Text version

EX. NBP-C#5

PB

PB

PB

PB

PB

PB

PB

PB

PB

PB

PB

PB

PB

PB

PB

UE

PB

PB

NBP-C #6

EX. MDP-C

NBP-C #7

EX. NBP-C #4

NBP-C #8

EX. NBP-C #3

1,3

2,4

5,7

6,8

9,11

10,12

1,3

2,4 5,7

6,8 9,11

1,3

2,4

5,7

T

M

E101

E101

E101

TYP. OF 14

E101 w w w .te tra te ch .c om

C

H U

R C

H S

TR

EE

T, S

U

IT

E

H

U N

TS

VI

LL

E, A

LA

BA

M

A

TE

L.

: 2

-5

-0

NOTES:

2 RUNS OF 2-350KCMIL(P.), 1-350KCMIL(N.), 1 #4(G.)-2"C

2-350KCMIL(P.), 1-350KMCIL(N.), 1 #4(G.)-2"C

6 #2(P.), 3#2(N.), 3 #8(G.)-2"C

2 #2(P.), 1#2(N.), 1 #8(G.)-1"C

8 #2/0(P.), 4#2/0(N.), 4 #6(G.)-3"C

6 #2/0(P.), 3#2/0(N.), 3 #6(G.)-2 1/2"C

4 #2/0(P.), 2#2/0(N.), 2 #6(G.)-2 1/2"C

2 #2/0(P.), 1#2/0(N.), 1 #6(G.)-2 1/2"C

10 #2/0(P.), 5#2/0(N), 5 #6(G.)-3 1/2"C

ADD 2-200/2 CIRCUIT BREAKERS TO EXISTING 800A SERVICE PANEL.

MATCH EXISTING MANUFACTURE, STYLE AND AIC RATING.

EXISTING UTILITY TRANSFORMER TO BE UPGRADED BY UTILITY. CONTRACTOR

RESPONSIBLE FOR COMPENSATION TO UTILITY FOR ELECTRICAL SERVICE UPGRADES..

NEW 200A METER BASE BY CONTRACTOR, COORDINATE WITH LOCAL

UTILITY. CONTRACTOR RESPONSIBLE FOR COMPENSATION

TO UTILITY FOR ELECTRICAL SERVICE UPGRADES.

SEE SHEET E101 FOR SYMBOL LEGEND

http://www.tetratech.com/

NBP-D#1

MDP-D

NBP-D#6

NBP-D#2

NBP-D#3

NBP-D#4

NBP-D#5

PB

PB

PB

UE PB

PB

PB

PB

PB

PB

PB

PB

PB

PB

PB PB

PB

PB

PB

PB

PB

PB

T

7 7

11 11

E201

E201

E201

TYP OF 30

E201

E201

E201

E201

6,8

5,7

2,4

1,3

1,3

2,4

5,7

6,8 10,12

9,11

1,3

2,4

5,7

6,8 1,3

2,4

5,7

6,8

1,3

2,4

9,11

10,12

1,3

2,4

5,7

6,8

10,12

9,11 w w w .te tra te ch .c om

C

H U

R C

H S

TR

EE

T, S

U

IT

E

H

U N

TS

VI

LL

E, A

LA

BA

M

A

TE

L.

: 2

-5

-0

5 RUNS OF 2-350KCMIL(P.), 1-350KCMIL(N.), 1 #4(G.)-2"C1

2 4 RUNS OF 2-350KCMIL(P.), 1-350KCMIL(N.), 1 #4(G.)-2"C

3 3 RUNS OF 2-350KCMIL(P.), 1-350KCMIL(N.), 1 #4(G.)-2"C

4 2 RUNS OF 2-350KCMIL(P.), 1-350KCMIL(N.), 1 #4(G.)-2"C

5 2-350KCMIL(P.), 1-350KCMIL(N.), 1 #4(G.)-2"C

6 6 #2(P.), 3#2(N.), 3 #8(G.)-2"C

7 2 #2(P.), 1#2(N.), 1 #8(G.)-1"C

8 8 #2/0(P.), 4#2/0(N.), 4 #6(G.)-3"C

9 6 #2/0(P.), 3#2/0(N.), 3 #6(G.)-2 1/2"C

12 2-250KCMIL(P.), 1#250KCMIL(N.), 1#4(G.)-2"C

4 #2/0(P.), 2#2/0(N.), 2 #6(G.)-2 1/2"C

2 #2/0(P.), 1#2/0(N.), 1 #6(G.)-2 1/2"C

NOTES:

SEE SHEET E201 FOR SYMBOL LEGEND

13 NEW 200 KVA PAD MOUNT TRASFORMER BY UTILITY. COORDINATE

LOCATION AND REQUIREMENTS PER LOCAL UTILITY. CONTRACTOR

RESPONSIBLE FOR COMPENSATION TO UTILITY FOR ELECTRICAL

SERVICE.

http://www.tetratech.com/ w w w .te tra te ch .c om

C

H U

R C

H S

TR

EE

T, S

U

IT

E

H

U N

TS

VI

LL

E, A

LA

BA

M

A

TE

L.

: 2

-5

-0

EX

60/3

EX

60/3 NEW BOOSTER

PUMP #1

10 H.P.

240V, 3PH

NEW BOOSTER

PUMP #2

10 H.P.

240V, 3PH

3#10, 1#10(G.) 3/4"C.

EX. ELEC

PANEL "P"

EX. EQUIPMENT

CONTROL PANEL

"CP"

EX. WIREWAY, DISCONNECTS AND

STARTERS FOR BOOSTER PUMPS.

EX. PHASE CONVERTERS

FOR BOOSTER AND WELL

PUMPS.

5.

4.

3.

2.

1.

ELECTRICAL NOTES

VERIFY EX. CONDUCTOR, FUSE, CIRCUIT BREAKER AND DISCONNECT SIZES AS SHOWN

ON THIS DRAWING. PROVIDE A $5000. ALLOWANCE TO REPLACE CONDUCTORS, FUSES,

DISCONNECTS OR CIRCUIT BREAKERS. TO MATCH THESE CONDITIONS.

BECOME FAMILIAR WITH THE MECHANICAL AND DRAWINGS PRIOR TO THE

INSTALLATION OF THE ELECTRICAL SYSTEMS

ELECTRICAL WORK SHALL CONFORM TO THE N.E.C. AS A MINIMUM STANDARD.

ITEMS SPECIFIED BY BRAND NAME ARE ON AN "OR EQUAL" BASIS (UNLESS

OTHERWISE NOTED).

FIELD ADJUST THE CONDUIT AND EQUIPMENT LAYOUT TO CLEAR ANY OBSTACLES

THAT MIGHT BE IN THE WAY.

REFER TO THE APPROPRIATE DRAWING FOR THE EXACT LOCATION OF EQUIPMENT

INSTALLED UNDER DIVISIONS OF THE DOCUMENTS WHICH REQUIRE ELECTRICAL SERVICE.

EX. NEMA

SIZE 2

STARTER

EX.

30H.P MAX

ROTO PHASE

PHASE CONVERTER

EX. 60A DISCONNECT

W/ 35A TIME DELAY

FUSES

EX.

PANEL

"P"

EX. WIREWAY

EX.

175/2 C.B.

L1

L2

T1 T2 T3

EX. EQUIPMENT

CONTROL PANEL

"CP"

EX. 60A

DISCONNECT

EX. 60A

DISCONNECT

EX. 60A DISCONNECT

W/ 35A TIME DELAY

FUSESEX. 60A DISCONNECT

W/ 35A TIME DELAY

FUSES

NEW BOOSTER

PUMP #1

NEW BOOSTER

PUMP #2

10 10

EX. 3#6,1#8(G.)-1"C

EX. 2#2,1#6(G)-1"C.

EX. 3#10,1#10(G.)-3/4"C

3#10,1#10(G)-3/4"C

EX. 3#10,1#10(G.)-3/4"C

EX. 3#10,1#10(G.)-3/4"C

THE ELECTRICAL SCOPE OF WORK IN THIS AREA IS TO PROVIDE A NEW ELECTRICAL

CONNECTION TO FOR TWO BOOSTER PUMPS THAT ARE BEING REPLACED AND ANY

WORK AS DESCRIBED IN THE NOTES BELOW.

WELLHOUSE BOOSTER PUMP STATION

CAMP SITE AREA C

http://www.tetratech.com/

E102 ADDENDUM 1.pdf
E-202 ADDENDUM 1
E-204 ADDENDUM 1