W912HN-10-B-0003 0001.pdf
PDF 105 KB Posted
- Solicitation number
- W912HN-10-B-0003
About this file
SF 30 - Summary of changes.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W912HN-10-B-0003 0003.pdf | ||
| Jrdn_WQCG_Amd3_Plans.pdf | ||
| W912HN-10-B-00030002.pdf | ||
| Jrdn_WQCG_Amd1_Plans.pdf | ||
| Jordan_WQCG_Plans.pdf | ||
| SPECIFICATIONS.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W81LJ892532593
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Solicitation W912HN-10-B-0003, "B. Everett Jordan Dam and Lake Water Quality Control Gates Rehabilitation", is hereby amended as follow s:
See page 2 for summary of changes.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 05-Feb-2010
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912HN-10-B-0003
X 9B. DATED (SEE ITEM 11)
13-Jan-2010
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
08-Feb-2010
CODE
U.S. ARMY ENGINEER DISTRICT SAVANNAH
WILMINGTON OFFICE
69 DARLINGTON AVENUE
WILMINGTON NC 28403
W912HN 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912HN-10-B-0003
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00010 - SOLICITATION CONTRACT FORM
The required response date/time has changed from 12-Feb-2010 02:00 PM to 17-Feb-2010 02:00 PM.
SECTION 01 33 00 – SUBMITTAL PROCEDURES
Delete existing Attachment 1 – ENG FORM 4288 (Page 1 and Page
2) SUBMITTAL REGISTER in their entirety and replace with enclosed revised Pages.
SECTION 41 24 27.00 10 – HYDRAULIC POWER SYSTEMS FOR CIVIL
WORKS STRUCTURES
Delete existing Page 1 through Page 25 in their entirety and replace with enclosed revised Page 1 through Page 26.
NOTE:
Text that is added or revised by this amendment is replaced in its entirety and underlined and/or printed in bold and/or highlighted in yellow and/or stamped appropriately.
The text changes may have necessitated reformatting of subsequent text or pages. If this is the case, those pages have also been issued as amended pages but are not underlined or bold text.
DRAWINGS
Delete existing Plates Numbers M-603, E-101, E-102, E-601, M-101, and M-407 in their entirety and replace with enclosed revised Plates.
(End of Summary of Changes)
Encls As stated
SUBMITTAL REGISTER (ER 415-1-10)
TITLE AND LOCATION DATE
CONTRACTOR CONTRACT NUMBER
ACTIVITY
No.
TRANS-
MITTAL
No.
ITEM
No.
SPEC
PARAGRAPH
No.
DESCRIPTION OF
SUBMITTAL
TYPE OF SUBMITTAL
CLASSI-
FICATION
FIO
GA, DA
or CR
REVIEWER
OFFICE / NAME
CONTRACTOR
SCHEDULE DATES
CONTRACTOR
ACTION
GOVERNMENT
ACTION
SUBMIT
NEEDED
BY
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
CODE
CORPS
RECEIVED
DATE
CODE
CORPS
RETURNED
DATE
B E Jordan Water Quality Control Gates
W912HN-10-B-0003 NA
05 Feb 2010
SORT : SECTION & ITEMRANGE : ALL
SECTION - 01 10 00.10 38 SUPPLEMENTARY SPECIAL CONTRACT REQUIREMENTS
1 01 10 00.10 38 1.14 List of Subcontractors PRECON SUBMTL FIO
2 01 10 00.10 38 Progress Chart PRECON SUBMTL GA
3 01 10 00.10 38 1.14 Quality Control Plan PRECON SUBMTL GA
4 01 10 00.10 38 1.14 Certificate of Insurance CERTIFICATES FIO
5 01 10 00.10 38 1.14 Completion of Corps CQC Course CERTIFICATES FIO
6 01 10 00.10 38 1.14 Letter Appointing Superintendent CERTIFICATES FIO
7 01 10 00.10 38 1.13 Testing Laboratory CERTIFICATES GA
SECTION - 01 30 00 ADMINISTRATIVE REQUIREMENTS
1 01 30 00 1.5.1 List of contact personnel PRECON SUBMTL GA
2 01 30 00 1.2 View location map PRECON SUBMTL GA
3 01 30 00 1.3 Progress and completion pictures PRECON SUBMTL GA
SECTION - 01 32 01.00 10 PROJECT SCHEDULE
1 01 32 01.00 10 3.4 Project Schedule PRECON SUBMTL GA
SECTION - 01 33 00 SUBMITTAL PROCEDURES
1 01 33 00 1.7 Submittal register PRECON SUBMTL GA
SECTION - 01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
1 01 35 26 1.6 Accident Prevention Plan (APP) PRECON SUBMTL GA
2 01 35 26 1.5.1.3 Crane Operators PRECON SUBMTL GA
3 01 35 26 1.5.1.1 Site Safety and Health Officer PRECON SUBMTL GA
4 01 35 26 1.6.1 Competent Persons PRECON SUBMTL GA
5 01 35 26 1.12 Reports TEST REPORTS FIO
6 01 35 26 1.12.1 Accident Reports TEST REPORTS FIO
7 01 35 26 1.12.3 Crane Reports TEST REPORTS FIO
8 01 35 26 1.7 Activity Hazard Analysis (AHA) TEST REPORTS GA
9 01 35 26 1.6.1 Crane Critical Lift Plan TEST REPORTS GA
10 01 35 26 1.8 Confined Space Entry Permit CERTIFICATES FIO
11 01 35 26 1.8 Hot work permit CERTIFICATES FIO
12 01 35 26 3.5.1 License CERTIFICATES FIO
13 01 35 26 1.12.4 Certificate of Compliance CERTIFICATES FIO
SECTION - 01 57 20.00 10 ENVIRONMENTAL PROTECTION
1 01 57 20.00 10 1.7 Environmental Protection Plan PRECON SUBMTL GA
SECTION - 26 05 19.00 10 INSULATED WIRE AND CABLE
1 26 05 19.00 10 3.1 Installation Instructions PRODUCT DATA FIO
2 26 05 19.00 10 1.5 Tests, Inspections, and Verifications TEST REPORTS FIO
SUBMITTAL REGISTER (ER 415-1-10)
TITLE AND LOCATION DATE
CONTRACTOR CONTRACT NUMBER
ACTIVITY
No.
TRANS-
MITTAL
No.
ITEM
No.
SPEC
PARAGRAPH
No.
DESCRIPTION OF
SUBMITTAL
TYPE OF SUBMITTAL
CLASSI-
FICATION
FIO
GA, DA
or CR
REVIEWER
OFFICE / NAME
CONTRACTOR
SCHEDULE DATES
CONTRACTOR
ACTION
GOVERNMENT
ACTION
SUBMIT
NEEDED
BY
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
CODE
CORPS
RECEIVED
DATE
CODE
CORPS
RETURNED
DATE
B E Jordan Water Quality Control Gates
W912HN-10-B-0003 NA
05 Feb 2010
SORT : SECTION & ITEMRANGE : ALL
SECTION - 26 20 00 INTERIOR DISTRIBUTION SYSTEM
1 26 20 00 2.12 Panelboards SHOP DRAWINGS FIO
2 26 20 00 2.11 Receptacles PRODUCT DATA FIO
3 26 20 00 2.12.3 Circuit breakers PRODUCT DATA FIO
4 26 20 00 2.9 Switches PRODUCT DATA FIO
5 26 20 00 2.15 Manual motor starters PRODUCT DATA FIO
6 26 20 00 3.5.4 Grounding system test TEST REPORTS FIO
7 26 20 00 3.5.3 Ground-fault receptacle test TEST REPORTS FIO
8 26 20 00 2.10 Fuses CERTIFICATES FIO
9 26 20 00 Transformer factory tests MFRS FLD REPT FIO
SECTION - 41 24 27.00 10 HYDRAULIC POWER SYSTEMS FOR CIVIL WORKS STRUCTURES
1 41 24 27.00 10 1.6 Schematic and Drawings SHOP DRAWINGS FIO
2 41 24 27.00 10 1.10 Work Plan SHOP DRAWINGS FIO
3 41 24 27.00 10 2.1 Materials and Mechanical Equipment PRODUCT DATA FIO
4 41 24 27.00 10 2.2 Electrical Equipment PRODUCT DATA FIO
5 41 24 27.00 10 1.3 System Description PRODUCT DATA FIO
6 41 24 27.00 10 1.4 Design and Performance Requirements PRODUCT DATA FIO
7 41 24 27.00 10 2.3 Shop Assembly and Testing PRODUCT DATA FIO
8 41 24 27.00 10 3.2.2 Cleaning and Flushing the System PRODUCT DATA FIO
9 41 24 27.00 10 3.5.1 Field Testing PRODUCT DATA FIO
10 41 24 27.00 10 2.3 Shop Tests TEST REPORTS FIO
11 41 24 27.00 10 3.5.3.3 Field Tests TEST REPORTS FIO
12 41 24 27.00 10 2.1.3.4 Piston Rods (Standard Design) TEST REPORTS FIO
13 41 24 27.00 10 1.9 Operation and Maintenance O&M DATA FIO
K7EPEOAF
Highlight
B. Everett Jordan Dam and Lake Water Quality Control Gates W912HN-10-B-0003 Rehabilitation, Chatham County, North Carolina
SECTION TABLE OF CONTENTS
DIVISION 41 - MATERIAL PROCESSING AND HANDLING EQUIPMENT
SECTION 41 24 27.00 10
HYDRAULIC POWER SYSTEMS FOR CIVIL WORKS STRUCTURES
PART 1 GENERAL
1.1 LUMP SUM PRICES
1.1.1 Payment
1.1.2 Unit of Measure
1.2 REFERENCES
1.3 SYSTEM DESCRIPTION
1.4 DESIGN AND PERFORMANCE REQUIREMENTS
1.4.1 Design Parameters
1.4.2 Allowable Stresses
1.4.2.1 Structural Items
1.4.2.2 Hydraulic Cylinders
1.4.2.3 Stress Concentration Factors
1.4.3 Connections
1.4.3.1 Shop Connections
1.4.3.2 Welded Connections
1.4.3.3 Structural Bolted Connections
1.5 SUBMITTALS
1.6 SCHEMATIC AND DRAWINGS
1.6.1 Shop Drawings
1.6.2 Fabrication Drawings
1.6.3 Shop Assembly Drawings
1.6.4 Hydraulic Schematic
1.6.5 Delivery Drawings
1.6.6 Field Installation Procedures
1.7 DELIVERY, STORAGE, AND HANDLING
1.7.1 Packaging
1.7.2 Shipping, Preservation, and Storage
1.8 WARRANTY
1.9 OPERATION AND MAINTENANCE
1.10 WORK PLAN
PART 2 PRODUCTS
2.1 MATERIALS AND MECHANICAL EQUIPMENT
2.1.1 General
2.1.2 Standard Products
2.1.3 Hydraulic Cylinders (Standard Design)
2.1.3.1 Cylinder Tubes
2.1.3.2 Cylinder Heads and Caps
2.1.3.3 Pistons
2.1.3.4 Piston Rods (Standard Design)
2.1.4 Hydraulic Power Unit
2.1.5 Oil Reservoirs
2.1.5.1 Reservoir Heater
2.1.5.2 Magnetic Separators
SECTION 41 24 27.00 10 Page 1 (Revised by Amendment No. 0001)
2.1.5.3 Air Breather
2.1.6 Pumps
2.1.7 Filters
2.1.8 Gauges
2.1.8.1 Pressure Gauges
2.1.8.2 Thermometer
2.1.9 Valves
2.1.9.1 Ball Valves
2.1.9.2 Needle Valves
2.1.9.3 Control Valves
2.1.9.4 Pressure Relief Valves
2.1.9.5 Supply Spring Loaded Check Valves
2.1.9.6 Return Spring Loaded Check Valves
2.1.9.7 Bleeder Valves
2.1.9.8 Pressure Snubbers
2.1.9.9 Counterbalance Valve
2.1.10 Piping
2.1.10.1 Pipe
2.1.10.2 Pipe Fittings
2.1.10.3 Unions
2.1.10.4 Hydraulic Tubing
2.1.10.5 Tube Fittings
2.1.10.6 Hose
2.1.11 Bolts, Nuts, and Washers
2.1.11.1 Carbon Steel Bolts and Nuts
2.1.11.2 Stainless Steel Bolts and Nuts
2.1.11.3 Flat Washers
2.1.12 Hydraulic Fluid
2.2 ELECTRICAL EQUIPMENT
2.2.1 Conduit, Duct, and Accessories
2.2.1.1 Rigid Metal Conduit
2.2.1.2 Conduit Fittings
2.2.1.3 Conduit and Cabinet Supports
2.2.2 Cabinets and Boxes
2.2.3 Pump Motors
2.2.3.1 Rating
2.2.3.2 Winding Insulation
2.2.3.3 Winding Heaters
2.2.3.4 Terminal Leads
2.2.4 Control Components
2.2.4.1 Control Devices and Wiring
2.2.4.2 Pressure Switches
2.2.4.3 Electronic Limit Switches
2.2.4.4 Transducer (Electromagnetic Position Sensor)
2.2.4.5 Remote Read-Out Digital Display
2.2.4.6 Manual Switches
2.2.4.7 Relays
2.2.4.8 Indicating Lights
2.2.5 Control Consoles and Valve and Gauge Panels
2.2.5.1 Control Console Construction
2.2.5.2 Valve and Gauge Panel Construction
2.2.5.3 Nameplates and Instruction Plates
2.2.5.4 Security Provisions
2.2.5.5 Weather Protection
2.3 SHOP ASSEMBLY AND TESTING
2.3.1 Cleaning
2.3.2 Cylinder Tests
2.3.3 Hydraulic Power Units
SECTION 41 24 27.00 10 Page 2
PART 3 EXECUTION
3.1 EXAMINAION
3.2 INSTALLATION
3.2.1 General
3.2.2 Cleaning and Flushing the System
3.2.3 Filling and Bleeding the System
3.3 PAINTING
3.4 ERECTION ENGINEER
3.5 FIELD TESTS AND INSPECTIONS
3.5.1 Field Testing
3.5.2 Proof Testing
3.5.3 Final Acceptance Tests
3.5.3.1 Initial Start-Up
3.5.3.2 Combined System Tests
3.5.3.3 Test Reports
-- End of Section Table of Contents --
SECTION 41 24 27.00 10 Page 3
SECTION 41 24 27.00 10
HYDRAULIC POWER SYSTEMS FOR CIVIL WORKS STRUCTURES
PART 1 GENERAL
1.1 LUMP SUM PRICES
1.1.1 Payment
Payment will be made for costs associated with the hydraulic power system(s) as specified.
1.1.2 Unit of Measure
Unit of measure: lump sum.
1.2 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN WELDING SOCIETY (AWS)
AWS D1.1/D1.1M (2008; Errata 2009) Structural Welding Code - Steel
ASME INTERNATIONAL (ASME)
ASME B16.11 (2005) Forged Fittings, Socket-Welding and Threaded
ASME B31.1 (2007; Addenda 2008) Power Piping
ASME B40.100 (2005) Pressure Gauges and Gauge Attachments
ASME BPVC SEC VIII D1 (2007; Addenda 2008) Boiler and Pressure Vessel Code; Section VIII, Pressure Vessels Division 1 - Basic Coverage
ASTM INTERNATIONAL (ASTM)
ASTM A 106/A 106M (2008) Standard Specification for Seamless Carbon Steel Pipe for High-Temperature Service
ASTM A 108 (2007) Standard Specification for Steel Bar, Carbon and Alloy, Cold-Finished
ASTM A 182/A 182M (2009) Standard Specification for Forged or Rolled Alloy-Steel Pipe Flanges, Forged Fittings, and Valves and Parts for High-Temperature Service
SECTION 41 24 27.00 10 Page 4
ASTM A 193/A 193M (2008b) Standard Specification for Alloy-Steel and Stainless Steel Bolting Materials for High-Temperature Service
ASTM A 194/A 194M (2009) Standard Specification for Carbon and Alloy Steel Nuts for Bolts for High-Pressure or High-Temperature Service, or Both
ASTM A 234/A 234M (2007) Standard Specification for Piping Fittings of Wrought Carbon Steel and Alloy Steel for Moderate and High Temperature Service
ASTM A 325 (2009) Standard Specification for Structural Bolts, Steel, Heat Treated, 120/105 ksi Minimum Tensile Strength
ASTM A 354 (2007a) Standard Specification for Quenched and Tempered Alloy Steel Bolts, Studs, and Other Externally Threaded Fasteners
ASTM A 519 (2006) Standard Specification for Seamless Carbon and Alloy Steel Mechanical Tubing
ASTM A 576 (1990b; R 2006) Standard Specification for Steel Bars, Carbon, Hot-Wrought, Special Quality
ASTM A 659/A 659M (2008) Standard Specification for Commercial Steel (CS), Sheet and Strip, Carbon (0.l6 Maximum to 0.25 Maximum Percent), Hot-Rolled
ASTM A 789/A 789M (2008b) Standard Specification for Seamless and Welded Ferritic/Austenitic Stainless Steel Tubing for General Service
ASTM D 3951 (1998; R 2004) Commercial Packaging
ASTM F 844 (2007a) Washers, Steel, Plain (Flat), Unhardened for General Use
INSTITUTE OF ELECTRICAL AND ELECTRONICS ENGINEERS (IEEE)
IEEE C57.12.70 (2000; R 2006) Standard Terminal Markings and Connections for Distribution and Power Transformers
INTERNATIONAL ORGANIZATION FOR STANDARDIZATION (ISO)
ISO 1219-1 (2006) Fluid Power Systems and Components Graphic Symbols and Circuit Diagrams Part 1: Graphic Symbols for Conventional Use and Data-Processing Applications
ISO 1219-2 (1995) Fluid Power Systems and Components
SECTION 41 24 27.00 10 Page 5
Graphic Symbols and Circuit Diagrams Part 2: Circuit Diagrams
ISO 4021 (1992) Hydraulic Fluid Power - Particulate Contamination Analysis - Extraction of Fluid Samples from Lines of an Operating System
ISO 5598 (2008) Fluid Power Systems and Components
- Vocabulary
NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION (NEMA)
NEMA C80.1 (2005) Standard for Electrical Rigid Steel Conduit (ERSC)
NEMA ICS 1 (2000; R 2005; R 2008) Standard for Industrial Control and Systems General Requirements
NEMA ICS 2 (2000; Errata 2002; R 2005; Errata 2006) Standard for Industrial Control and Systems: Controllers, Contactors, and Overload Relays Rated Not More than 2000 Volts AC or 750 Volts DC: Part 8 - Disconnect Devices for Use in Industrial Control Equipment
NEMA ICS 6 (1993; R 2006) Standard for Industrial Controls and Systems Enclosures
NEMA MG 1 (2007; Errata 2008) Standard for Motors and Generators
NATIONAL FLUID POWER ASSOCIATION (NFLPA)
NFLPA T2.24.1 R1 (2007) Hydraulic Fluid Power - Systems Standard for Stationary Industrial Machinery; Supplement to ISO 4413
NFLPA T3.16.2 R1 (1997; R 2005) Hydraulic Fluid Power - Design for Nonintegral Industrial Reservoirs
SOCIETY OF AUTOMOTIVE ENGINEERS INTERNATIONAL (SAE)
SAE ARP598 (2003; Rev C) Aerospace Microscopic Sizing and Counting of Particulate Contamination for Fluid Power Systems
SAE J1165 (1979; R 1986) Reporting Cleanliness Levels of Hydraulic Fluids
SAE J514 (2004) Hydraulic Tube Fittings
UNDERWRITERS LABORATORIES (UL)
UL 50 (2007) Standard for Enclosures for Electrical Equipment
SECTION 41 24 27.00 10 Page 6
UL 6 (2007) Standard for Electrical Rigid Metal Conduit-Steel
1.3 SYSTEM DESCRIPTION
The work covered by this section of the specifications consists of detailed requirements for the design, fabrication, shop assembly, testing, delivery, and installation of the hydraulic power systems for operation of the control gates as specified and as shown.
1.4 DESIGN AND PERFORMANCE REQUIREMENTS
The contract drawings indicate the general arrangement of the hydraulic power system for operation of the control gates , clearances necessitated by the structure or other equipment, maximum overall dimensions, and other pertinent features. Furnish the detailed design in conformity with NFLPA T2.24.1 R1, and the following design criteria.
1.4.1 Design Parameters
The principal design parameters for the hydraulic power system are as follows:
a. Maximum operating pressure: 3000 PSI
b. Rated retracting and extending force/pressure: As shown
c. Cylinder bore and rod diameters: As shown
d. Cylinder stroke: As Shown
e. Critical and limiting dimension: Contractor to field verify dimensions and clearances
f. Special features: Cylinders shall have means to indicate gate position as Open or Closed. The indicating device shall be electronic and pistion shall be adjustable by the users. The indicating sensor shall be located on the cylinder housing.
g. Valves shall be of modular design stacked on manifold.
h. Oil tank shall be heated to maintain oil temperature as shown in the schedule.
i. Hydraulic power unit capable of operating two hydraulic pumps at 8 gpm each at 2,500 PSI. Power unit to include oil heater, high and low level switch, visual level indicator, filters, relief valves, motors, pumps and motor starters as shown on the drawings.
1.4.2 Allowable Stresses
1.4.2.1 Structural Items
Structural items associated with the hydraulic power system, such as support beams, shall be designed to withstand the maximum force exerted by the hydraulic cylinder plus any dead loads with a factor of safety of 2 based on the yield strength of the materials involved.
1.4.2.2 Hydraulic Cylinders
Design the hydraulic cylinders to withstand the maximum operating pressure in the system with a factor of safety of 5, based on the ultimate strength of the material, or 2, based on the yield strength of the material. Apply a factor of safety of 3 to the compression load when designing the hydraulic cylinders to resist buckling.
SECTION 41 24 27.00 10 Page 7
1.4.2.3 Stress Concentration Factors
Stress concentration factors shall be used where applicable. Reduction of allowable stresses to compensate for repeated cycles of loading is not required.
1.4.3 Connections
1.4.3.1 Shop Connections
Design shop connections for assembly by means of welding or by bolting.
1.4.3.2 Welded Connections
Design of welded connections shall be in accordance with the applicable provisions of AWS D1.1/D1.1M except that provisions for repeated stress will not be required. Hydraulic cylinders shall be welded in accordance with ASME BPVC SEC VIII D1, Section VIII. Piping shall be welded in accordance with ASME B31.1.
1.4.3.3 Structural Bolted Connections
Structural bolted connections carrying primary loads shall be made with ASTM A 325 bolts.
1.5 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-02 Shop Drawings
Schematic and Drawings
Schematic and drawings as specified.
Work Plan
Submit work plan as specified.
SD-03 Product Data
Materials and Mechanical Equipment Electrical Equipment
Manufacturer's catalog data and descriptive literature for all standard equipment and products to be incorporated in the work, including all materials and equipment specified in paragraphs MATERIALS AND MECHANICAL EQUIPMENT and ELECTRICAL EQUIPMENT.
Include in this data specifications and assembly drawings showing sizes, ratings, parts and material lists, overall dimensions, and mounting dimensions.
System Description Design and Performance Requirements
SECTION 41 24 27.00 10 Page 8
Design computations for all items which are to be designed by the Contractor.
Shop Assembly and Testing
Procedures for shop testing for all testing outlined in paragraph SHOP ASSEMBLY AND TESTING.
Cleaning and Flushing the System
Procedures for field cleaning and flushing as outlined in paragraph CLEANING AND FLUSHING THE SYSTEM and a detailed field cleaning procedure not less than 10 days before start of cleaning operations.
Field Testing
Procedures for field testing as specified in paragraph FIELD TESTING. Proposed testing program, at least 4 weeks prior to the first scheduled test, to ensure agreement as to personnel required and scope of the testing program.
SD-06 Test Reports
Shop Tests Field Tests
Operational test reports for all required shop testing and testing of the equipment after installation.
Piston Rods (Standard Design)
Certified test report of the corrosion resistant test on ceramic coating as specified in paragraph(s) PISTON RODS (STANDARD DESIGN) .
SD-10 Operation and Maintenance Data
Operation and Maintenance
Operation and maintenance requirement as specified.
1.6 SCHEMATIC AND DRAWINGS
1.6.1 Shop Drawings
Detailed shop drawings shall include fabrication, shop assembly, delivery, and field installation drawings. Any component part of fabricated items omitted shall be detailed on the shop drawings. If departures from the contract drawings are deemed necessary by the Contractor, submit details of such departures, including changes in related portions of the project and reasons thereof, with the shop drawings.
1.6.2 Fabrication Drawings
Provide fabrication drawings for all mechanical and structural parts or components, except those which are of standard manufacture. The drawings shall show complete details of materials, tolerances, machined surface finishes, connections, and proposed welding sequences which differentiate
SECTION 41 24 27.00 10 Page 9 shop welds and field welds.
1.6.3 Shop Assembly Drawings
Provide shop assembly drawings with details for connecting the adjoining fabricated components in the shop to ensure satisfactory field installation.
1.6.4 Hydraulic Schematic
Hydraulic Schematic: Provide a complete hydraulic schematic in accordance with ISO 1219-1 and ISO 1219-2. All hydraulic components shall be shown on the schematic, and all setpoint and size parameters shall be indicated for each component.
1.6.5 Delivery Drawings
Provide delivery drawings with descriptions of methods of delivering components to the site, including details for supporting fabricated components during shipping to prevent distortion or other damage.
1.6.6 Field Installation Procedures
Provide field installation drawings with a detailed description of the field installation procedures. The description shall include the location and method of support of installation and handling equipment, the provisions to be taken to protect concrete and other work during installation, the method of maintaining components in correct alignment, and the methods for installing other appurtenant items.
1.7 DELIVERY, STORAGE, AND HANDLING
1.7.1 Packaging
The hydraulic power systems shall not be prepared for shipment until they have been inspected and accepted for shipment at origin by the Contracting Officer, unless inspection has been waived in writing. Each hydraulic power system or subassembly shall be shipped completely assembled. The subassemblies shall be defined as the following:
a. Hydraulic cylinders
b. Hydraulic power units
c. Piping assemblies
d. Control consoles
Provide the subassemblies with adequate protective pads, supports, and blocking and securely restrained to prevent distortion or damage to the painted surfaces in transit. Any loss or damage during shipment, including damage to the painted surfaces, will be considered the responsibility of the Contractor, and shall be replaced or repaired without cost to the Government. All accessories and spare parts shall be packed separately in containers plainly marked "ACCESSORIES ONLY," or "SPARE PARTS ONLY." A packing list, listing the contents of each container, shall be placed in a moisture-proof envelope and securely fastened to the outside of the container. Standard commercial packaging in accordance with ASTM D 3951 will be acceptable except where a different method or standard of packaging is specified.
SECTION 41 24 27.00 10 Page 10
1.7.2 Shipping, Preservation, and Storage
Packing, crating, cradles, etc., necessary to ensure safe shipment are the responsibility of the Contractor and shall become the property of the Government upon delivery of the equipment. The hydraulic cylinders shall be filled with the specified hydraulic fluid and the piping connections sealed. The shipping provisions shall be such that the cylinders may be rotated in increments of 90 degrees during storage. Should the cylinders be stored by the Contractor during fabrication, shipping, or at the worksite in the horizontal position more than 30 days, they shall be rotated every 30 days as follows: first 90 degrees, then 180 degrees, then 90 degrees, and then 180 degrees. Provisions shall be made with external shipping devices to prevent damage to the cylinder and piston rod resulting from the rod flexing up and down in the cylinder during transport.
Internal rod supports are not acceptable. Submit a proposal for controlling movement of the piston rod for approval. Adequately protect machined surfaces from corrosion and physical damage. Protect equipment delivered and placed in storage from the weather, humidity, temperature variation, dirt and dust, or other contaminants.
1.8 WARRANTY
All equipment shall be guaranteed for a period of 2 years from the date of acceptance. Replacement parts shall be guaranteed for 2 years from date of replacement. Provide Warranty against defective materials, design, and workmanship. In cases where the equipment manufacturer's advertised minimum guarantee is in excess of 2 years, it shall remain in force for its full period. Upon receipt of notice from the Government of failure of any of the parts during the warranty period, new replacement parts shall be furnished and installed promptly at no additional cost to the Government.
1.9 OPERATION AND MAINTENANCE
Furnish 4 complete sets of instructions containing the manufacturer's operation and maintenance instructions for each piece of equipment to the Contracting Officer. Each set shall be permanently bound and shall have a hard cover. Furnish one complete set prior to field testing and the remaining sets shall be furnished before the contract is completed. The following identification shall be inscribed on the covers: "OPERATING AND MAINTENANCE INSTRUCTIONS," title of the project, location of the project, the name of the Contractor, and the contract number. A flysheet shall be placed before instructions covering each subject. The instruction sheets shall be approximately 8 1/2 by 11 inches, with large sheets of drawings folded in. The instructions shall include, but not be limited to, the following:
a. A cross-section drawing of the hydraulic cylinder with parts list.
b. A system layout drawing showing the piping, valves, and controls.
c. A system hydraulic schematic.
d. Electrical wiring and control diagrams.
e. Operating and maintenance instructions.
f. Manufacturer's bulletins, catalog cuts, and descriptive data.
SECTION 41 24 27.00 10 Page 11
Provide the Operation and Maintenance (O&M) Manual with all information which may be needed or useful for operation, maintenance, repair, dismantling or assembling, and for identification of parts for ordering replacements. The manual will be subject to approval. Furnish parts lists and recommended spare parts in the quantities listed below:
ITEM QUANTITY
Cylinder seal kit 1
Control Valve Seal Kit 1
Control Valve Solenoid 1
Oil Filter 2
1.10 WORK PLAN
Provide a work plan to Contracting Officer which minimizes the interruption to the operation of Water Quality, Emergency and Maintenance Gates. The work plan shall define the work to be completed in each phase. The work plan shall be approved by the Contracting Officer before commencing work.
The work plan shall include but not limited to the following:
a. Phase I Site Inspection and Verification:Verify cylinder dimensions, mounting, connections and accessibility. Verify location of hydraulic unit, pipe routing and valve location. Verify control panel location, conduit routing and wiring. Verify existing conditions and equipment required for the project.
b. Phase II Electrical Power Panel Upgrades. Upgrade the power distribution panel as noted on the drawings.
c. Phase III Hydraulic Piping/Valve Installation: This phase of work shall not begin until all required supplies are onsite. This phase includes: Installation of new hydraulic pipe and valves for the distribution piping; Flushing of the hydraulic piping; and Purging of old hydraulic oil.
d. Phase IV Hydraulic Unit Replacement: This phase of work includes:
Removal of existing hydraulic power unit; Installation of new hydraulic unit; and Electrical connection of hydraulic unit. Note, new hydraulic power unit to include motor starter with local or remote start stop capabilities.
e. Phase V Water Quality Gate Cylinder Replacement and Control Panel Side 1: This phase includes: Replacement of cylinders, valves and controls for water quality gates 4, 5, and 8; Installation of new control panel; control connections to gates 1, 4, 5, and 8 cylinders and valves; and control panel connections, maintenance and emergency gates on same tower side. During this phase, power to the existing control panel to remain to control opposite side of tower gates.
f. Phase VI Water Quality Gate Cylinder Replacement and Control Updates Side 2: This phase includes: Replacement of cylinders, valves and controls for water quality gates 3, 6, and 7; Installation of new control panel; control connections to gates 2, 3, 6, and 7 cylinders and valves; and control panel connections, maintenance and emergency
SECTION 41 24 27.00 10 Page 12 gates on same tower side.
g. Phase VII Stem Guide Repair/Replacement: This phase includes the repair/replacement of stem guides on gates 6 and 7.
Contractor is responsible for identifying and scheduling all tasks required to complete the scope of work. Coordinate with Contracting Officer for tasks required by the Government.
PART 2 PRODUCTS
2.1 MATERIALS AND MECHANICAL EQUIPMENT
2.1.1 General
Provide materials and mechanical equipment that conform to the requirements indicated or specified, and if not specified, furnish materials and mechanical equipment of the best commercial grade quality suited to the intended use and as approved. The manufacturer's name, address, and catalog number shall be permanently displayed on a nameplate securely attached to each major item of equipment.
2.1.2 Standard Products
Where items are referred to hereinafter as "similar and equal to" a particular manufacturer's product, such references have been made merely as a convenient method of indicating the type of material or equipment required, with no intention of asserting superiority thereof. The standard product of any reputable manufacturer regularly engaged in the commercial production of the type and quality of material or equipment referred to will not be excluded on the basis of minor differences, provided essential requirements of the specifications relative to materials, capacity, and performance are met. In accordance with paragraph SUBMITTALS, furnish for approval, performance capacities and other pertinent information concerning the manufacturer's "equal to" standard products intended for incorporation in the work. "Equal to" standard products installed or used without such approval shall be at the risk of subsequent rejection.
2.1.3 Hydraulic Cylinders (Standard Design)
The hydraulic cylinder shall be one of the types listed in ISO 5598, and specified or indicated, of tie rod design, square head standard construction. The pressure rating of the cylinder shall not be less than the maximum system pressure indicated. The manufacturer shall produce evidence that each cylinder was hydrostatically tested to 200 percent of the severest service rating and that dynamic seals are suitable for both frequent and infrequent operation and are capable of not less than 500,000 cycles of operation in systems properly maintained. The bore, stroke, rod diameter, and mounting style of the cylinder shall be as indicated. The hydraulic cylinder shall have adjustable cushions on the rod end only .
Cushions shall have free reverse flow check valves. The cylinder shall be provided with double end rods where indicated and the piping ports shall be SAE straight thread O-ring or SAE 4 bolt hydraulic flanges.
2.1.3.1 Cylinder Tubes
The cylinder tube shall be machined from ASTM A 519, Grade 1018, heavy wall seamless steel tubing and shall have the bore honed to a surface finish compatible with the seals being used so as to result in zero leakage past
SECTION 41 24 27.00 10 Page 13 the seals.
2.1.3.2 Cylinder Heads and Caps
The cylinder head and cap shall be fabricated from ASTM A 576, Grade 1018, steel bar stock and machine finished on all surfaces. The cylinder head shall be equipped with a rod seal and external dirt wiper and shall have a rod bushing piloted into the head to ensure concentricity. Rod bushings shall be removable without the use of special tools and without removing the tie rods or cylinder head. Attachment of the cylinder tube to the head and cap shall be by tie rods having a minimum yield strength of 100,000 psi.
Removable attachments shall have the cylinder tube end seals arranged to seal with pressure and shall be designed to prevent shearing and extrusion and to provide axial metal backup.
2.1.3.3 Pistons
The piston shall be precision fitted to the cylinder body bore. The piston shall be fine-grained cast iron and shall be designed and equipped with zero leakage cup-type seals . The design shall protect the piston rings from blow-out and oversqueezing. Cup-type seals shall be self-regulating and shall automatically compensate for wear.
2.1.3.4 Piston Rods (Standard Design)
The piston rod shall be made of 90,000 to 110,000 psi high tensile strength steel using ASTM A 108, Type C 1045, for rods 5/8 to 2 1/2 inches in diameter, and ASTM A 108, Type CR 4140, for rods 3 to 10 inches in diameter. The rod shall be case hardened to 50-54 Rockwell C, polished to a 10 microinch RMS surface finish or better, and nickel and hard-chrome plated to 0.003 inch minimum thickness.
2.1.4 Hydraulic Power Unit
The hydraulic power unit shall be a self-contained, packaged unit designed by the Contractor to operate the hydraulic cylinders in accordance with the criteria stated in paragraph DESIGN PARAMETERS. The power unit shall be designed to meet the space limitations shown shall be configured essentially as shown.
2.1.5 Oil Reservoirs
The oil reservoir shall be sized as shown . The reservoir shall be made of steel with welded joints and shall conform to the requirements of NFLPA T3.16.2 R1 and as shown. The reservoir shall be equipped with a fluid level indicator and filler with built-in strainer. There shall be a baffle provided between the intake and return lines to facilitate the separation of air and foreign matter from the hydraulic fluid. Both the intake and return pipes shall be brought down to a distance of 1 1/2 pipe diameters above the tank bottom. Interior surfaces of the reservoir shall be cleaned down to bright metal and coated with an epoxy-based urethane finish or an approved alternate that is compatible with oil and water.
2.1.5.1 Reservoir Heater
The reservoir shall be provided with one or more screw plug type immersion heaters with a watt density not to exceed 11 watts per square inch and a remote thermostat set to maintain the hydraulic oil at 90 degrees F. The heater sheath and screwplug shall be fabricated from stainless steel.
SECTION 41 24 27.00 10 Page 14
Total heating output shall be 4,500 watts] at 208 volts AC. The heater shall be supplied with a watertight, stainless steel, NEMA 4X terminal housing as a minimum.
2.1.5.2 Magnetic Separators
The manufacturer's standard magnetic separator shall be provided in the reservoir. The magnetic separator shall consist of a high-strength permanent magnet arranged for rigid mounting with the poles of the magnet exposed to the fluid in the reservoir. The magnet shall be mounted on a removable rod assembly installed through the top of the reservoir . The drain plug type installation shall include provisions for automatic chip detection without removal of the plug.
2.1.5.3 Air Breather
The reservoir shall be provided with an air breather which removes dirt and moisture from the incoming air. The incoming air shall first pass through a desiccant bed to remove the moisture, and then pass through a filter to eliminate the solid contaminants before entering the reservoir. Outgoing air shall pass directly to the atmosphere through a check valve. The breather shall also provide visual indication of the desiccant and filter condition.
2.1.6 Pumps
The pumps for the hydraulic system shall be an electric motor-driven, fixed displacement, vane type rated to deliver a nominal 8 gpm at 2,500 psi while operating with the specified oil in the specified temperature range.
Maximum rotating speed shall be 1800 rpm. Exposed rotating parts shall be properly safety guarded. The pumps shall mount in the reservoir in a manner similar to that shown on the drawings so that the pump suction is flooded. The pumps shall operate on 208 volts, 60 Hz, three phase power.
The pumps shall be rated for continuous operation at a discharge pressure equal to or greater than the system design pressure. The rated discharge capacity of each pump shall not be less than indicated when the pump is operated at the design input speed and discharge pressure.
2.1.7 Filters
The filter shall be located in the return line to the reservoir and shall be of the spin-on type with a bypass and an indicator to show the condition of the filter element . The filter element shall have a rating of 10 microns absolute unless a smaller mesh is recommended by the pump manufacturer. The filter shall be rated for use with hydraulic oil and the pressure drop should not exceed 6 psi in the clean condition. Determine the pressure and flow rating of the filters to be compatible with this design of the power units.
2.1.8 Gauges
2.1.8.1 Pressure Gauges
Pressure gauges shall conform to ASME B40.100, have a black enameled metal case, a 4-1/2 inch dial, and a stainless steel Bourdon tube. The scale range of the gauge shall be approximately 150 percent of the maximum pressure of the line in which installed. Gauges shall be the safety type with solid fronts and blowout backs. Each gauge shall be provided with a pressure snubber. The pressure gauges shall be panel mounted and readable
SECTION 41 24 27.00 10 Page 15 from the front of the power unit after opening the doors of the enclosure.
Gauges and gauge lines shall be bottom tapped in horizontal pressure lines.
2.1.8.2 Thermometer
A direct indicating thermometer shall be provided to indicate fluid temperature in the reservoir. Mercury shall no be used in thermometers.
The thermometer shall be of the bimetallic type mounted directly on the reservoir . The thermometer shall have a minimum 3 inch dial with black markings on a white background. The scale range shall be 20 to 240 degrees F. The case and stem shall be corrosion resistant, and the wetted components shall be stainless steel. Thermometer wells of the separable socket type shall be provided for each thermometer with a direct type bulb.
2.1.9 Valves
Valves shall have a minimum pressure rating of 3000 psi unless stated otherwise. Valves 1 inch or larger shall have socket-welded piping connections. Valves less than 1 inch shall have SAE straight thread ends and Viton O-rings with tube fittings. Valves shall be specifically designed and rated for hydraulic system applications. Valves and subplates shall be steel construction.
2.1.9.1 Ball Valves
Ball valves shall be made of stainless steel and designed for use with hydraulic oil. Pipe connections shall be socket welded. The valves shall have replaceable seats and be repairable without disturbing the welded connections.
2.1.9.2 Needle Valves
Needle valves shall be made of stainless steel and designed for fine flow regulation. The stem sealing O-rings shall be Viton.
2.1.9.3 Control Valves
a. Flow - Flow control valves shall be subplate mounted for tubing connections . The valves shall be pressure-compensating, free flowing in one direction, and adjustable. The valves shall be capable of being locked in position to prevent an unintentional adjustment. The flow rating shall be a minimum of 8 gpm .
b. Pilot-Operated, Solenoid-Controlled Four-Way Directional Control Directional - Pilot-operated, solenoid-controlled four-way directional control valves shall be three position and closed centered as shown.
The valve shall be pilot operated and have two solenoids. The valve shall be subplate mounted with tubing connections. The solenoids shall operate at 120 volts AC. The flow rating shall be a minimum of 8 gpm .
Valves shall be provided with manual pins for emergency operation in the event of solenoid malfunction or failure.
2.1.9.4 Pressure Relief Valves
Pressure relief valves shall be adjustable with a body designed for a set pressure of as shown. The valve shall have the capacity to pass 8 gpm.
SECTION 41 24 27.00 10 Page 16
2.1.9.5 Supply Spring Loaded Check Valves
Supply spring loaded check valves shall be of stainless steel construction and shall be the ball or poppet type with a body designed for high shock and 3000 psi service.
2.1.9.6 Return Spring Loaded Check Valves
Return spring loaded check valves shall be of stainless steel construction and shall be the ball or poppet type with a body designed for 3000 psi service. Cracking pressure shall be 70 psi.
2.1.9.7 Bleeder Valves
Bleeder valves shall be 1/4 inch, stainless steel construction, and wrench operated.
2.1.9.8 Pressure Snubbers
Pressure snubbers shall be provided for all pressure gauges and pressure switches to protect against shock and provide more stable instrument operation. Snubbers shall be of stainless steel construction.
2.1.9.9 Counterbalance Valve
A counterbalance valve shall be installed in the oil line to the bottom side of the hoist piston as indicated to balance the load being held by the cylinder. The valve shall be directly operated, have an external type drain, and shall be adjustable for operating over a pressure range of70 to 500 psi. The valve shall be designed for a system operating pressure of 3000 psi. The capacity rating for the valve shall not be less than 8 gpm.
The valve shall permit unrestrained flow to the underside of the hoist piston and shall function to retain pressure in the hoist cylinder in the amount of the valve's pressure adjustment.
2.1.10 Piping
Piping, tubing, and hose shall be designed for a working pressure of 3000 psi. Pipe shall be used when a 1 inch or larger diameter is required.
Tubing shall be used when less than 1 inch diameter is required. Pipe shall be welded or threaded as required on the drawings.
2.1.10.1 Pipe
Pipe shall be seamless steel conforming to ASTM A 106/A 106M, Grade B .
The piping weight class shall be Schedule 80.
2.1.10.2 Pipe Fittings
Pipe fittings shall be the socket welding type conforming to ASME B16.11 and made of steel conforming to ASTM A 234/A 234M, Grade WPB . The pressure class shall be 1500 pounds. Flanges shall conform to ASTM A 182/A 182M with the grade suitable for the pipe to which attached.
Threaded fittings shall also conform to the above, but shall be used only where absolutely necessary for the application.
2.1.10.3 Unions
Unions shall be the O-ring type, made of stainless steel with
SECTION 41 24 27.00 10 Page 17 socket-welding ends. The Contractor may at his option substitute four bolt split flanges with Viton O-rings for the unions.
2.1.10.4 Hydraulic Tubing
Tubing shall be seamless stainless steel tubing conforming to ASTM A 789/A 789M. The wall thickness shall be selected to provide a safety factor of 6 based on the manufacturer's ratings for burst strength.
2.1.10.5 Tube Fittings
Tube fittings shall be made of stainless steel and be the flareless type with SAE straight threads and Viton O-ring seals. The fittings shall conform with SAE J514.
2.1.10.6 Hose
Flexible hydraulic lines shall be wire-reinforced, high-pressure-type hose made of neoprene or Buna N. Flexible hose shall be rated by the manufacturer for a working pressure not lower than the system operating pressure indicated above with a factor of safety of 4. Fittings shall be specifically designed for use with the hose selected and shall be as recommended by the hose manufacturer. Fittings shall be made of stainless steel and shall be the reusable type.
2.1.11 Bolts, Nuts, and Washers
2.1.11.1 Carbon Steel Bolts and Nuts
Carbon steel bolts and nuts shall conform to ASTM A 354, Grade BC, with ASTM A 194/A 194M, Grade 2H nuts. Structural bolted connections carrying primary loads shall be made with ASTM A 325 bolts.
2.1.11.2 Stainless Steel Bolts and Nuts
Stainless steel bolts and nuts shall conform to ASTM A 193/A 193M, Grade B7 or B16, with ASTM A 194/A 194M, Grade 8 nuts.
2.1.11.3 Flat Washers
Flat washers shall conform to ASTM F 844.
2.1.12 Hydraulic Fluid
The hydraulic fluid to be used during shop testing, to fill the cylinders before shipment, flush the system after installation, and to fill the complete hydraulic system shall be AMSOIL TBI ISO 32/46. Fresh hydraulic fluid shall be filtered through a 10 micron filter before it is added to the system. All oil shall be supplied by the Contractor.
2.2 ELECTRICAL EQUIPMENT
The electrical equipment for the hydraulic power systems shall be as shown and as specified. Other electrical materials and equipment required for the installation of the hydraulic power systems shall be as specified in Section 26 20 00 INTERIOR DISTRIBUTION SYSTEM. All electrical equipment furnished shall be standard catalog items under regular manufacture with preexisting catalog ratings equal to or better than the requirements of the contract drawings and specifications. The Contractor's request for
SECTION 41 24 27.00 10 Page 18 approval of equipment other than as specified or as shown shall be accompanied by technical and descriptive data and specifications sufficient for the Contracting Officer to determine its adequacy. Unless otherwise specified or indicated, all electrical materials and equipment shall meet the standards, specifications, and tests referenced.
2.2.1 Conduit, Duct, and Accessories
Threads on the following equipment shall be American Standard. No metric threads will be accepted.
2.2.1.1 Rigid Metal Conduit
The conduit shall be hot-dip galvanized including the threads. The galvanized conduit shall conform to NEMA C80.1 and UL 6.
2.2.1.2 Conduit Fittings
Conduit fittings shall be galvanized, high test, gray iron castings.
Gaskets shall be furnished for all covers.
2.2.1.3 Conduit and Cabinet Supports
Conduit and cabinets shall be supported as required by IEEE C57.12.70. The supports shall be galvanized .
2.2.2 Cabinets and Boxes
Cabinets and boxes shall be watertight, stainless steel, NEMA 4X housings sized as required. The cabinet and box hubs shall be consistent with the NEMA 4X rating of the box. Cabinets and boxes shall be mounted such that the NEMA 4X rating is not compromised. Threads on the hubs shall match the threads on the conduit and shall be American Standard. Metric threads will not be accepted. The cabinets and boxes shall conform to UL 50.
2.2.3 Pump Motors
The pump motors shall conform to the applicable requirements of NEMA MG 1, except as hereinafter specified, and shall be designed to withstand full voltage starting. The motor shall be of totally enclosed frame construction and shall be fan cooled. A stainless steel drain-breather similar and equal to Crouse-Hinds type "ECD Universal" shall be provided and located so that any water present can be drained from inside the motor. Motor starters shall be provided complete with properly sized thermal overload protection and other appurtenances necessary for the motors specified. Manual or automatic control and protective or signal devices required for the operation, and any control wiring required for controls and devices but not shown on the electrical drawings, shall be provided.
2.2.3.1 Rating
The motors shall operate on 208 volts, 60 Hz, 3 phase power and shall be sized to operate the pumps specified in paragraph PUMPS. The motor shall be designed to operate continuously without exceeding the temperature rise permitted by the applicable NEMA standards for the class of insulation and frame construction used.
SECTION 41 24 27.00 10 Page 19
2.2.3.2 Winding Insulation
The winding insulation shall be either class F or H . The winding insulation shall be of the type designed and constructed to withstand the severe moisture conditions and the wide range in ambient temperature to which the motors will be subjected.
2.2.3.3 Winding Heaters
A heater or heaters shall be installed in the motor frame or end bells or wrapped around the winding…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .