IFB No. W912HN-10-B-0008

Recreation Building Improvements,g p , Philpott Lake, Franklin County, Virginia

Recreation Building ImprovementsRecreation Building Improvements, W. Kerr Scott Dam and Reservoir, Wilkes County, North Carolina

Specifications - Volume 1

April 2010

Recreation Building Improvements, Philpott Lake W912HN-10-B-0008 Recreation Builidng Improvements, W.K.Scott Dam and Reservoir

PROJECT TABLE OF CONTENTS

VOLUME 1

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

00010 SOLICITATION CONTRACT FORM

00100 BIDDING SCHEDULE/INSTRUCTIONS TO BIDDERS

00600 REPRESENTATIONS & CERTIFICATIONS

00700 CONTRACT CLAUSES

00800 SPECIAL CONTRACT REQUIREMENTS

00 01 15 LIST OF DRAWINGS

DIVISION 01 - GENERAL REQUIREMENTS

01 10 00.10 38 SUPPLEMENTARY SPECIAL CONTRACT REQUIREMENTS

01 32 01.00 10 PROJECT SCHEDULE

01 33 00 SUBMITTAL PROCEDURES

01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS

01 42 00 SOURCES FOR REFERENCE PUBLICATIONS

01 45 01 USACE QUALITY CONTROL

01 45 01.10 USACE QUALITY CONTROL SYSTEM (QCS)

01 57 20.00 10 ENVIRONMENTAL PROTECTION

01 57 23 TEMPORARY STORM WATER POLLUTION CONTROL

01 78 23 OPERATION AND MAINTENANCE DATA

DIVISION 02 - EXISTING CONDITIONS

02 41 00 DEMOLITION AND DECONSTRUCTION

02 82 14.00 10 ASBESTOS HAZARD CONTROL ACTIVITIES

DIVISION 03 - CONCRETE

03 11 13 STRUCTURAL CONCRETE FORMWORK

03 15 13 EXPANSION JOINTS, CONTRACTION JOINTS, AND WATERSTOPS

03 20 01 CONCRETE REINFORCEMENT

03 30 00 CAST-IN-PLACE STRUCTURAL CONCRETE

DIVISION 04 - MASONRY

04 20 00 MASONRY

DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES

06 10 00 ROUGH CARPENTRY

06 20 00 FINISH CARPENTRY

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 21 13 BOARD AND BLOCK INSULATION

07 21 16 MINERAL FIBER BLANKET INSULATION

07 31 13 ASPHALT SHINGLES

07 60 00 FLASHING AND SHEET METAL (SHEET METALWORK, GENERAL)

07 92 00 JOINT SEALING

PROJECT TABLE OF CONTENTS Page 1

DIVISION 08 - OPENINGS

08 11 13 STEEL DOORS AND FRAMES

08 62 00 SKYLIGHTS

08 71 00 DOOR HARDWARE

DIVISION 09 - FINISHES

09 06 90 COLOR SCHEDULE

09 30 00 CERAMIC TILE, QUARRY TILE, AND PAVER TILE (CERAMIC TILE)

09 90 00 PAINTING AND COATING (PAINTING, GENERAL)

DIVISION 10 - SPECIALTIES

10 21 13 TOILET PARTITIONS

10 28 13 TOILET ACCESSORIES

DIVISION 12 - FURNISHINGS

12 36 00 COUNTERTOPS (CABINETS AND COUNTERTOPS)

PROJECT TABLE OF CONTENTS Page 2

VOLUME 2

DIVISION 22 - PLUMBING

22 00 00 PLUMBING, GENERAL PURPOSE

22 07 19 PLUMBING PIPING INSULATION

DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING

23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS

23 03 00.00 20 BASIC MECHANICAL MATERIALS AND METHODS

23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC

23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS

23 08 00.00 10 COMMISSIONING OF HVAC SYSTEMS

23 09 33.00 40 ELECTRIC AND ELECTRONIC CONTROL SYSTEM FOR HVAC

23 31 13 METAL DUCTS

23 37 13 DIFFUSERS, REGISTERS, AND GRILLS

DIVISION 26 - ELECTRICAL

26 00 00.00 20 BASIC ELECTRICAL MATERIALS AND METHODS

26 08 00 APPARATUS INSPECTION AND TESTING

26 20 00 INTERIOR DISTRIBUTION SYSTEM

26 27 13.10 30 ELECTRIC METERS

26 51 00 INTERIOR LIGHTING

DIVISION 28 - ELECTRONIC SAFETY AND SECURITY

28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM

DIVISION 31 - EARTHWORK

31 00 00 EARTHWORK

31 23 00.00 20 EXCAVATION AND FILL

31 31 16 TERMITICIDE TREATMENT MEASURES FOR SUBTERRANEAN TERMITE

CONTROL

DIVISION 32 - EXTERIOR IMPROVEMENTS

32 11 23 AGGREGATE AND/OR GRADED-CRUSHED AGGREGATE BASE COURSE

32 11 27 BITUMINOUS-STABILIZED BASE COURSE, SUBBASE, OR SUBGRADE

32 12 16 HOT-MIX ASPHALT (HMA) FOR ROADS

32 16 13 CONCRETE SIDEWALKS AND CURBS AND GUTTERS

32 92 19 SEEDING

DIVISION 33 - UTILITIES

33 11 00 WATER DISTRIBUTION

33 30 00 SANITARY SEWERS

33 70 02.00 10 ELECTRICAL DISTRIBUTION SYSTEM, UNDERGROUND

-- End of Project Table of Contents --

PROJECT TABLE OF CONTENTS Page 3

Solicitation No. W912HN-10-B-0008, entitled Recreation Building Improvements, Philpott Lake, Franklin County, VA and W. Kerr Scott Dam and Reservoir, Wilkes County, NC

Estimated magnitude of construction for this project is betw een $1,000,000 and $5,000,000.

-----------------------------THIS IS A 100% SMALL BUSINESS SET ASIDE---------------------------------------

NOTICE: RETURN SECTION 00600, REPRESENTATIONS AND CERTIFICATIONS WITH BID.

IF BID IS HANDCARRIED, DELIVER TO: 69 DARLINGTON AVE, WILMINGTON, N.C. 28403, ATTN: BRUCE HELMS, (910-251-4580), PRIOR TO THE TIME AND DATE SPECIFIED BELOW FOR BID OPENING. DUE TO HEIGHTENED SECURITY CONDITIONS, ACCESS TO THE BUILDING IS CONTROLLED BY SECURITY PERSONNEL. BRIEFCASES MAY BE OPENED FOR EXAMINATION BY SECURITY PERSONNEL. PERSONS HAND-DELIVERING BIDS SHOULD TAKE CARE TO ALLOW SUFFICIENT TIME TO PERMIT COMPLETION OF SECURITY REQUIREMENTS AND DELIVERY OF THE BID TO THE DESIGNATED OFFICE PRIOR TO THE TIME SET FOR RECEIPT OF BIDS.

VERBAL AND WRITTEN REQUESTS FOR INFORMATION MUST BE DIRECTED TO THE PERSON LISTED IN ITEM 9 ABOVE. INQUIRIES AND REQUESTS THAT ARE DIRECTED TO ANY OTHER PERSON MAY NOT BE RELAYED TO THE PROPER PERSON AND, THEREFORE, MAY NOT

BE ANSWERED. SEE 52.0000-4011 IN SECTION 00100.

X

BRUCE A HELMS 910-251-4580

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

29-Apr-2010

(RFP)

(IFB)

CALL:

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

See Item 7

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________365 calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________Section 00800

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

X YES NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specified in Item 8 by ___________ local time ______________02 Jun 2010 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee X is, is not required.

C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______60 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

USACE CONTRACTING, WILMINGTON DISTRICT

ATTN: BRUCE HELMS

69 DARLINGTON AVE

WILMINGTON NC 28403-1343

W912HN

PAGE OF PAGES

1 OF

CODE

(Title, identifying no., date):

12B. CALENDAR DAYS

02:00 PM (hour) Sealed envelopes containing offers

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

8. ADDRESS OFFER TO (If Other Than Item 7)

910-251-4454FAX:TEL: 910-251-4580 TEL: FAX:

W912HN-10-B-0008 146

20B. SIGNATURE

(REV. 4-85)STANDARD FORM 1442 BACK

TO SIGN

NSN 7540-01-155-3212

SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)

CODE FACILITY CODE

17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.

the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

(4 copies unless otherwise specified)

CODE

(Insert any number equal to or greater than

20C. OFFER DATE

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY

(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)

See Item 14

(Include only if different than Item 14)16. REMITTANCE ADDRESS

30B. SIGNATURE

29. AWARD (Contractor is not required to sign this document.)

document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .

gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)

30C. DATE

(Type or print)

TEL: EMAIL:

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this28. NEGOTIATED AGREEMENT

(M ust be fully completed by offeror)OFFER

W912HN-10-B-0008

Section 00010 - Solicitation Contract Form

52.214-4006

52.214-4006 Solicitation/Technical Inquiries via ProjNet (Local Instruction - CECT-SAS Nov 2009)

1. Solicitation/Technical Inquiries.

a. Inquiries are to be submitted via Bidder Inquiry in ProjNet at www.projnet.org\projnet.

b. If you have problems submitting your inquires via ProjNet, contact Mr. Shane Jones at 910-251-4095 or Ms.

Oweita Freeman at 910-251-4741.

2. Read this paragraph in conjunction with contract provision FAR 52.214-6, “Explanation to Prospective Bidders”.

3. Any prospective bidder/offer desiring an explanation or interpretation of the solicitation, drawings specifications, etc., must request it in writing via Bidder Inquiry in ProjNet within no less than ten (10) calendar days prior to the date of bid opening or receipt of proposals. The Government reserves the right to decline addressing questions received less than ten (10) calendar days prior to receipt of bid opening or receipt of proposals.

4. ProjNet - Bidder Inquiry module.

a. To submit and review bid inquiry items, bidders/offerors will need to be a current registered user or self-register into system. To self-register go to the ProjNet web page, click BID tab, select Bidder inquiry, select agency USACE, enter Bidder Inquiry Key for this solicitation listed below, and your e-mail address, click login. Fill in all required information and click create user. Verify that information on next screen is correct and click continue.

Please remember your Secret Question Answer for future access to this website.

b. From this page you may view all bidder/offeror inquiries under Reports or post a new inquiry under Submit.

c. Bidders/Offerors will receive an acknowledgement of their question via email, followed by another email notification that an answer to their question has been posted after it has been reviewed by our technical team and responded to by a Contracting Officer.

d. Bidders/Offerors are responsible for checking bid inquiry items.

e. Bidders/Offerors are requested to review the specification in its entirety, review the Bidder Inquiry System for answers to questions prior to submission of a new inquiry. The name of the submitter or firm is not published for the public on the report of all Bidder Inquiries.

5. Solicitation Information:

IFB/RFP No: W912HN-10-B-0008

Bidder Inquiry Key: 7I3CR7-1LEFSZ

(end)

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Lump Sum

WARRIOR CREEK SHOWERHOUSE

ARRA FUNDED - LOCATED AT W. KERR SCOTT DAM AND RESERVIOR,

WILKES COUNTY, NORTH CAROLINA.

WORK INCLUDES DEMOLITION OF EXISTING BUILDING, SEPTIC

SYSTEM UPGRADES, AND BUILDING NEW SHOWERHOUSE IN

ACCORDANCE WITH PLANS AND SPECIFICATIONS

FOB: Destination

NET AMT

0002 1 Lump Sum

HORSESHOE MAIN SHOWERHOUSE

ARRA FUNDED - LOCATED AT PHILPOTT LAKE, FRANKLIN COUNTY,

VIRGINIA.

WORK INCLUDES DEMOLITION OF EXISTING BUILDING AND

BUILDING NEW SHOWERHOUSE IN ACCORDANCE WITH PLANS AND

SPECIFICATIONS

0003 1 Lump Sum

HORSESHOE LOWER SHOWERHOUSE

ARRA FUNDED - LOCATED AT PHILPOTT LAKE, FRANKLIN COUNTY,

VIRGINIA.

WORK INCLUDES DEMOLITION OF EXISTING BUILDING, SEPTIC

SYSTEM UPGRADES, AND BUILDING NEW SHOWERHOUSE IN

0004 1 Lump Sum

ROLANDS BRANCH SHOWERHOUSE

ARRA FUNDED - LOCATED AT PHILPOTT LAKE, FRANKLIN COUNTY,

VIRGINIA.

WORK INCLUDES DEMOLITION OF EXISTING BUILDING, SEPTIC

SYSTEM UPGRADES, AND BUILDING NEW SHOWERHOUSE IN

0005 1 Lump Sum

SALTHOUSE MAIN SHOWERHOUSE

ARRA FUNDED - LOCATED AT PHILPOTT LAKE, FRANKLIN COUNTY,

VIRGINIA.

WORK INCLUDES DEMOLITION OF EXISTING BUILDING AND

BUILDING NEW SHOWERHOUSE IN ACCORDANCE WITH PLANS AND

SPECIFICATIONS

0006 1 Lump Sum

SALTHOUSE BEACH SHOWERHOUSE

ARRA FUNDED - LOCATED AT PHILPOTT LAKE, FRANKLIN COUNTY,

VIRGINIA.

WORK INCLUDES RENOVATIONS TO EXISTING SHOWERHOUSE IN

ACCORDANCE WITH PLANS AND SPECIFICATIONS.

THIS BUILDING WILL NOT BE DEMOLISHED AND REBUILT.

0007 1 Lump Sum

PERFORMANCE AND PAYMENT BONDS

ARRA FUNDED

TOTAL AMOUNT

TOTAL AMOUNT OF LINE ITEMS 0001-0007 $______________________

NOTICE TO BIDDERS

NOTE 1:

OFFERORS MUST BID ON ALL LINE ITEMS PROVIDING ALL UNIT PRICES AND EXTENDED

PRICES FOR EACH LINE ITEM BASED ON UNIT OF MEASURE AND THE TOTAL BID

AMOUNT. SEE PROVISION 52.214-18 (SECTION 00100)

NOTE 2:

FAILURE TO COMPLETE AND RETURN ALL REQUIRED SUBMISSIONS (SF1442, SECTION

00010, SECTION 00600, AND BID GUARANTEE) COULD RENDER YOUR BID NON-

RESPONSIVE.

NOTE 3:

THE SOLICITATION CONTAINS LINE ITEMS AT TWO DIFFERENT GEOGRAPHIC

LOCATIONS. LINE ITEM 0001 IS AT W. KERR SCOTT DAM AND LAKE IN WILKES COUNTY,

NC. LINE ITEMS 0002-0006 ARE AT PHILPOTT LAKE IN FRANKLIN COUNTY, VA. LINE ITEM

0007 IS FOR THE PAYMENT AND PERFORMANCE BONDS THAT COVER 100% OF THE BID

FOR BOTH LOCATIONS.

NOTE 4:

A. THIS CONTRACT ACTION REQUIRES PRODUCTS AND/OR SERVICES THAT ARE FUNDED

UNDER THE AMERICAN RECOVERY AND REINVESTMENT ACT OF 2009 (ARRA).

B. CONTRACT LINE ITEMS USING ARRA FUNDS WILL BE IDENTIFIED ON THE CONTRACT

AWARD DOCUMENT.

C. SEE ARRA CONTRACT CLAUSES AND ARRA REPORTING REQUIREMENTS.

D. SEE www.federalreporting.gov FOR MORE INFORMATION.

NOTE 5:

A. FOR LINE ITEM 0001 WARRIOR CREEK SHOWERHOUSE, W. KERR SCOTT DAM AND

RESERVIOR, PHYSICAL WORK ON THE GROUND MAY START NO EARLIER THAN 1

NOVEMBER 2010 AND MUST BE COMPLETED BY 31 MARCH 2011 DUE TO RECREATIONAL

SEASON REQUIREMENTS.

B. FOR LINE ITEM 0002 HORSESHOE MAIN SHOWERHOUSE, PHILPOTT LAKE, PHYSICAL

WORK ON THE GROUND MAY START NO EARLIER THAN 1 OCTOBER 2010 AND MUST BE

COMPLETED BY 15 APRIL 2011 DUE TO RECREATIONAL SEASON REQUIREMENTS.

C. FOR LINE ITEM 0003 HORSESHOE LOWER SHOWERHOUSE, PHILPOTT LAKE,

PHYSICAL WORK ON THE GROUND MAY START IMMEDIATELY AFTER NOTICE TO

PROCEED IS ISSUED AND MUST BE COMPLETED BY 15 APRIL 2011 DUE TO

RECREATIONAL SEASON REQUIREMENTS.

D. FOR LINE ITEM 0004 ROLANDS BRANCH SHOWERHOUSE, PHILPOTT LAKE, PHYSICAL

WORK ON THE GROUND MAY START IMMEDIATELY AFTER NOTICE TO PROCEED IS

ISSUED AND MUST BE COMPLETED BY 15 MARCH 2011 DUE TO RECREATIONAL SEASON

REQUIREMENTS.

E. FOR LINE ITEM 0005 SALTHOUSE MAIN SHOWERHOUSE, PHILPOTT LAKE, PHYSICAL

WORK ON THE GROUND MAY START NO EARLIER THAN 1 NOVEMBER 2010 AND MUST

BE COMPLETED BY 365 DAYS AFTER NOTICE TO PROCEED DUE TO RECREATIONAL

SEASON REQUIREMENTS.

F. FOR LINE ITEM 0006 SALTHOUSE BEACH SHOWERHOUSE, PHILPOTT LAKE,

PHYSICAL WORK ON THE GROUND MAY START NO EARLIER THAN 1 OCTOBER 2010 AND

MUST BE COMPLETED BY 15 MAY 2011 DUE TO RECREATIONAL SEASON REQUIREMENTS.

G. THE NOTICE TO PROCEED WILL BE ISSUED ON OR ABOUT 2 AUGUST 2010. THE

CONTRACTOR IS EXPECTED TO PLAN AND SCHEDULE SUCCESSFUL CONTRACT

PERFORMANCE AND COMPLETION ACCORDINGLY.

DESCRIPTION OF WORK

RECREATION BUILDING IMPROVEMENTS

PHILPOTT LAKE, FRANKLIN COUNTY, VIRGINIA

AND

W. KERR SCOTT DAM AND LAKE, WILKES COUNTY, NORTH CAROLINA

THIS PROJECT INVOLVES DEMOLITION OF FOUR RESTROOM OR SHOWERHOUSE

BUILDINGS AT VARIOUS RECREATION AREAS AT PHILPOTT LAKE AND CONSTRUCTION

OF NEW BUILDINGS, GENERALLY IN THE FOOTPRINT WHERE THE OLD BUILDINGS WERE

LOCATED. ONE BUILDING AT W. KERR SCOTT WILL BE DEMOLISHED AND REPLACED.

AN ADDITIONAL BUILDING AT PHILPOTT LAKE WILL BE RENOVATED TO ADD SHOWERS.

DISPOSAL OF DEMOLITION DEBRIS, SITEWORK, AND UTILITY UPGRADES ARE ALSO

INCLUDED IN THE CONTRACT.

Section 00100 - Bidding Schedule/Instructions to Bidders

CLAUSES INCORPORATED BY FULL TEXT

52.000-4001 HANDCARRIED BIDS/PROPOSALS (Sep 2003)

(Wilmington Local Instruction)

1. If bids/proposals are handcarried, deliver them to the U. S. Army Corps of Engineers, Wilmington District, Attn: Bruce Helms, Contracting, 69 Darlington Avenue, Wilmington, NC, 28403. All bids/proposals must be received in the Contracting Office not later than the exact time specified for bid opening or time specified for receipt of proposals.

2. Due to security measures at the Wilmington District Office, you should allow sufficient time for delivery of the bid/proposal to ensure it is received timely.

(End)

52.’0000-4028 INFORMATION TO ALL CONTRACTORS

Central Contractor Registration (CCR) and Electronic Funds Transfer (EFT) (Wilmington Local Instruction)

*****************I M P O R T A N T ********************

1. All contractors MUST REGISTER in the Central Contractor Registration (CCR) database BEFORE THEY

CAN BE AWARDED A CONTRACT. You may register through the CCR website at http://www.ccr.gov. A CCR registration form is also available from the DoD Electronic Commerce Information Center at 1-888-227- 2423.

2. a. Public Law 104-134 requires the use of Electronic Funds Transfer (EFT) for all Federal payments, starting

2 January 1999. Although EFT data is now being obtained through the CCR, the interface between the CCR and the U. S. Army Corps of Engineers (USACE) payment office in Millington, TN is not currently available.

Therefore, the U. S. Army Corps of Engineers Finance Center is now offering EFT payments directly to vendors.

b. For USACE contract awards, you must be enrolled in the EFT program at the USACE FINANCE

CENTER, Millington, TN.

c. After a contract award with the Wilmington District, and once EFT is established, payments will be directly deposited into your checking or savings account avoiding mail delays and a six week delay for replacement of lost checks.

d. A Direct Deposit Authorization Form (UFC-DISB-4) and instructions are available from our Resource

Management Office for completing and mailing the form. Please make a copy for your records and for your bank.

e. MAIL COMPLETED FORM TO:

USACE FINANCE CENTER

ATTN: EFT/DISBURSING

5720 INTEGRITY DRIVE

MILLINGTON, TN 38054-5005

f. Contact the Wilmington District Resource Management Office, Anita Bissette, at 910/251-4803 for questions/forms concerning EFT.

g. See contract clause 52.0232-0034 “Payment By Electronic Funds Transfer – Other Than Central

Contractor Registration (May 1999)” and contract clause 52.0232-0035 “Designation of Office for Government Receipt of Electronic Funds Transfer Information (May 1999).

(End)

52.204-6 DATA UNIVERSAL NUMBERING SYSTEM (DUNS) NUMBER (APR 2008)

(a) The offeror shall enter, in the block with its name and address on the cover page of its offer, the annotation “DUNS” or “DUNS+4” followed by the DUNS number or “DUNS+4” that identifies the offeror's name and address exactly as stated in the offer. The DUNS number is a nine-digit number assigned by Dun and Bradstreet, Inc. The DUNS+4 is the DUNS number plus a 4-character suffix that may be assigned at the discretion of the offeror to establish additional CCR records for identifying alternative Electronic Funds Transfer (EFT) accounts (see Subpart 32.11) for the same concern.

(b) If the offeror does not have a DUNS number, it should contact Dun and Bradstreet directly to obtain one.

(1) An offeror may obtain a DUNS number--

(i) Via the Internet at http://fedgov.dnb.com/webform or if the offeror does not have internet access, it may call Dun and Bradstreet at 1-866-705-5711 if located within the United States; or

(ii) If located outside the United States, by contacting the local Dun and Bradstreet office. The offeror should indicate that it is an offeror for a U.S. Government contract when contacting the local Dun and Bradstreet office.

(2) The offeror should be prepared to provide the following information:

(i) Company legal business name.

(ii) Tradestyle, doing business, or other name by which your entity is commonly recognized.

(iii) Company physical street address, city, state and Zip Code.

(iv) Company mailing address, city, state and Zip Code (if separate from physical).

(v) Company telephone number.

(vi) Date the company was started.

(vii) Number of employees at your location.

(viii) Chief executive officer/key manager.

(ix) Line of business (industry).

(x) Company Headquarters name and address (reporting relationship within your entity).

(End of provision)

52.209-4005 Alt1 PRE-AWARD INFORMATION

(Wilmington Local Instruction)

1. Contracts shall be awarded to responsible prospective contractors only. Before award, to be determined responsible, a prospective contractor must:

a. Have adequate financial resources to perform the contract, or the ability to obtain them;

b. Be able to comply with the required or proposed delivery or performance schedule, taking into consideration all existing commercial and government business commitments;

c. Have a satisfactory performance record;

d. Have a satisfactory record of integrity and business ethics;

e. Have the necessary organization, experience, accounting and operational controls, and technical skills, or the ability to obtain them;

f. Have the necessary production, construction, and technical equipment and facilities, or the ability to obtain them; and

g. Be otherwise qualified and eligible to receive an award under applicable laws and regulations.

2. Each Bidder shall, upon request of the Contracting Officer, furnish information on any or all of the above areas so that the Contracting Officer can make an affirmative determination of responsibility or nonresponsibility.

(End of Paragraph)

52.214-3 AMENDMENTS TO INVITATIONS FOR BIDS (DEC 1989)

(a) If this solicitation is amended, then all terms and conditions which are not modified remain unchanged.

(b) Bidders shall acknowledge receipt of any amendment to this solicitation (1) by signing and returning the amendment, (2) by identifying the amendment number and date in the space provided for this purpose on the form for submitting a bid, (3) by letter or telegram, or (4) by facsimile, if facsimile bids are authorized in the solicitation.

The Government must receive the acknowledgment by the time and at the place specified for receipt of bids.

52.214-4 FALSE STATEMENTS IN BIDS (APR 1984)

Bidders must provide full, accurate, and complete information as required by this solicitation and its attachments.

The penalty for making false statements in bids is prescribed in 18 U.S.C. 1001.

52.214-5 SUBMISSION OF BIDS (MAR 1997)

(a) Bids and bid modifications shall be submitted in sealed envelopes or packages (unless submitted by electronic means) (1) addressed to the office specified in the solicitation, and (2) showing the time and date specified for receipt, the solicitation number, and the name and address of the bidder.

(b) Bidders using commercial carrier services shall ensure that the bid is addressed and marked on the outermost envelope or wrapper as prescribed in subparagraphs (a)(1) and (2) of this provision when delivered to the office specified in the solicitation.

(c) Telegraphic bids will not be considered unless authorized by the solicitation; however, bids may be modified or withdrawn by written or telegraphic notice.

(d) Facsimile bids, modifications, or withdrawals, will not be considered unless authorized by the solicitation.

(e) Bids submitted by electronic commerce shall be considered only if the electronic commerce method was specifically stipulated or permitted by the solicitation.

52.214-6 EXPLANATION TO PROSPECTIVE BIDDERS (APR 1984)

Any prospective bidder desiring an explanation or interpretation of the solicitation, drawings, specifications, etc., must request it in writing soon enough to allow a reply to reach all prospective bidders before the submission of their bids. Oral explanations or instructions given before the award of a contract will not be binding. Any information given a prospective bidder concerning a solicitation will be furnished promptly to all other prospective bidders as an amendment to the solicitation, if that information is necessary in submitting bids or if the lack of it would be prejudicial to other prospective bidders.

52.214-7 LATE SUBMISSIONS, MODIFICATIONS, AND WITHDRAWALS OF BIDS (NOV 1999)

(a) Bidders are responsible for submitting bids, and any modifications or withdrawals, so as to reach the Government office designated in the invitation for bids (IFB) by the time specified in the IFB. If no time is specified in the IFB, the time for receipt is 4:30 p.m., local time, for the designated Government office on the date that bids are due.

(b)(1) Any bid, modification, or withdrawal received at the Government office designated in the IFB after the exact time specified for receipt of bids is “late” and will not be considered unless it is received before award is made, the Contracting Officer determines that accepting the late bid would not unduly delay the acquisition; and--

(i) If it was transmitted through an electronic commerce method authorized by the IFB, it was received at the initial point of entry to the Government infrastructure not later than 5:00 p.m. one working day prior to the date specified for receipt of bids; or

(ii) There is acceptable evidence to establish that it was received at the Government installation designated for receipt of bids and was under the Government's control prior to the time set for receipt of bids.

(2) However, a late modification of an otherwise successful bid that makes its terms more favorable to the Government, will be considered at any time it is received and may be accepted.

(c) Acceptable evidence to establish the time of receipt at the Government installation includes the time/date stamp of that installation on the bid wrapper, other documentary evidence of receipt maintained by the installation, or oral testimony or statements of Government personnel.

(d) If an emergency or unanticipated event interrupts normal Government processes so that bids cannot be received at the Government office designated for receipt of bids by the exact time specified in the IFB and urgent Government requirements preclude amendment of the IFB, the time specified for receipt of bids will be deemed to be extended to the same time of day specified in the solicitation on the first work day on which normal Government processes resume.

(e) Bids may be withdrawn by written notice received at any time before the exact time set for receipt of bids. If the IFB authorizes facsimile bids, bids may be withdrawn via facsimile received at any time before the exact time set for receipt of bids, subject to the conditions specified in the provision at 52.214-31, Facsimile Bids. A bid may be withdrawn in person by a bidder or its authorized representative if, before the exact time set for receipt of bids, the identity of the person requesting withdrawal is established and the person signs a receipt for the bid.

52.214-18 PREPARATION OF BIDS--CONSTRUCTION (APR 1984)

(a) Bids must be (1) submitted on the forms furnished by the Government or on copies of those forms, and (2) manually signed. The person signing a bid must initial each erasure or change appearing on any bid form.

(b) The bid form may require bidders to submit bid prices for one or more items on various bases, including--

(1) Lump sum bidding;

(2) Alternate prices;

(3) Units of construction; or

(4) Any combination of subparagraphs (1) through (3) above.

(c) If the solicitation requires bidding on all items, failure to do so will disqualify the bid. If bidding on all items is not required, bidders should insert the words "no bid" in the space provided for any item on which no price is submitted.

(d) Alternate bids will not be considered unless this solicitation authorizes their submission.

52.214-19 CONTRACT AWARD--SEALED BIDDING--CONSTRUCTION (AUG 1996)

(a) The Government will evaluate bids in response to this solicitation without discussions and will award a contract to the responsible bidder whose bid, conforming to the solicitation, will be most advantageous to the Government, considering only price and the price-related factors specified elsewhere in the solicitation.

(b) The Government may reject any or all bids, and waive informalities or minor irregularities in bids received.

(c) The Government may accept any item or combination of items, unless doing so is precluded by a restrictive limitation in the solicitation or the bid.

(d) The Government may reject a bid as nonresponsive if the prices bid are materially unbalanced between line items or subline items. A bid is materially unbalanced when it is based on prices significantly less than cost for some work and prices which are significantly overstated in relation to cost for other work, and if there is a reasonable doubt that the bid will result in the lowest overall cost to the Government even though it may be the low evaluated bid, or if it is so unbalanced as to be tantamount to allowing an advance payment.

(End of provison)

52.214-34 SUBMISSION OF OFFERS IN THE ENGLISH LANGUAGE (APR 1991)

Offers submitted in response to this solicitation shall be in the English language. Offers received in other than English shall be rejected.

52.214-35 SUBMISSION OF OFFERS IN U.S. CURRENCY (APR 1991)

Offers submitted in response to this solicitation shall be in terms of U.S. dollars. Offers received in other than U.S.

dollars shall be rejected.

52.214-5000 APPARENT CLERICAL MISTAKES (MAR 1995)--EFARS

(a) For the purpose of initial evaluations of bids, the following will be utilized in the resolving arithmetic discrepancies found on the face of bidding schedule as submitted by the bidder:

(1) Obviously misplaced decimal points will be corrected;

(2) Discrepancy between unit price and extended price, the unit price will govern;

(3) Apparent errors in extension of unit prices will be corrected;

(4) Apparent errors in addition of lump-sum and extended prices will be corrected.

(b) For the purpose of bid evaluation, the government will proceed on the assumption that the bidder intends his bid to be evaluated on basis of the unit prices, the totals arrived at by resolution of arithmetic discrepancies as provided above and the bid will be so reflected on the abstract of bids.

(c) These correction procedures shall not be used to resolve any ambiguity concerning which bid is low.

(End of statement)

52.216-1 TYPE OF CONTRACT (APR 1984)

The Government contemplates award of a Firm Fixed Price contract resulting from this solicitation.

52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL

EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)

(a) The offeror's attention is called to the Equal Opportunity clause and the Affirmative Action Compliance Requirements for Construction clause of this solicitation.

(b) The goals for minority and female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered area, are as follows:

Work Area Goals for minority participation for each trade

Goals for female participation for each trade

Philpott Reservoir VA 12.0% 6.9%

W. Kerr Scott Dam and Reservoir NC

15.5%

6.9%

These goals are applicable to all the Contractor's construction work performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, the Contractor shall apply the goals established for the geographical area where the work is actually performed. Goals are published periodically in the Federal Register in notice form, and these notices may be obtained from any Office of Federal Contract Compliance Programs office.

(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1) its implementation of the Equal Opportunity clause, (2) specific affirmative action obligations required by the clause entitled "Affirmative Action Compliance Requirements for Construction,'' and (3) its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade. The Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from Contractor to Contractor, or from project to project, for the sole purpose of meeting the Contractor's goals shall be a violation of the contract, Executive Order 11246, as amended, and the regulations in 41 CFR 60-4. Compliance with the goals will be measured against the total work hours performed.

(d) The Contractor shall provide written notification to the Deputy Assistant Secretary for Federal Contract Compliance, U.S. Department of Labor, within 10 working days following award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the --

(1) Name, address, and telephone number of the subcontractor;

(2) Employer's identification number of the subcontractor;

(3) Estimated dollar amount of the subcontract;

(4) Estimated starting and completion dates of the subcontract; and

(5) Geographical area in which the subcontract is to be performed.

(e) As used in this Notice, and in any contract resulting from this solicitation, the "covered area" for the work at Philpott Reservoir is the folowing counties in Virgina: Alleghany, Augusta; Bath; Bedford; Bland; Carroll;

Floyd; Franklin; Giles; Grayson; Henry; Highland; Montgomery; Nelson; Patrick; Pittsylnia; Pulaski;

Rockbridge; Rockingham; Wythe; Bedford City; Buena Vista; Clifton Forge; Covington; Danville;

Galex; Harrisonburg; Lexington; Martinsville; Radford; Staunton; Waynesboro; and the following county in West Virginia: Pendleton.

The "covered area" for the work at W. Kerr Scott Dam and Reservoir is the folowing counties in North Carolina:

Alleghany; Ashe; Caswell; Davie; Montgomery; Moore; Rockingham; Surry; Watauga; Wilkes

52.225-22 NOTICE OF REQUIRED USE OF AMERICAN IRON, STEEL, AND OTHER MANUFACTURED

GOODS—BUY AMERICAN ACT—CONSTRUCTION MATERIALS (MAR 2009) ALTERNATE I (MAR

2009)

(a) Definitions. “Construction material,” “domestic construction material,” “foreign construction material,” “manufactured construction material,” “steel,” and “unmanufactured construction material,” as used in this provision, are defined in the clause of this solicitation entitled “Required Use of Iron, Steel, and Other Manufactured Goods—Buy American Act—Construction Materials” (Federal Acquisition Regulation (FAR) clause 52.225-21).

(b) Requests for determinations of inapplicability. An offeror requesting a determination regarding the inapplicability of section 1605 of the American Recovery and Reinvestment Act of 2009 (Pub. L. 111-5) (Recovery Act) or the Buy American Act shall submit the request with its offer, including the information and applicable supporting data required by paragraphs (c) and (d) of the clause at FAR 52.225-21.

(c) Evaluation of offers. (1) If the Government determines that an exception based on unreasonable cost of domestic construction material applies, the Government will evaluate an offer requesting exception to the requirements of section 1605 of the Recovery Act or the Buy American Act by adding to the offered price of the contract—

(i) 25 percent of the offered price of the contract, if foreign iron, steel, or other manufactured goods are used as construction material based on unreasonable cost of comparable manufactured domestic construction material; and

(ii) 6 percent of the cost of foreign unmanufactured construction material included in the offer based on unreasonable cost of comparable domestic unmanufactured construction material.

(2) If two or more offers are equal in price, the Contracting Officer will give preference to an offer that does not include foreign construction material excepted at the request of the offeror on the basis of unreasonable cost.

(d) Alternate offers. (1) When an offer includes foreign construction material not listed by the Government in this solicitation in paragraph (b)(2) of the clause at FAR 52.225-21, the offeror also may submit an alternate offer based on use of equivalent domestic construction material.

(2) If an alternate offer is submitted, the offeror shall submit a separate Standard Form 1442 for the alternate offer and a separate cost comparison table prepared in accordance with paragraphs (c) and (d) of the clause at FAR 52.225-21 for the offer that is based on the use of any foreign construction material for which the Government has not yet determined an exception applies.

(3) If the Government determines that a particular exception requested in accordance with paragraph (c) of the clause at FAR 52.225-21 does not apply, the Government will evaluate only those offers based on use of the equivalent domestic construction material, and the offeror shall be required to furnish such domestic construction material. An offer based on use of the foreign construction material for which an exception was requested—

(i) Will be rejected as nonresponsive if this acquisition is conducted by sealed bidding; or

(ii) May be accepted if revised during negotiations.

52.228-1 BID GUARANTEE (SEP 1996)

(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.

(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States.

The Contracting Officer will return bid guarantees, other than bid bonds, (1) to unsuccessful bidders as soon as practicable after the opening of bids, and (2) to the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.-

(c) The amount of the bid guarantee shall be 20% percent of the bid price or $ 3,000,000, whichever is less.-

(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.-

(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.

(End of clause)

52.233-2 SERVICE OF PROTEST (SEP 2006)

(a) Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from U.S. Army Corps of Engineers, Attn: Contracting Officer, 69 Darlington Ave, Wilmington, NC 28403-1343.

(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.

52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) – ALTERNATE I (FEB 1995)

(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.

(b) An organized site visit has been scheduled for--

18 May 2010 for the Philpott Lake part of the project - Meet at 10:30am at the Visitor's Assistance Center at Philpott Lake, 1058 Philpott Dam Road, Bassett VA 24055

20 May 2010 for the W Kerr Scott part of the project - Meet at 10:30am at the Visitor's Assistance Center at W Kerr Scott Dam & Reservoir, 499 Reservoir Road, Wilkesboro NC 28697

(c) Participants will meet at--

See paragraph (b) above.

52.236-4011 Disclosure of Magnitude of Construction (FAR 36.204 and DFARS 236.204)

The estimated price range for this project is between $ 1,000,000 and $ 5,000,000.

252.204-7001 COMMERCIAL AND GOVERNMENT ENTITY (CAGE) CODE REPORTING (AUG 1999)

(a) The offeror is requested to enter its CAGE code on its offer in the block with its name and address. The CAGE code entered must be for that name and address. Enter “CAGE” before the number.

(b) If the offeror does not have a CAGE code, it may ask the Contracting Officer to request one from the Defense Logistics Information Service (DLIS). The Contracting Officer will--

(1) Ask the Contractor to complete section B of a DD Form 2051, Request for Assignment of a Commercial and Government Entity (CAGE) Code;

(2) Complete section A and forward the form to DLIS; and

(3) Notify the Contractor of its assigned CAGE code.

(c) Do not delay submission of the offer pending receipt of a CAGE code.

252.209-7001 DISCLOSURE OF OWNERSHIP OR CONTROL BY THE GOVERNMENT OF A TERRORIST

COUNTRY (JAN 2009)

(a) "Definitions."

As used in this provision --

(a) "Government of a terrorist country" includes the state and the government of a terrorist country, as well as any political subdivision, agency, or instrumentality thereof.

(2) "Terrorist country" means a country determined by the Secretary of State, under section 6(j)(1)(A) of the Export Administration Act of 1979 (50 U.S.C. App. 2405(j)(i)(A)), to be a country the government of which has repeatedly provided support for such acts of international terrorism. As of the date of this provision, terrorist countries subject to this provision include: Cuba, Iran, Sudan, and Syria.

(3) "Significant interest" means --

(i) Ownership of or beneficial interest in 5 percent or more of the firm's or subsidiary's securities. Beneficial interest includes holding 5 percent or more of any class of the firm's securities in "nominee shares," "street names," or some other method of holding securities that does not disclose the beneficial owner;

(ii) Holding a management position in the firm, such as a director or officer;

(iii) Ability to control or influence the election, appointment, or tenure of directors or officers in the firm;

(iv) Ownership of 10 percent or more of the assets of a firm such as equipment, buildings, real estate, or other tangible assets of the firm; or

(v) Holding 50 percent or more of the indebtness of a firm.

(b) "Prohibition on award."

In accordance with 10 U.S.C. 2327, no contract may be awarded to a firm or a subsidiary of a firm if the government of a terrorist country has a significant interest in the firm or subsidiary or, in the case of a subsidiary, the firm that owns the subsidiary, unless a waiver is granted by the Secretary of Defense.

(c) "Disclosure."

If the government of a terrorist country has a significant interest in the Offeror or a subsidiary of the Offeror, the Offeror shall disclosure such interest in an attachment to its offer. If the Offeror is a subsidiary, it shall also disclose any significant interest the government of a terrorist country has in any firm that owns or controls the subsidiary.

The disclosure shall include --

(1) Identification of each government holding a significant interest; and

(2) A description of the significant interest held by each government.

252.209-7002 DISCLOSURE OF OWNERSHIP OR CONTROL BY A FOREIGN GOVERNMENT (JUN

2005)

(a) Definitions. As used in this provision--

(1) “Effectively owned or controlled” means that a foreign government or any entity controlled by a foreign government has the power, either directly or indirectly, whether exercised or exercisable, to control the election, appointment, or tenure of the Offeror’s officers or a majority of the Offeror’s board of directors by any means, e.g., ownership, contract, or operation of law (or equivalent power for unincorporated organizations).

(2) “Entity controlled by a foreign government”—

(i) Means—

(A) Any domestic or foreign organization or corporation that is effectively owned or controlled by a foreign government;

or

(B) Any individual acting on behalf of a foreign government.

(ii) Does not include an organization or corporation that is owned, but is not controlled, either directly or indirectly, by a foreign government if the ownership of that organization or corporation by that foreign government was effective before October 23, 1992.

(3) “Foreign government” includes the state and the government of any country (other than the United States and its outlying areas) as well as any political subdivision, agency, or instrumentality thereof.

(4) “Proscribed information” means—

(i) Top Secret information;

(ii) Communications Security (COMSEC) information, except classified keys used to operate secure telephone units (STU IIIs);

(iii) Restricted Data as defined in the U.S. Atomic Energy Act of 1954, as amended;

(iv) Special Access Program (SAP) information; or

(v) Sensitive Compartmented Information (SCI).

(b) Prohibition on award. No contract under a national security program may be awarded to an entity controlled by a foreign government if that entity requires access to proscribed information to perform the contract, unless the Secretary of Defense or a designee has waived application of 10 U.S.C. 2536(a).

(c) Disclosure. The Offeror shall disclose any interest a foreign government has in the Offeror when that interest constitutes control by a foreign government as defined in this provision. If the Offeror is a subsidiary, it shall also disclose any reportable interest a foreign government has in any entity that owns or controls the subsidiary, including reportable interest concerning the Offeror’s immediate parent, intermediate parents, and the ultimate parent. Use separate paper as needed, and provide the information in the following format:

Offeror’s Point of Contact for Questions about Disclosure (Name and Phone Number with Country Code, City Code and Area Code, as applicable)

Name and Address of Offeror

Name and Address of Entity Controlled by a Foreign Government

Description of Interest, Ownership Percentage, and Identification of Foreign Government

252.225-7031 SECONDARY ARAB BOYCOTT OF ISRAEL (JUN 2005)

(a) Definitions. As used in this provision--

(1) Foreign person means any person (including any individual, partnership, corporation, or other form of association) other than a United States person.

(2) United States means the 50 States, the District of Columbia, outlying areas, and the outer Continental Shelf as defined in 43 U.S.C. 1331.

(3) United States person is defined in 50 U.S.C. App. 2415(2) and means--

(i) Any United States resident or national (other than an individual resident outside the United States who is employed by other than a United States person);

(ii) Any domestic concern (including any permanent domestic establishment of any foreign concern); and

(iii) Any foreign subsidiary or affiliate (including any permanent foreign establishment) of any domestic concern that is controlled in fact by such domestic concern.

(b) Certification. If the offeror is a foreign person, the offeror certifies, by submission of an offer, that it--

(1) Does not comply with the Secondary Arab Boycott of Israel; and

(2) Is not taking or knowingly agreeing to take any action, with respect to the Secondary Boycott of Israel by Arab countries, which 50 U.S.C. App. 2407(a) prohibits a United States person from taking.

252.236-7008 CONTRACT PRICES - BIDDING SCHEDULES. (DEC 1991)

(a) The Government's payment for the items listed in the Bidding Schedule shall constitute full compensation to the Contractor for --

(1) Furnishing all plant, labor, equipment, appliances, and materials; and

(2) Performing all operations required to complete the work in conformity with the drawings and specifications.

(b) The Contractor shall include in the prices for the items listed in the Bidding Schedule all costs for work in the specifications, whether or not specifically listed in the Bidding Schedule.

Section 00600 - Representations & Certifications

52.204-4001 OFFEROR IDENTIFICATION (CESAS-CT-C APR 1993)

Offeror is requested to furnish the following information:

Name/Address: ____________________________________________________________

Telephone No. ____________________________________________________________

DUNS: ________________________ CAGE: _______________________

52.204-4002 CORPORATE CERTIFICATE (MAR 1994 CESAS-CT) (Ref. FAR 4.102(c))

The offeror shall execute and affix seal on attached Corporate Certificate if the company is incorporated. Company name on the seal should always be the same as company name on Page A-1 of the solicitation. If a proposal is signed by an officer of the company, the certificate shall be certified by another officer of the company.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .