reactors, and isolated-phase bus; conduits; medium voltage cables and control cables and terminations; and the miscellaneous electrical accessories. Additional items include installation of eight (8) three-phase disconnect switches for the MCBs, installation of two (2) three-phase disconnect switches for in isolated-phase bus to the SFC current limiting reactors, and installation of four (4) vacuum circuit breakers.
Section E - Inspection and Acceptance
CLAUSES INCORPORATED BY FULL TEXT
52.246-4 INSPECTION OF SERVICES--FIXED-PRICE (AUG 1996)
(a) Definitions. "Services," as used in this clause, includes services performed, workmanship, and material furnished or utilized in the performance of services.
(b) The Contractor shall provide and maintain an inspection system acceptable to the Government covering the services under this contract. Complete records of all inspection work performed by the Contractor shall be maintained and made available to the Government during contract performance and for as long afterwards as the contract requires.
(c) The Government has the right to inspect and test all services called for by the contract, to the extent practicable at all times and places during the term of the contract. The Government shall perform inspections and tests in a manner that will not unduly delay the work.
(d) If the Government performs inspections or tests on the premises of the Contractor or a subcontractor, the Contractor shall furnish, and shall require subcontractors to furnish, at no increase in contract price, all reasonable facilities and assistance for the safe and convenient performance of these duties.
(e) If any of the services do not conform with contract requirements, the Government may require the Contractor to perform the services again in conformity with contract requirements, at no increase in contract amount. When the defects in services cannot be corrected by reperformance, the Government may (1) require the Contractor to take necessary action to ensure that future performance conforms to contract requirements and (2) reduce the contract price to reflect the reduced value of the services performed.
(f) If the Contractor fails to promptly perform the services again or to take the necessary action to ensure future performance in conformity with contract requirements, the Government may (1) by contract or otherwise, perform the services and charge to the Contractor any cost incurred by the Government that is directly related to the performance of such service or (2) terminate the contract for default.
(End of clause)
Section F - Deliveries or Performance
52.242-15 STOP-WORK ORDER (AUG 1989)
(a) The Contracting Officer may, at any time, by written order to the Contractor, require the Contractor to stop all, or any part, of the work called for by this contract for a period of 90 days after the order is delivered to the Contractor, and for any further period to which the parties may agree. The order shall be specifically identified as a stop-work order issued under this clause. Upon receipt of the order, the Contractor shall immediately comply with its terms and take all reasonable steps to minimize the incurrence of costs allocable to the work covered by the order during the period of work stoppage. Within a period of 90 days after a stop-work is delivered to the Contractor, or within any extension of that period to which the parties shall have agreed, the Contracting Officer shall either--
(1) Cancel the stop-work order; or
(2) Terminate the work covered by the order as provided in the Default, or the Termination for Convenience of the Government, clause of this contract.
(b) If a stop-work order issued under this clause is canceled or the period of the order or any extension thereof expires, the Contractor shall resume work. The Contracting Officer shall make an equitable adjustment in the delivery schedule or contract price, or both, and the contract shall be modified, in writing, accordingly, if--
(1) The stop-work order results in an increase in the time required for, or in the Contractor's cost properly allocable to, the performance of any part of this contract; and
(2) The Contractor asserts its right to the adjustment within 30 days after the end of the period of work stoppage;
provided, that, if the Contracting Officer decides the facts justify the action, the Contracting Officer may receive and act upon the claim submitted at any time before final payment under this contract.
(c) If a stop-work order is not canceled and the work covered by the order is terminated for the convenience of the Government, the Contracting Officer shall allow reasonable costs resulting from the stop-work order in arriving at the termination settlement.
(d) If a stop-work order is not canceled and the work covered by the order is terminated for default, the Contracting Officer shall allow, by equitable adjustment or otherwise, reasonable costs resulting from the stop-work order.
Section G - Contract Administration Data
52.232-4012 PAYMENT ADDRESS
(a) Submit invoices to the following address:
U.S. Army Corps of Engineers ATTN: Phillip Payne Fort Gordon Resident Office Post Office Box 7496 Fort Gordon, GA 30905-0496
(b) Payment will be made by:
U.S. Army Corps of Engineers Finance Center
ATTN: CEFC-AO-P
5720 Integrity Drive Millington, Tennessee 38054-5005
Section H - Special Contract Requirements
52.0200-4115 WAGE RATES (CESAS-CT FEB 95)
U.S. Department of Labor Wage Decision No. GA100232 dated 08/05/2011 shall be applicable to any contract resulting from this solicitation. These rates and benefits are the minimums to be paid employees hereunder. (See Section J; 52.222-6, Davis-Bacon Act; and 52.222-16 Approval of Wage Rates.)
52.200-4501 EQUIPMENT AND OPERATING PERSONNEL
The Contractor, in entering into the contract, shall have available during the contract period, the necessary equipment and qualified personnel to perform the services provided for in these specifications. If, in the opinion of the Contracting Officer or his authorized representative, any item of equipment or any of the personnel is considered unfit or unqualified for the performance of the services herein specified, the contractor shall, within three (3) calendar days after receipt of written notification of such deficiency, replace the unsatisfactory equipment or personnel by equipment or personnel to the satisfaction of the Contracting Officer or his authorized representative.
52.214-34 SUBMISSION OF OFFERS IN THE ENGLISH LANGUAGE (APR 1991)
Offers submitted in response to this solicitation shall be in the English language. Offers received in other than English shall be rejected.
(End of provision)
52.214-35 SUBMISSION OF OFFERS IN U.S. CURRENCY (APR 1991)
Offers submitted in response to this solicitation shall be in terms of U.S. dollars. Offers received in other than U.S.
dollars shall be rejected.
(End of provision)
52.214-5000 APPARENT CLERICAL MISTAKES (MAR 1995)--EFARS
(a) For the purpose of initial evaluations of bids, the following will be utilized in the resolving arithmetic discrepancies found on the face of bidding schedule as submitted by the bidder:
(1) Obviously misplaced decimal points will be corrected;
(2) Discrepancy between unit price and extended price, the unit price will govern;
(3) Apparent errors in extension of unit prices will be corrected;
(4) Apparent errors in addition of lump-sum and extended prices will be corrected.
(b) For the purpose of bid evaluation, the government will proceed on the assumption that the bidder intends his bid to be evaluated on basis of the unit prices, the totals arrived at by resolution of arithmetic discrepancies as provided above and the bid will be so reflected on the abstract of bids.
(c) These correction procedures shall not be used to resolve any ambiguity concerning which bid is low.
(End of statement)
52.223-4002 U.S. ARMY CORPS OF ENGINEERS SAFETY AND HEALTH REQUIREMENTS MANUAL,
EM 385-1-1
This paragraph applies to contracts and purchase orders that require the contractor to comply with EM 385-1-1 (e.g., contracts that include the Accident Prevention clause at FAR 52.236-13 and/or other safety provisions).
EM 385-1-1 and its changes are available at http://www.hq.usace.army.mil. (At the HQ homepage, select Safety and Occupational Health.) The Contractor shall be responsible for complying with the current edition and all changes posted on the web through the date that is 10 calendar days prior to the date offers are due. If the solicitation is amended to extend the time set for receipt of offers, the 10 calendar days rule stated above shall be applied against the amended date. (For example, if offers are due on 10 April, all changes posted on or before 31 March shall apply to the contract. If the time for receipt of offers is extended from 10 April to 20 April, all changes posted on or before 10 April shall apply to the contract.)
52.228-4002 REQUIRED INSURANCE (FEB 1987 SAS) (Ref. FAR 28.307)
(a) The Contractor shall procure and maintain during the entire period of his performance under this contract the following minimum insurance:
Comprehensive and Employer's Liability Insurance in the amount required by the State law in which the work is to be performed under this contract.
Comprehensive General Liability Insurance in an amount not less than $500,000 per accident.
Automobile Liability Insurance: $200,000 per person and $500,000 per accident for bodily injury liability and $20,000 property damage liability.
(b) Prior to the commencement of work hereunder, the Contractor shall furnish to the Contracting Officer a certificate or written statement of the above-required insurance. The policies evidencing required insurance shall contain an endorsement to the effect that cancellation, or any material change in the policies adversely affecting the interests of the Government in such insurance, shall not be effective for such period as may be prescribed by the laws of the State in which this contract is to be performed and in no event less than 30 days after written notice thereof to the Contracting Officer.
(c) The Contractor agrees to insert the substance of this clause, including this subparagraph (c), in all subcontracts hereunder.
252.201-7000 CONTRACTING OFFICER'S REPRESENTATIVE (DEC 1991)
(a) "Definition. Contracting officer's representative" means an individual designated in accordance with subsection 201.602-2 of the Defense Federal Acquisition Regulation Supplement and authorized in writing by the contracting officer to perform specific technical or administrative functions.
(b) If the Contracting Officer designates a contracting officer's representative (COR), the Contractor will receive a copy of the written designation. It will specify the extent of the COR's authority to act on behalf of the contracting officer. The COR is not authorized to make any commitments or changes that will affect price, quality, quantity, delivery, or any other term or condition of the contract.
Section I - Contract Clauses
52.202-1 DEFINITIONS (JUL 2004)
(a) When a solicitation provision or contract clause uses a word or term that is defined in the Federal Acquisition Regulation (FAR), the word or term has the same meaning as the definition in FAR 2.101 in effect at the time the solicitation was issued, unless--
(1) The solicitation, or amended solicitation, provides a different definition;
(2) The contracting parties agree to a different definition;
(3) The part, subpart, or section of the FAR where the provision or clause is prescribed provides a different meaning; or
(4) The word or term is defined in FAR Part 31, for use in the cost principles and procedures.
(b) The FAR Index is a guide to words and terms the FAR defines and shows where each definition is located. The FAR Index is available via the Internet at http://www.acqnet.gov at the end of the FAR, after the FAR Appendix.
52.203-3 GRATUITIES (APR 1984)
(a) The right of the Contractor to proceed may be terminated by written notice if, after notice and hearing, the agency head or a designee determines that the Contractor, its agent, or another representative--
(1) Offered or gave a gratuity (e.g., an entertainment or gift) to an officer, official, or employee of the Government;
and
(2) Intended, by the gratuity, to obtain a contract or favorable treatment under a contract.
(b) The facts supporting this determination may be reviewed by any court having lawful jurisdiction.
(c) If this contract is terminated under paragraph (a) of this clause, the Government is entitled--
(1) To pursue the same remedies as in a breach of the contract; and
(2) In addition to any other damages provided by law, to exemplary damages of not less than 3 nor more than 10 times the cost incurred by the Contractor in giving gratuities to the person concerned, as determined by the agency head or a designee. (This subparagraph (c)(2) is applicable only if this contract uses money appropriated to the Department of Defense.)
(d) The rights and remedies of the Government provided in this clause shall not be exclusive and are in addition to any other rights and remedies provided by law or under this contract.
52.203-5 COVENANT AGAINST CONTINGENT FEES (APR 1984)
(a) The Contractor warrants that no person or agency has been employed or retained to solicit or obtain this contract upon an agreement or understanding for a contingent fee, except a bona fide employee or agency. For breach or violation of this warranty, the Government shall have the right to annul this contract without liability or, in its discretion, to deduct from the contract price or consideration, or otherwise recover, the full amount of the contingent fee.
(b) "Bona fide agency," as used in this clause, means an established commercial or selling agency, maintained by a contractor for the purpose of securing business, that neither exerts nor proposes to exert improper influence to solicit or obtain Government contracts nor holds itself out as being able to obtain any Government contract or contracts through improper influence.
"Bona fide employee," as used in this clause, means a person, employed by a contractor and subject to the contractor's supervision and control as to time, place, and manner of performance, who neither exerts nor proposes to exert improper influence to solicit or obtain Government contracts nor holds out as being able to obtain any Government contract or contracts through improper influence.
"Contingent fee," as used in this clause, means any commission, percentage, brokerage, or other fee that is contingent upon the success that a person or concern has in securing a Government contract.
"Improper influence," as used in this clause, means any influence that induces or tends to induce a Government employee or officer to give consideration or to act regarding a Government contract on any basis other than the merits of the matter.
52.203-6 RESTRICTIONS ON SUBCONTRACTOR SALES TO THE GOVERNMENT (SEP 2006)
(a) Except as provided in (b) of this clause, the Contractor shall not enter into any agreement with an actual or prospective subcontractor, nor otherwise act in any manner, which has or may have the effect of restricting sales by such subcontractors directly to the Government of any item or process (including computer software) made or furnished by the subcontractor under this contract or under any follow-on production contract.
(b) The prohibition in (a) of this clause does not preclude the Contractor from asserting rights that are otherwise authorized by law or regulation.
(c) The Contractor agrees to incorporate the substance of this clause, including this paragraph (c), in all subcontracts under this contract which exceed the simplified acquisition threshold.
52.203-7 ANTI-KICKBACK PROCEDURES. (OCT 2010)
(a) Definitions.
"Kickback," as used in this clause, means any money, fee, commission, credit, gift, gratuity, thing of value, or compensation of any kind which is provided, directly or indirectly, to any prime Contractor, prime Contractor employee, subcontractor, or subcontractor employee for the purpose of improperly obtaining or rewarding favorable treatment in connection with a prime contract or in connection with a subcontract relating to a prime contract.
"Person," as used in this clause, means a corporation, partnership, business association of any kind, trust, joint-stock company, or individual.
"Prime contract," as used in this clause, means a contract or contractual action entered into by the United States for the purpose of obtaining supplies, materials, equipment, or services of any kind.
"Prime Contractor," as used in this clause, means a person who has entered into a prime contract with the United States.
"Prime Contractor employee," as used in this clause, means any officer, partner, employee, or agent of a prime Contractor.
"Subcontract," as used in this clause, means a contract or contractual action entered into by a prime Contractor or subcontractor for the purpose of obtaining supplies, materials, equipment, or services of any kind under a prime contract.
"Subcontractor," as used in this clause, (1) means any person, other than the prime Contractor, who offers to furnish or furnishes any supplies, materials, equipment, or services of any kind under a prime contract or a subcontract entered into in connection with such prime contract, and (2) includes any person who offers to furnish or furnishes general supplies to the prime Contractor or a higher tier subcontractor.
"Subcontractor employee," as used in this clause, means any officer, partner, employee, or agent of a subcontractor.
(b) The Anti-Kickback Act of 1986 (41 U.S.C. 51-58) (the Act), prohibits any person from -
(1) Providing or attempting to provide or offering to provide any kickback;
(2) Soliciting, accepting, or attempting to accept any kickback; or
(3) Including, directly or indirectly, the amount of any kickback in the contract price charged by a prime Contractor to the United States or in the contract price charged by a subcontractor to a prime Contractor or higher tier subcontractor.
(c)(1) The Contractor shall have in place and follow reasonable procedures designed to prevent and detect possible violations described in paragraph (b) of this clause in its own operations and direct business relationships.
(2) When the Contractor has reasonable grounds to believe that a violation described in paragraph (b) of this clause may have occurred, the Contractor shall promptly report in writing the possible violation. Such reports shall be made to the inspector general of the contracting agency, the head of the contracting agency if the agency does not have an inspector general, or the Department of Justice.
(3) The…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .