Amendment 002.pdf
PDF 30 KB Posted
- Solicitation number
- W912HN-10-B-0023
About this file
SF 30 - Summary of changes with enclosure.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| BID ABSTRACT.pdf | ||
| Amendment 0001.pdf | ||
| AIWW_Xings_Plans_Amd1.pdf | ||
| AIWW_Xings_2010_Plans.pdf | ||
| SPECIFICATION.PF.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Solicitation Number W912HN-10-B-0023, entitled Maintenance Dredging, Atlantic Intracoastal Waterw ays, North Carolina is Amended as follow s:
A. See Summary of Changes.
B. The Time and Date for Bid Opening is 10 Sep 2010 at 01:00 PM and remains unchanged.
C. All other terms and conditions of the solicitiaton remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 08-Sep-2010
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912HN-10-B-0023
X 9B. DATED (SEE ITEM 11)
12-Aug-2010
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
08-Sep-2010
CODE
U S ARMY CORPS OF ENGINEERS
WILMINGTON DISTRICT
ATTN: DANNY KISSAM
69 DARLINGTON AVE
WILMINGTON NC 28403-1343
W912HN 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
A. SECTION 01 10 00.10 38 - SUPPLEMENTARY SPECIAL CONTRACT
REQUIREMENTS
Delete existing Page 11 in its entirety and replace with enclosed revised Page.
NOTE: Text that is added or revised by this amendment is replaced in its entirety and underlined and/or printed in bold and/or stamped appropriately.
The text changes may have necessitated reformatting of subsequent text or pages. If this is the case, those pages have also been issued as amended pages but are not underlined or bold text.
(End of Summary of Changes)
Encls As stated
AIWW - Hobucken and Core Creek Land Cuts W912HN-10-B-0023 Bogue Inlet to Shallotte Inlet, NC accordance with accepted standards and as approved by the Contracting Officer. All the above data shall be available at all times during the progress of the work for ready examination and use by the Contracting Officer. Upon request of the Contracting Officer, the Contractor shall furnish a copy of above survey data.
(End of Clause)
1.18 ADDITIONAL SURVEYS AND SURVEY PERSONNEL REQUIREMENTS
(a) Beach surveys to be performed by the Contractor are as follows:
(1) Preplacement surveys shall be made of each beach (onshore and offshore) prior to placement of dredged material on each beach and at least one week prior to the initiation of any dredging. Such surveys shall be scheduled so that field notes and computations can be furnished to the Contracting Officer in advance of placement so that control of quantities and adjustments to the fill sections may be made if necessary. The sections shall be taken at intervals of 100 feet, generally at increments of no more than 1,500 feet in advance of the beach work and at right angles to the beach or as otherwise directed. All sections shall extend from the top of the existing dune to a minimum distance of 1,500 feet seaward of the top of the existing dune. Elevations and ocean soundings shall be taken generally at a maximum of 25-foot intervals and at all break points. All data shall be recorded in feet and shall be referenced to NAD 1983 horizontal datum and NGVD 1929 vertical datum. The Contractor shall submit the survey data to the Contracting Officer's Representative as soon as practicable but no more than five (5) calendar days after completion of survey.
(2) Postplacement surveys for each beach shall be made and submitted to the Contracting Officer within 24 hours after completion of placement of dredged material on the beach using the same stations and the same specifications required for the preplacement surveys. In the event the first examination shows additional work is required in an area prior to its acceptance, additional elevations and/or soundings will be required only in the area where additional work is required. Elevations and soundings will continue to be taken until such area is acceptable.
(b) Survey personnel. All quantity surveys required by the Contractor, except those for any periods for which progress payments are requested, shall be made by personnel of a professional engineering and/or surveying firm experienced in the practice of such work including Global Positioning Systems (GPS) surveys. The survey personnel shall have the following minimum qualifications:
(1) Each party chief shall be a Professional Land Surveyor registered in the State of North Carolina and shall be proficient in the operation of precise and semi-precise instruments. They shall be capable of running horizontal and vertical control of 2nd order accuracy. In the event it is considered advantageous to employ a party chief who is not a Professional Land Surveyor, detailed qualifications of the individual shall be submitted to the Contracting Officer for review and approval.
(2) Instrument men shall be proficient in the operation of precise and semi-precise instruments including transit, total station, level, and alidade, and shall prepare all survey notes in a firm and legible manner.
SECTION 01 10 00.10 38 Page 11 (Revised by Amendment No. 0002)