W81LJ892301531

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Solicitation Number W912HN-09-B-0019, Entitled Breakw ater Repairs, Atlantic Harbor of Refuge, Carteret County, North Carolina is amended as follow s:

A. The Time and Date for Bid Opening remains unchanged.

B. See Summary of Changes.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 09-Mar-2010

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912HN-09-B-0019

X 9B. DATED (SEE ITEM 11)

11-Feb-2010

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 2 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

09-Mar-2010

CODE

USACE CONTRACTING, WILMINGTON DISTRICT

ATTN: BRUCE HELMS

69 DARLINGTON AVE

WILMINGTON NC 28403-1343

W912HN 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912HN-09-B-0019

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00010 - SOLICITATION CONTRACT FORM

The Issued By organization has changed from

USACE CONTRACTING, WILMINGTON DISTRICT

ATTN: BRUCE HELMS

69 DARLINGTON AVE

WILMINGTON NC 28403-1343

to

U.S. ARMY ENGINEER DISTRICT SAVANNAH

WILMINGTON OFFICE

69 DARLINGTON AVENUE

WILMINGTON NC 28403

SECTION 01 33 00 – SUBMITTAL PROCEDURES

Delete existing Attachment 1 ENG FORM 4288 Page 1 and Page 2 in their entirety and replace with revised enclosed Pages.

SECTION 31 01 00 – EMBANKMENT

Delete existing Page 8 in its entirety and replace with revised enclosed Page.

SECTION 32 92 19 – SEEDING

Delete existing Page 1 through Page 13 in their entirety and replace with revised enclosed Page 1 through Page 16.

NOTE:

Text that is added or revised by this amendment is replaced in its entirety and underlined or highlighted in yellow and/or printed in bold and/or stamped appropriately.

The text changes may have necessitated reformatting of subsequent text or pages. If this is the case, those pages have also been issued as amended pages but are not underlined or bold text.

DRAWINGS

Delete existing Plate P-5 in its entirety and replace with revised enclosed Plate.

-- End of Summary of Changes --

Encls As stated

SUBMITTAL REGISTER (ER 415-1-10)

TITLE AND LOCATION DATE

CONTRACTOR CONTRACT NUMBER

ACTIVITY

No.

TRANS-

MITTAL

No.

ITEM

No.

SPEC

PARAGRAPH

No.

DESCRIPTION OF

SUBMITTAL

TYPE OF SUBMITTAL

CLASSI-

FICATION

FIO

GA, DA

or CR

REVIEWER

OFFICE / NAME

CONTRACTOR

SCHEDULE DATES

CONTRACTOR

ACTION

GOVERNMENT

ACTION

SUBMIT

NEEDED

BY

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

CODE

CORPS

RECEIVED

DATE

CODE

CORPS

RETURNED

DATE

WWCPB-Atlantic Breakwater Repair

W912HN-09-B-0019 NA

09 Mar 2010

SORT : SECTION & ITEMRANGE : ALL

SECTION - 01 10 00.10 38 SUPPLEMENTARY SPECIAL CONTRACT REQUIREMENTS

1 01 10 00.10 38 1.12 List of Subcontractors PRECON SUBMTL FIO

2 01 10 00.10 38 1.2 Progress Chart PRECON SUBMTL GA

3 01 10 00.10 38 1.12 Quality Control Plan PRECON SUBMTL GA

4 01 10 00.10 38 1.12 Certificate of Insurance CERTIFICATES FIO

5 01 10 00.10 38 1.12 Completion of Corps CQC Course CERTIFICATES FIO

6 01 10 00.10 38 1.12 Letter Appointing Superintendent CERTIFICATES FIO

7 01 10 00.10 38 1.11 Testing Laboratory CERTIFICATES GA

SECTION - 01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS

1 01 35 26 1.6 Accident Prevention Plan (APP) PRECON SUBMTL GA

2 01 35 26 1.5.2.3 Crane Operators PRECON SUBMTL GA

3 01 35 26 1.5.1.1 Site Safety and Health Officer PRECON SUBMTL GA

4 01 35 26 1.5.2.1 Site Safety and Health Officer PRECON SUBMTL GA

5 01 35 26 3.1.2 Safe Access PRECON SUBMTL GA

6 01 35 26 1.12 Accident Notification and Reporting TEST REPORTS FIO

7 01 35 26 1.12.2 Accident Investigation Reports TEST REPORTS FIO

8 01 35 26 1.12.3 Monthly Exposure Reports TEST REPORTS GA

9 01 35 26 1.7 Activity Hazard Analysis (AHA) TEST REPORTS GA

10 01 35 26 1.6.1 Crane Critical Lift Plan TEST REPORTS GA

11 01 35 26 1.4 Regulatory TEST REPORTS GA

12 01 35 26 1.2 License Certificates CERTIFICATES FIO

13 01 35 26 1.6.1 Confined Space Entry Plan CERTIFICATES FIO

14 01 35 26 1.12.6 Third Party Certification of Barge-Mount CERTIFICATES FIO

15 01 35 26 1.12.5 Certificate of Compliance CERTIFICATES FIO

SECTION - 01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS

1 01 50 00 1.3 Construction Site Plan PRECON SUBMTL GA

SECTION - 01 57 20.00 10 ENVIRONMENTAL PROTECTION

1 01 57 20.00 10 1.8 Environmental Protection Plan PRECON SUBMTL GA

SECTION - 01 57 23 TEMPORARY STORM WATER POLLUTION CONTROL

1 01 57 23 1.3.2 Storm Water Pollution Prevention Plan PRECON SUBMTL GA

2 01 57 23 1.3.2 Storm Water Notice of Intent PRECON SUBMTL GA

3 01 57 23 1.3 Erosion and Sediment Controls TEST REPORTS GA

4 01 57 23 2.1.3 Mill Certificate or Affidavit CERTIFICATES GA

SECTION - 31 05 19 GEOTEXTILE

1 31 05 19 1.3 Shop Drawings SHOP DRAWINGS GA

SUBMITTAL REGISTER (ER 415-1-10)

TITLE AND LOCATION DATE

CONTRACTOR CONTRACT NUMBER

ACTIVITY

No.

TRANS-

MITTAL

No.

ITEM

No.

SPEC

PARAGRAPH

No.

DESCRIPTION OF

SUBMITTAL

TYPE OF SUBMITTAL

CLASSI-

FICATION

FIO

GA, DA

or CR

REVIEWER

OFFICE / NAME

CONTRACTOR

SCHEDULE DATES

CONTRACTOR

ACTION

GOVERNMENT

ACTION

SUBMIT

NEEDED

BY

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

CODE

CORPS

RECEIVED

DATE

CODE

CORPS

RETURNED

DATE

WWCPB-Atlantic Breakwater Repair

W912HN-09-B-0019 NA

09 Mar 2010

SORT : SECTION & ITEMRANGE : ALL

2 31 05 19 2.1.2 Thread PRODUCT DATA FIO

3 31 05 19 2.2 Manufacturing Quality Control Sampling PRODUCT DATA FIO

4 31 05 19 1.3 Mftr's Product Literature and Specs PRODUCT DATA FIO

5 31 05 19 1.3 Mftr's Quality Control Test Results TEST REPORTS FIO

6 31 05 19 3.2 Seams TEST REPORTS FIO

7 31 05 19 2.1.1 Geotextile CERTIFICATES FIO

SECTION - 31 05 22 GEOTEXTILES USED AS FILTERS

1 31 05 22 2.1.1 Geotextile CERTIFICATES FIO

SECTION - 32 22 13 STONE PROTECTION

1 32 22 13 2.1.4 Identification of Stone Sources CERTIFICATES GA

SECTION - 32 92 19 SEEDING

1 32 92 19 2.6.3 Wood Cellulose Fiber Mulch PRODUCT DATA FIO

2 32 92 19 2.5 Fertilizer PRODUCT DATA FIO

3 32 92 19 3.5.3 Seed Establishment Period PRODUCT DATA FIO

4 32 92 19 2.2 Topsoil Composition Tests TEST REPORTS FIO

5 32 92 19 2.1 Seed CERTIFICATES FIO

SECTION - 35 20 23 DREDGING

1 35 20 23 3.6.4 Dredged Material Disposal Plan PRECON SUBMTL GA

SECTION - 35 20 24.38 TURBIDITY CURTAIN

1 35 20 24.38 1.4 Work Sequence Schedule PRECON SUBMTL FIO

2 35 20 24.38 1.1.1 Equipment PRODUCT DATA FIO

3 35 20 24.38 1.6 Materials SAMPLES FIO

4 35 20 24.38 1.5.1 Installer's Qualifications CERTIFICATES FIO

5 35 20 24.38 1.4 Maintenance Instructions O&M DATA FIO

K7EPEOAF

Highlight

K7EPEOAF

Highlight

K7EPEOAF

Highlight

Breakwater Repairs W912HN-09-B-0019 Atlantic Harbor of Refuge, Carteret County, NC approved power hand tampers to compact material in areas where it is impracticable to use approved equipment.

3.5.2 Degree of Compaction

The degree of compaction for the breakwater repair area embankment, DA 26 Borrow Area dike embankment repairs, and aggregate base course shall be the resulting condition after 3 complete passes of the equipment specified in subparagraph Equipment for each lift. Heavy equipment shall not operate within 10 feet of the sandbags to prevent damage. Sandbags damaged by the use of heavy equipment shall be replaced by the Contractor at no additional cost to the Government.

3.6 TESTING

The borrow material shall be tested as stated in ASTM D 422, ASTM D 2487, and ASTM D 4318. The rate of testing shall be 1 test of each type for every 3,000 cubic yards of material excavated and at every change of material type.

3.7 REMOVAL OF TEMPORARY ACCESS ROAD

The Contractor shall remove the construction fencing, geotextile and the aggregate base course installed for the temporary access road. The Contractor shall provide a gentle walking slope from the elevation behind the limestone toe protection to the elevation behind the new sandbags place along the existing sandbag alignment. The Contractor shall grade, seed with approved seed and mulch the temporary access road to the western extent of the limestone toe protection.

3.8 SMITH PROPERTY BULKHEAD

The Contractor shall repair any de-stabilization or rupture of the Smith Property Bulkhead along the length of the temporary access road, caused by the Contractor's activities. The Contractor shall temporarily remove the rock and geotextile fabric along the damaged area, backfill and compact satisfactory material, and install the geotextile and rock removed to the satisfaction of the Contracting Officer and/or his or her designated representative.

-- End of Section --

SECTION 31 01 00 Page 8 (Revised by Amendment No. 0002)

SECTION TABLE OF CONTENTS

DIVISION 32 - EXTERIOR IMPROVEMENTS

SECTION 32 92 19

SEEDING

PART 1 GENERAL

1.1 REFERENCES

1.2 DEFINITIONS

1.2.1 Stand of Grass

1.3 SUBMITTALS

1.4 DELIVERY, INSPECTION, STORAGE, AND HANDLING

1.4.1 Delivery

1.4.1.1 Seed Protection

1.4.1.2 Fertilizer and Lime Delivery

1.4.2 Inspection

1.4.3 Storage

1.4.3.1 Seed, Fertilizer and Lime Storage

1.4.3.2 Handling

1.5 RESTRICTIONS

1.5.1 Restrictions

1.6 TIME LIMITATIONS

1.6.1 Seeding

1.6.2 Hydroseeding

1.7 MEASUREMENT AND PAYMENT

1.7.1 Seeding and Mulching

1.7.2 Erosion Control Matting

PART 2 PRODUCTS

2.1 SEED

2.1.1 Classification

2.1.2 Permanent Seed Species and Mixtures

2.1.3 Temporary Seed Species

2.1.4 Quality

2.1.5 Seed Mixing

2.1.6 Substitutions

2.2 TOPSOIL

2.2.1 On-Site Topsoil

2.2.2 Off-Site Topsoil

2.2.3 Composition

2.3 SOIL CONDITIONERS

2.3.1 Lime

2.3.2 Aluminum Sulfate

2.3.3 Sulfur

2.3.4 Iron

2.3.5 Peat

2.3.6 Sand

2.3.7 Perlite

2.3.8 Composted Derivatives

2.3.8.1 Particle Size

SECTION 32 92 19 Page 1

2.3.8.2 Nitrogen Content

2.3.9 Gypsum

2.3.10 Calcined Clay

2.4 VERMICULITE

2.5 FERTILIZER

2.5.1 Granular Fertilizer

2.5.2 Hydroseeding Fertilizer

2.6 MULCH

2.6.1 Straw

2.6.2 Hay

2.6.3 Wood Cellulose Fiber Mulch

2.7 WATER

2.8 EROSION CONTROL MATERIALS

2.8.1 Erosion Control Matting

2.8.1.1 Erosion Control Matting Material

2.8.1.2 Erosion Control Matting Anchors

PART 3 EXECUTION

3.1 PREPARATION

3.1.1 Extent of Work

3.1.1.1 Lime Application Rates

3.1.1.2 Fertilizer Application Rates

3.2 SEEDING

3.2.1 Seed Application Times, Conditions, and Equipment Calibration

3.2.1.1 Seeding Times

3.2.1.2 Tillage

3.2.2 Finished Grading

3.2.2 Preparation

3.2.3 Seed Area Debris

3.2.4 Protection

3.2.4.1 Seeding Conditions

3.2.4.2 Equipment Calibration

3.2.5 Seed Application Method

3.2.5.1 Broadcast and Drop Seeding

3.2.5.2 Drill Seeding

3.2.5.3 Hydroseeding

3.2.6 Mulching

3.2.6.1 Hay or Straw Mulch

3.2.6.2 Mechanical Anchor

3.2.6.3 Wood Cellulose Fiber

3.2.7 Rolling

3.2.8 Erosion Control Matting

3.2.9 Temporary Seeding

3.2.9.1 Lime and Fertilizer

3.2.9.2 Remaining Lime and Fertilizer

3.2.10 Watering

3.3 PROTECTION OF INSTALLED AREAS

3.4 QUANTITY CHECK

3.5 RESTORATION AND CLEAN UP

3.5.1 Restoration

3.5.2 Clean Up

3.5.3 SEED ESTABLISHMENT PERIOD

3.5.3.1 Commencement

3.5.4 Maintenance During Establishment Period

3.5.4.1 Post-Fertilization

3.5.4.2 Repair or Reinstall

3.5.5 Maintenance of Matting

3.5.6 FINAL ACCEPTANCE

SECTION 32 92 19 Page 2

3.5.6.1 Preliminary Inspection

3.5.6.2 Final Inspection

-- End of Section Table of Contents --

SECTION 32 92 19 Page 3

SECTION 32 92 19

SEEDING

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

ASTM INTERNATIONAL (ASTM)

ASTM C 602 (2006) Agricultural Liming Materials

ASTM D 4427 (1992; R 2002e1) Peat Samples by Laboratory Testing

ASTM D 4972 (2001) pH of Soils

U.S. DEPARTMENT OF AGRICULTURE (USDA)

AMS Seed Act (1940; R 1988; R 1998) Federal Seed Act

DOA SSIR 42 (1996) Soil Survey Investigation Report No. 42, Soil Survey Laboratory Methods Manual, Version 3.0

1.2 DEFINITIONS

1.2.1 Stand of Grass

A satisfactory stand of grass plants (minimum of 1 inch high) for a seeded area shall be a minimum 10 grass plants per square foot. Bare spots shall be a maximum 1 foot square. The total bare spots shall be a maximum 2 percent of the total seeded area. Grass plants shall be evaluated for species and health when the grass plants are minimum 1 inch high.

1.3 SUBMITTALS

Government approval is required for submittals with a "G, A" designation;

submittals not having a "G, A" designation are for information only. When used, a designation following the "G, A" designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-03 Product Data

Wood cellulose fiber mulch

Fertilizer

Include physical characteristics, and recommendations.

Seed Establishment Period

SECTION 32 92 19 Page 4

Calendar time period for the seed establishment period. When there is more than one seed establishment period, the boundaries of the seeded area covered for each period shall be described.

SD-06 Test Reports

Topsoil composition tests (reports and recommendations)

SD-07 Certificates

State approval for seed

Prior to the delivery of seed, certificates of compliance attesting that seed meet the specified requirements. Certified copies of the seed certificates shall include the following:

Seed, classification, botanical name, common name, percent pure live seed, minimum percent germination and hard seed, maximum percent weed seed contents, and date tested.

1.4 DELIVERY, INSPECTION, STORAGE, AND HANDLING

1.4.1 Delivery

1.4.1.1 Seed Protection

Protect from drying out and from contamination during delivery, on-site storage, and handling.

1.4.1.2 Fertilizer and Lime Delivery

Deliver to the site in original, unopened containers bearing manufacturer's chemical analysis, name, trade name, trademark, and indication of conformance to state and federal laws. Instead of containers, fertilizer and lime may be furnished in bulk with certificate indicating the above information.

1.4.2 Inspection

Seed shall be inspected upon arrival at the job site for conformity to species and quality. Seed that is wet, moldy, or bears a test date five months or older, shall be rejected. Other materials shall be inspected for compliance with specified requirements. Open soil amendment containers or wet soil amendments shall be rejected. Unacceptable materials shall be removed from the job site.

1.4.3 Storage

1.4.3.1 Seed, Fertilizer and Lime Storage

Store in cool, dry locations away from contaminants.

1.4.3.2 Handling

Do not drop or dump materials from vehicles.

SECTION 32 92 19 Page 5

1.5 RESTRICTIONS

1.5.1 Restrictions

Do not plant when the ground is frozen, snow covered, muddy, or when air temperature exceeds 90 degrees Fahrenheit.

1.6 TIME LIMITATIONS

1.6.1 Seeding

Apply seed within twenty four hours after seed bed preparation.

1.6.2 Hydroseeding

Hydroseeding time limitations for holding seed in the slurry shall be a maximum 24 hours.

1.7 MEASUREMENT AND PAYMENT

1.7.1 Seeding and Mulching

There will be no direct measurement of work performed in connection with seeding and mulching. The appropriate contract lump sum prices for "DA 26 BORROW AREA REPAIRS", "BREAKWATER REPAIR AREA SEEDING" and "DREDGED MATERIAL DISPOSAL AREA SEEDING" as listed in the BIDDING SCHEDULE shall constitute full compensation for furnishing all labor, materials, plant, equipment, tools, supplies, and incidentals necessary to complete the work in accordance with this section.

1.7.2 Erosion Control Matting

There will be no direct measurement of work performed in connection with the installation of erosion control matting. The contract lump sum price for "DA 26 BORROW AREA REPAIRS" as listed in the BIDDING SCHEDULE shall constitute full compensation for furnishing all labor, materials, plant, equipment, tools, supplies, and incidentals necessary to complete the work in accordance with this section.

PART 2 PRODUCTS

2.1 SEED

2.1.1 Classification

Provide State-approved seed of the latest season's crop delivered in original sealed packages, bearing producer's guaranteed analysis for percentages of mixtures, purity, germination, weedseed content, and inert material. Label in conformance with AMS Seed Act and applicable state seed laws. Wet, moldy, or otherwise damaged seed will be rejected. Field mixes will be acceptable when field mix is performed on site in the presence of the Contracting Officer and/or his or her designated representative.

2.1.2 Permanent Seed Species and Mixtures

Permanent seed species and mixtures shall be as follows:

SECTION 32 92 19 Page 6

Planting Period Common Name Minimum LBS Per Acre

1 Feb - 30 Apr Tall Fescue 50 Pensacola Bahiagrass 10 Common or Kobe Lespedza 25 Spring Oats 32 Weeping Lovegrass 5

1 May - 31 Aug Common or Kobe Lespedeza 25 Browntop Proso or German (Foxtail) Millet 30 Weeping Lovegrass 5

1 Sep - 31 Jan Tall Fescue 50 Common or Kobe Lespedeza 40 Rye Grain 56

Additional permanent seed species shall be placed as follows:

Planting Period Common Name Minimum LBS Per Acre

1 Sep-28 Feb Common Bermudagrass 20 (unhulled)

1 Mar-31 Jul Common Bermudagrass 12 (hulled)

2.1.3 Temporary Seed Species

Temporary seed species for surface erosion control or over seeding shall be as follows:

Planting Period Common Name Minimum LBS Per Acre

15 Mar - 14 Sep Browntop, Proso or German (Foxtail) Millet 50

15 Sep - 14 Jan Rye Grain 112

15 Jan - 14 Mar Spring Oats 128

2.1.4 Quality

Weed seed shall be a maximum 1 percent by weight of the total mixture.

Wet, moldy, or otherwise damaged seed shall be rejected.

2.1.5 Seed Mixing

The mixing of seed may be done by the seed supplier prior to delivery, or on site in the presence of the Contracting Officer and/or his or her designated representative.

SECTION 32 92 19 Page 7

2.1.6 Substitutions

Substitutions will not be allowed without written request and approval from the Contracting Officer and/or his or her designated representative.

2.2 TOPSOIL

2.2.1 On-Site Topsoil

Surface soil stripped and stockpiled on site and modified as necessary to meet the requirements specified for topsoil in subparagraph entitled "Composition." When available topsoil shall be existing surface soil stripped and stockpiled on-site in accordance with Section 31 01 00

EMBANKMENT.

2.2.2 Off-Site Topsoil

Conform to requirements specified in subparagraph entitled "Composition."

Additional topsoil shall be furnished by the Contractor.

2.2.3 Composition

Containing from 5 to 10 percent organic matter as determined by the topsoil composition tests of the Organic Carbon, 6A, Chemical Analysis Method described in DOA SSIR 42. Maximum particle size, 3/4 inch, with maximum 3 percent retained on 1/4 inch screen. The pH shall be tested in accordance with ASTM D 4972. Topsoil shall be free of sticks, stones, roots, and other debris and objectionable materials. Other components shall conform to the following limits:

Silt 25-50 percent Clay 10-30 percent Sand 20-35 percent pH 5.5 to 7.0 Soluble Salts 600 ppm maximum

2.3 SOIL CONDITIONERS

Add conditioners to topsoil as required to bring into compliance with "composition" standard for topsoil as specified herein.

2.3.1 Lime

Commercial grade limestone containing a calcium carbonate equivalent (C.C.E.) as specified in ASTM C 602 of not less than 80 percent.

2.3.2 Aluminum Sulfate

Commercial grade.

2.3.3 Sulfur

100 percent elemental.

2.3.4 Iron

100 percent elemental.

SECTION 32 92 19 Page 8

2.3.5 Peat

Natural product of peat moss derived from a freshwater site and conforming to ASTM D 4427. Shred and granulate peat to pass a 1/2 inch mesh screen and condition in storage pile for minimum 6 months after excavation.

2.3.6 Sand

Clean and free of materials harmful to plants.

2.3.7 Perlite

Horticultural grade.

2.3.8 Composted Derivatives

Ground bark, nitrolized sawdust, humus or other green wood waste material free of stones, sticks, and soil stabilized with nitrogen and having the following properties:

2.3.8.1 Particle Size

Minimum percent by weight passing:

No. 4 mesh screen 95 No. 8 mesh screen 80

2.3.8.2 Nitrogen Content

Minimum percent based on dry weight:

Fir Sawdust 0.7 Fir or Pine Bark 1.0

2.3.9 Gypsum

Coarsely ground gypsum comprised of calcium sulfate dehydrate 61 percent, calcium 22 percent, sulfur 17 percent; minimum 96 percent passing through 20 mesh screen, 100 percent passing thru 16 mesh screen.

2.3.10 Calcined Clay

Calcined clay shall be granular particles produced from montmorillonite clay calcined to a minimum temperature of 1200 degrees F. Gradation: A minimum 90 percent shall pass a No. 8 sieve; a minimum 99 percent shall be retained on a No. 60 sieve; and a maximum 2 percent shall pass a No. 100 sieve. Bulk density: A maximum 40 pounds per cubic foot.

2.4 VERMICULITE

Vermiculite shall not be used.

2.5 FERTILIZER

Fertilizer shall be commercial grade, free flowing, uniformly composed.

Fertilizer shall be balanced with the inclusion of trace minerals and micro nutrients.

SECTION 32 92 19 Page 9

2.5.1 Granular Fertilizer

Synthetic, granular controlled release fertilizer containing the following minimum percentages, by weight, of plant food nutrients:

10 percent available nitrogen 20 percent available phosphorus 20 percent available potassium

2.5.2 Hydroseeding Fertilizer

Controlled release fertilizer, to use with hydroseeding and composed of pills coated with plastic resin to provide a continuous release of nutrients for at least 6 months and containing the following minimum percentages, by weight, of plant food nutrients.

10 percent available nitrogen 20 percent available phosphorus 20 percent available potassium

2.6 MULCH

Mulch shall be free from noxious weeds, mold, and other deleterious materials. Mulch materials shall be native to the region.

2.6.1 Straw

Stalks from oats, wheat, rye, barley, or rice. Furnish in air-dry condition and of proper consistency for placing with commercial mulch blowing equipment. Straw shall contain no fertile seed.

2.6.2 Hay

Hay shall be native hay, sudan-grass hay, broomsedge hay, or other herbaceous mowing. Air-dry condition and of proper consistency for placing with commercial mulch blowing equipment. Hay shall be sterile, containing no fertile seed.

2.6.3 Wood Cellulose Fiber Mulch

Use recovered materials of either paper-based (100 percent) or wood-based (100 percent) hydraulic mulch. Processed to contain no growth or germination-inhibiting factors and dyed an appropriate color to facilitate visual metering of materials application. Composition on air-dry weight basis: 9 to 15 percent moisture, pH range from 4.5 to 6.0. Use with hydraulic application of grass seed and fertilizer.

2.7 WATER

Water shall be the responsibility of the Contractor, unless otherwise noted. Water shall not contain elements toxic to plant life.

2.8 EROSION CONTROL MATERIALS

2.8.1 Erosion Control Matting

2.8.1.1 Erosion Control Matting Material

Matting shall be heavy, twisted jute mesh, weighing approximately 1.22

SECTION 32 92 19 Page 10 pounds per linear yard and 4 feet wide with mesh openings of approximately 1 inch square. Matting shall not be dyed, bleached, or otherwise treated in a manner that will result in toxicity to vegetation. Other acceptable material manufactured especially for erosion control may be used when approved by the Contracting Officer and/or his or her designated representative in writing before being used.

2.8.1.2 Erosion Control Matting Anchors

Erosion control matting anchors shall be as recommended by the manufacturer.

PART 3 EXECUTION

3.1 PREPARATION

3.1.1 Extent of Work

For the purpose of this contract, the Contractor shall provide soil preparation, liming, fertilizing, and seeding of all newly graded finished earth surfaces including the Atlantic Harbor breakwater repair area and temporary access road, the DA 26 Borrow Area dike embankment repair area, and the Dredged Material Disposal Area unless indicated otherwise or as directed by the Contracting Officer and/or his or her designated representative, and at all areas inside or outside the limits of construction that are disturbed by the Contractor's operation.

The Contractor shall verify that the required embankment grades have been achieved prior to commencement of the seeding operation.

3.1.1.1 Lime Application Rates

Apply lime at rates as determined by laboratory soil analysis of the soils at the job site. For bidding purposes only apply at rates for the following:

Lime 3000 pounds per acre.

3.1.1.2 Fertilizer Application Rates

Apply fertilizer at rates as determined by laboratory soil analysis of the soils at the job site. For bidding purposes only apply at rates for the following:

Synthetic Fertilizer 3000 pounds per acre.

Hydroseeding Fertilizer 3000 pounds per acre.

3.2 SEEDING

3.2.1 Seed Application Times, Conditions, and Equipment Calibration

3.2.1.1 Seeding Times

Seed shall be installed for the planting period as specified for the particular seed mixture.

3.2.1.2 Tillage

Soil on slopes up to a maximum 3-horizontal-to-1-vertical other than soils on the Temporary Access Road shall be tilled to a minimum 4 inch depth.

SECTION 32 92 19 Page 11

Soils on the Temporary Access Road shall be tilled to a maximum 2 inch depth or as directed by the Contracting Officer's Representative. On slopes between 3-horizontal-to-1-vertical and 1-horizontal-to-1 vertical, the soil shall be tilled to a minimum 2 inch depth by scarifying with heavy rakes, spiked tooth harrows, chisel plows, or similar implements, or other similar method. Rototillers shall be used where soil conditions and length of slope permit. On slopes 1-horizontal-to-1 vertical and steeper, no tillage is required. Drainage patterns shall be maintained as indicated on drawings. Areas compacted by construction operations shall be completely pulverized by tillage. Soil used for repair of surface erosion or grade deficiencies shall conform to requirements for satisfactory soil of Section 31 01 00. The fertilizer may be applied during this procedure.

3.2.2 Finished Grading

3.2.2 Preparation

Seed areas shall be graded as required to attain the finished grade shown on the drawings. New surfaces shall be blended to existing areas. The prepared surface shall be completed with a light raking to remove debris.

3.2.3 Seed Area Debris

Debris and stones over a minimum 3 inch in any dimension shall be removed from the surface.

3.2.4 Protection

Areas with the prepared surface shall be protected from compaction or damage by vehicular or pedestrian traffic and surface erosion.

3.2.4.1 Seeding Conditions

Immediately before seeding, restore soil to the finished grade. See subparagraph Finished Grading. Do not seed when ground is muddy, frozen, snow covered or in an unsatisfactory condition for seeding. If special conditions exist that may warrant a variance in the above seeding dates or conditions, submit a written request to the Contracting Officer and/or his or her designated representative stating the special conditions and proposed variance. Apply seed within twenty four hours after seedbed preparation. Sow seed by approved sowing equipment. Sow one-half the seed in one direction, and sow remainder at right angles to the first sowing.

Seeding operations shall not take place when wind velocity will prevent uniform seed distribution.

3.2.4.2 Equipment Calibration

Immediately prior to the commencement of seeding operations, calibration tests shall be conducted on the equipment to be used. These tests shall confirm that the equipment is operating within the manufacturer's specifications and will meet the specified criteria. The equipment shall be calibrated a minimum of once every day during the operation in the presence of the Contracting Officer and/or his or her designated representative.

3.2.5 Seed Application Method

Seeding method shall be broadcasted and drop seeding, drill seeding or hydroseeding.

SECTION 32 92 19 Page 12

3.2.5.1 Broadcast and Drop Seeding

Seed shall be uniformly broadcast using broadcast or drop seeders. Sow one-half the seed in one direction, and sow remainder at right angles to the first sowing. Cover seed uniformly to a maximum depth of 1/4 inch by means of spike-tooth harrow, cultipacker, raking or other approved devices.

3.2.5.2 Drill Seeding

Seed shall be uniformly drilled to an average of 1/2 inch depth, using equipment having drills a maximum 7 inches distance apart. Row markers shall be used with the drill seeder. Half the total rate of seed application shall be drilled in 1 direction, with the remainder of the seed rate drilled at 90 degrees from the first direction. The drilling equipment shall be maintain with half full seed boxes during the seeding operations.

3.2.5.3 Hydroseeding

First, mix water and fiber. Wood cellulose fiber, paper fiber, or recycled paper shall be applied as part of the hydroseeding operation. Fiber shall be added at the rates recommended by the manufacturer. Next add and mix seed and fertilizer to produce a homogeneous slurry. Seed shall be mixed to ensure broadcasting at the rate specified. Then slurry shall be hydraulically sprayed on the ground, material shall form a blotter like cover impregnated uniformly with grass seed. Spread with one application with no second application of mulch. Only one application is necessary.

The hydroseeded area shall be rolled. The time limitation for holding seed slurry shall be a maximum of 24 hours.

3.2.6 Mulching

3.2.6.1 Hay or Straw Mulch

Hay or straw mulch shall be spread uniformly at the rate of 2 tons per acre.

Mulch shall be spread by hand, blower-type mulch spreader, or other approved method. Mulching shall be started on the windward side of relatively flat areas or on the upper part of steep slopes, and continued uniformly until the area is covered. The mulch shall not be bunched or clumped. Sunlight shall not be completely excluded from penetrating to the ground surface. All areas installed with seed shall be mulched on the same day as the seeding. Mulch shall be anchored immediately following spreading.

3.2.6.2 Mechanical Anchor

Mechanical anchor shall be a V-type-wheel land packer; a scalloped-disk land packer designed to force mulch into the soil surface; or other suitable equipment.

3.2.6.3 Wood Cellulose Fiber

Wood cellulose fiber shall be applied as part of the hydroseeding operation. The mulch shall be mixed and applied in accordance with the manufacturer's recommendations.

SECTION 32 92 19 Page 13

3.2.7 Rolling

Immediately after seeding, firm entire area except for slopes in excess of 3 to 1 with a roller not exceeding 90 pounds for each foot of roller width.

If seeding is performed with cultipacker-type seeder or by hydroseeding, rolling may be eliminated.

3.2.8 Erosion Control Matting

The Contractor shall place erosion control matting on all dike embankment repair areas at DA 26 Borrow Area extending from the toe of the outside side slope, over the top of the dike embankment, and down the inside side slope 2 feet below the top of dike elevation. Placing of matting shall be done immediately following seeding and mulching. The earth surface shall be smooth and free from stones, clods, or debris which will prevent the contact of the matting with the soil. Care shall be taken to preserve the required line, grade, and cross section of the area covered.

Matting shall be unrolled in the direction of the flow of water, and shall be applied without stretching so that it will lie smoothly but loosely on the soil surface. The up-channel or top of slope end of each piece of matting shall be buried in a narrow trench at least 5 inches deep and tamped firmly. After the end of the matting is buried, the trench shall be closed and tamped firmly. Where one roll of matting ends and a second roll begins, the end of the upper roll shall be brought over the buried end of the second roll so that there will be a 6 inch overlap. Check slots shall be constructed at each 50 feet longitudinally in the matting or as directed by the Contracting Officer and/or his or her designated representative.

These slots shall be narrow trenches at least 5 inches deep. The matting shall be folded over and buried to the full depth of the trench, after which the trench shall be closed and firmly tamped. Where 2 or more widths of matting are laid side by side, the overlap shall be at least 4 inches.

Staples shall be placed across matting at ends, junctions, and check slots and shall be spaced approximately 10 inches apart. Staples shall be placed along the outer edges and down the center of each strip of matting and shall be spaced 3 feet apart. After jute matting has been placed and stapling completed, the matting shall be rolled with an approved roller to assure that it is in proper contact with the soil and mulch. The installation of erosion control matting on cut or fill slopes the Contracting Officer and/or his or her designated representative may require adjustments in the trenching or stapling requirements to fit individual slope conditions.

3.2.9 Temporary Seeding

When directed by the Contracting Officer and/or his or her designated representative during contract delays affecting the seeding operation, or when a quick cover is required to prevent surface erosion, or when grading is interrupted for more than 15 working days or 30 calendar days (whichever is shorter), the areas designated shall be seeded in accordance with temporary seed species listed under subparagraph Temporary Seed Species.

3.2.9.1 Lime and Fertilizer

When soil, lime and fertilizer have not been applied to the area, the quantity of 1/2 of the required lime and fertilizer shall be applied and the area tilled in accordance with subparagraph Tillage.

SECTION 32 92 19 Page 14

3.2.9.2 Remaining Lime and Fertilizer

The remaining lime and fertilizer shall be applied in accordance with subparagraph Tillage when the surface is prepared for installing seed.

3.2.10 Watering

Start watering areas seeded as required by temperature and wind conditions.

Apply water at a rate sufficient to insure thorough wetting of soil to a depth of 2 inches without run off. During the germination process, seed is to be kept actively growing and not allowed to dry out.

3.3 PROTECTION OF INSTALLED AREAS

Immediately upon completion of the seeding operation in an area, the area shall be protected against traffic and other use.

3.4 QUANTITY CHECK

For materials provided in bags, the empty bags shall be retained for recording the amount used. For materials provided in bulk, the weight certificates shall be retained as a record of the amount used. The amount of material used shall be compacted with the total area covered to determine the rate of application used. Differences between the quantity applied and the quantity specified shall be adjusted as directed by the Contracting Officer and/or his or her designated representative.

3.5 RESTORATION AND CLEAN UP

3.5.1 Restoration

Existing seeded areas, and facilities that have been damaged from the Contractor's operation shall be restored to original condition at Contractor's expense.

3.5.2 Clean Up

Excess and waste material shall be removed from the seeded areas and shall be disposed off Government property.

3.5.3 SEED ESTABLISHMENT PERIOD

3.5.3.1 Commencement

The seed establishment period to obtain a healthy stand of grass plants shall begin on the first day of seeding work under this contract and shall continue through the remaining life of the contract and end 3 months after the last day of the seeding operation required by this contract. Written calendar time period shall be furnished for the seed establishment period.

When there is more than 1 seed establishment period, the boundaries of the seeded area covered for each period shall be described. The seed establishment period shall be modified for inclement weather, shut down periods, or for separate completion dates of areas. See subparagraph Stand of Grass.

3.5.4 Maintenance During Establishment Period

Maintenance of the seeded areas shall include eradicating weeds, protecting embankments and ditches from surface erosion; maintaining mulch; protecting

SECTION 32 92 19 Page 15 installed areas from traffic; watering; and post-fertilization.

3.5.4.1 Post-Fertilization

The application rate shall be as directed by the Contracting Officer and/or his or her designated representative. A maximum 1/2 pound per 1000 square feet of actual available nitrogen shall be provided to the grass plants.

The application shall be timed prior to the advent of winter dormancy and shall be made without burning the installed grass plants.

3.5.4.2 Repair or Reinstall

Unsatisfactory stand of grass plants and mulch shall be repaired or reinstalled, and eroded areas shall be repaired in accordance with paragraph PREPARATION.

3.5.5 Maintenance of Matting

The Contractor shall maintain matting until all work on the project has been completed and accepted. Prior to acceptance of the project, if any staples have become loosened or raised of if the matting becomes loose or torn, or undermined for any reasons, the damaged areas shall be reshaped, reseeded, and refertilized, and the matting shall be acceptably repaired or replaced, as directed by the Contracting Officer and/or his or her designated representative.

3.5.6 FINAL ACCEPTANCE

3.5.6.1 Preliminary Inspection

Prior to the completion of the Seed Establishment Period, a preliminary inspection will be held by the Contracting Officer and/or his or her designated representative. Time for the inspection shall be established in writing. The acceptability of the grass in accordance with paragraph, SEED ESTABLISHMENT PERIOD shall be determined. An unacceptable stand of grass shall be repaired or reinstalled as soon as grassing conditions permit and at no further cost to the Government. A seed establishment period in accordance with subparagraph Commencement shall begin on the first day of the repair or reinstall of an unacceptable strand of grass.

3.5.6.2 Final Inspection

A final inspection will be held by the Contracting Officer and/or his or her designated representative to determine that deficiencies noted in the preliminary inspection have been corrected. Time for the inspection shall be established in writing.

-- End of Section --

SECTION 32 92 19 Page 16

PUBLISH.pdf
DIVISION 01 - GENERAL REQUIREMENTS
TEMPORARY STORM WATER POLLUTION CONTROL
TEMPORARY STORM WATER POLLUTION CONTROL
PART 1 GENERAL
1.1 REFERENCES
1.2 SYSTEM DESCRIPTION
1.3 EROSION AND SEDIMENT CONTROLS
1.3.1 Stabilization Practices
1.3.1.1 Unsuitable Conditions
1.3.1.2 No Activity for Less Than 21 Days
1.3.1.3 Burnoff
1.3.1.4 Protection of Erodible Soils
1.3.2 Erosion, Sediment and Stormwater Control
1.3.3 Structural Practices
1.3.3.1 Silt Fences
1.3.3.2 Straw Bales

1.3.4 Vegetation and Mulch

1.4 SUBMITTALS
1.5 DELIVERY, STORAGE, AND HANDLING
PART 2 PRODUCTS
2.1 COMPONENTS FOR SILT FENCES
2.1.1 Filter Fabric
2.1.2 Silt Fence Stakes and Posts
2.1.3 Mill Certificate or Affidavit

2.2 COMPONENTS FOR STRAW BALES

PART 3 EXECUTION
3.1 INSTALLATION OF SILT FENCES
3.2 INSTALLATION OF STRAW BALES
3.3 FIELD QUALITY CONTROL
3.3.1 Silt Fence Maintenance
3.3.2 Straw Bale Maintenance
3.4 INSPECTIONS
3.4.1 General
3.4.2 Inspections Details
3.4.3 Inspection Reports
DIVISION 31 - EARTHWORK
EMBANKMENT
EMBANKMENT
PART 1 GENERAL
1.1 SCOPE
1.2 REFERENCES
1.3 GENERAL PROVISIONS
1.3.1 Breakwater Repair Area
1.3.1.1 Lines and Grades
1.3.1.2 Conduct of the Work
1.3.2 Temporary Access Road
1.3.3 Temporary Access Road Ramp to Breakwater Repair Area
1.3.4 DA 26 Borrow Area Dike Embankment Repairs
1.4 EQUIPMENT
1.5 MEASUREMENT AND PAYMENT
1.5.1 Breakwater Repair Area Embankment
1.5.2 Temporary Access Road
1.5.3 Smith Property Bulkhead
1.5.4 DA 26 Borrow Area Dike Embankment Repairs
PART 2 PRODUCTS
2.1 MATERIALS
2.1.1 Embankment
2.1.2 Temporary Access Road
2.1.2.1 Aggregate Base Course ABC
2.1.2.2 Geotextile
PART 3 EXECUTION
3.1 BORROW AREA
3.2 FOUNDATION PREPARATION
3.3 PLACEMENT
3.3.1 Embankment and Temporary Access Road Ramp to Breakwater Repair Area
3.3.2 Temporary Access Road
3.3.3 DA 26 Borrow Area Dike Embankment Repairs
3.4 MOISTURE CONTROL
3.4.1 Breakwater Repair Area Embankment and Temporary Access Road Ramp to
3.4.2 Temporary Access Road
3.4.3 DA 26 Borrow Area Dike Embankment Repairs
3.5 COMPACTION
3.5.1 Equipment
3.5.2 Degree of Compaction
3.6 TESTING
3.7 REMOVAL OF TEMPORARY ACCESS ROAD
3.8 SMITH PROPERTY BULKHEAD
DIVISION 32 - EXTERIOR IMPROVEMENTS
SEEDING
SEEDING
PART 1 GENERAL
1.1 REFERENCES
1.2 DEFINITIONS
1.2.1 Stand of Grass
1.3 SUBMITTALS
1.4 DELIVERY, INSPECTION, STORAGE, AND HANDLING
1.4.1 Delivery
1.4.1.1 Seed Protection
1.4.1.2 Fertilizer and Lime Delivery
1.4.2 Inspection
1.4.3 Storage
1.4.3.1 Seed, Fertilizer and Lime Storage
1.4.3.2 Handling
1.5 RESTRICTIONS
1.5.1 Restrictions
1.6 TIME LIMITATIONS
1.6.1 Seeding
1.6.2 Hydroseeding
1.7 MEASUREMENT AND PAYMENT
1.7.1 Seeding and Mulching
1.7.2 Erosion Control Matting
PART 2 PRODUCTS
2.1 SEED
2.1.1 Classification
2.1.2 Permanent Seed Species and Mixtures
2.1.3 Temporary Seed Species
2.1.4 Quality
2.1.5 Seed Mixing
2.1.6 Substitutions
2.2 SOIL CONDITIONERS
2.2.1 Lime
2.2.2 Aluminum Sulfate
2.2.3 Sulfur
2.2.4 Iron
2.2.5 Peat
2.2.6 Sand
2.2.7 Perlite
2.2.8 Composted Derivatives
2.2.8.1 Particle Size
2.2.8.2 Nitrogen Content
2.2.9 Gypsum
2.2.10 Calcined Clay
2.3 VERMICULITE
2.4 FERTILIZER
2.4.1 Granular Fertilizer
2.4.2 Hydroseeding Fertilizer
2.5 MULCH
2.5.1 Straw
2.5.2 Hay
2.5.3 Wood Cellulose Fiber Mulch
2.6 WATER
2.7 EROSION CONTROL MATERIALS
2.7.1 Erosion Control Matting
2.7.1.1 Erosion Control Matting Material
2.7.1.2 Erosion Control Matting Anchors
PART 3 EXECUTION
3.1 PREPARATION
3.1.1 Extent of Work
3.1.1.1 Lime Application Rates
3.1.1.2 Fertilizer Application Rates
3.2 SEEDING
3.2.1 Seed Application Times, Conditions, and Equipment Calibration
3.2.1.1 Seeding Times
3.2.1.2 Tillage
3.2.2 Preparation
3.2.3 Seed Area Debris
3.2.4 Protection
3.2.4.1 Seeding Conditions
3.2.4.2 Equipment Calibration
3.2.5 Seed Application Method
3.2.5.1 Broadcast and Drop Seeding
3.2.5.2 Drill Seeding
3.2.5.3 Hydroseeding
3.2.6 Mulching
3.2.6.1 Hay or Straw Mulch
3.2.6.2 Mechanical Anchor
3.2.6.3 Wood Cellulose Fiber
3.2.7 Rolling
3.2.8 Erosion Control Matting
3.2.9 Temporary Seeding
3.2.9.1 Lime and Fertilizer
3.2.9.2 Remaining Lime and Fertilizer

3.2.10 Watering

3.3 PROTECTION OF INSTALLED AREAS
3.4 QUANTITY CHECK
3.5 RESTORATION AND CLEAN UP
3.5.1 Restoration
3.5.2 Clean Up
3.5.3 SEED ESTABLISHMENT PERIOD
3.5.3.1 Commencement
3.5.4 Maintenance During Establishment Period
3.5.4.1 Post-Fertilization
3.5.4.2 Repair or Reinstall
3.5.5 Maintenance of Matting
3.5.6 FINAL ACCEPTANCE
3.5.6.1 Preliminary Inspection
3.5.6.2 Final Inspection