amd0001SF30RR08B0012.pdf
PDF 980 KB Posted
- Solicitation number
- W912HN-08-B-0012
About this file
SF30 Summary of Channges.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RRBenchCuts2009Amend004 | — | |
| Amend 0004SF30RR08B0012.pdf | ||
| Amend 0003RR08B0012.pdf | ||
| Amend0002RR08B0012.pdf | ||
| RRBenchCuts2009Amend001.pdf | ||
| RRBenchCuts2009.pdf | ||
| SPECIFICATIONS.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W81LJ880937903
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Solicitation Number W912HN-08-B-0012, entitled Roanoke River Flood Reduction Project, Bench Cuts 143, 184 and 195, Roanoke River Basin, Roanoke, Virginia, is amended as follow s:
A. Time and Date of Bid Opening remains UNCHANGED at 29 August 2008 @ 2:00 pm, local time.
B. See Summary of Changes.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 5
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 15-Aug-2008
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912HN-08-B-0012
X 9B. DATED (SEE ITEM 11)
30-Jul-2008
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
15-Aug-2008
CODE
USAED, SAVANNAH, WILMINGTON CONTRACT OFF
ATTH: HILDA AYERS
PO BOX 1890 (69 DARLINGTON AVE 28403)
WILMINGTON NC 28402-1890
W912HN 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912HN-08-B-0012
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00010 - SOLICITATION CONTRACT FORM
CLIN 0004
The pricing detail quantity has decreased by 1,378.00 from 17,765.00 to 16,387.00.
CLIN 0005
The pricing detail quantity has increased by 81.00 from 50.00 to 131.00.
CLIN 0006
This CLIN has been renumbered to CLIN 0007.
The pricing detail quantity has decreased by 4.00 from 76,540.00 to 76,536.00.
CLIN 0007
This CLIN has been renumbered to CLIN 0008.
CLIN 0008
This CLIN has been renumbered to CLIN 0009.
The pricing detail quantity has decreased by 1.00 from 10.00 to 9.00.
CLIN 0009
This CLIN has been renumbered to CLIN 0010.
CLIN 0010
This CLIN has been renumbered to CLIN 0011.
CLIN 0011
This CLIN has been renumbered to CLIN 0012.
CLIN 0012
This CLIN has been renumbered to CLIN 0013.
CLIN 0013
This CLIN has been renumbered to CLIN 0014.
CLIN 0014
This CLIN has been renumbered to CLIN 0015.
CLIN 0015
This CLIN has been renumbered to CLIN 0016.
SUBCLIN 0015AA
This SUBCLIN has been renumbered to SUBCLIN 0016AA.
SUBCLIN 0015AB
This SUBCLIN has been renumbered to SUBCLIN 0016AB.
SUBCLIN 0015AC
This SUBCLIN has been renumbered to SUBCLIN 0016AC.
CLIN 0016
This CLIN has been renumbered to CLIN 0017.
SUBCLIN 0016AA
This SUBCLIN has been renumbered to SUBCLIN 0017AA.
SUBCLIN 0016AB
This SUBCLIN has been renumbered to SUBCLIN 0017AB.
CLIN 0006 is added as follows:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0006 16 Short Ton CLASS A1 RIP RAP (ESTD.)FOB: Destination
NET AMT
The following have been modified:
BASE BID:
(BASE BID: LINE ITEMS 0001 THRU 0015)
NOTES:
NOTE 1: THE GOVERNMENT RESERVES THE RIGHT TO EXERCISE OPTION 1 AND/OR OPTION 2
(LINE ITEMS 0016 & 0017) UPON ENCOUNTERING CONTAMINATED SOIL OF THE TYPE DESCRIBED
DURING THE CONTRACT CONSTRUCTION PERIOD.
NOTE 2: THE ABILITY TO EXERCISE OPTIONAL LINE ITEMS SHALL BE SUBJECT TO THE
AVAILABIITY OF FUNDS.
NOTE 3: IF AN OPTION IS EXERCISED, CONTRACT PERFORMANCE TIME WILL BE GRANTED IN
ACCORDANCE WITH CLAUSE 52.211-10, COMMENCEMENT, PROSECUTION, AND COMPLETION OF
WORK, IN SECTION 00800 OF THIS SOLICITATION.
TOTAL:
TOTAL BASE BID: ITEMS 0001 THRU 0015 --- $ _______________________
TOTAL OPTION NO. 1: ITEM 0016 --------- ---- $ ____________________
TOTAL OPTION NO. 2: ITEM 0017 --------------- $_____________________
TOTAL BID: ITEMS 0001 THRU 0017 ----------- $______________________________
(OFFERORS MUST QUOTE ON ALL LINE ITEMS OF THE BID SCHEDULE AND ENTER AMOUNTS AS
SHOWN ABOVE).
SECTION 00800 - SPECIAL CONTRACT REQUIREMENTS
The following have been modified:
52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)
(1) BASE BID (Line Items 0001 thru 0015):
(a) The Contractor shall be required to commence work under this contract within fifteen (15) calendar days after the date the Contractor receives the notice to proceed, shall prosecute the work diligently, and shall complete the entire work for the BASE BID (LINE ITEMS 0001 thru 0015), ready for use not later than
TWO HUNDRED (200) CALENDAR DAYS AFTER THE CONTRACTOR RECEIVES THE NOTICE
TO PROCEED, except for work under Base Bid Line Item, LANDSCAPING, COMPLETE.
(b) All work under BASE BID ITEM, LANDSCAPING, COMPLETE, shall be completed and ready for use by April 30, 2009.
(2) OPTION NUMBERS 1 & 2: IF OPTION NO. 1 (LINE ITEMS 0016) AND/OR OPTION NO. 2 (LINE
ITEM 0017), is exercised, fifteen (15) additional calendar days will be added to the existing contract performance period from the time the Contractor receives the Notice to Proceed.
(3) All times stated for completion shall include final cleanup of the premises.
(End of clause)
SECTION 31 00 01 – BLASTING
(1) Delete existing Page 11 in its entirety and replace with enclosed revised Page.
(2) ADD Attachment 1 through Attachment 5 COVERS and Enclosures in their entirety.
SECTION 31 22 16 – PROJECT SPECIAL PROVISIONS
Delete existing Page 3 in its entirety and replace with enclosed revised Page.
SECTION 32 22 13 – STONE PROTECTION
Delete existing Page 2 and Page 3 in their entirety and replace with enclosed revised Pages.
APPENDIX
A – Delete existing Letter dated June 9, 2008 in its entirety and replace with enclosed Letter dated July 31, 2008.
NOTE:
Text that is added or revised by this amendment is replaced in its entirety and underlined and/or printed in bold and/or stamped appropriately.
The text changes may have necessitated reformatting of subsequent text or pages. If this is the case, those pages have also been issued as amended pages but are not underlined or bold text.
DRAWINGS
Delete existing Plate Numbers LS-1, LS-4, and EC-3 in their entirety and replace with enclosed revised Plates.
Encls As stated
(End of Summary of Changes)
W912HN-08-B-0012-0001
W81LJ880937903
SPECIFICATIONS FOR ROANOKE RIVER FLOOD REDUCTION PROJECT, BENCH CUTS 143, 184, AND 195, ROANOKE, VIRGINIA
(JULY 2008)
ESTIMATED MAGNITUDE OF THIS PROJECT IS $1,000,000 - $5,000,000.
THIS IS AN UNRESTRICTED ADVERTISEMENT.
RETURN COMPLETED SECTION 00600, REPRESENTATIONS & CERTIFICATIONS, WITH BID SUBMITTAL.
VERBAL OR WRITTEN REQUESTS FOR INFORMATION MUST BE DIRECTED TO THE PERSON LISTED IN BLOCK 9 ABOVE. INQUIRIES AND REQUESTS THAT ARE DIRECTED TO ANY OTHER PERSON MAY NOT BE RELAYED TO THE PROPER PERSON AND THEREFORE, MAY NOT BE ANSWERED. SEE 52.000-4001 IN SECTION 00100.
DUE TO SECURITY REQUIREMENTS, PLEASE ALLOW FOR DELAYS OF APPROXIMATELY 30 MINUTES FOR PERSONS AND MATERIAL
ENTERING THE DISTRICT HEADQUARTERS BUILDING.
X
HILDA D AYERS 910-251-4862
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
30-Jul-2008
(RFP)
(IFB)
CALL:
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
See Item 7
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance w ithin _______15 calendar days and complete it w ithin ________200 calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
X YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________2 copies to perform the w ork required are due at the place specified in Item 8 by ___________ local time ______________29 Aug 2008 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee X is, is not required.
C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______60 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
USAED, SAVANNAH, WILMINGTON CONTRACT OFF
ATTH: HILDA AYERS
PO BOX 1890 (69 DARLINGTON AVE 28403)
WILMINGTON NC 28402-1890
W912HN
PAGE OF PAGES
1 OF
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
02:00 PM (hour) Sealed envelopes containing offers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
8. ADDRESS OFFER TO (If Other Than Item 7)
910-251-4454FAX:TEL: 910-251-4862 TEL: FAX:
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .
gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(M ust be fully completed by offeror)OFFER
Section 00010 - Solicitation Contract Form
BASE BID:
(BASE BID: LINE ITEMS 0001 THRU 0015)
0001 1 Lump Sum MOBILIZATION AND DEMOBILIZATIONFOB: Destination
MILSTRIP: W81LJ880937903
0002 1 Lump Sum CLEARING AND GRUBBINGFOB: Destination
0003 200 Short Ton
CHANNEL SNAGGING AND DEBRIS REMOVAL (ESTD.)
FOB: Destination
0004 16,387 Square
Yard
SOIL STABILIZATION MATTING (ESTD.)FOB: Destination
0005 131 Short Ton CLASS 1 RIP RAP (ESTD.)FOB: Destination
0006 16 Short Ton CLASS A1 RIP RAP (ESTD.)FOB: Destination
0007 76,536 Cubic
COMMON EXCAVATION AND DISPOSAL AT HANNAH COURT (ESTD.)
0008 330 Cubic
ROCK EXCAVATION (ESTIMATED)FOB: Destination
0009 9 Acre SEEDING (ESTD.)FOB: Destination
0010 1 Lump Sum LANDSCAPING, COMPLETEFOB: Destination
0011 1 Lump Sum DEMOLITION GENERALFOB: Destination
0012 1 Lump Sum TRAFFIC CONTROL, COMPLETEFOB: Destination
0013 20 Days UTILITY RELOCATION DELAYS (ESTD.)FOB: Destination
0014 1 Lump Sum DEMOLITION HANNAH COURT DISPOSAL AREAFOB: Destination
0015 1 Lump Sum PERFORMANCE AND PAYMENT BONDSFOB: Destination
OPTION NO. 1: CONTAMINATED SOIL EXCAVATION, TPH: (UNPRICED
CLIN; SEE SUB-CLINS BELOW TO INSERT PRICES)
0016AA 250 Short Ton
OPTION SUITABLE FOR DAILY COVER AT LANDFILL (ESTD.)
0016AB 250 Short Ton
OPTION UNSUITABLE FOR DAILY COVER AT LANDFILL (ESTD.)
0016AC 250 Short Ton
OPTION DISPOSAL AT APPROVED SOIL TREATMENT FACILITY (ESTD.)
OPTION 2: NON-HAZARDOUS SOLID WASTE CONTAMINATED SOIL:
(UNPRICED CLIN; SEE SUB-CLINS BELOW TO INSERT PRICES).
0017AA 3,000 Short Ton
OPTION SUITABLE FOR DAILY COVER AT LANDFILL (ESTD.)
0017AB 3,000 Short Ton
OPTION UNSUITABLE FOR DAILY COVER AT LANDFILL (ESTD)
CLAUSES INCORPORATED BY FULL TEXT
52.217-5 EVALUATION OF OPTIONS (JUL 1990)
Except when it is determined in accordance with FAR 17.206(b) not to be in the Government's best interests, the Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. Evaluation of options will not obligate the Government to exercise the option(s).
(End of provision)
TOTAL:
TOTAL BASE BID: ITEMS 0001 THRU 0015 --- $ _______________________
TOTAL OPTION NO. 1: ITEM 0016 --------- ---- $ ____________________
TOTAL OPTION NO. 2: ITEM 0017 --------------- $_____________________
TOTAL BID: ITEMS 0001 THRU 0017 ----------- $______________________________
(OFFERORS MUST QUOTE ON ALL LINE ITEMS OF THE BID SCHEDULE AND ENTER AMOUNTS AS
SHOWN ABOVE).
NOTES:
NOTE 1: THE GOVERNMENT RESERVES THE RIGHT TO EXERCISE OPTION 1 AND/OR OPTION 2
(LINE ITEMS 0016 & 0017) UPON ENCOUNTERING CONTAMINATED SOIL OF THE TYPE DESCRIBED
DURING THE CONTRACT CONSTRUCTION PERIOD.
NOTE 2: THE ABILITY TO EXERCISE OPTIONAL LINE ITEMS SHALL BE SUBJECT TO THE
AVAILABIITY OF FUNDS.
NOTE 3: IF AN OPTION IS EXERCISED, CONTRACT PERFORMANCE TIME WILL BE GRANTED IN
ACCORDANCE WITH CLAUSE 52.211-10, COMMENCEMENT, PROSECUTION, AND COMPLETION OF
WORK, IN SECTION 00800 OF THIS SOLICITATION.
Section 00800 - Special Contract Requirements
CLAUSES INCORPORATED BY FULL TEXT
52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)
(1) BASE BID (Line Items 0001 thru 0015):
(a) The Contractor shall be required to commence work under this contract within fifteen (15) calendar days after the date the Contractor receives the notice to proceed, shall prosecute the work diligently, and shall complete the entire work for the BASE BID (LINE ITEMS 0001 thru 0015), ready for use not later than
TWO HUNDRED (200) CALENDAR DAYS AFTER THE CONTRACTOR RECEIVES THE NOTICE
TO PROCEED, except for work under Base Bid Line Item, LANDSCAPING, COMPLETE.
(b) All work under BASE BID ITEM, LANDSCAPING, COMPLETE, shall be completed and ready for use by April 30, 2009.
(2) OPTION NUMBERS 1 & 2: IF OPTION NO. 1 (LINE ITEMS 0016) AND/OR OPTION NO. 2 (LINE
ITEM 0017), is exercised, fifteen (15) additional calendar days will be added to the existing contract performance period from the time the Contractor receives the Notice to Proceed.
(3) All times stated for completion shall include final cleanup of the premises.
52.211-12 LIQUIDATED DAMAGES--CONSTRUCTION (SEP 2000)
(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $1,490.00 for each calendar day of delay until the work is completed or accepted.
(b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.
52.211-13 TIME EXTENSIONS (SEP 2000)
Time extensions for contract changes will depend upon the extent, if any, by which the changes cause delay in the completion of the various elements of construction. The change order granting the time extension may provide that the contract completion date will be extended only for those specific elements related to the changed work and that the remaining contract completion dates for all other portions of the work will not be altered. The change order also may provide an equitable readjustment of liquidated damages under the new completion schedule.
Roanoke River Flood Reduction W912HN-08-B-0012 Bench Cuts 143, 184 and 195, Roanoke, VA
WEEKLY SAFETY MEETING).
Activity Hazard Analysis; G
An Activity Hazard Analysis shall be prepared and submitted conforming to the requirements in EM 385-1-1, 3 November 2003, page 8, paragraph 01.A.13.
Contingency Plan; G
The Contractor shall submit a contingency plan to the Contracting Officer prior to the beginning of any blasting and shall notify same in the event of a misfire, inadvertent initiator extraction, or accidental loss of down lines.
SD-07 Certificates
Blasting Consultant's qualifications
Blasting Consultant's, Blaster's, and other blasting-related personnel's qualifications (see paragraph, BLASTING PERSONNEL).
1.7 OPERATIONAL BLASTING PLAN
The Operational Blasting Plan describes every aspect of how the Contractor proposes to accomplish the blasting. The Plan shall be signed by the Contractor's authorized representative. No drilling of blast holes will be allowed until the Operational Blasting Plan has been reviewed and accepted by the Contracting Officer. The Contractor shall make corrections and/or respond to comments and receive final approval in writing from the Contracting Officer prior to blasting.
The Operational Blasting Plan shall include as a minimum the following items:
a. Plan for complying with the environmental protection requirements for blasting in SECTION 01 57 20.00 10A ENVIRONMENTAL PROTECTION.
b. Copies of licenses, permits, and approvals required for the transportation, storage, handling, and use of explosives.
c. Proposed methods of conducting pre-blast surveys of structures potentially affected by blasting. (See SECTION 31 00 02 PRE-CONSTRUCTION
STRUCTURE AND PROPERTY CONDITION SURVEYS.)
d. Copies of all applicable codes, regulations, and ordinances governing blasting under this contract. Regulations include but are not limited to all rules referenced in paragraph Codes, Regulations, and References of this Section of the specifications.
e. Copy of certificate of insurance required for blasting with minimum of $5,000,000 liability coverage.
f. Names, addresses, and telephone numbers of Contractor's representatives to whom any claims from the public for damage due to blasting should be addressed.
g. Names, addresses, resumes, responsibilities, and qualifications of all blasting control personnel. Also include names, addresses, resumes, SECTION 31 00 01 Page 11 (Revised by Amendment No. 0001)
ATTACHMENT 1
Pre-Blast Survey
(Attachments 1 thru 5) (Added by Amendment No. 0001)
PREBLASTSURVEY
Prvjeec: mE BLASTEDPROJECf
Su"'er Datc:, _
Sun'cJ'or(print)
Sun'CYor's ntlc.
BuDdlaJlStrueture IlUpected ..
SlreCtAddras Owner'SDIII'IC
Cilr,StatcZip ------------ SlreetAddrea _.....;...
SlIUCtUre's Lcc:ation Cil)',&alc Zip ConI8ct Durina Surw:y Vllit _ Owner, _ Occupllllt _ Owner's Authari:zlcd Rep Rep'IcrOccupant'1Name (priDt)
Coablct·.Slpature ...: clate__~ _
GaenJ Structure Dacriptioa ~·sPurpolc ...: _
Numberol'FJoon_ Direccion MaiD EntnneeFICCI Lotcooditica (JcveI.tIopift& eIc.)
FOlJadltian (Sklae, bIoc:t, eIc.) CCIIldi&ion
.E1evalioa diffcrcnc:e bclwecn bifhest IIIId Iowa!. (ClUIldalion corD&:rS(1IIChcs) __ • Consaruction (hmc, brick. eIc.) Cmdilian__.....;.
Chimney Condilic.lII Pcrcha Condilitlll OtbcrUausualFKICn
RoarudD.......RGOf ...;...
GUUA'3
RQOfIlrliDapAdcquIIC_ Draiasro LotSudice Draiaqo FlowDinlclion _ ~narfouDdlliaa .CIClIIIIDCDt il'J'CS
Caadibaa.
C«ladilioa
...i
____ S(SW}_' W(NW) _
OCIIereoa.-c.(c:riIic:U alIIIIaIs,l(*iIJ...-.>' --"""":'""'"
. ~r'IS.....re- _ Dldc-:'' _
.Dat&--:..... _
Buildin~~ (:IlI'c:a;ddn,sc or IClClIlion) ,;.-___ Sheet or Floor Plan Sketch Prcblut Sune,. ~~
Room lnspccticxl FloorSizi: _ CriticalCoaIClUs (YIN)__ .:...
Narth Wall isWall(I)__ Numbero(Walls_
GeaenJDelcriptloa(uae. waIIs~critCOlllalts) _
Wall,l _
Wa1l2 WiUJ----;..........---------------------------
. WaD,, --------------~ _ Wall
WaII ---:.... _
CciliDI ...... _ Fklar =-=:--__---=~---
Ccil~ Wall Wall WaD . Wall .. N(NE}-
... laspeccion FIoarSizl= _
Ncx1h. Wallis WaD (1)_ Numbcro(WI1l:s_
°l je-.JDacriptiaa.(.-. waUspliDled. c:riL CCIII&IlDtS) _._--.....,..---------'----
Will 1__.:.
WIII2 -=-~....:..__....:._
WIll3 ~
·WaII4 :=.-
WaIl
WaD
,Wall .Wall...... WaII..;-.
ATTACHMENT 2
Drill Log
(Added (A(999
DRILLING LOG 1........-.......--
Blast Reference No.
Driller: _
Bench Elevations:, Rock Type: Rock Structure:
Bit Size:__(in) Bit S.N., Date Bit installed Drill:
Location: _
• separate logs shall be kept for each day of drilling
Drilling Date:
Coordinates:
R HN F H \ • 81 f00 AT· U I D Describe Conditions Encountered While Drilling. 0 c I ~ R N E W L o A P Note Depth Ranges From Hole Collar. Ii Ii I
Ii L T• I.e. Mud Seam: 12 to 17 ft. or Crack: 19 ft.0 NIH
(II) (II) (II) (1I)
I
I
1-
Daily Total Drilled Footage: I 1ft
Approvals: Driller _ Supervising Manager _ DLPage_of_
ATTACHMENT 3
Shot Plan
SHOT PLAN SHOT NUMBER: ___
CONTRACT NO. TODAYS I S DATE: _
BLASTER'S NAME BLASTING CONSULTANT
LOCATI ON
WEATHER
ROCK TYPE
DATE DR[LLEO
DATE LOADED __.
EXPLOSIVE (Brand
Nome>
PR IMER (Brand Nome}
Stort time End Time
Start time
BLASTING CAPS IBrond Nome) BLASTING INITIATORS (Brand Name) MISC. 8LAST1NG ITEMS (connectors. starters.
__________ QUANTITY--
BLAST ING PATTERN --'
DELAYS (/oCosec>
F JRING TIMES
DJAMETER OF HOL'ES
Pr"oduct j on
Other
NUMBER OF HOLES
Pr"oduction _
Other
SUBDR ILL WG
Length Elevation fBottoml
STEMMING LENGTH
EXPLOSJVE (LBS./HOLE}
POWOER FACTOR_,~~=-
CU. yo ./HOLE
CU. YD./SHOT
REMARK.S
ON BACK OF PAGE DIAGRAM DELAY PATTERN
AND CROSS SECTION OF SHOT
__________,__ TEMP. ..._...
etc.)
End time .•..
QUANT. ILBS./SHOTl
QUANT I TY
OUANTITy
OUANTITY
" ! ~ I : , I' I '. :
I I , I "
-,~ '- --+-r'~10+~*
, -r \ . - I
I , :
!. ; I : i
I· · , , , , . ; I. , \ , ., , , i I
: I , : , :
:, '. I ... , _. , , , " . , , , , I , , , , : I I
, · I 1 , ; !
I, : , " I ; , ! ./ ; : : , I e ; I e : ; , ; I ; , -' . ~
1 " I . ~ , '. : , , I
" I I , ;
, > ! , . J. I
., , I ; j ~ I , I ~ , : I , : ! , ;. ; ; ! I , I , ; ; , I , :
I ·I ! , I, , , ; I - . + - r~-, , , : : I . I !
l , 1 1 I I k , : ; I I, , J , : -H=t:t7+, , I J
.. t :
, I' I , : ; , I .
: I , , I !, , , I I
, J
1 , : ! .. 1 ; :
'" I , t I I
, I , I , , i ; I I : ;
DIAGRAM OF TYPICAL LOADED HOLE
ATTACHMENT 4
Shot Report Monitoring Data
SHOT REPORT
PIlQJECI': ----------
Actual (Act) Blut Elat8, -'kt Blut Tm. (Mill _
Act WeatbC' c::aad, TInP. F Clear, Partly ClCllldy. owreast:: Baro i'rU mHg, fOX' tbe Blut Wind~ed-l-!!Ph - -
'1'otal &IIIbc of '1'otal Wm.ght of IIIIX Cllazge
BIll.. ~, ZIIp1os:l.". UMd' lb Wt/~, lb
Nuniler of nnico~ locations fer shot'__ Mclnitorillg Type(s) :__Paxticle Veloc:ity,__Aid:llast
• Nearest M:lnitOX' #_ Instrulrent MaIIIl: InIItr ,: Instr Ollibratian Date: _
Nearest llDllitoring: Clolest approacll' ft Peak OVl!%presllllZ'e' tlsi
Locatian(N/E;"N/"W) SC&led Dists:lCe' fppl/2 Peak Resultant Particle Veloc: ips
Peak Resultant Part Vela III 5 hz, __ips Peak C9n\?Cr!o;nt Part Vela (itls) : T__,V__I.__
• Monitor ,_ InstJ:\lllli!nt Manu, Instr # Instr calibration Date: _
Neuest nmitoring Closest approach: ft Peak Clvup:essure: psi
Location (N/E, "N/"Wl SC&led Distance , fppl/2 Peak Resultant Panicle Velocity: ips
Peak Resultant Pan Vela ill 5 hz: __ips Peak Cs!!p9nent Part: Vela (ips): T , V__L__
• Monitor #__ Instrument Manu: Instr #: Instr calibraticm Date:...- _
Nurest nmitorin;: Closest approac:h: ft Peak Overprusu:e: psi
IDeation (N/E; "N/"W) 8c:aled Di.staZIc:e , fppl/2 Peak Resultant Particle Velocity: ,ips
Peak RuI.l1tant Part Vela III 5 hz: __ips Peak £arpc!nellt Put Vela (ips): T , V__L__
• Moniter #__ InstrI.II-.It Mmw.: :rn.tr #, InIItr CIl.im:ation Date<-. _
NeuelIt m::n1torin;: Cloaest appxgac:h:_ft Peak Ove:prllssure:_ JI8i Location(N/E; "II/OW) scaled Distsne:e' ffpl/2 Peale ResultllM Particle Velccity, ips
Peak Resultant Pan Velo III 5 hz: __ips Peak 9iln'cxmant Put Vela (i!?!!): T ,V__L__
Were any blut damages apparent? (yIN) Damages include, an inju:y OX' a c:cnplaint of clamage clue to bluting for this OX' a prior sIloI:, a flyz:cek prcjec:tile tlmlwn--.rzable distAnce, and the ~ stating that a signific:snt enviralmental inpact.
occ:urred.
Did the Ihot dIMllop lIllY iJlpdinwnta? (Y/Nl Shot ilrp!ldiments :include: an aborted o:c cIelll)l8C1 IIbot, • misfire, arr:t p:lZtion of the pattem DOt firing. a delay being slci.ppii!';' and exceeclirlq the ccntrae:t' s allOlOlllbl.e pareicle velocity OX' airblut c:m=l values.
Did tbe recaRIed particle velocity OX' aUtlJ.ast of any IUliter exceed 25. of either preabot estimate? (Y/N)__
If any of the three ~tions were answered YES. uplain the prcb1ll111 in c1etail. _
Explain in detail tbe means to be taken al all' future blasts to avoid t.be stated problem. _
QmtimIat1cla. an llbeet (s) __of__
~(print) _
ATTACHMENT 5
Vibration Section of the International Society of Explosives
Engineers (ISEE)
INDUSTRY STANDARD BLAST VIBRATION & NOISE MONITORING
PROCEDURES
The following standards should be applied when measuring blast-induced vibration and air overpressure (noise). These standards are based on the best practices recommended by The Vibration Section of the International Society of Explosives Engineers - 1999.
Part 1. General Guidelines
1. Qperators: Only personnel who have successfully completed a proper training course should operate monitoring equipment.
2. Calibration: The instrument manufacturer should annually calibrate recording units and sensors. Documenting certificates should be kept on file and copies should be provided to appropriate persons upon request.
3. Event Record Keeping: Hard copy reports and electronic file-copies of all event monitoring records should be maintained for all blasts. Operating notes should be programmed into the instruments, which should be printed monitoring records. These notes at a minimum should include the operator's name, date, time, place and other pertinent data specific to the monitoring location.
4. Trigger Levels: When employing instruments to operate in auto-trigger-mode, trigger levels should be set low enough to record blast effects. If expected levels of blast noise or vibration do not exceed minimum trigger levels, the instrument should be attended by an operator and turned on manually.
5. Documenting Monitor Location: In addition to event reports, an accurate method should be used to determine the monitoring location for later reference. Acceptable methods are 1) plotting numbered locations on scaled maps; 2) defining location with GPS northing, easting and elevation values; and 3) noting the name of the structure and the measured distance (+/- 1 ft) where the seismograph was placed relative to at least two identifiable reference points. Any person should be able to locate and identify the exact monitoring location at a future date.
6. Distance to Blast: The horizontal distance from the seismograph to the blast should be known to at least two significant digits. For example, a blast within 1000 feet would be nearest tens of feet and a blast within 10,000 feet would be measured to the nearest hundreds of feet. Where the vertical-to-horizontal ground slope ratio exceeds 2.5 tol, slant distances or true distance should be used and recorded in the monitoring records.
7. Processing Time: When instruments are used in auto-trigger and continuous-recording mode to record the effects of multiple blasts, the time between successive blasts shall be at least one (1) minute and seismographs shall be set to NOT automatically print out event records. These procedures should ensure that instruments have adequate time to save event data for each blast and reset to monitoring mode before subsequent blasts occur.
8. Memory Management: The instrument operator should know the memory or record capacity of the seismograph and ensure that adequate memory is available to store the event data from the blast(s) planned during that operating day.
9. Waveform Data: Instruments shall be set to save full waveform data for all monitored blast and digitally saved event files shall contain this data for use in further analyses if needed.
10. Instrument Setup Time: Equipment operators should allow ample time for proper setup of the seismograph, transducers and microphones. At least 15 minutes of time should be allotted for each setup location.
11. Securing cables: In order to prevent false triggering caused by wind-blown cables, the operator should secure suspended or freely moving cables from the wind or other extraneous sources.
Part II. Ground Vibration Monitoring
A. Sensor Placement
The sensor should be placed on or in the ground on the side of the structure towards the blast. A structure can be a house, pipeline, telephone pole, etc. Measurements on driveways, walkways, and slabs are to be avoided where possible.
1. Location relative to the structure: The sensor should be placed within 10 feet of the structure or less than 10% of the distance from the blast, whichever is less.
2. Soil density evaluation: The operator should avoid placing velocity transducers in loose or low-density soils. The density of the ground should be 'greater than or equal to the sensor density.
3. Sensor Level: Transducers should be placed so they are level or nearly level.
4. Sensor Orientation: Sensor blocks should be oriented so the arrow indicating the longitudinal direction is aimed at the blast location.
5. Monitoring when Access to Nearest Structure is not Accessible: Where access to a structure is not available, the transducers should placed at the accessible location closest the structure of concern and in line with the blast.
B. Sensor coupling
1. Sensor Coupling Methods: Based on expected acceleration determined from Chart 1, to avoid decoupling errors, the operator shall use the following methods to couple vibration transducers to the ground or structure.
a. Less than 0.2 g: No burial or attachment is necessary.
b. Between 0.2 and 1.0 g: Transducer should be attached to the ground with a spike or covered with a sand bag.
c. Greater than 1.0 g: Transducer should be buried, bonded to the ground or structure with stiff clay or putty, or some other method that should achieve firm attachment.
TABLE 1- Acceleration intensity (g's) based onestimated particle velocities and frequencies
Maximum FreQuency (Hz or cycles-per-second) 4 10 15 20 25 30 40 50 100 150 200
PPV (in/s) at Ace. (g)~ 0.2 3.08 1.23 0.82 0.62 0.49 0.41 0.31 0.25 0.12 0.08 0.06
PPV (in/s) at Ace. (g)~ 1.0 15.38 6.15 4.10 3.08 2.46 2.05 1.54 1.23 0.62 0.41 0.31
2. Sensor Burial: When velocity transducers are buried the operator should employ the following methods.
a. Excavate a hole that is no less than three times the height of the sensor (ANSI
S2.47-1990, RI997).
| b. | If possible, spike the sensor to the bottom of the hole. |
| c. | Firmly compact soil around and over the sensor. |
3. Attaching Sensors to bedrock or hard Structural Surfaces:
| a. | Bolt, clamp or use epoxy or putty to firmly couple the sensor to the hard surface. |
| b. | The sensor may be attached to the foundation of the structure if it is located |
within +/- l-foot of ground level (USBM RI 8969). This should only be used if burial, spiking or and bagging is not practical.
4. Other sensor placement methods: Use other methods as described below if disturbance of the ground is not possible.
a. Cover transducers with sand bags loosely filled with about 10 pounds of sand.
When placed over the sensor the sandbag profile should be as low and wide as possible with a maximwn amount of firm contact with the ground.
b. A combination of both spiking and sandbagging gives even greater assurance that good coupling is obtained.
c. Programming considerations
Site conditions dictate certain actions when programming the seismograph.
1. Ground motion trigger level: The PPV-trigger-level should be programmed low enough to trigger the unit from blast vibrations and high enough to minimize the occurrence of false events. The level should be slightly above the expected background vibrations for the area. A good starting level is 0.05 in/so
2. Dynamic range and resolution: If PPV is expected to exceed 10 in/s or frequency is expected to exceed 250 Hz, special sensors approved by the Vibration Specialist should be used to measure blast effects. In these cases, the Vibration Specialist should also determine a digital sampling rate that should provide accurate recordings.
3. Recording duration: Set the record time for 2 seconds longer than the blast duration plus I second for each 1100 feet from the blast.
Part III Air-overpressure Monitoring The following procedures should be used as possible when setting up instruments to measure blast-induced noise.
A. Microphone placement
The microphone should be placed along the side of the structure nearest the blast.
1. The microphone should be covered with a windscreen and mounted near the velocity transducers.
2. The preferred microphone height is 3 feet above the ground or within 1.2 inches of the ground. Other heights may be acceptable for practical reasons. (ANSI SI2.l8-1994, ANSI SI2.9-1992/Part2) (USBM RI 8508)
3. If practical, the microphone should not be shielded from the blast by nearby buildings, vehicles or other large barriers. If such shielding cannot be avoided, the horizontal distance between the microphone and shielding object should be greater than the height of the shielding object above the microphone.
4. If placed too close to a structure, the airblast may reflect from the house surface and record higher amplitudes. Structure response noise may also be recorded. Placing the microphone near a comer of the structure can minimize reflection of over-pressure energy. (RI 8508)
B. Programming considerations
Site conditions dictate certain actions when programming the seismograph to record air overpressure.
1. Trigger level: When only an airblast measurement is desired, the trigger level should be low enough to trigger the unit from the airblast and high enough to minimize the occurrence of false events. The level should be slightly above the expected background noise for the area. A good starting level is 120 dB.
2. Recording duration: When only recording airblast, set the recording time for at least 2 seconds more than the blast duration. When ground vibrations and air-overpressure measurements are desired on the same record, follow the guidelines for ground vibration programming (Part II C.3).
described elsewhere in these specifications. Such price and payment will be full compensation for the work as described in the above paragraphs including but not limited to furnishing all materials, tools, labor, equipment and all incidentals necessary to complete and maintain the work as specified.
3.3 SOIL STABILIZATION MATTING (VDCR ESCH Std. 3.36)
3.3.1 General
The work shall consist of furnishing and installing soil stabilization matting in accordance with the requirements of these specifications and in reasonably close conformity to the dimensions, lines, and grades shown on the plans or as established by the Contracting Officer. This work shall include all necessary materials, labor, supervision and equipment for installation of a complete system. This section shall be coordinated with the requirements of Section 31 00 00 EARTHWORK and Section 32 92 19 SEEDING.
3.3.2 Material
The soil stabilization matting shall conform to the requirements of VDCR Virginia Erosion and Sediment Control Handbook STD. & SPEC 3.36, Treatment-2. The soil stabilization matting shall be North American Green C350 or approved equal
3.3.3 Installation
Before placing the soil stabilization matting, ensure the site has been shaped and graded smooth; has no depressed, void areas; is free from obstructions, such as tree roots, projecting stones or other foreign matter. Vehicles shall not be permitted directly on the blankets. Stones, roots, and other objects that will prevent protective matting from making close contact with the seedbed shall be removed before covering is installed. The soil stabilization matting shall be installed in accordance with the VDCR Virginia Erosion and Sediment Control Handbook STD. & SPEC 3.36, Treatment-2 Typical Installation (Plates 3.36-4 and 3.36-5) or the VDOT STD DRWGS Standard Drawing EC-3 and manufacturer's recommendations.
The Contractor shall use metal or wood stakes to secure and anchor the soil stabilization matting to the finished grade.
Seed shall be applied in accordance with the requirements of Section 32 92 19 SEEDING. Seed, fertilizer, and lime shall be applied prior to installation of soil stabilization matting. Seeded areas adjacent to the ditch that are disturbed during installation of covering shall be uniformly reshaped, reseeded, and mulched at the Contractor's expense.
3.3.4 Measurement and Payment
The quantity of soil stabilization matting to be paid for shall be the actual number of square yards of matting installed in place in accordance with the plans and specifications and accepted by the Contracting Officer.
The quantity of soil stabilization matting measured as provided above will be paid for at the contract unit price per square yard for "SOIL STABILIZATION MATTING" as listed in Section 00010. Overlaps, overwidths, and cut slots will not be measured for separate payment. Such price and payments will be full compensation for the work as described in the above paragraphs including but not limited to furnishing all materials, installing, and staking soil stabilization matting, smoothing and shaping ditch channels slopes, equipment, and all incidentals necessary to complete
SECTION 31 22 16 Page 3
d. Stone placed to the lines and grades shown on the drawings and within allowable tolerances.
A copy of the records of inspections and report of operations as well as the corrective action taken shall be furnished the Government as directed by the Contracting Officer.
1.5 MEASUREMENT AND PAYMENT
The quantity of riprap to be paid for will be the actual number of tons of stone which has been incorporated in the completed and accepted work. The stone will be measured by being weighed in trucks on approved platform scales or by other approved weighing devices. The price bid for riprap shall include all costs for furnishing, hauling, testing, and placing the stone as specified. Payment will be based on the weight of stone, surface dry, in its natural state. Payment shall constitute full compensation for all labor, equipment, tools, maintenance, and incidentals necessary to place riprap and will be made under:
Class 1 Riprap . . . . . TON Class A1 Riprap . . . . . TON
PART 2 PRODUCTS
2.1 MATERIALS
2.1.1 General
All stone for the protection work shall be fresh durable stone as approved by the Contracting Officer. All stone for riprap shall be supplied from Contractor procured sources.
2.1.2 Stone
Riprap stone shall consist of fresh, sound, hard, dense, durable rock, which shall be separated from bedrock by quarrying. The stone shall be of such quality that individual integrity and permanence within the structures is assured under all conditions to which it is subjected. The unit weight, saturated surface dry (SSD), of the stone shall not be less than 160 pounds per cubic foot and the specific gravity not less than 2.58. The stone shall be free from open or incipient cracks, seams, fissures and structural planes of weakness, and other defects that would tend to increase its deterioration from natural causes. Not more than 15% by weight of the stone shall have its breadth or thickness of any piece less than one-third of its length. Not more than 1% by weight for inclusion of objectionable quantities of dirt, sand, clay, and rock fines will be permitted. An allowance of 5% by weight for inclusion of spalls will be permitted. The stone shall be furnished in sizes as indicated in subparagraph, Stone Gradations.
2.1.3 Bedding Material
Bedding material shall consist of geotextiles meeting the requirements of
SECTION 31 05 22: GEOTEXTILES USED AS FILTERS.
2.1.4 Stone Gradations
The stone used on the project shall meet the following requirements.
VDOT STD SPECS Class 1 riprap shall be used as erosion control stone for
SECTION 32 22 13 Page 2 culvert outlets, rock check dams, and as shown on the plans.
VDOT STD SPECS VDOT #1 Course Aggregate shall be used as erosion control stone for rock check dams and as shown on the plans.
2.1.5 Identification of Stone Sources
The sources from which the Contractor proposes to obtain stone materials required for the features covered in these specifications shall be selected and identified to the Contracting officer well in advance of the time when the materials will be required in the work, a minimum of 30 days. The Contractor may select a source from the Virginia Department of Transportation list of approved sources of aggregates.
2.1.6 Testing And Approval For Rock Quality
The acceptability of the rock may be determined from existing test reports, service records from similar usage, by geologic examination of samples and of the quarry and/or by testing. The tests to which the materials will be subjected include petrographic analysis, specific gravity, abrasion, absorption, unit weight determination, sulfate soundness, wetting and drying, freezing and thawing and unconfined compressive strength, and such other tests as may be considered necessary to demonstrate to the satisfaction of the Contracting Officer that the materials are acceptable for use in the work. The minimum rock quality criteria which must be met are those specified in subparagraph Stone. In addition to the minimum criteria, other criteria determined from the tests or inspections listed above may be used to establish the acceptability of the stone. Approval of any source of stone shall not be construed as approval of all of the stone from that source. The right is reserved to reject certain localized areas, strata, or channels within the approved source when in the opinion of the Contracting Officer the stone is disintegrated, badly weathered, contains incipient planes of weakness or hidden joints/fractures, or is otherwise unsatisfactory for use in the work. All stone will be subject to inspection during loading at the source, at intermediate transfer points and at the site of work prior to placement.
2.1.7 Stone Not Meeting the Specifications
If, during the progress of the work, it is found that the stone being furnished and/or placed by the Contractor does not meet all the requirements of the specifications, the Contractor shall be required to furnish other stone of a quality acceptable to the Contracting Officer. Any stone rejected at the site of the work as not meeting the requirements of these specifications for quality, condition, size, gradation or otherwise shall be removed from the site by and at the expense of the Contractor, and stone of suitable quality shall be furnished and/or placed at no additional cost to the Government. The Contractor shall dispose of all rejected stone in a manner approved by the Contracting Officer.
2.1.8 Gradation Testing
The Contractor shall perform one in-place test to verify that the completed work, i.e., stone protection, meets the requirements of this specification.
The in-place test is to consist of removing all riprap from a 10' by 10' area and weighing each stone in order to determine the gradation of the riprap supplied. The test shall be performed at the beginning of riprap placement for an area. These tests will not relieve the Contractor of the responsibility of complying with the full requirements of the