Question.docx

DOCX document 15 KB Posted

Attached to
Hilton Head Island Survey Tower Demolition
Solicitation number
W912HN-10-T-0051
Issued by

About this file

Contractor Questions and Responses

View the file

Other files

File Type Posted
HH Tower 002.jpg JPG image
HH Tower 003.jpg JPG image
HH Tower 001.jpg JPG image
tower top.JPG JPG image
tower from bottom.JPG JPG image
tower top zoom.JPG JPG image
tower platform.JPG JPG image
tower from beach zoom.JPG JPG image
tower and house.JPG JPG image
tower mid section.JPG JPG image
Service Project Profile Sheet.docx DOCX document
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Question-Would it be permissible if the teaming member be in business for three years, and not the SDVOB?

Answer-The prime contractor must have been in business for at least 3 years.

Question-What is the closest address to the tower or it's Gps coordinates. It will make a difference on whether to deconstruct it or drop it in sections.

Can a mobile Crane get to it...............in other words is there enough room to mobilize on the ground?

Answer-The closest address is 52 Canvasback Rd in the Sea Pines development on Hilton Head Island 29928. GPS coordinates are: N32 degrees 07'57.92", W80 degrees 46'14.63"

I do not believe a mobile crane can get to the site because of trees, heavy vegetation and fences between the nearest roads and the tower. Don't believe you can mobilize on the ground.

Question-I would like to formally ask for clarification regarding the credit for scrap metal. Is a best engineering estimate acceptable for purposes of bidding? Also, what documentation (if any) will be required for scrap metal upon completing the demolition activities?

Answer-I think a best estimate would be fine for the scrap and no documentation is required. Just need to ensure all material minus the concrete footings are removed from the site.

Question-What is the measurements at the bottom of the base?

Answer-Estimate the bottom of the base to be around 19' feet by 19' feet.

Question-What is the diameter and schedule of the steel pipe (Can better estimate rebate for scrap steel)

Answer- Unknown. The original bill of materials says it is 8" inches outside diameter.

Question- Can we leave trailer for scrap on nearby street while loading, and can it be left overnight? Or is there a place off street to put trailer?

Answer-It may be possible to leave a trailer either on the side of the road (S. Forest Drive) or by the tower in a vacant lot. I need to get approval from the city. Should not be a problem, but we don't know for sure now.

Question- How wide is the trail? Can a small tracked loader make it in and out okay?

Answer- The trail is not big enough for a full-sized vehicle, but a small tracked loader should make it through OK.