About this file

PLANS

View the file

Other files

File Type Posted
Award.doc DOC document
Award.doc DOC document
conformed copy to include Amendment 5.doc DOC document
amd 5.doc DOC document
amd 0004.pdf PDF
conformed copy to include amd 4.pdf PDF
amendment3.pdf PDF
amendment 2.pdf PDF
amendment 1.pdf PDF
SPECIFICATIONS.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

z2tg001g_R1_snd.dgn 9/14/2009 11:11:55 AM

STANDARD ABBREVIATIONS

SECTION SYMBOLS

MATERIAL INDICATIONS

A4 A8

A4 A8

A

A4 A8

A4 A8

A

A4 A8

ELEVATION SYMBOL

ELEVATION

SHEET

C

A

B

1 2 3 4 5

D US Army Corps of Engineers

PLATE NUMBER ON WHICH

SECTION OR DETAIL IS DRAWN

SECTION OR DETAIL

IDENTIFICATION NUMBER

PLATE NUMBER ON WHICH

SECTION OR DETAIL

CONDITION IS TAKEN

VIEW

SECTION

VIEW

SECTION

SYMBOL WHERE SECTION IS TAKEN

SECTION/DETAIL

TITLE WHERE SECTION IS DRAWN

IDENTIFICATION LETTER WHERE

ELEVATION IS TAKEN

TITLE WHERE

ELEVATION IS SHOWN

EARTH (ORIGINAL GRADE)

EARTH (COMPACTED FILL)

GRAVEL

CONCRETE

MORTAR - CEMENT - PLASTER - STUCCO

CONCRETE MASONRY UNITS (C.M.U.,

SMALL\ SCALE - PLAN)

CONCRETE MASONRY UNITS (C.M.U., LARGE

SCALE - SECTION)

CONCRETE MASONRY UNITS OR HOLLOW

TILE (SMALL SCALE - SECTION)

METAL (ELEVATION)

STEEL (CROSS SECTION)

INSULATION (RIGID)

INSULATION (LOOSE OR BATT)

BRICK

WOOD (BLOCKING)

WOOD (FINISH)

A.T.

A.T.C.

BAL.

BD.

BLDG.

BLK.

BM.

BOT.

BRG.

B.T.U.H.

CAB.

CAP.

C/B

C.D.

CEM.

CER.

C.F.M.

AIR CONDITIONED

AREA DRAIN

AIR HANDLING UNIT

ALTERNATE

ALUMINUM

AMPERES

ACCESS OPENING

APPROXIMATELY

ARCHITECTURAL

ASPHALT TILE

ACOUSTIC TILE CEILING

BALANCE

BOARD

BUILDING

BLANK

BEAM

BOTTOM

BEARING

BRITISH THERMO UNIT/HOUR

CABINET

CAPACITY

CIRCUIT BREAKER

CEILING DIFFUSER

CEMENT

CERAMIC

CUBIC FEET/MINUTE

CKT.

L

CEIL.

CL.

C.M.U.

C.O.

COL.

CONC.

COND.

CONN.

CONST.

CONT.

CONTR. JT.

C.S.C.

C.T.

C.T.B.

C. TO C.

DET.

DIA.

DIFF.

DIM.

DISC.

D.J.

DN.

DR.

D.S.

DWG.(S)

EA.

CIRCUIT

CENTER LINE

CEILING

CLOSET

CONCRETE MASONRY UNIT

CLEAN OUT

COLUMN

CONCRETE

CONDENSATE

CONNECTION

CONSTRUCTION

CONTINUOUS

CONTRACTION JOINT

COLOR SYMBOL CODE

CERAMIC TILE

CERAMIC TILE BASE

CENTER TO CENTER

DETAIL

DIAMETER

DIFFUSER

DIMENSION

DISCONNECT

DUMMY JOINT

DOWN

DRAIN

DOWN SPOUT

DRAWING(S)

EACH

ELEC.

EQUIP.

E.W.C.

EXH.

EXP. JT.

EXT.

EXIST.

F.A.

F.C.

F.D.

F.E.C.

FIN.

FL.

FT.

FTG.

GA.

GAL.

GALV.

G.F.E.

GL.

GND.

GOV’T

G.P.H.

G.P.M.

GR.

G.W.B.

H.

ELECTRIC

EQUIPMENT

ELECTRIC WATER COOLER

EXHAUST

EXPANSION JOINT

EXTERIOR

EXISTING

FIRE ALARM

FLEXIBLE CONNECTION

FLOOR DRAIN

FIRE EXTINGUISHER CABINET

FINISH

FLOOR

FOOT, FEET

FOOTING

GAGE

GALLON

GALVANIZED

GOVERNMENT FURNISHED

EQUIPMENT

GLASS

GROUND

GOVERNMENT

GALLONS/HOUR

GALLONS/MINUTE

GRILLE

GYPSUM WALL BOARD

HIGH

H.B.

H.C.

HT.

H.M.

H.P.

HR.

HTG.

HTR.

H.&V.

HW.

HYD.

I.D.

I.E.

IN.

INCAND.

INSUL.

INT.

J.B.

JCT.

JT.

KVA

LB.,#

LG.

L.P.

LTG.

HOSE BIBB

HOLLOW CORE

HEIGHT

HOLLOW METAL

HORSE POWER

HOUR

HEATING

HEATER

HEATING AND VENTILATING

HARDWARE

HYDRANT

INSIDE DIAMETER

INVERT ELEVATION

INCHES

INCANDESCENT

INSULATION

INTERIOR

JUNCTION BOX

JUNCTION

JOINT

KILOVOLT AMPERE

POUND

LONG

LIGHTING PANEL

LIGHTING

M.

MAINT.

MAX.

M.D.P.

MECH.

MTL.

MIN.

MISC.

M.O.

M.T.

MTD.

MTG.

M.V.

M.G.T.

N.A.

N.I.C.

NO.

O.A.

OL.

OPNG.

OPP.

O.S.D.

P.

PART. MOTOR

MAINTENANCE

MAXIMUM

MAIN DISTRIBUTION PANEL

MECHANICAL

METAL

MINIMUM

MISCELLANEOUS

MASONRY OPENING

METAL THRESHOLD

MOUNTED

MOUNTING

MECHANICAL VENTILATION

MATT GLAZE TILE

NOT APPLICABLE

NOT IN CONTRACT

NUMBER

OUTDOOR AIR

OVERLOAD

OPENING

OPPOSITE

OPEN SIGHT DRAIN

PAPER

PARTITION

PER.

L, PL.

PLBG.

PLYW’D

PNL.

PRESS.

PSF

PSI

PSIG

PT.

PTD.

QTR.

QUAN.

R.

R.A.

RAD.

RD.

REG.

REINF.

REQ.

RET.

R.G.

RM.

R.P.M.

PERIMETER

PLATE

PLUMBING

PLYWOOD

PANEL

PRESSURE

POUNDS/SQUARE FOOT

POUNDS/SQUARE INCH

POUNDS/SQUARE INCH GAGE

POINT

PAINTED

QUARTER

QUANTITY

RISER

RETURN AIR

RADIUS

ROUND

REGISTER

REINFORCING

REQUIRED

RETURN

RETURN GRILLE

ROOM

REVOLUTION/MINUTE

T.

TEL.

TEMP.

THK.

THD.

TOIL.

TYP.

TOILET

V.

V.A.T.

VENT.

VERT.

W.

W/

WD.

W.D.

W.G.

WP.

WTR.

W.W.F.

S.A.

SCH.

SECT.

SERV.

SHT.

S.J.

SPEC.

SQ. FT.

ST.

STOR.

STRUC.

SUSP.

SW.

SUPPLY AIR

SCHEDULE

SECTION

SERVICE

SHEET

SLIP JOINT

SPECIFICATIONS

SQUARE FEET

STEEL

STORAGE

STRUCTURAL

SUSPENDED

SWITCH

S. SUPPLY

c

P

PLATE

REFERENCE

NUMBER

WOOD

WIDE FLANGE

WINDOW DIMENSION

WATT

WITH

WAINSCOATING

WATER GAGE

WEATHERPROOF

WATER

WELDED WIRE FABRIC

VOLT

VINYL ASBESTOS TILE

VENTILATION

VERTICAL

VENT THRU ROOF

TELEPHONE

TEMPERATURE

THICKNESS

THRESHOLD

TOILET

L

P M

N

Q

O

R

S

T

V

W

H

I

J

K

F

G

E

D

B

C

WC

WF

VTR

TYPICAL

SOLICITATION NO:

G-01

S Y

M B

O L

D E S

C R

IP

T

IO

N

F

IL

E

N

M E

C H

K

B

D E S

IG

N

D

D A T E

S O

L

IC

IT

A T

IO

O

C O

N T R

A

T

C A T E

G O

R Y

C

O D

E

P L O

T

S

C A L E

B Y

D A T E

S

IZ

E

D

"X

R E

V

IE

W

C H

IE

F D

E S

IG

C T

IO

N

A P P

R O

V

C H

IE

F E

N G

IN

E E

R

IN

G

R

A N

C H

P R

E P

A R

J D

H

C H

A

N O

X

F

A W

IN

G S

SOLICITATION NO:

Savannah District

US ARMY CORPS

OF ENGINEERS

SAVANNAH

W

IL

M

IN

G T

G

IO

N A L

E N

G

IN

E E

R

N T E

R

U S

A R

M Y

E

N G

IN

E

IS

T R

IC

T

C O

R P

E

N G

IN

E E

R S

S A

V A

N N

T R

IC

T

W912HN-09-B-0024

A.C.

A.D.

A.H.U.

ALT.

ALUM.

AMP., A.

A.O.

APPROX.

ARCH.

J U

L

W

H N B

DISPOSAL AREA 14A DIKE RAISING

SAVANNAH HARBOR, JASPER COUNTY, SOUTH CAROLINA

FY-09

C W

K

IK

IS

IN

G

S A

V A

N N

R B

O R

G E

O R

G

IA

TITLEDGN FILESHEET NO.PLATE NO. PLATE NO. SHEET NO. DGN FILE TITLE

G-01 1 z2tg001g

G-02 2 z2tg002g z2tg003g3G-03

D-01

D-02

D-06

D-07

D-08

D-09

14D-10

D-11 15

G-04 4 z2tg004g

GENERAL NOTES

INDEX OF DRAWINGS

GENERAL LOCATION PLAN

D-12

D-13

D-14 z2tg406d z2tg410d z2tg414d z2tg401d z2tg402d z2tg405d z2tg407d z2tg408d z2tg409d z2tg411d z2tg412d z2tg413d17

BENCHING DETAIL

TEMPORARY SILT FENCE PLAN

TEMPORARY SILT FENCE DETAILS

S-01

S-02

S-03

S-04

S-05

S-06

S-07

S-08

S-09

S-10

S-11

S-12

S-13

S-14 z2tg403d z2tg404d

D-03

D-04

D-05

INDEX OF DRAWINGS

z tg

1g .d g n

KEY MAP 14A

AREA 14A, LOCATION PLAN

DISPOSAL AREA 14B BORROW SITE

FRONT DIKE CENTERLINE ALIGNMENT

FINGER DIKE CENTERLINE ALIGNMENT

PLAN, BACK DIKE, STATION 0+00 TO 25+00

PLAN, BACK DIKE, STATION 25+00 TO 57+00

PLAN, BACK DIKE, STATION 57+00 TO 85+46

PLAN, FRONT DIKE, STA. 46+00 TO 66+60, FINGER DIKE, STA. 0+00 TO 26+00

PLAN, FRONT DIKE, STATION 22+00 TO 46+00

PLAN, FRONT DIKE, STATION 0+00 TO 22+00

PLAN, FINGER DIKE, STATION 26+00 TO 58+62

D-15

D-16 z2tg415d z2tg416d

BIRD ISLAND DETAILS

SETTLEMENT PLATE DETAILS

z2tg301s z2tg302s z2tg303s z2tg304s z2tg305s z2tg306s z2tg307s z2tg308s z2tg309s z2tg310s z2tg311s z2tg313s z2tg312s z2tg314s

TYPICAL CROSS SECTION AND PROFILE, BACK DIKE

BACK DIKE, CROSS SECTIONS, STATIONS 1+00 TO 35+00

BACK DIKE, CROSS SECTIONS, STATIONS 40+00 TO 75+00

BACK DIKE, CROSS SECTIONS, STATIONS 80+00 TO 85+46

FINGER DIKE TYPICAL SECTIONS

FRONT DIKE SECTIONS, STATION 0+00 TO 7+00

FRONT DIKE SECTIONS, STATION 8+00 TO 15+00

FRONT DIKE SECTIONS, STATION 16+00 TO 23+00

FRONT DIKE SECTIONS, STATION 24+00 TO 31+00

FRONT DIKE SECTIONS, STATION 32+00 TO 39+00

FRONT DIKE SECTIONS, STATION 40+00 TO 47+00

FRONT DIKE SECTIONS, STATION 48+00 TO 55+00

FRONT DIKE SECTIONS, STATION 56+00 TO 63+00

FRONT DIKE SECTIONS, STATION 64+00 TO 66+60

R a n d a ll C

M il le r, P .E

G-03

SP-1 1020703.04 767432.37

SP-2 1021578.04 766945.44

SP-3 1022449.57 766452.24

SP-4 1023319.95 765964.66

SP-5 1024193.13 765474.76

SP-6 1025064.66 764986.19

SP-7 1025936.44 764496.95

SP-8 1026806.98 764006.56

SP-9 1027679.67 763517.32

SP-10 1020528.04 763836.93

SP-11 1020372.20 764089.31

SP-12 1020195.22 764345.65

SP-13 1019948.23 764530.64

SP-14 1019816.16 764623.14

SP-15 1020092.94 764970.49

SP-16 1020056.78 765003.03

SP-17 1020626.36 765567.26

SP-18 1020590.20 765599.96

SP-19 1021050.32 766043.44

SP-20 1021037.11 766089.86

SP-21 1022171.31 765431.49

SP-22 1022193.93 765475.09

SP-23 1023163.85 764899.14

SP-24 1023186.80 764941.92

SP-25 1024064.85 764009.03

SP-26 1024098.86 764043.06

east north back dike front dike finger dike plate

no. east north plate

no. east north plate no.

16. SETTLEMENT PLATES ARE TO BE INSTALLED ALONG THE COUNTERWEIGHTS AND

ALONG THE FINGER DIKE WITHIN AREA 14A. DETAILS FOR SETTLEMENT PLATE

CONSTRUCTION ARE SHOWN ON PLATE D-16. LOCATIONS ARE ITEMIZED IN THE FOLLOWING:

15. BERMS CONSTRUCTED AS COUNTERWEIGHTS ADJACENT TO DIKES SHALL NOT BE USED

AS HAUL ROADS ONCE COMPLETED. THE CONTRACTOR MAY CROSS THE BERMS AS REQUIRED TO

ACCESS DIKES AT APPROVED LOCATIONS SPACED NO CLOSER THAN 500 FEET. DAMAGES TO

BERMS BY HAULING EQUIPMENT, IF ANY, SHALL BE REPAIRED BY THE CONTRACTOR AT

NO ADDITIONAL COST TO THE GOVERNMENT.

GENERAL NOTES:

G E

N E

R

L

T E

S

3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE MAINTENANCE OF ACCESS ROADS FROM

THE MAIN GATE TO THE SITE AND SHALL LEAVE THE ROAD IN AS GOOD A CONDITION UPON

COMPLETION OF THE CONTRACT AS IT WAS PRIOR TO THE BEGINNING OF CONSTRUCTION.

THE CONTRACTOR WILL BE REQUIRED TO MAINTAIN THE DITCHES ALONG THE PROPOSED

ACCESS ROAD AND TO MAINTAIN A CROWN ON THE HAUL ROAD TO ASSURE PROPER RUNOFF

OF WATER ALONG THE ROAD. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL DRAINAGE

STRUCTURES CROSSING THE ACCESS ROADS. NO ADDITIONAL PAYMENT WILL BE MADE FOR

THE MAINTENANCE OF ACCESS ROADS OR THE REPLACEMENT OF ANY DAMAGED DRAINAGE

STRUCTURES.

5. THE CONTRACTOR SHALL BE RESPONSIBLE TO MAKE HIS OWN ESTIMATE OF THE NUMBER

OF CUBIC YARDS OF MATERIAL ACTUALLY REQUIRED TO OBTAIN THE PAY SECTION AS SHOWN

BY THE CROSS SECTIONS OF THE EMBANKMENT.

2. THE CONTRACTOR SHALL INSURE THAT THE ACCESS GATE REMAINS LOCKED AT

ALL TIMES EXCEPT WHEN REQUIRED TO BE OPENED FOR THE IMMEDIATE PASSAGE

OF MANPOWER AND EQUIPMENT.

6. PAYMENT FOR DIKE AND RAMP EMBANKMENT WILL BE BASED ON THE NEAT VOLUME OF

MATERIAL PLACED WITHIN THE DESIGN CROSS SECTION AS DETERMINED FROM THE BEFORE

SURVEY, THE FINAL SURVEY AND THE DESIGN TEMPLATE. MATERIALS WHICH ARE PLACED

OUTSIDE OF DESIGN TEMPLATE AND/OR PLACED OFF OF THE REQUIRED ALIGNMENT WILL NOT

BE PAID FOR.

9. THE MATERIAL REQUIRED FOR DIKE ’TOP OUT’ (THE TOP 6 INCHES) SHALL CONSIST

OF A MIXTURE OF ABOUT 50 PERCENT SAND AND 50 PERCENT SILT. RAMP TOP OUT IS 6

INCHES.

10. AT ALL TIMES, THE RATE OF EMBANKMENT CONSTRUCTION SHALL BE NO MORE THAN

ONE VERTICAL FOOT IN HEIGHT PER WEEK. AN EXCEPTION MAY BE MADE FOR THE LAST OR

TOP THREE FEET OF FILL TO BE PLACED, IF REQUESTED BY THE CONTRACTOR AND

APPROVED BY THE CONTRACTING OFFICER’S REPRESENTATIVE.

11. PRIOR TO INSTALLATION OF ANY UTILITY LINES, THE CONTRACTOR SHALL GIVE THE

UTILITY COMPANIES THREE (3) WORKING DAYS NOTICE TO ALLOW TIME FOR EXISTING

UTILITIES TO BE STAKED. BEFORE CALLING (1-800-282-7411) THE CONTRACTOR SHALL

HAVE THE FOLLOWING INFORMATION READY: COUNTY, TOWN, LOCATION, NEAREST STREET

INTERSECTIONS, TYPE OF WORK (SEWER, WATER, ELECTRIC, PAVING, ETC.), YOUR

COMPANY NAME, TELEPHONE NUMBER, OWNER’S NAME, DATE AND TIME YOU EXPECT TO

COMMENCE CONSTRUCTION, AND WHERE AND HOW YOU CAN BE REACHED AND THE BEST TIME

TO CONTACT YOU. THE CONTRACTOR SHALL EXERCISE CAUTION WHEN CROSSING AN

UNDERGROUND UTILITY, WHETHER SHOWN ON THE PLAN OR LOCATED BY THE UTILITY

COMPANY. ALL UTILITIES WHICH INTERFERE WITH THE PROPOSED CONSTRUCTION SHALL BE

RELOCATED BY THE RESPECTIVE UTILITY COMPANIES, AND THE CONTRACTOR SHALL

COOPERATE WITH THEM DURING RELOCATION OPERATIONS. THE CONTRACTOR SHALL NOTIFY

THE CONTRACTING OFFICER OF ANY VARIANCES PRIOR TO COMMENCEMENT OF WORK OR

PURCHASING ANY MATERIALS.

1. IT IS HIGHLY RECOMMENDED THAT CONTRACTORS BIDDING ON THIS WORK VISIT THE

PROJECT SITE PRIOR TO BIDDING.

12. ELEVATIONS SHOWN ARE MEAN LOWER LOW WATER (MLLW). EPOCH 1983-2001.

14. WITH REGARD TO ITEM 13 ABOVE, THE 14A CONTRACTOR WILL BE REQUIRED TO

MAINTAIN ACCESS FOR OTHERS ACROSS THE SITE (TOWARDS FIELDS CUT). THE

CONTRACTOR MAY NEED TO SEQUENCE DIKE CONSTRUCTION IN A MANNER THAT WILL

MAINTAIN EITHER THE FRONT (SOUTH) PASSABLE OR THE BACK (NORTH) PASSABLE AT ALL

TIMES. ALL CONTRACTORS ARE EXPECTED TO TALK TO EACH OTHER, PLAN TOGETHER AS

NECESSARY, AND SEQUENCE ACTIVITIES IN AN ACCEPTABLE AND AMICABLE MANNER AT ALL

TIMES.

13. OTHER CONTRACTORS WILL BE PERFORMING WORK IN AREAS ADJACENT TO AREAS

14A/14B AND ALONG THE ROUTE TO AREAS 14A AND 14B. THE CONTRACTOR SHALL

COORDINATE WORK WITH THE OTHER CONTRACTORS AS NEEDED TO ENSURE THE ORDERLY

PROGRESS OF EACH. ANY DISPUTES OR DISAGREEMENTS ARISING FROM AREA USE SHALL

BE BROUGHT TO THE ATTENTION OF THE CONTRACTING OFFICER, WHO WILL THEN MAKE A

DETERMINATION FOR OPERATIONAL PROCEDURES. DETERMINATIONS MADE BY THE

CONTRACTING OFFICER SHALL BE BINDING ON ALL PARTIES CONCERNED.

4. THE QUANTITY SHOWN ON THE PLANS AND SPECIFICATIONS (AA BID QUANTITY) FOR

’DIKE EMBANKMENT’ IS THE NEAT OR TEMPLATE VOLUME REQUIRED FOR THE

CONSTRUCTION OF THE PROPOSED DIKE. THE (AA) NEAT VOLUME DOES NOT INCLUDE ANY

ADDITIONAL QUANTITY THAT MAY RESULT FROM SETTLEMENT, CONSOLIDATION, SHRINKAGE,

ELASTIC DISTORTION, ETC., OR VARIATIONS IN THE EXISTING CROSS SECTIONS DUE TO

SETTLEMENTS WHICH MIGHT OCCUR BETWEEN THE TIME THE EXISTING CROSS SECTIONS

WERE TAKEN, THE TIME THAT BEFORE CROSS SECTIONS WERE TAKEN AND THROUGH THE

TIME OF CONSTRUCTION. SUCH QUANTITIES ARE ESTIMATED IN THE AB BID ITEMS.

7. PAYMENT FOR DISPLACEMENT OF SOFT FOUNDATION MATERIALS SUPPORTING THE

BACK DIKE COUNTERWEIGHT BETWEEN STATIONS 0+00 AND 85+00, THE FINGER DIKE,

AND THE FRONT DIKE COUNTERWEIGHT BETWEEN STATIONS 40+00 AND 52+00 WILL BE

BASED ON THE MEASURED MOVEMENT OF PROPERLY INSTALLED SETTLEMENT PLATES.

INSTALLATION OF SETTLEMENT PLATES SHALL BE CONDUCTED IN THE PRESENCE

OF THE COR AND IN ACCORDANCE WITH DRAWINGS AND SPECIFICATIONS. THE

DISPLACED VOLUME CALCULATED FROM SETTLEMENT PLATE READINGS WILL BE

ADDED TO THE VOLUME CALCULATED BETWEEN ORIGINAL AND FINAL SURVEYS.

SETTLEMENT PLATES WILL BE READ BY THE GOVERNMENT IMMEDIATELY PRIOR

TO PLACEMENT OF ANY FILL MATERIAL AND AGAIN IMMEDIATELY AFTER COUNTERWEIGHT

COMPLETION. THE CONTRACTOR SHALL NOTIFY THE CONTRACTING OFFICER AT

LEAST 7 DAYS PRIOR TO BEGINNING CONSTRUCTION AND AGAIN AT LEAST 3 DAYS

PRIOR TO COMPLETION. INTERIM MEASUREMENTS OF SETTLEMENT PLATES SHALL BE MADE

BY THE CONTRACTOR EVERY WEEK. RESULTS OF INTERIM MEASUREMENTS SHALL BE GIVEN

TO THE COR WITHIN 24 HOURS OF READING.

8. THE MATERIAL REQUIRED FOR THE DIKE EMBANKMENT SHALL BE OBTAINED FROM

WITHIN THE DREDGED MATERIAL CONTAINMENT AREA 14B. BORROW LIMITS ARE SHOWN

ON PLATE D-02. EXCAVATION WILL NOT BE PERMITTED WITHIN 100 FEET OF PROPOSED

TOE OF NEW DIKE EMBANKMENT OR BERMS UNLESS OTHERWISE SPECIFIED. BORROW

EXCAVATION WILL BE LIMITED TO DEPTHS EVENLY HARVESTED OVER THE DESIGNATED

BORROW SITE AND THE BOTTOM SLOPED TO DRAIN TOWARD THE WEIRS ON THE NORTH

DIKE. EXCEPTIONS WILL NOT BE MADE UNLESS SPECIFICALLY AUTHORIZED BY THE

CONTRACTING OFFICER.

D

2 3

C

4 5

$$DGNSPEC$$

$$SYSTIME$$

$$USERNAME$$

D G

N S

P E

C

S

Y S

T

IM

E

U S

E R

N A

M E

Y

M B

O L

D E S

C R

IP

T

IO

N

F

M E

C

D E S

IG

N

D A T E

S O

L

IC

IT

A T

C O

N T R

A

C A T E

G O

R Y

C

O D

E

P L O

T

S

C A L E

B Y

D A T E

PLATE

REFERENCE

NUMBER

S

IZ

E

D

"X

F

M E

V

IE

W

C H

IE

F D

E S

C T

IO

N

J D

H

D G

N S

P E

C

S

Y S

T

IM

E

U S

E R

N A

M E

A

R a n d a ll C

M il le r, P .E

US ARMY CORPS

OF ENGINEERS

SAVANNAH

U S

A R

M Y

E

N G

IN

E

T R

IC

T

C O

R

E

N G

IN

E E

R S

S A

V A

N N

T R

IC

T

C W

K

W

H N B

IS

IN

G

S A

V A

N N

R B

O R

G E

O R

G

IA

J U

L

AREA 13B

AREA 14A

AREA 14B

N768000

D-08

D-09

D-10

D-11

D-12

D-13

D-14

K

M

A

G-04

L

U

R N I

S I

N

S A

V A

N N

I

V E

R

WEIR 14A-1

WEIR 14A-2

WEIR 14A-3

DIKE IMPROVEMENT 8,446 LF

L

R N I

S I

N

S A

V A

N N

V E

R

1+00 BEGIN

WEIR 14A-1

WEIR 14A-2

WEIR 14A-3

BACK

FINGER DIKE IMPROVEMENT

5,862 LF

SP-10

SP-11

SP-12

SP-13

SP-14

SP-15

SP-16

SP-17

SP-19

SP-20

SP-21

SP-22

SP-23

SP-24

SP-26

SP-1

SP-2

SP-3

SP-4

SP-5

SP-6

SP-7

SP-8

SP-9

BIRD ISLAND

NORTH

BIRD ISLAND

SOUTH

F I

N G

K E

F I

N G

K E

FRONT DIKE IMPROVEMENT

6,660 LF

MARSH

BORROW AREA

D

2 3

C

4 5

$$USERNAME$$

D G

N S

P E

C

S

Y S

T

IM

E

U S

E R

N A

M E

Y

M B

O L

D E S

C R

IP

T

IO

N

F

M E

C

D E S

IG

N

D A T E

S O

L

IC

IT

A T

C O

N T R

A

C A T E

G O

R Y

C

O D

E

P L O

T

S

C A L E

B Y

D A T E

PLATE

REFERENCE

NUMBER

S

IZ

E

D

"X

F

M E

V

IE

W

C H

IE

F D

E S

C T

IO

N

J D

H

D G

N S

P E

C

S

Y S

T

IM

E

U S

E R

N A

M E

A

R a n d a ll C

M il le r, P .E

US ARMY CORPS

OF ENGINEERS

SAVANNAH

U S

A R

M Y

E

N G

IN

E

T R

IC

T

C O

R

E

N G

IN

E E

R S

S A

V A

N N

T R

IC

T

C W

K

W

H N B

IS

IN

G

S A

V A

N N

R B

O R

G E

O R

G

IA

J U

L

SP-18

N 762,339.5

E 1,026,267.4

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

END 85+46

E1027907.5

N 763448.9

0+00

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+6

BEGIN 0+00

E1020465.3

N 767625.4

0+

5+

10+

15+

+00

+00

+0

+0

+0

+0

+0

+0

+0

+6

B-7B-7

E

E

E

E

E

N768000

N766000

N764000

N766000

N764000

E

N762000

N760000

E

E

E

E

E

N766000

N764000

N766000

N764000

E

B-7

0+00

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+6

WEIR 14A-1

WEIR 14A-2

WEIR 14A-3

0+

5+

10+

15+

+00

+00

+0

+0

+0

+0

+0

+0

+0

+6

N762000

N760000

DIKE IMPROVEMENT 8,446 LF

L

R N I

S I

N

S A

V A

N N

V E

R

B-7

1+00 BEGIN

WEIR 14A-1

WEIR 14A-2

WEIR 14A-3

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

BACK

FINGER DIKE IMPROVEMENT

5,862 LF

SP-10

SP-11

SP-12

SP-13

SP-14

SP-15

SP-16

SP-17

SP-18

SP-19

SP-20

SP-21

SP-22

SP-23

SP-24

SP-26

SP-1

SP-2

SP-3

SP-4

SP-5

SP-6

SP-7

SP-8

SP-9

BIRD ISLAND

NORTH

BIRD ISLAND

SOUTH

F I

N G

K E

FRONT DIKE IMPROVEMENT

6,660 LF

BEGIN 0+00

E1020465.3

N 767625.4

END 85+46

E1027907.5

N 763448.9

MARSH

A R

E A

C A

T

A N

D-01

1. COORDINATE SYSTEM: NAD83, GEORGIA.

3. DIKE SURVEY COMPLETED JUNE, 2009 BY DURDEN & PARTY, COE.

SCALE: 1"=400’

400 800 1200400

2. SURVEY FEB. 2009, MLLW EPOCH 1983-2001

S E

T T

L E

M E

B E

S

S E

T T

L E

M E

B E

S

D

2 3

C

4 5

$$USERNAME$$

D G

N S

P E

C

S

Y S

T

IM

E

U S

E R

N A

M E

Y

M B

O L

D E S

C R

IP

T

IO

N

F

M E

C

D E S

IG

N

D A T E

S O

L

IC

IT

A T

C O

N T R

A

C A T E

G O

R Y

C

O D

E

P L O

T

S

C A L E

B Y

D A T E

PLATE

REFERENCE

NUMBER

S

IZ

E

D

"X

F

M E

V

IE

W

C H

IE

F D

E S

C T

IO

N

J D

H

D G

N S

P E

C

S

Y S

T

IM

E

U S

E R

N A

M E

A

R a n d a ll C

M il le r, P .E

US ARMY CORPS

OF ENGINEERS

SAVANNAH

U S

A R

M Y

E

N G

IN

E

T R

IC

T

C O

R

E

N G

IN

E E

R S

S A

V A

N N

T R

IC

T

C W

K

W

H N B

IS

IN

G

S A

V A

N N

R B

O R

G E

O R

G

IA

J U

L

B

B

B

B

B

B

B

BBB

B

B

B

B

P I

E Z

A

P I

E Z

A

P I

E Z

A

P I

E Z

A

P I

E Z

A

B

B

B

B-7

1+00 BEGIN

85+46 END

S I

L T

F

E N

C E

WEIR 2

WEIR 1

(REMOVED)

WEIR 2

WEIR 1

(REMOVED)

WEIR 14A-1

WEIR 14A-2

WEIR 14A-3

APPROX TOE OF WASHOUT

LENGTH APPROX.

250 FEET

MARSH

BORROW AREA

N 762,339.5

E 1,026,267.4

0+0

5+0

+0

+0

+0

+0

+0

+0

+6

SCALE: 1"=400’

400 800 1200400

S A

N D

C

A P

B

O R R

O W

R E S

WEIR 14A-2

WEIR 14A-3

L

R N I

S I

N

WEIR 14A-2

WEIR 14A-3

SP-9

BIRD ISLAND

NORTH

BIRD ISLAND

SOUTH

85+46 END

BOAT RAMP

MARSH

SAVANNAH RIVER

FLOOD

EBB

WEIR 6

WEIR 3

WEIR 2

WEIR 1

(REMOVED)

WEIR 4

(REMOVED)

CPT-1

CPT-2

CPT-3

CPT-4

CPT-5

CPT-6

CPT-7

CPT-9

CPT-8

SAND

BIRD ISLAND 14B-1

BIRD ISLAND 14B-2

C U T

F I

E L

D S

FOR BIRD ISLAND CAPS

BOAT RAMP

MARSH

SAVANNAH RIVER

WEIR 5

WEIR 6

WEIR 3

WEIR 2

WEIR 1

(REMOVED)

WEIR 4

(REMOVED)

SAND

BIRD ISLAND 14B-1

BIRD ISLAND 14B-2

C U T

F I

E L

D S

FOR BIRD ISLAND CAPS

WEIR 14A-2

WEIR 14A-3

BORROW AREA

BORROW AREA LIMIT

100 FT FROM DIKE CENTERLINE

N 758,104.2

E 1,030,459.4

DISPOSAL AREA 14A

DISPOSAL AREA 14B

D

IS

P O

S

E A

B

B O

R R

W

IT

E

D-02

3. THIS AREA MAY BE IN USE BY MORE THAN

ONE CONTRACTOR AT ANY TIME. CONTRACTORS

ARE EXPECTED TO HARMONIOUSLY COMMUNICATE AND

AGREE ON SHARED USE FOR THIS AREA. IN THE

EVENT THAT CONTRACTORS FAIL TO COMMUNICATE

AND/OR AGREE, FINAL DISPOSITION SHALL BE

AT THE DISCRETION ON THE COR. CHANGES AND/OR

MODIFICATIONS TO CONTRACTORS’ OPERATIONS AS

A RESULT OF SHARED USE WILL BE CONTRACTORS’

RESPONSIBILITY AND NOT CONSIDERED FOR ANY

ADDITIONAL PAYMENTS BY THE GOVERNMENT.

D

2 3

C

4 5

$$USERNAME$$

D G

N S

P E

C

S

Y S

T

IM

E

U S

E R

N A

M E

Y

M B

O L

D E S

C R

IP

T

IO

N

F

M E

C

D E S

IG

N

D A T E

S O

L

IC

IT

A T

C O

N T R

A

C A T E

G O

R Y

C

O D

E

P L O

T

S

C A L E

B Y

D A T E

PLATE

REFERENCE

NUMBER

S

IZ

E

D

"X

F

M E

V

IE

W

C H

IE

F D

E S

C T

IO

N

J D

H

D G

N S

P E

C

S

Y S

T

IM

E

U S

E R

N A

M E

A

R a n d a ll C

M il le r, P .E

US ARMY CORPS

OF ENGINEERS

SAVANNAH

U S

A R

M Y

E

N G

IN

E

T R

IC

T

C O

R

E

N G

IN

E E

R S

S A

V A

N N

T R

IC

T

C W

K

W

H N B

IS

IN

G

S A

V A

N N

R B

O R

G E

O R

G

IA

J U

L

9N 759,526.8

E 1,028,312.2

GM-8

T10562

11.52

TIE

T10556

11.65

TIE

T10224

11.68

TIE

T10229

11.96

TIET4

GM-7

GM-5

N 762,339.5

E 1,026,267.4

GM-315

JT1599

16.82

DEFAULTT

GM-2

GM-6

T10465

17.44

TB

T10467

17.51

TB T10468

17.68

TB

+0

T10466

18.34

TB

T10464

18.46

TB

END 85+46

E1027907.5

N 763448.9

END 85+46

E1027907.5

N 763448.9

T10463

18.73

TB

T10469

18.77

TB

GM-4

T10470

19.07

TB

T10462

19.52

TB

T10471

19.58

TB

T10461

19.85

TB

0 2

T10473

20.64

TB

T10472

20.81

TB

T10474

20.82

TB

T10459

21.42

TB

T10460

21.55

TB

1. COORDINATE SYSTEM: NAD83, GEORGIA.

2. SURVEY FEB. 2009 MLLW, EPOCH 1983-2001

T10560

22.06

TIE

T10457

22.07

TB

T10685

22.12

TIE

T10228

22.15

TIE

T10771

22.15

TIE

T10458

22.31

TB

T10451

22.65

TB

Z1326

23.20

SUN

T10951

23.24

TB

T10953

23.44

TB

T10952

23.52

TB

T10452

23.60

TB

T10454

23.70

TB

T10456

23.71

TB

T10950

23.71

TB

T10455

23.83

TB

T10955

23.86

TB

T10453

23.87

TB

T10954

23.87

TB

T10450

23.91

TB

T10949

24.03

TB

T10449

24.07

TB

T10966

24.23

TB

T10448

24.25

TB

T10963

24.26

TB

T10962

24.27

TB

T10958

24.47

TB

T10948

24.65

TB

T10947

24.68

TB

JT1002

24.72

DEFAULT

T10959

24.80

TB

T10961

24.87

TB

T10965

24.95

TB

T10926

24.96

TB

GM-1

T10956

25.03

TB

T10935

25.16

TB

T10957

25.29

TB

T10960

25.36

TB

T10934

25.59

TB

T10946

25.86

TB

T10944

25.89

TB

60’

60’

60’

60’

T10933

26.09

TB

T10964

26.43

TB

T10927

26.52

TB

T10945

26.54

TB

300007

26.56

SUN

T10943

26.62

TB

T10227

26.66

TIE

T10931

26.70

TB

T10443

26.74

TB

T10552

26.80

TIE

T10839

26.83

TIE

T10932

26.86

TB

T10930

26.99

TB

T10938

26.99

TB

T10929

27.27

TB

T10226

27.28

TIE

T10928

27.29

TB

T10936

27.34

TB

T10942

27.39

TB

T10440

27.56

TB

T10441

27.57

TB

T10719

27.65

TIE

T10444

27.74

TB

T10442

27.95

TB

T10446

27.99

TB

5+0

+0

+0

+0

+0

T10447

28.08

TB

T10445

28.30

TB

T10941

28.31

TB

T10937

28.43

TB

T10439

28.46

TB

T10438

28.48

TB

T10939

29.19

TB

0+0

Z1001

30.53

BS

Z1155

30.56

BS

T10555

30.62

TIE

T10357

30.67

TIE

T10230

30.71

TIE

T10559

30.77

TIECP9628

T10940

31.03

TB

T10557

32.56

TIECP9622

300005

32.57

BS10557

JT1328

32.77

DEFAULT

Z1257

32.93

TIE

Z1256

33.03

BS

T10650

33.11

TIE

T10554

33.14

TIE

Z1156

33.19

IPF

T10558

33.21

TIECP9620

JT1510

33.24

TIE

T10612

33.34

TIE

Z1158

33.36

IPF

Z1327

33.36

BS

T10553

33.36

TIE

JT1001

33.42

TIE

300006

33.45

TIE

Z1157

33.47

BS

T10561

33.48

SUNIP

Z1351

33.58

BS

T10225

33.62

TIECP9626

E

E

E

E

N762000

E

E

N760000

N758000

N756000

2 3

C

4 5

$$USERNAME$$

D G

N S

P E

C

S

Y S

T

IM

E

U S

E R

N A

M E

Y

M B

O L

D E S

C R

IP

T

IO

N

F

M E

C

D E S

IG

N

D A T E

S O

L

IC

IT

A T

C O

N T R

A

C A T E

G O

R Y

C

O D

E

P L O

T

S

C A L E

B Y

D A T E

PLATE

REFERENCE

NUMBER

S

IZ

E

D

"X

F

M E

V

IE

W

C H

IE

F D

E S

C T

IO

N

J D

H

D G

N S

P E

C

S

Y S

T

IM

E

U S

E R

N A

M E

A

R a n d a ll C

M il le r, P .E

US ARMY CORPS

OF ENGINEERS

SAVANNAH

U S

A R

M Y

E

N G

IN

E

T R

IC

T

C O

R

E

N G

IN

E E

R S

S A

V A

N N

T R

IC

T

C W

K

W

H N B

IS

IN

G

S A

V A

N N

R B

O R

G E

O R

G

IA

J U

L

D-05

N

A L

E

4’ MAX.

4’ MAX.

4’ MAX.

8’ MAX. 8’ MAX.

A

B

C

D

E

F

G

2. THE DIAGRAM SHOWS THAT BEFORE LAYER "A" IS PLACED, THE FIRST STEP IS CUT

INTO THE SLOPE A MAXIMUM DISTANCE OF ABOUT 8 FEET (ABOUT � THE WIDTH OF

THE USUAL D-8 BULLDOZER BLADE.) THE SUCCESSIVE LAYER(S) ARE THEN PLACED.

BEFORE LAYER "C" IS PLACED, THE SECOND STEP IS CUT 8 FEET INTO THE SLOPE AND

SUCCESSIVE LAYERS ARE AGAIN PLACED. IF IT IS ANTICIPATED THAT THE VERTICAL

PART OF THE STEP WILL EXCEED 4 FEET WHERE AN 8-FOOT HORIZONTAL CUT IS MADE,

THEN THE ACTUAL CUT STOPS WHEN THE VERTICAL PART REACHES A MAXIMUM OF 4 FEET

ALLOWING THE HORIZONTAL DISTANCE TO VARY.

3. THE PROCESS OF BENCHING IS CONSIDERED INCIDENTAL TO THE ITEM OF UNCLASSIFIED

EXCAVATION AND BORROW IN THE CONSTRUCTION OF THE EMBANKMENT AND NO ADDITIONAL

MEASUREMENT OF QUANTITY OR PAYMENT WILL BE MADE FOR BENCHING.

1. WHERE THE EMBANKMENT IS A HILLSIDE OR ANOTHER EXISTING EMBANKMENT

HAVING A SLOPE OF 3H TO 1V OR STEEPER, THE FOUNDATION MUST BE BENCHED

WHILE THE EMBANKMENT IS BEING CONSTRUCTED. (SEE DIAGRAM).

(TYP.) (TYP.)

H

4. THE LAYERS A THROUGH H SHALL NOT EXCEED THE LOOSE THICKNESS REQUIREMENTS AS

SPECIFIED IN SECTION: EMBANKMENT.

B E

N C

H

T

E

E

E

E

E

N766000

N764000

N766000

N764000

E

B-7

0+00

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+6

WEIR 14A-1

WEIR 14A-2

WEIR 14A-3

0+

5+

10+

15+

+00

+00

+0

+0

+0

+0

+0

+0

+0

+6

N762000

N760000

DIKE IMPROVEMENT 8,446 LF

L

R N I

S I

N

S A

V A

N N

V E

R

B-7

1+00 BEGIN

WEIR 14A-1

WEIR 14A-2

WEIR 14A-3

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

BACK

FINGER DIKE IMPROVEMENT

5,862 LF

SP-10

SP-11

SP-12

SP-13

SP-14

SP-15

SP-16

SP-17

SP-18

SP-19

SP-20

SP-21

SP-22

SP-23

SP-24

SP-26

SP-1

SP-2

SP-3

SP-4

SP-5

SP-6

SP-7

SP-8

SP-9

BIRD ISLAND

NORTH

BIRD ISLAND

SOUTH

F I

N G

K E

BEGIN 0+00

E1020465.3

N 767625.4

END 85+46

E1027907.5

N 763448.9

MARSH

D-06

1. COORDINATE SYSTEM: NAD83, GEORGIA.

3. DIKE SURVEY COMPLETED JUNE, 2009 BY DURDEN & PARTY, COE.

SCALE: 1"=400’

400 800 1200400

T E

M P

O R

A

N

A N

APPROXIMATE SILT FENCE LOCATION (SEE NOTES)

APPROXIMATE SILT FENCE LOCATION (SEE NOTES)

4. SILT FENCE SHALL BE PLACED MAXIMUM OF 8 FEET OUTSIDE OF NEW DIKE TOE.

OR AT THE TOE OF EXISTING FILL. IN NO INSTANCE SHALL IT BE PLACED IN

WETLANDS.

2. SURVEY, MLLW EPOCH 1983-2001

D

2 3

C

4 5

$$USERNAME$$

D G

N S

P E

C

S

Y S

T

IM

E

U S

E R

N A

M E

Y

M B

O L

D E S

C R

IP

T

IO

N

F

M E

C

D E S

IG

N

D A T E

S O

L

IC

IT

A T

C O

N T R

A

C A T E

G O

R Y

C

O D

E

P L O

T

S

C A L E

B Y

D A T E

PLATE

REFERENCE

NUMBER

S

IZ

E

D

"X

F

M E

V

IE

W

C H

IE

F D

E S

C T

IO

N

J D

H

D G

N S

P E

C

S

Y S

T

IM

E

U S

E R

N A

M E

A

R a n d a ll C

M il le r, P .E

US ARMY CORPS

OF ENGINEERS

SAVANNAH

U S

A R

M Y

E

N G

IN

E

T R

IC

T

C O

R

E

N G

IN

E E

R S

S A

V A

N N

T R

IC

T

C W

K

W

H N B

IS

IN

G

S A

V A

N N

R B

O R

G E

O R

G

IA

J U

L

DISPOSAL AREA 14B

DISPOSAL AREA 14A

B

B

B

B

B

B

B

BBB

B

B

B

B

DISPOSAL AREA

13-B

P I

E Z

A

P I

E Z

A

P I

E Z

A

P I

E Z

A

P I

E Z

A

B

B

B

B-7

1+00 BEGIN

85+46 END

S I

L T

F

E N

C E

WEIR 2

WEIR 1

(REMOVED)

WEIR 2

WEIR 1

(REMOVED)

WEIR 14A-1

WEIR 14A-2

WEIR 14A-3

APPROX TOE OF WASHOUT

LENGTH APPROX.

250 FEET

MARSH

BORROW AREA

N 762,339.5

E 1,026,267.4

0+0

5+0

+0

+0

+0

+0

+0

+0

+6

ELONGATION (% MAX) (ASTM D-4632) 40

TENSILE STRENGTH (LBS.MIN) (ASTM D-4632) WARP - 120

FILL - 100

AOS (APPARENT OPENING SIZE) (MAX SIEVE SIZE)

(ASTM D-4751) #30

BURSTING STRENGTH (PSI MIN) (ASTM D-3786

DIAPHRAGM BURSTING STRENGTH TESTER) 175

7. THE FILTER FABRIC SHALL MEET THE FOLLOWING REQUIREMENTS:

FLOW RATE (GAL/MIN/SQ FT) (GDT - 87) 25

ULTRAVIOLET STABILITY (ASTM D-4632 AFTER 300

HRS WEATHERING IN ACC. WITH ASTM D-4355) 80

D

2 3

C

4 5

Y

M B

O L

D E S

C R

IP

T

IO

N

F

M E

C

D E S

IG

N

D A T E

S O

L

IC

IT

A T

C O

N T R

A

C A T E

G O

R Y

C

O D

E

P L O

T

S

C A L E

B Y

D A T E

PLATE

REFERENCE

NUMBER

S

IZ

E

D

"X

F

M E

V

IE

W

C H

IE

F D

E S

C T

IO

N

J

A

R a n d a ll C

M il le r, P .E

US ARMY CORPS

OF ENGINEERS

SAVANNAH

U S

A R

M Y

E

N G

IN

E

T R

IC

T

C O

R

E

N G

IN

E E

R S

S A

V A

N N

T R

IC

T

C W

K

W

H N B

IS

IN

G

S A

V A

N N

R B

O R

G E

O R

G

IA

J U

L

N

A L

E

ELEVATION

WOOD POST

3’-0" MIN. WIDTH

FILTER FABRIC

FILL SLOPE

GROUND LINE

SECTION

W O

S T

3"

GENERAL NOTES:

5. CONTRACTOR SHALL PERIODICALLY REMOVE ACCUMULATED SEDIMENT, AS REQUIRED.

6. STEEL POSTS SHALL NOT BE USED WITHOUT THE EXPRESS WRITTEN CONSENT

OF THE CONTRACTING OFFICER.

TEMPORARY EROSION CONTROL (SILT FENCE)

NOT TO SCALE

ANCHOR FILTER FABRIC

MIN. 7" DEEP

2. THE DISTANCE SILT FENCE IS INSTALLED FROM THE OUTSIDE TOE SHALL BE

KEPT TO THE MINIMUM DISTANCE REQUIRED FOR THE SATISFACTORY COMPLETION OF THE

WORK BEING PERFORMED.

VARIES (6’ MAX.)

3. FILTER FABRIC SHALL BE A MINIMUM OF 36 INCHES IN WIDTH.

FABRIC

8. THE CONTRACTOR SHALL PROVIDE A SUBMITTAL FOR SILT FENCE MATERIALS AND

GEOTEXTILE IN ACCORDANCE WITH SPECIFICATION SECTION 02373, SEPARATION/

FILTRATION GEOTEXTILE, PARAGRAPH 1.4, SUBMITTALS.

D-07

1. A SILT FENCE SHALL BE INSTALLED AT THE OUTSIDE TOE OF EARTHFILL

EMBANKMENTS. MAY ALSO BE INSTALLED AROUND ALL DRAINAGE INLETS AND/OR OTHER

AREAS AS DIRECTED. IN NO INSTANCE SHALL IT BE PLACED IN WETLANDS.

4. WOODEN POSTS SHALL BE A MINIMUM OF 4’-0" IN HEIGHT AND 2 INCHES OR MORE

IN DIAMETER. FABRIC SHALL BE FASTENED TO WOODEN POST WITH NOT LESS

THAN 17 GUAGE WIRE STAPLES � INCH LONG. A MINIMUM OF 5 STAPLES SHALL BE USED

PER POST.

T E

M P

O R

A

N

T A

2 3

C

4 5

$$USERNAME$$

D G

N S

P E

C

S

Y S

T

IM

E

U S

E R

N A

M E

Y

M B

O L

D E S

C R

IP

T

IO

N

F

M E

C

D E S

IG

N

D A T E

S O

L

IC

IT

A T

C O

N T R

A

C A T E

G O

R Y

C

O D

E

P L O

T

S

C A L E

B Y

D A T E

PLATE

REFERENCE

NUMBER

S

IZ

E

D

"X

F

M E

V

IE

W

C H

IE

F D

E S

C T

IO

N

J D

H

D G

N S

P E

C

S

Y S

T

IM

E

U S

E R

N A

M E

A

R a n d a ll C

M il le r, P .E

US ARMY CORPS

OF ENGINEERS

SAVANNAH

U S

A R

M Y

E

N G

IN

E

T R

IC

T

C O

R

E

N G

IN

E E

R S

S A

V A

N N

T R

IC

T

C W

K

W

H N B

IS

IN

G

S A

V A

N N

R B

O R

G E

O R

G

IA

J U

L

9P I

E Z

A

B-7

1+00 BEGIN

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

1+

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

1+

+0

+0

+0

+0

+0

+0

SP-1

SP-2

SP-3

N767000

TOE

LEGEND

28.7 SPOT ELEVATION

15+00

0100’ 100’ 200’

SCALE: 1"=100’

N767000

TOE

B-7

LEGEND

SPOT ELEVATION

E

E

DMCA 14A

SILT FENCE

ALIGNMENT BASELINE IS A STRAIGHT LINE BETWEEN GA EAST NAD83 COORDINATES

FOR 0+00 AT E 1020465.27, N 767625.35 AND STATION 85+46 AT E 1027917.67,

N 763443.15.

STATION ALONG EXISTING ALIGNMENT

THE CENTERLINE OF THE PROPOSED CONSTRUCTION IS OFFSET FROM THE GIVEN

BASELINE 22 FEET TO THE INTERIOR OF DMCA 14A.

DIKE CONSTRUCTION BEGINS AT STATION 1+00 AND ENDS AT STATION 85+46.

N768000

BEGIN 0+00

E1020465.3

N 767625.4

TOE

COUNTERWEIGHT

TOP

SILT FENCE

SETTLEMENT PLATE

D-08

P L

A N

B A

E S

T A

T

IO

SILT FENCE TO BE PLACED NORTH OF PROPOSED WORK AS NEAR AS PRACTICAL,

BUT NOT MORE THAN 8 FEET FROM THE NEW WORK. IN NO INSTANCE SHALL SILT

FENCE BE PLACED IN WETLANDS.

NOTES:

TOPOGRAPHIC MAP BASED ON SURVEY DATED JUNE, 2009.

EXISTING GROUND ELEVATIONS ARE REFERENCED TO MLLW AND ARE

APPROXIMATE. GROUND ELEVATIONS MUST BE VERIFIED BY THE CONTRACTOR.

2 3

C

4 5

$$USERNAME$$

D G

N S

P E

C

S

Y S

T

IM

E

U S

E R

N A

M E

Y

M B

O L

D E S

C R

IP

T

IO

N

F

M E

C

D E S

IG

N

D A T E

S O

L

IC

IT

A T

C O

N T R

A

C A T E

G O

R Y

C

O D

E

P L O

T

S

C A L E

B Y

D A T E

PLATE

REFERENCE

NUMBER

S

IZ

E

D

"X

F

M E

V

IE

W

C H

IE

F D

E S

C T

IO

N

J D

H

D G

N S

P E

C

S

Y S

T

IM

E

U S

E R

N A

M E

A

R a n d a ll C

M il le r, P .E

US ARMY CORPS

OF ENGINEERS

SAVANNAH

U S

A R

M Y

E

N G

IN

E

T R

IC

T

C O

R

E

N G

IN

E E

R S

S A

V A

N N

T R

IC

T

C W

K

W

H N B

IS

IN

G

S A

V A

N N

R B

O R

G E

O R

G

IA

J U

L

P I

E Z

A

P I

E Z

A

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

1+

+0

+0

+0

+0

+0

+0

1+

+0

+0

+0

+0

+0

+0

+0

+0

1+

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

SP-4

SP-5

SP-6

SP-24

SP-23 1

0100’ 100’ 200’

SCALE: 1"=100’

DMCA 14A

TOE

COUNTERWEIGHT

TOP

SILT FENCE

LEGEND

28.7 SPOT ELEVATION

15+00

LEGEND

SPOT ELEVATION

SILT FENCE

ALIGNMENT BASELINE IS A STRAIGHT LINE BETWEEN GA EAST NAD83 COORDINATES

FOR 0+00 AT E 1020465.27, N 767625.35 AND STATION 85+46 AT E 1027917.67,

N 763443.15.

STATION ALONG EXISTING ALIGNMENT

THE CENTERLINE OF THE PROPOSED CONSTRUCTION IS OFFSET FROM THE GIVEN

BASELINE 22 FEET TO THE INTERIOR OF DMCA 14A.

DIKE CONSTRUCTION BEGINS AT STATION 1+00 AND ENDS AT STATION 85+46.

SETTLEMENT PLATE

E

E

N766000

N765000

E

D-09

P L

A N

B A

E S

T A

T

IO

SILT FENCE TO BE PLACE NORTH OF PROPOSED WORK AS NEAR AS PRACTICAL,

BUT NOT MORE THAN 8 FEET FROM THE NEW WORK. IN NO INSTANCE SHALL SILT

2 3

C

4 5

$$USERNAME$$

D G

N S

P E

C

S

Y S

T

IM

E

U S

E R

N A

M E

Y

M B

O L

D E S

C R

IP

T

IO

N

F

M E

C

D E S

IG

N

D A T E

S O

L

IC

IT

A T

C O

N T R

A

C A T E

G O

R Y

C

O D

E

P L O

T

S

C A L E

B Y

D A T E

PLATE

REFERENCE

NUMBER

S

IZ

E

D

"X

F

M E

V

IE

W

C H

IE

F D

E S

C T

IO

N

J D

H

D G

N S

P E

C

S

Y S

T

IM

E

U S

E R

N A

M E

A

R a n d a ll C

M il le r, P .E

US ARMY CORPS

OF ENGINEERS

SAVANNAH

U S

A R

M Y

E

N G

IN

E

T R

IC

T

C O

R

E

N G

IN

E E

R S

S A

V A

N N

T R

IC

T

C W

K

W

H N B

IS

IN

G

S A

V A

N N

R B

O R

G E

O R

G

IA

J U

L

P I

E Z

A

P I

E Z

A

85+46 END

S I

L T

F

E N

C E5

+0

+0

+0

+0

+0

+0

+0

+0

+4

+0

+0

+0

1+

+0

+0

+0

+0

+0

+0

1+

+0

+0

+0

+0

+0

+0

+0

1+

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

SP-7

SP-8

SP-9

0100’ 100’ 200’

SCALE: 1"=100’

DMCA 14A

TOE

COUNTERWEIGHT

TOP

LEGEND

28.7 SPOT ELEVATION

15+00

LEGEND

SPOT ELEVATION

SILT FENCE

ALIGNMENT BASELINE IS A STRAIGHT LINE BETWEEN GA EAST NAD83 COORDINATES

FOR 0+00 AT E 1020465.27, N 767625.35 AND STATION 85+46 AT E 1027917.67,

N 763443.15.

STATION ALONG EXISTING ALIGNMENT

THE CENTERLINE OF THE PROPOSED CONSTRUCTION IS OFFSET FROM THE GIVEN

BASELINE 22 FEET TO THE INTERIOR OF DMCA 14A.

DIKE CONSTRUCTION BEGINS AT STATION 1+00 AND ENDS AT STATION 85+46.

SETTLEMENT PLATE

D-10

E

E

E

N765000N765000

N764000

P L

A N

B A

E S

T A

T

IO

SILT FENCE TO BE PLACE NORTH OF PROPOSED WORK AS NEAR AS PRACTICAL,

BUT NOT MORE THAN 8 FEET FROM THE NEW WORK. IN NO INSTANCE SHALL SILT

2 3

C

4 5

$$USERNAME$$

D G

N S

P E

C

S

Y S

T

IM

E

U S

E R

N A

M E

Y

M B

O L

D E S

C R

IP

T

IO

N

F

M E

C

D E S

IG

N

D A T E

S O

L

IC

IT

A T

C O

N T R

A

C A T E

G O

R Y

C

O D

E

P L O

T

S

C A L E

B Y

D A T E

PLATE

REFERENCE

NUMBER

S

IZ

E

D

"X

F

M E

V

IE

W

C H

IE

F D

E S

C T

IO

N

J D

H

D G

N S

P E

C

S

Y S

T

IM

E

U S

E R

N A

M E

A

R a n d a ll C

M il le r, P .E

US ARMY CORPS

OF ENGINEERS

SAVANNAH

U S

A R

M Y

E

N G

IN

E

T R

IC

T

C O

R

E

N G

IN

E E

R S

S A

V A

N N

T R

IC

T

C W

K

W

H N B

IS

IN

G

S A

V A

N N

R B

O R

G E

O R

G

IA

J U

L

0+00

SP-12

SP-13

SP-14

SP-16

SP-15

SP-17

SP-18

SP-20

SP-19

+0

+0

+6

0100’ 100’ 200’

SCALE: 1"=100’

DMCA 14A

LEGEND

28.7 SPOT ELEVATION

15+00

LEGEND

SPOT ELEVATION

SILT FENCE

STATION ALONG EXISTING ALIGNMENT

SETTLEMENT PLATE

D-11

E

N765000

N766000

E

E

A N

F R

O

A

F

IN

G

A

SILT FENCE

TOE

TOE

TOP

COUNTERWEIGHT

TOPOGRAPHIC MAP BASED ON SURVEY DATED JUNE 2009.

APPROXIMATE. GROUND ELEVATIONS MUST BE VERIFIED BY THE CONTRACTOR.

SILT FENCE TO BE PLACE SOUTH OF PROPOSED WORK AS NEAR AS PRACTICAL,

BUT NOT MORE THAN 8 FEET FROM THE NEW WORK. SILT FENCE SHALL NOT BE

PLACED IN WETLANDS OR TIDAL ZONE.

2 3

C

4 5

$$USERNAME$$

D G

N S

P E

C

S

Y S

T

IM

E

U S

E R

N A

M E

Y

M B

O L

D E S

C R

IP

T

IO

N

F

M E

C

D E S

IG

N

D A T E

S O

L

IC

IT

A T

C O

N T R

A

C A T E

G O

R Y

C

O D

E

P L O

T

S

C A L E

B Y

D A T E

PLATE

REFERENCE

NUMBER

S

IZ

E

D

"X

F

M E

V

IE

W

C H

IE

F D

E S

C T

IO

N

J D

H

D G

N S

P E

C

S

Y S

T

IM

E

U S

E R

N A

M E

A

R a n d a ll C

M il le r, P .E

US ARMY CORPS

OF ENGINEERS

SAVANNAH

U S

A R

M Y

E

N G

IN

E

T R

IC

T

C O

R

E

N G

IN

E E

R S

S A

V A

N N

T R

IC

T

C W

K

W

H N B

IS

IN

G

S A

V A

N N

R B

O R

G E

O R

G

IA

J U

L

WEIR 14A-1

BIRD ISLAND

NORTH

SP-10

SP-11

+0

+0

+0

0100’ 100’ 200’

SCALE: 1"=100’

DMCA 14A

LEGEND

28.7 SPOT ELEVATION

15+00

LEGEND

SPOT ELEVATION

SILT FENCE

STATION ALONG EXISTING ALIGNMENT

SETTLEMENT PLATE

D-12

E

N764000 E

P L

A N

F R

O

A

SILT FENCE

TOE

TOE

TOP

COUNTERWEIGHT

N763000

E

TOE

TOP

APPROXIMATE. GROUND ELEVATIONS MUST BE VERIFIED BY THE CONTRACTOR.

SILT FENCE TO BE PLACE SOUTH OF PROPOSED WORK AS NEAR AS PRACTICAL,

BUT NOT MORE THAN 8 FEET FROM THE NEW WORK. IN NO INSTANCE SHALL SILT

FENCE BE PLACED IN WETLANDS OR TIDAL ZONE.

2 3

C

4 5

$$USERNAME$$

D G

N S

P E

C

S

Y S

T

IM

E

U S

E R

N A

M E

Y

M B

O L

D E S

C R

IP

T

IO

N

F

M E

C

D E S

IG

N

D A T E

S O

L

IC

IT

A T

C O

N T R

A

C A T E

G O

R Y

C

O D

E

P L O

T

S

C A L E

B Y

D A T E

PLATE

REFERENCE

NUMBER

S

IZ

E

D

"X

F

M E

V

IE

W

C H

IE

F D

E S

C T

IO

N

J D

H

D G

N S

P E

C

S

Y S

T

IM

E

U S

E R

N A

M E

A

R a n d a ll C

M il le r, P .E

US ARMY CORPS

OF ENGINEERS

SAVANNAH

U S

A R

M Y

E

N G

IN

E

T R

IC

T

C O

R

E

N G

IN

E E

R S

S A

V A

N N

T R

IC

T

C W

K

W

H N B

IS

IN

G

S A

V A

N N

R B

O R

G E

O R

G

IA

J U

L

L

R N I

S I

N

E L

E V

A T I

O N

WEIR 14A-2

WEIR 14A-3

BIRD ISLAND

SOUTH

0+0

5+0

+0

+0

+0

0100’ 100’ 200’

SCALE: 1"=100’

DMCA 14A

LEGEND

28.7 SPOT ELEVATION

15+00

LEGEND

SPOT ELEVATION

SILT FENCE

STATION ALONG EXISTING ALIGNMENT

SETTLEMENT PLATE

D-13

P L

A N

F R

O

A

SILT FENCE

TOE

TOE

N761000

E

DMCA 14B

BORROW AREA

N762000

TOP

E

E

TOP

TOE

APPROXIMATE. GROUND ELEVATIONS MUST BE VERIFIED BY THE CONTRACTOR.

SILT FENCE TO BE PLACE SOUTH OF PROPOSED WORK AS NEAR AS PRACTICAL,

BUT NOT MORE THAN 8 FEET FROM THE NEW WORK. IN NO INSTANCE SHALL SILT

FENCE BE PLACED IN WETLANDS OR TIDAL ZONE.

2 3

C

4 5

$$USERNAME$$

D G

N S

P E

C

S

Y S

T

IM

E

U S

E R

N A

M E

Y

M B

O L

D E S

C R

IP

T

IO

N

F

M E

C

D E S

IG

N

D A T E

S O

L

IC

IT

A T

C O

N T R

A

C A T E

G O

R Y

C

O D

E

P L O

T

S

C A L E

B Y

D A T E

PLATE

REFERENCE

NUMBER

S

IZ

E

D

"X

F

M E

V

IE

W

C H

IE

F D

E S

C T

IO

N

J D

H

D G

N S

P E

C

S

Y S

T

IM

E

U S

E R

N A

M E

A

R a n d a ll C

M il le r, P .E

US ARMY CORPS

OF ENGINEERS

SAVANNAH

U S

A R

M Y

E

N G

IN

E

T R

IC

T

C O

R

E

N G

IN

E E

R S

S A

V A

N N

T R

IC

T

C W

K

W

H N B

IS

IN

G

S A

V A

N N

R B

O R

G E

O R

G

IA

J U

L

+0

+0

+0

+0

1+

+0

+0

0 4 +0

+0

SP-5

SP-22

SP-21

SP-24

SP-23

SP-26

0100’ 100’ 200’

SCALE: 1"=100’

DMCA 14A

LEGEND

28.7 SPOT ELEVATION

15+00

LEGEND

SPOT ELEVATION

SILT FENCE

STATION ALONG EXISTING ALIGNMENT

SETTLEMENT PLATE

D-14

P L

A N

TOE

TOE

E

N764000

E

E

TOP

N765000

F

IN

G

A

2.

3.

4.

5.

6.

7.

8.

9.

10.

12.

11.

13.

BIRD ISLAND DIMENSIONS

DESIGNATION

BIRD ISLAND

(cy)

MATERIAL

DREGDED

(cy)

SAND

(cy)

CLEAN SAND

(cy)

FILL

TOTAL

ELEVATION

BIRD

ISLAND

Z1

SHOULDER

BIRD ISLAND SAND

1.

2.

15’

5’ (MIN)

1’ (MIN)

MATERIAL

(NOTE 5)

1 1

NOTES 13 AND 14

MATERIAL

120’ 120’

2%

(NOTE 5)

2%

CLEAN SAND (NOTE 6)

1’ (MIN)

5’ (MIN)

10%

EXISTING DIKE

150’

(MIN)

MATERIALDREDGED

120’

ELEV. Z1 (TYP)

2%

(NOTE 5)

2%

CLEAN SAND (NOTE 6)

ACCESS ROAD TO BE REMOVED (NOTE 10)

FINAL SURFACE

TEMPORARY SURFACE

PERMANENT ACCESS ROAD

DIKE

2’

CL

A SECTION (TYP)

BIRD ISLAND AND ACCESS ROAD

B

SECTION (TYP)

BIRD ISLAND

DETAIL

ACCESS ROAD

1.5’

2’

120’

IR

D

IS

L A

T A

IL

S

1.

1.5’

D-09

D-09

D-17

D-17

D-17

D-09

D-10

D-10

D-10

36,650 0

26,650

DETAILED ESTIMATE (REMAINING WORK)

14A-1(WEST)

14A-2(EAST)

14A-1 (WEST)

14A-2 (EAST)

140’

ACCESS ROAD

ELEVATION

SURFACE OF

FINISHED

17 (MIN.)

20 (MIN.)

300’

(MIN)

ROCK SURFACE (NOTE 7)

140’+/-

140’+/-

1.5’

140’+/-

10,000

10,000 31,000 21,000

SLOPE BEYOND

ACCESS ROAD

SAND

SAND

APPROX. EXISTING

GROUND LINE

SAND

NEW DREDGED

NEW DREDGED

CENTER

CENTER

BIRD

ISLAND

14A-1 (WEST)

14A-2 (EAST)

761,027.6

759,235.5

BIRD ISLAND LOCATION

COORDINATES GA E NAD 83

EAST NORTH

1,028,630.3

1,030,846.1

CENTER

EXISTING GROUND

EXISTING GROUND

EXISTING

GROUND

EXISTING GOUND

CLEAN SAND SHALL BE USED TO INHIBIT VEGETATION GROWTH. THE SAND SHALL BE

OBTAINED FROM THE BORROW AREA(S) AVAILABLE AT DMCA 14B UNLESS OTHERWISE DIRECTED.

TEMPORARY ACCESS ROAD(S) SHALL BE REMOVED AFTER COMPLETION OF EACH BIRD ISLAND.

MATERIAL REMOVED FROM TEMPORARY ACCESS ROADS SHALL BE USED AS EARTH FILL DURING

CONSTRUCTION AND/OR EVENLY STOCKPILED DIRECTLY ADJACENT TO DIKE BETWEEN STATIONS

AS APPROVED BY THE CONTRACTING OFFICERS REPRESENTATIVE.

THE CONTRACTOR MAY CHOOSE AN ALTERNATE ACCESS ROUTE IF CONDITIONS PERMIT

ACCESS FROM WITHIN THE DREDGED MATERIAL CONTAINMENT AREA. SUCH ACCESS WILL NOT

NEGATE THE NEED FOR THE PERMANENT PORTION OF THE DESIGN ACCESS ROAD AS SHOWN.

THE CONTRACTOR MAY CHOOSE TO USE GEOTEXTILE REINFORCEMENT TO REDUCE THE AMOUNT

OF SUBSIDENCE AND ENHANCE STABILITY OF THE ACCESS ROAD.

ALL MATERIALS INCLUDING DREDGED MATERIAL AND CLEAN SAND SHALL BE APPROVED BY THE

CONTRACTING OFFICER.

HAUL ROADS TO BIRD ISLANDS SHALL ONLY BE USED TO RAISE THE ISLANDS AND NOT FOR

DIKE CONSTRUCTION. TRAFFIC TO, FROM AND OVER EACH ISLAND SHALL BE LIMITED TO ONLY

THAT REQUIRED TO CONSTRUCT EACH ISLAND. THE CONTRACTOR SHALL ROUTE ALL BIRD ISLAND

HAULING EQUIPMENT IN A MANNER TO PROTECT AND AVOID ALL SETTLENT PLATE RISER PIPES, IF EXISTING. REPEATED HAULING PATHS OR PATTERNS SHALL NOT ENCROACH CLOSER THAN 20

FEET OF ANY SETTLEMENT PLATE RISER PIPE, IF EXISTING. HAUL ROADS TO BIRD ISLANDS

SHALL ONLY BE USED TO RAISE THE ISLANDS, NOT FOR DIKE CONSTRUCTION.

14.

THE BIRD ISLANDS HAVE BEEN CONSTRUCTED UNDER A PREVIOUS CONTRACT AND ARE DESIGNATED

TO BE RAISED AND MODIFIED UNDER THIS CONTRACT. QUANTITIES SHOWN IN THE DETAILED ESTIMATE

REFLECT ANTICIPATED WORK UNDER THIS CONTRACT. CROSS SECTIONS INDICATE THE COMPLETED

ISLAND FINAL PRODUCT DESIRED. EXISTING GROUND SHOWN ON THIS DRAWING SHOULD NOT BE USED

FOR WORK PREVIOUSLY COMPLETED. ACTUAL GROUND ELEVATIONS ARE TO BE OBTAINED FROM LATEST

SURVEY DATA.

SETTLEMENT PLATES ARE NOT ANTICIPATED FOR USE DURING THE RAISING OF THE BIRD ISLANDS. THE

CONTRACTOR IS EXPECTED TO MAKE AN ESTIMATE OFANY ADDITIONAL MATERIAL NEEDED TO COMPLETE

EACH ISLAND AND INCLUDE THAT COST INTO THE BID PRICE FOR ’BIRD ISLANDS, COMPLETE.’

QUANTITIES ARE PROVIDED FOR INFORMATION ONLY. QUANTITIES

ARE BASED ON JUNE 2009 SURVEY BY

NED DURDEN & PARTY, COE, SAVANNAH, GA. ELEVATIONS SHALL

BE VERIFIED BY CONTRACTOR PRIOR TO BEGINNING OPERATIONS.

THE COST FOR CLEARING AND GRUBBING SHALL BE INCLUDED IN

THE BID ITEM "CLEARING AND GRUBBING, COMPLETE."

* ELEVATIONS ARE IN FEET ABOVE MEAN LOWER LOW WATER DATUM (EPOCH 1983-2001).

PRIOR TO CONSTRUCTION OF THE BIRD ISLANDS AND THE ACCESS ROAD, THE CONTRACTOR SHALL

REMOVE SURFACE WATER BY DITCHING WITHIN AND AROUND THE CONSTRUCTION AREA. THE COR

SHALL APPROVE SURFACE CONDITIONS PRIOR TO CONSTRUCTION ACTIVITIES.

CONSTRUCTION ACTIVITIES SHALL BE EXECUTED SUCH THAT EXISTING DREDGED MATERIAL AND

EMPLACED FILL REMAINS IN A STABLE CONDITION. A LARGE AMOUNT OF SETTLEMENT AND MUD

WAVING MAY RESULT FROM CONSTRUCTION OF THE BIRD ISLANDS AND ACCESS ROAD.

THE BIRD ISLAND SHALL BE RAISED UNIFORMLY OVER THE ENTIRE FOOTPRINT.

DURING CONSTRUCTION, THE BIRD ISLAND(S) SHALL BE RAISED NOT MORE THAN 1 VERTICAL

FOOT PER WEEK.

PRIOR TO CONSTRUCTION, THE CONTRACTOR IS RESPONSIBLE TO VERIFY THE

THE BIRD ISLAND DIMENSIONS TABLE AND VOLUMES WHICH ARE BASED ON THE ELEVATION

OF THE DREDGED MATERIAL AT THE TIME OF SURVEY. THE CONTRACTOR SHALL NOTIFY THE COR

IMMEDIATELY IF THE AS-BUILT THICKNESS AND VOLUME WILL BE GREATER THAN THE VALUE

SHOWN ON THE CONSTRUCTION DRAWINGS.

EARTH MATERIAL SHALL BE HARVESTED FROM BORROW AREAS SPECIFIED IN THE CONTRACT

DOCUMENTS. BORROW MATERIAL SHALL NOT BE TAKEN FROM WITHIN 100 FT OF THE PERIMETER

OF THE FOOTPRINT OF THE BIRD ISLAND.

D-15

D

2 3

C

4 5

$$USERNAME$$

D G

N S

P E

C

S

Y S

T

IM

E

U S

E R

N A

M E

Y

M B

O L

D E S

C R

IP

T

IO

N

F

M E

C

D E S

IG

N

D A T E

S O

L

IC

IT

A T

C O

N T R

A

C A T E

G O

R Y

C

O D

E

P L O

T

S

C A L E

B Y

D A T E

PLATE

REFERENCE

NUMBER

S

IZ

E

D

"X

F

M E

V

IE

W

C H

IE

F D

E S

C T

IO

N

J D

H

D G

N S

P E

C

S

Y S

T

IM

E

U S

E R

N A

M E

A

R a n d a ll C

M il le r, P .E

US ARMY CORPS

OF ENGINEERS

SAVANNAH

U S

A R

M Y

E

N G

IN

E

T R

IC

T

C O

R

E

N G

IN

E E

R S

S A

V A

N N

T R

IC

T

C W

K

W

H N B

IS

IN

G

S A

V A

N N

R B

O R

G E

O R

G

IA

J U

L

PROPOSED FILL

EXISTING SURFACE 3. CENTERLINE OF PROPOSED FILL

OFFSET 22 FEET TOWARD INTERIOR.

2. TOP OF FILL ELEVATION 22 MLLW.

1. FILL ASSUMED TO HAVE TOP

WIDTH OF 16 FEET AND 1V ON 2.5H

SIDE SLOPES.

S-01

D

2 3

C

4 5

$$USERNAME$$

D G

N S

P E

C

S

Y S

T

IM

E

U S

E R

N A

M E

Y

M B

O L

D E S

C R

IP

T

IO

N

F

M E

C

D E S

IG

N

D A T E

S O

L

IC

IT

A T

C O

N T R

A

C A T E

G O

R Y

C

O D

E

P L O

T

S

C A L E

B Y

D A T E

PLATE

REFERENCE

NUMBER

S

IZ

E

D

"X

F

M E

V

IE

W

C H

IE

F D

E S

C T

IO

N

J D

H

D G

N S

P E

C

S

Y S

T

IM

E

U S

E R

N A

M E

A

R a n d a ll C

M il le r, P .E

US ARMY CORPS

OF ENGINEERS

SAVANNAH

U S

A R

M Y

E

N G

IN

E

T R

IC

T

C O

R

E

N G

IN

E E

R S

S A

V A

N N

T R

IC

T

C W

K

W

H N B

IS

IN

G

S A

V A

N N

R B

O R

G E

O R

G

IA

J U

L

E L

E V

A T I

O N

0 25 50 75 100-25-50-75-100

LDIKE C EL. 22.0

PROPOSEDTOP WIDTH = 16.0’

EXISTING

2.0%

TYPICAL CROSS SECTION

N.T.S.

22’OFFSET

SN

EXISTING GROUND

CENTERLINE OF EXISTING DIKE

EW

N.T.S.

DMCA 14A INTERIOREXTERIOR

2.5

2.5

E L

E V

A T I

O N

CENTERLINE PROFILE

EL. 15.0

30’

B A

S E

L I

N E

GEOTEXTILE FABRIC

65 FT. LENGTH PLACED

PERPENDICULAR TO

DIKE ALIGNMENT

T Y

P I

C

O

C T I

O N

A

O F I

L

K E

SEE PLATES S-02, S-03 AND S-04

B E

G

E N

D

TO 14BTOP OF NEW DIKE - EL. 22 MLW (OFFSET FROM EXISTING CENTERLINE 22 FEET)

0 25 50 75 100-25-50-75-100

1+00

0 25 50 75 100-25-50-75-100

5+00

0 25 50 75 100-25-50-75-100

10+00

0 25 50 75 100-25-50-75-100

15+00

0 25 50 75 100-25-50-75-100

20+00

0 25 50 75 100-25-50-75-100

25+00

0 25 50 75 100-25-50-75-100

30+00

0 25 50 75 100-25-50-75-100

35+00

Area 0.7 ft2 Volume 0.0 CY

Area 384.8 ft2 Volume 2855.6 CY

Area 381.2 ft2 Volume 7092.6 CY

Area 382.4 ft2 Volume 7070.4 CY

Area 385.3 ft2 Volume 7108.3 CY

Area 390.4 ft2 Volume 7182.4 CY

Area 388.1 ft2 Volume 7208.3 CY

Area 383.7 ft2 Volume 7146.3 CY

S-02

C R

O

C T

IO

N S

S T

A T

IO

S T

A 1+

S

T A +0

B A

E

D

2 3

C

4 5

$$USERNAME$$

D G

N S

P E

C

S

Y S

T

IM

E

U S

E R

N A

M E

Y

M B

O L

D E S

C R

IP

T

IO

N

F

M E

C

D E S

IG

N

D A T E

S O

L

IC

IT

A T

C O

N T R

A

C A T E

G O

R Y

C

O D

E

P L O

T

S

C A L E

B Y

D A T E

PLATE

REFERENCE

NUMBER

S

IZ

E

D

"X

F

M E

V

IE

W

C H

IE

F D

E S

C T

IO

N

J D

H

D G

N S

P E

C

S

Y S

T

IM

E

U S

E R

N A

M E

A

R a n d a ll C

M il le r, P .E

US ARMY CORPS

OF ENGINEERS

SAVANNAH

U S

A R

M Y

E

N G

IN

E

T R

IC

T

C O

R

E

N G

IN

E E

R S

S A

V A

N N

T R

IC

T

C W

K

W

H N B

IS

IN

G

S A

V A

N N

R B

O R

G E

O R

G

IA

J U

L

-5

0 25 50 75 100-25-50-75-100

40+00

-5

-5

0 25 50 75 100-25-50-75-100

45+00

-5

-5

0 25 50 75 100-25-50-75-100

50+00

-5

-5

0 25 50 75 100-25-50-75-100

55+00

-5

-5

0 25 50 75 100-25-50-75-100

60+00

-5

-5

0 25 50 75 100-25-50-75-100

65+00

-5

-5

0 25 50 75 100-25-50-75-100

70+00

-5

-5

0 25 50 75 100-25-50-75-100

75+00

-5

Area 392.3 ft2 Volume 7185.2 CY

Area 389.1 ft2 Volume 7235.2 CY

Area 393.0 ft2 Volume 7241.7 CY

Area 394.7 ft2 Volume 7293.5 CY

Area 392.7 ft2 Volume 7290.7 CY

Area 384.9 ft2 Volume 7200.0 CY

Area 391.8 ft2 Volume 7191.7 CY

Area 380.6 ft2 Volume 7151.9 CY

S T

A T

IO

C R

O

C T

IO

N S

S-03

S T

A +0

S

T A +0

B A

E

D

2 3

C

4 5

$$USERNAME$$

D G

N S

P E

C

S

Y S

T

IM

E

U S

E R

N A

M E

Y

M B

O L

D E S

C R

IP

T

IO

N

F

M E

C

D E S

IG

N

D A T E

S O

L

IC

IT

A T

C O

N T R

A

C A T E

G O

R Y

C

O D

E

P L O

T

S

C A L E

B Y

D A T E

PLATE

REFERENCE

NUMBER

S

IZ

E

D

"X

F

M E

V

IE

W

C H

IE

F D

E S

C T

IO

N

J D

H

D G

N S

P E

C

S

Y S

T

IM

E

U S

E R

N A

M E

A

R a n d a ll C

M il le r, P .E

US ARMY CORPS

OF ENGINEERS

SAVANNAH

U S

A R

M Y

E

N G

IN

E

T R

IC

T

C O

R

E

N G

IN

E E

R S

S A

V A

N N

T R

IC

T

C W

K

W

H N B

IS

IN

G

S A

V A

N N

R B

O R

G E

O R

G

IA

J U

L

0 25 50 75 100-25-50-75-100

80+00

0 25 50 75 100-25-50-75-100

85+00

0 25 50 75 100-25-50-75-100

85+46

Area 382.0 ft2 Volume 7061.1 CY

Area 344.3 ft2 Volume 6725.0 CY

Area 0.0 ft2 Volume 293.3 CY

S-04

C R

O

C T

IO

N S

S T

A T

IO

S T

A . 8

+0

S

T A . 8

+4

B A

E

4. FINAL PAYMENT WILL BE BASED ON THE IN-PLACE TOTAL DIKE NEAT TEMPLATE

CUBIC YARDAGE OF 118,000 CY. NO ADDITIONAL OR SEPARATE PAYMENT WILL BE

MADE FOR TOLERANCE MATERIAL, SETTLEMENT OR CONSOLIDATION, OR DENSITY

DIFFERENCES BETWEEN BORROW AREA, HAULING EQUIPMENT, AND FINAL PLACEMENT.

THE CONTRACTOR SHALL DETERMINE THE REQUIREMENTS FOR EACH AND INCLUDE

THE COST THEREOF IN HIS UNIT BID PRICE.

NOTES:

1. TOTAL DIKE (NEAT TEMPLATE) INDICATES ABOUT 118,000 CUBIC YARDS.

2. TOLERANCE FOR CONSTRUCTION IS MINUS ZERO (0) AND PLUS

NINE (9) INCHES FOR ALL PROPOSED EARTHWORK SURFACES.

3. THE ADDITIONAL MATERIAL REQUIRED TO CONSISTANTLY CONSTRUCT THE

DESIGN TEMPLATE TO DESIGN ELEVATION IS ESTIMATED TO BE 19,400 CY.

5. TOTAL GEOTEXTILE FOR BACK DIKE IS ABOUT 61,800 SY.

D

2 3

C

4 5

$$USERNAME$$

D G

N S

P E

C

S

Y S

T

IM

E

U S

E R

N A

M E

Y

M B

O L

D E S

C R

IP

T

IO

N

F

M E

C

D E S

IG

N

D A T E

S O

L

IC

IT

A T

C O

N T R

A

C A T E

G O

R Y

C

O D

E

P L O

T

S

C A L E

B Y

D A T E

PLATE

REFERENCE

NUMBER

S

IZ

E

D

"X

F

M E

V

IE

W

C H

IE

F D

E S

C T

IO

N

J D

H

D G

N S

P E

C

S

Y S

T

IM

E

U S

E R

N A

M E

A

R a n d a ll C

M il le r, P .E

US ARMY CORPS

OF ENGINEERS

SAVANNAH

U S

A R

M Y

E

N G

IN

E

T R

IC

T

C O

R

E

N G

IN

E E

R S

S A

V A

N N

T R

IC

T

C W

K

W

H N B

IS

IN

G

S A

V A

N N

R B

O R

G E

O R

G

IA

J U

L

TYPICAL FINGER DIKE SECTION

EXISTING FINGER DIKE AND GROUND ELEVATION VARIES

TOP EL. 22 MLLW

N.T.S.

FILL 2

FILL 1 FILL 1

NOTES:

N.T.S.

C L

SETTLEMENT PLATE

1. PLACE ALL FILL TO TOP ELEVATION OF EXISTING FINGER DIKE (FILL 1)

BEFORE PLACING ANY FILL ABOVE THE EXISTING TOP ELEVATION (FILL 2).

24’ 24’

16’

E L

E V

A T I

O N

E L

E V

A T I

O N

-100 -80 -60 -40 -20 0 20 40 60 80 100

100806040200-20-40-60-80-100

TYPICAL SETTLEMENT PLATE SECTION

FOR FINGER DIKE

G

P

IC

A L

S E

C T

IO

N S

S-05

2. DIKE TEMPLATE VOLUME IS 148,000 CY. SETTLEMENT & CONSOLIDATION ESTIMATED AT 30,000 CY

D

2 3

C

4 5

$$USERNAME$$

D G

N S

P E

C

S

Y S

T

IM

E

U S

E R

N A

M E

Y

M B

O L

D E S

C R

IP

T

IO

N

F

M E

C

D E S

IG

N

D A T E

S O

L

IC

IT

A T

C O

N T R

A

C A T E

G O

R Y

C

O D

E

P L O

T

S

C A L E

B Y

D A T E

PLATE

REFERENCE

NUMBER

S

IZ

E

D

"X

F

M E

V

IE

W

C H

IE

F D

E S

C T

IO

N

J D

H

D G

N S

P E

C

S

Y S

T

IM

E

U S

E R

N A

M E

A

R a n d a ll C

M il le r, P .E

US ARMY CORPS

OF ENGINEERS

SAVANNAH

U S

A R

M Y

E

N G

IN

E

T R

IC

T

C O

R

E

N G

IN

E E

R S

S A

V A

N N

T R

IC

T

C W

K

W

H N B

IS

IN

G

S A

V A

N N

R B

O R

G E

O R

G

IA

J U

L

O

E

S E

C T

IO

N S

S T

A

T

O

S-06

EXISTING GRADE PROPOSED DIKE FA = FILL AREA FV = FILL VOLUME

E L

E V

A T I

O N

0 20 40 60 80 100-20-40-60-80-100

0+00

E L

E V

A T I

O N

0 20 40 60 80 100-20-40-60-80-100

1+00

E L

E V

A T I

O N

0 20 40 60 80 100-20-40-60-80-100

2+00

E L

E V

A T I

O N

0 20 40 60 80 100-20-40-60-80-100

3+00

E L

E V

A T I

O N

0 20 40 60 80 100-20-40-60-80-100

4+00

E L

E V

A T I

O N

0 20 40 60 80 100-20-40-60-80-100

5+00

E L

E V

A T I

O N

0 20 40 60 80 100-20-40-60-80-100

6+00

E L

E V

A T I

O N

0 20 40 60 80 100-20-40-60-80-100

7+00

FA 0.0 FV 0.0

FA 8.9 FV 16.5

FA 13.1 FV 40.8

FA 15.1 FV 52.2

FA 18.1 FV 61.4

FA 23.7 FV 77.4

FA 3.5 FV 50.4

FA 0.5 FV 7.3

BEGIN

D

2 3

C

4 5

$$USERNAME$$

D G

N S

P E

C

S

Y S

T

IM

E

U S

E R

N A

M E

Y

M B

O L

D E S

C R

IP

T

IO

N

F

M E

C

D E S

IG

N

D A T E

S O

L

IC

IT

A T

C O

N T R

A

C A T E

G O

R Y

C

O D

E

P L O

T

S

C A L E

B Y

D A T E

PLATE

REFERENCE

NUMBER

S

IZ

E

D

"X

F

M E

V

IE

W

C H

IE

F D

E S

C T

IO

N

J D

H

D G

N S

P E

C

S

Y S

T

IM

E

U S

E R

N A

M E

A

R a n d a ll C

M il le r, P .E

US ARMY CORPS

OF ENGINEERS

SAVANNAH

U S

A R

M Y

E

N G

IN

E

T R

IC

T

C O

R

E

N G

IN

E E

R S

S A

V A

N N

T R

IC

T

C W

K

W

H N B

IS

IN

G

S A

V A

N N

R B

O R

G E

O R

G

IA

J U

L

O

E

S E

C T

IO

A

T

O

S-07

EXISTING GRADE PROPOSED DIKE FA = FILL AREA FV = FILL VOLUME

E L

E V

A T I

O N

0 20 40 60 80 100-20-40-60-80-100

8+00

E L

E V

A T I

O N

0 20 40 60 80 100-20-40-60-80-100

9+00

E L

E V

A T I

O N

0 20 40 60 80 100-20-40-60-80-100

10+00

E L

E V

A T I

O N

0 20 40 60 80 100-20-40-60-80-100

11+00

E L

E V

A T I

O N

0 20 40 60 80 100-20-40-60-80-100

12+00

E L

E V

A T I

O N

0 20 40 60 80 100-20-40-60-80-100

13+00

E L

E V

A T I

O N

0 20 40 60 80 100-20-40-60-80-100

14+00

E L

E V

A T I

O N

0 20 40 60 80 100-20-40-60-80-100

15+00

FA 14.1 FV 26.9

FA 4.9 FV 35.2

FA 50.7 FV 103.0

FA 174.3 FV 416.7

FA 278.1 FV 837.7

FA 302.0 FV 1074.2

FA 234.6 FV 993.7

FA 248.1 FV 893.9

D

2 3

C

4 5

$$USERNAME$$

D G

N S

P E

C

S

Y S

T

IM

E

U S

E R

N A

M E

Y

M B

O L

D E S

C R

IP

T

IO

N

F

M E

C

D E S

IG

N

D A T E

S O

L

IC

IT

A T

C O

N T R

A

C A T E

G O

R Y

C

O D

E

P L O

T

S

C A L E

B Y

D A T E

PLATE

REFERENCE

NUMBER

S

IZ

E

D

"X

F

M E

V

IE

W

C H

IE

F D

E S

C T

IO

N

J D

H

D G

N S

P E

C

S

Y S

T

IM

E

U S

E R

N A

M E

A

R a n d a ll C

M il le r, P .E

US ARMY CORPS

OF ENGINEERS

SAVANNAH

U S

A R

M Y

E

N G

IN

E

T R

IC

T

C O

R

E

N G

IN

E E

R S

S A

V A

N N

T R

IC

T

C W

K

W

H N B

IS

IN

G

S A

V A

N N

R B

O R

G E

O R

G

IA

J U

L

O

E

S E

C T

IO

A

T

O

S-08

EXISTING GRADE PROPOSED DIKE FA = FILL AREA FV = FILL VOLUME

E L

E V

A T I

O N

0 20 40 60 80 100-20-40-60-80-100

16+00

E L

E V

A T I

O N

0 20 40 60 80 100-20-40-60-80-100

17+00

E L

E V

A T I

O N

0 20 40 60 80 100-20-40-60-80-100

18+00

E L

E V

A T I

O N

0 20 40 60 80 100-20-40-60-80-100

19+00

E L

E V

A T I

O N

0 20 40 60 80 100-20-40-60-80-100

20+00

E L

E V

A T I

O N

0 20 40 60 80 100-20-40-60-80-100

21+00

E L

E V

A T I

O N

0 20 40 60 80 100-20-40-60-80-100

22+00

E L

E V

A T I

O N

0 20 40 60 80 100-20-40-60-80-100

23+00

FA 401.5 FV 1203.1

FA 473.9 FV 1621.1

FA 504.0 FV 1810.9

FA 504.4 FV 1867.5

FA 540.3 FV 1934.7

FA 583.2 FV 2080.6

FA 603.3 FV 2197.3

FA 625.6 FV 2275.9

D

2 3

C

4 5

$$USERNAME$$

D G

N S

P E

C

S

Y S

T

IM

E

U S

E R

N A

M E

Y

M B

O L

D E S

C R

IP

T

IO

N

F

M E

C

D E S

IG

N

D A T E

S O

L

IC

IT

A T

C O

N T R

A

C A T E

G O

R Y

C

O D

E

P L O

T

S

C A L E

B Y

D A T E

PLATE

REFERENCE

NUMBER

S

IZ

E

D

"X

F

M E

V

IE

W

C H

IE

F D

E S

C T

IO

N

J D

H

D G

N S

P E

C

S

Y S

T

IM

E

U S

E R

N A

M E

A

R a n d a ll C

M il le r, P .E

US ARMY CORPS

OF ENGINEERS

SAVANNAH

U S

A R

M Y

E

N G

IN

E

T R

IC

T

C O

R

E

N G

IN

E E

R S

S A

V A

N N

T R

IC

T

C W

K

W

H N B

IS

IN

G

S A

V A

N N

R B

O R

G E

O R

G

IA

J U

L

O

E

S E

C T

IO

A

T

O

1+

S-09

EXISTING GRADE PROPOSED DIKE FA = FILL AREA FV = FILL VOLUME

E L

E V

A T I

O N

0 20 40 60 80 100-20-40-60-80-100

24+00

E L

E V

A T I

O N

0 20 40 60 80 100-20-40-60-80-100

25+00

E L

E V

A T I

O N

0 20 40 60 80 100-20-40-60-80-100

26+00

E L

E V

A T I

O N

0 20 40 60 80 100-20-40-60-80-100

27+00

E L

E V

A T I

O N

0 20 40 60 80 100-20-40-60-80-100

28+00

E L

E V

A T I

O N

0 20 40 60 80 100-20-40-60-80-100

29+00

E L

E V

A T I

O N

0 20 40 60 80 100-20-40-60-80-100

30+00

E L

E V

A T I

O N

0 20 40 60 80 100-20-40-60-80-100

31+00

FA 683.1 FV 2423.7

FA 735.2 FV 2626.6

FA 789.0 FV 2822.6

FA 782.9 FV 2910.9

FA 800.8 FV 2932.7

FA 804.4 FV 2972.5

FA 775.9 FV 2926.3

FA 721.0 FV 2771.9

D

2 3

C

4 5

$$USERNAME$$

D G

N S

P E

C

S

Y S

T

IM

E

U S

E R

N A

M E

Y

M B

O L

D E S

C R

IP

T

IO

N

F

M E

C

D E S

IG

N

D A T E

S O

L

IC

IT

A T

C O

N T R

A

C A T E

G O

R Y

C

O D

E

P L O

T

S

C A L E

B Y

D A T E

PLATE

REFERENCE

NUMBER

S

IZ

E

D

"X

F

M E

V

IE

W

C H

IE

F D

E S

C T

IO

N

J D

H

D G

N S

P E

C

S

Y S

T

IM

E

U S

E R

N A

M E

A

R a n d a ll C

M il le r, P .E

US ARMY CORPS

OF ENGINEERS

SAVANNAH

U S

A R

M Y

E

N G

IN

E

T R

IC

T

C O

R

E

N G

IN

E E

R S

S A

V A

N N

T R

IC

T

C W

K

W

H N B

IS

IN

G

S A

V A

N N

R B

O R

G E

O R

G

IA

J U

L

O

E

S E

C T

IO

A

T

O

S-10

EXISTING GRADE PROPOSED DIKE FA = FILL AREA FV = FILL VOLUME

E L

E V

A T I

O N

0 20 40 60 80 100-20-40-60-80-100

32+00

E L

E V

A T I

O N

0 20 40 60 80 100-20-40-60-80-100

33+00

E L

E V

A T I

O N

0 20 40 60 80 100-20-40-60-80-100

34+00

E L

E V

A T I

O N

0 20 40 60 80 100-20-40-60-80-100

35+00

E L

E V

A T I

O N

0 20 40 60 80 100-20-40-60-80-100

36+00

E L

E V

A T I

O N

0 20 40 60 80 100-20-40-60-80-100

37+00

E L

E V

A T I

O N

0 20 40 60 80 100-20-40-60-80-100

38+00

E L

E V

A T I

O N

0 20 40 60 80 100-20-40-60-80-100

39+00

FA 624.8 FV 2492.1

FA 567.4 FV 2207.7

FA 514.4 FV 2003.2

FA 533.4 FV 1940.3

FA 550.0 FV 2006.3

FA 605.9 FV 2140.5

FA 653.7 FV 2332.5

FA 671.4 FV 2453.8

D

2 3

C

4 5

$$USERNAME$$

D G

N S

P E

C

S

Y S

T

IM

E

U S

E R

N A

M E

Y

M B

O L

D E S

C R

IP

T

IO

N

F

M E

C

D E S

IG

N

D A T E

S O

L

IC

IT

A T

C O

N T R

A

C A T E

G O

R Y

C

O D

E

P L O

T

S

C A L E

B Y

D A T E

PLATE

REFERENCE

NUMBER

S

IZ

E

D

"X

F

M E

V

IE

W

C H

IE

F D

E S

C T

IO

N

J D

H

D G

N S

P E

C

S

Y S

T

IM

E

U S

E R

N A

M E

A

R a n d a ll C

M il le r, P .E

US ARMY CORPS

OF ENGINEERS

SAVANNAH

U S

A R

M Y

E

N G

IN

E

T R

IC

T

C O

R

E

N G

IN

E E

R S

S A

V A

N N

T R

IC

T

C W

K

W

H N B

IS

IN

G

S A

V A

N N

R B

O R

G E

O R

G

IA

J U

L

O

E

S E

C T

IO

A

T

O

S-11

GEOTEXTILE 80’

EXISTING GRADE PROPOSED DIKE FA = FILL AREA FV = FILL VOLUME

GEOTEXTILE FABRIC

GEOTEXTILE 80’

GEOTEXTILE 80’

GEOTEXTILE 80’

GEOTEXTILE 80’GEOTEXTILE 80’

GEOTEXTILE 80’

E L

E V

A T I

O N

0 20 40 60 80 100-20-40-60-80-100

40+00

E L

E V

A T I

O N

0 20 40 60 80 100-20-40-60-80-100

41+00

E L

E V

A T I

O N

0 20 40 60 80 100-20-40-60-80-100

42+00

E L

E V

A T I

O N

0 20 40 60 80 100-20-40-60-80-100

43+00

E L

E V

A T I

O N

0 20 40 60 80 100-20-40-60-80-100

44+00

E L

E V

A T I

O N

0 20 40 60 80 100-20-40-60-80-100

45+00

E L

E V

A T I

O N

0 20 40 60 80 100-20-40-60-80-100

46+00

E L

E V

A T I

O N

0 20 40 60 80 100-20-40-60-80-100

47+00

FA 560.5 FV 2281.2

FA 673.5 FV 2285.2

FA 739.1 FV 2616.1

FA 871.9 FV 2983.5

FA 911.2 FV 3302.1

FA 750.3 FV 3076.9

FA 452.5 FV 2227.4

FA 572.9 FV 1898.9

GEOTEXTILE 80’

D

2 3

C

4 5

$$USERNAME$$

D G

N S

P E

C

S

Y S

T

IM

E

U S

E R

N A

M E

Y

M B

O L

D E S

C R

IP

T

IO

N

F

M E

C

D E S

IG

N

D A T E

S O

L

IC

IT

A T

C O

N T R

A

C A T E

G O

R Y

C

O D

E

P L O

T

S

C A L E

B Y

D A T E

PLATE

REFERENCE

NUMBER

S

IZ

E

D

"X

F

M E

V

IE

W

C H

IE

F D

E S

C T

IO

N

J D

H

D G

N S

P E

C

S

Y S

T

IM

E

U S

E R

N A

M E

A

R a n d a ll C

M il le r, P .E

US ARMY CORPS

OF ENGINEERS

SAVANNAH

U S

A R

M Y

E

N G

IN

E

T R

IC

T

C O

R

E

N G

IN

E E

R S

S A

V A

N N

T R

IC

T

C W

K

W

H N B

IS

IN

G

S A

V A

N N

R B

O R

G E

O R

G

IA

J U

L

O

E

S E

C T

IO

A

T

O

S-12

EXISTING GRADE PROPOSED DIKE FA = FILL AREA FV = FILL VOLUME

GEOTEXTILE FABRIC

GEOTEXTILE 80’

GEOTEXTILE 80’

GEOTEXTILE 80’

GEOTEXTILE 80’

E L

E V

A T I

O N

0 20 40 60 80 100-20-40-60-80-100

48+00

E L

E V

A T I

O N

0 20 40 60 80 100-20-40-60-80-100

49+00

E L

E V

A T I

O N

0 20 40 60 80 100-20-40-60-80-100

50+00

E L

E V

A T I

O N

0 20 40 60 80 100-20-40-60-80-100

51+00

E L

E V

A T I

O N

0 20 40 60 80 100-20-40-60-80-100

52+00

E L

E V

A T I

O N

0 20 40 60 80 100-20-40-60-80-100

53+00

E L

E V

A T I

O N

0 20 40 60 80 100-20-40-60-80-100

54+00

E L

E V

A T I

O N

0 20 40 60 80 100-20-40-60-80-100

55+00

FA 813.8 FV 2568.0

FA 987.8 FV 3336.3

FA 988.6 FV 3659.9

FA 938.6 FV 3568.8

FA 393.3 FV 2466.4

FA 631.0 FV 1896.8

FA 590.6 FV 2262.2

FA 590.0 FV 2186.3

D

2 3

C

4 5

$$USERNAME$$

D G

N S

P E

C

S

Y S

T

IM

E

U S

E R

N A

M E

Y

M B

O L

D E S

C R

IP

T

IO

N

F

M E

C

D E S

IG

N

D A T E

S O

L

IC

IT

A T

C O

N T R

A

C A T E

G O

R Y

C

O D

E

P L O

T

S

C A L E

B Y

D A T E

PLATE

REFERENCE

NUMBER

S

IZ

E

D

"X

F

M E

V

IE

W

C H

IE

F D

E S

C T

IO

N

J D

H

D G

N S

P E

C

S

Y S

T

IM

E

U S

E R

N A

M E

A

R a n d a ll C

M il le r, P .E

US ARMY CORPS

OF ENGINEERS

SAVANNAH

U S

A R

M Y

E

N G

IN

E

T R

IC

T

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .