Worksheet in Abstract.xls

XLS spreadsheet 47 KB Posted

Attached to
Maintenance Dredging for Savannah/Brunswick Inner Harbor, Savannah, Georgia
Solicitation number
W912HN-09-B-0009
Issued by

View the file

Other files

File Type Posted
Worksheet in Abstract.xls XLS spreadsheet
amd 0002 conform.pdf PDF
amd 0002.pdf PDF
SavBrunsInrHrbr09_Plans_Amd2.pdf PDF
AMENDMENT 0001.pdf PDF
CONF B-0009 0001.pdf PDF
PLANSInnerHarbor(09-B-0009).pdf PDF
SPECIFICATIONS.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

W912HN-09-B-0009 - IDIQ CONTRACT FOR SAVANNAH AND BRUNSWICK INNER HARBOR CHANNEL MAINTENANCE
IGEMarinex
EstimatedTotalTotalDifference between the IGE and the Contractor
Bid ItemQuantityU/MUPAmountUPAmount
0001Mobilization/Demobilization
0001AAMobilization/Demobilization1LS$1,393,500.00$1,450,000.00-3.90%
0001ABMobilization/Demobilization All over 11LS$224,000.00$200,000.0012.00%
2Production Dredging, Kings Island1,600,000CY$3.50$5,600,000.00$3.05$4,880,000.0014.75%
0003Maint Dredging, Station 112+500 to 103+000
0003AAProduction Dredging247,700CY$5.00$1,238,500.00$5.25$1,300,425.00-4.76%
0003ABStation Dredging750LF$82.00$61,500.00$60.00$45,000.0036.67%
0004Maint Dredging, Station 103+000 to 93+000
0004AAProduction Dredging182,700CY$5.10$931,770.00$5.20$950,040.00-1.92%
0004ABStation Dredging750LF$82.00$61,500.00$55.00$41,250.0049.09%
5Maint Dredging 93+000 to 86+000
0005AAProduction Dredging418,500CY$4.00$1,674,000.00$4.01$1,678,185.00-0.25%
0005ABStation Dredging750LF$82.00$61,500.00$65.00$48,750.0026.15%
6Maint Dredging 86+000 to 79+500
0006AAProduction Dredging152,500CY$4.65$709,125.00$3.25$495,625.0043.08%
0006ABStation Dredging750LF$82.00$61,500.00$60.00$45,000.0036.67%
7Production Dredging Marsh Island54,000LF$4.45$240,300.00$4.23$228,420.005.20%
8Maint Dredging 79+500 to 70+000
0008AAProduction Dredging216,000CY$2.80$604,800.00$2.85$615,600.00-1.75%
0008ABStation Dredging750LF$62.00$46,500.00$65.00$48,750.00-4.62%
9Maint Dredging 70+000 to 60+000
0009AAProduction Dredging258,900CY$2.45$634,305.00$3.09$800,001.00-20.71%
0009ABStation Dredging750LF$62.00$46,500.00$55.00$41,250.0012.73%
10Production Dredging Fig Island125,000CY$2.20$275,000.00$2.80$350,000.00-21.43%
11Maint Dredging 60+000 to 50+000
0011AAProduction Dredging276,800CY$2.25$622,800.00$2.84$786,112.00-20.77%
0011ABStation Dredging750LF$55.00$41,250.00$50.00$37,500.0010.00%
12Maint Dredging 50+000 to 40+000
0012AAProduction Dredging382,600CY$2.60$994,760.00$3.30$1,262,580.00-21.21%
0012ABStation Dredging750LF$55.00$41,250.00$68.00$51,000.00-19.12%
13Maint Dredging 40+000 to 24+000
0013AAProduction Dredging24,500CY$5.15$126,175.00$6.10$149,450.00-15.57%
0013ABStation Dredging750LF$55.00$41,250.00$75.00$56,250.00-26.67%
14Maint Dredging 24+000 to 0+000
0014AAProduction Dredging24,500CY$5.15$126,175.00$6.50$159,250.00-20.77%
0014ABStation Dredging750LF$55.00$41,250.00$80.00$60,000.00-31.25%
15Production Dredging 0+500 to 7+2851,317,000CY$1.50$1,975,500.00$0.78$1,027,260.0092.31%
16Production Dredging 7+285 to 13+3001,953,900CY$1.30$2,540,070.00$0.78$1,524,042.0066.67%
17Mob/Demob Savh Hbr to Brunswick1LS$382,500.00$469,000.00-18.44%
18Production Dredging357,000CY$3.10$1,106,700.00$2.79$996,030.0011.11%
19Maint Dredging 0+000 to 7+000
0019AAProduction Dredging50,000CY$4.20$210,000.00$5.10$255,000.00-17.65%
0019ABStation Dredging750LF$55.00$41,250.00$72.00$54,000.00-23.61%
20Maint Dredging Upper Turtle
0020AAProduction Dredging75,000CY$4.10$307,500.00$5.10$382,500.00-19.61%
0020ABStation Dredging750LF$55.00$41,250.00$72.00$54,000.00-23.61%
21Moving between sites2EA$42,000.00$84,000.00$30,000.00$60,000.0040.00%
Difference between the IGE and bidder9.64%IGEMARINEX
Totals 0001-0021$22,587,980.00$20,602,270.00
BondsX
1 Amendment receivedX

Sheet2

Sheet3

File details come from the government source that posted it. Updated .