SF30Amend0003.pdf
PDF 28 KB Posted
- Solicitation number
- W912HN-09-B-0018
About this file
SF 30 - Summary of Changes.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SF30Amend0002.pdf | ||
| Amdt002PlateEC-3.pdf | ||
| AMEND0001.pdf | ||
| SPECIFICATIONS.pdf | ||
| RoanokeRvr_BC99_Plans.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W81LJ890338765
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
SOLICITATION NO. W912HN-09-B-0018, ROANOKE RIVER FLOOD REDUCTION PROJECT, BENCH CUT 99, ROANOKE RIVER BASIN, ROANOKE, VA, IS AMENDED AS FOLLOWS:
A. SEE ATTACHED SUMMARY OF CHANGES FOR SPECIFICATIONS CLARIFICATIONS.
B. THERE ARE NO OTHER CHANGES DUE TO THIS AMENDMENT.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 09-Dec-2009
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912HN-09-B-0018
X 9B. DATED (SEE ITEM 11)
18-Nov-2009
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
09-Dec-2009
CODE
USAED, SAVANNAH, WILMINGTON CONTRACT OFF
ATTH: HILDA AYERS
69 DARLINGTON AVE
WILMINGTON NC 28403-1343
W912HN 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
SECTION 31 00 00 – EARTHWORK
Delete existing SECTION Page 5 in its entirety and replace with enclosed revised Page.
NOTE:
Text that is added or revised by this amendment is replaced in its entirety and underlined and/or printed in bold and/or stamped appropriately.
The text changes may have necessitated reformatting of subsequent text or pages. If this is the case, those pages have also been issued as amended pages but are not underlined or bold text.
(End of Summary of Changes)
Encls As stated
RRV Flood Reduction Project, Bench Cut 99 W912HN-09-B-0018 Roanoke River Basin, Ronoake, Virginia
Provide a minimum coefficient of permeability of 0.002 feet per minute when tested in accordance with ASTM D 2434.
1.3 MEASUREMENT
1.3.1 Excavation
The unit of measurement for excavation (including rock) will be the cubic yard, computed by the average end area method from cross sections taken before and after the excavation operations. The volume to be paid for will be the number of cubic yards of material measured in its original position and removed from the excavation areas, including the excavation for ditches, and channel changes, when the material is acceptably utilized or disposed of as herein specified. The measurements will include authorized excavation of rock, authorized excavation of satisfactory soil excavation, authorized excavation of loose rock less than 1/2 cubic yard in volume, authorized excavation of special waste material, and the volume of loose, scattered rocks and boulders collected within the limits of the work;
allowance will be made on the same basis for selected backfill ordered as replacement. The measurement will not include the volume of other material that is scarified or plowed and reused in-place, and will not include the volume excavated without authorization or the volume of any material used for purposes other than directed. The volume of overburden stripped from borrow pits and the volume of excavation for ditches to drain borrow pits, unless used as borrow material, will not be measured for payment. The measurement will not include the volume of any excavation performed prior to the taking of elevations and measurements of the undisturbed grade.
1.3.2 Rock Excavation
The unit of measurement for rock excavation to be paid for will be the cubic yard, computed by the average end area method from cross sections taken before and after the excavation operations. The volume to be paid for will be the number of cubic yards of rock which has been excavated and removed from the finished grade.
1.3.3 Topsoil Requirements
Separate excavation, hauling, and spreading or piling of topsoil and related miscellaneous operations will be considered subsidiary obligations of the Contractor, covered under the contract unit price for excavation.
1.4 PAYMENT
Payment will constitute full compensation for all labor, equipment, tools, supplies, and incidentals necessary to complete the work.
1.4.1 Unclassified Excavation
Unclassified excavation will be paid for at the contract unit price per cubic yard for "COMMON EXCAVATION".
1.4.2 Rock Excavation
All rock excavation will be paid for at the contract unit price per cubic yard for ROCK EXCAVATION. The quantity to be paid for shall include both rippable rock and rock which requires blasting.
SECTION 31 00 00 Page 5 (Revised by Amendment No. 0003)