W912GY-18-R-0018-00001_Amendment.pdf
PDF 262 KB Posted
- Attached to
- Concrete Requirements Contract
- Solicitation number
- W912GY-18-R-0018
About this file
Amendment 0001
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W912GY-18-R-0018-00001.pdf | ||
| Solicitation_-_W912GY-18-R-0018.pdf | ||
| Concrete_Mix_Specs.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Please see Block 14 Continuation Page "Purpose of Amendment".
1. CONTRACT ID CODE PAGE OF PAGES
J 1 22
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 16-Nov-2018
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912GY18R0018
X 9B. DATED (SEE ITEM 11)
02-Aug-2018
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
16-Nov-2018
CODE
SIERRA ARMY DEPOT
CONTRACTING OFFICE
74 C STREET BUILDING 60
HERLONG CA 96113
W912GY 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912GY18R0018
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 1449 - CONTINUATION SHEET
The following have been added by full text:
LOCAL NARRATIVES
AS7317
A.__ ALL OR NONE-COMMERCIAL ITEM ACQUISITION
(a) This provision serves as an addendum that modifies paragraph (h) of FAR 52.212-1, entitled INSTRUCTIONS TO OFFERORS--COMMERCIAL ITEMS. Paragraph (h) is modified to say that the proposal or quote must offer to provide the total quantity of the items in this solicitation.
(b) Only one award will be made as a result of this solicitation. Offers submitted for less than the total quantities of all the items in this solicitation will NOT be considered for award.
PURPOSE OF AMENDMENT
The purpose of amendment 0001 is as follows:
1. Add local narrative AS7317 "All or None"‐Commercial Item Acquisition
2. To clarify that all offerors must submit proposals that provide a price for each CLIN utilizing the unit of issue annotated for each CLIN, for all ordering periods.
3. To instruct offerors that proposals received that do not provide a price for each CLIN in the requested unit of issue, will be rejected.
4. To instruct all offerors they are required to acknowledge amendment 0001 even if they do not intend to submit a revised proposal.
5. To update Statement of Work paragraph 1.8 (Period of Performance) as follows:
Period of Performance:
The period of performance shall be for one (1) Base Year of 12 months and four (4) 12-month ordering years.
The Period of Performance is as follows:
Ordering Year 1 – 26 Nov 2018 to 25 Nov 2019 Ordering Year 2 -- 26 Nov 2019 to 25 Nov 2020 Ordering Year 3 -- 26 Nov 2020 to 25 Nov 2021 Ordering Year 4 -- 26 Nov 2021 to 25 Nov 2022 Ordering Year 5 -- 26 Nov 2022 to 25 Nov 2023
6. Suspense for submission of proposals under Amendment 0001 to this solicitation is Tuesday, 4:30 PM EST, 20 November 2018.
7. Offerors must provide a proposal validity of 14 days.
The following have been modified:
STATEMENT OF WORK
PERFORMANCE WORK STATEMENT (PWS)
Concrete Purchases @ SIAD
SIAD
PART 1
GENERAL INFORMATION
1 GENERAL: This shall be a Firm Fixed Price requirements type contract for concrete. The Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government.
1.1 Description of Services/Introduction: The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform Concrete Purchases Sierra Army Depot as defined in this Performance Work Statement except for those items specified as government furnished property and services. The Contractor shall perform to the standards in this contract.
1.2 Background: this contract will provide DPW with concrete for construction and maintenance.
1.3 Objectives:
1.3.1 Ready-Mix Concrete
1.3.2 Set-Retarding add mix
1.3.3 Fiber add mix
1.3.4 Air-entrainment add mix
1.3.5 Accelerator add mix
1.3.6 Superplasticizer add mix
1.3.7 Hot water add mix
1.3.8 Line pumping per cubic yard
1.4 Scope: The Contractor shall deliver Ready-Mix Concrete with add mix, if required, to locations on Sierra Army Depot.
1.5 Delivery: All concrete shall be delivered in mixer trucks. Delivery days shall be Monday through Thursday.
The daily delivery quantity and delivery days may be adjusted by the Government.
1.6 Waybills and Delivery Tickets: Before the final statement is allowed the Contractor shall file with the Contracting Officer certified waybills and certified delivery tickets for all concrete actually delivered. The delivery waybills shall be provided to the COR load by load.
1.7 Price will include all trucking, travel time, and standby time once on Sierra Army Depot.
1.8 The contractor shall utilize the concrete tailings pile located on “H” Street, Sierra Army Depot, for dumping and washing their concrete delivery trucks, upon completion of concrete delivery.
1.9 Period of Performance:
The period of performance shall be for one (1) Base Year of 12 months and four (4) 12-month ordering years.
The Period of Performance is as follows:
Ordering Year 1 – 26 Nov 2018 to 25 Nov 2019 Ordering Year 2 -- 26 Nov 2019 to 25 Nov 2020 Ordering Year 3 -- 26 Nov 2020 to 25 Nov 2021
Ordering Year 4 -- 26 Nov 2021 to 25 Nov 2022 Ordering Year 5 -- 26 Nov 2022 to 25 Nov 2023
1.10 General Information:
1.10.1 Quality Control: The contractor shall develop and maintain an effective quality control program to ensure services are performed in accordance with this PWS. The contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The contractor's quality control program is the means by which he assures himself that his work complies with the requirement. After acceptance of the quality control plan the contractor shall receive the contracting officer's acceptance in writing of any proposed change to his QC system.
1.10.2 Quality Assurance: The government shall evaluate the contractor's performance under this contract in accordance with the Quality Assurance Surveillance Plan. This plan is primarily focused on what the Government must do to ensure that the contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable defect rate(s).
1.10.3 Recognized Holidays: No Holiday work is required.
New Year's Day Martin Luther King Jr.'s Birthday President's Day Memorial Day Independence Day Labor Day Columbus Day Veteran's Day Thanksgiving Day Christmas Day
1.10.4 Hours of Operation: The contractor is responsible for conducting business, between the hours of 0630- 1700 Monday- Friday except holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. For other than firm fixed price contracts, the contractor will not be reimbursed when the government facility is closed for the above reasons. The Contractor must at all times maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons. When hiring personnel, the Contractor shall keep in mind that the stability and continuity of the workforce are essential.
1.10.5 Place of Performance: The work to be performed under this contract will be performed at Sierra Army Depot
1.10.6 Type of Contract: The government will award a Firm Fixed Price requirements type Contract.
1.10.7 Security Requirements: Contractor personnel performing work under this contract must have a Visitors Pass at time of the proposal submission, and must maintain the level of security required for the life of the contract.
The security requirements are in accordance with the attached DD254.
1.10.7.1 PHYSICAL Security: The contractor shall be responsible for safeguarding all government equipment, information and property provided for contractor use. At the close of each work period, government facilities, equipment, and materials shall be secured.
1.10.7.2 Key Control. The Contractor shall establish and implement methods of making sure all keys/key cards issued to the Contractor by the Government are not lost or misplaced and are not used by unauthorized persons.
NOTE: All references to keys include key cards. No keys issued to the Contractor by the Government shall be duplicated. The Contractor shall develop procedures covering key control that shall be included in the Quality Control Plan. Such procedures shall include turn-in of any issued keys by personnel who no longer require access to locked areas. The Contractor shall immediately report any occurrences of lost or duplicate keys/key cards to the Contracting Officer.
1.10.7.2.1 N/A
1.10.7.2.2
1.10.7.3 Lock Combinations. The Contractor shall establish and implement methods of ensuring that all lock combinations are not revealed to unauthorized persons. The Contractor shall ensure that lock combinations are changed when personnel having access to the combinations no longer have a need to know such combinations.
These procedures shall be included in the Contractor's Quality Control Plan.
1.10.8 Special Qualifications:N/A
1.10.9 Post Award Conference/Periodic Progress Meetings: The Contractor agrees to attend any post award conference convened by the contracting activity or contract administration office in accordance with Federal Acquisition Regulation Subpart 42.5. The contracting officer, Contracting Officers Representative (COR), and other Government personnel, as appropriate, may meet periodically with the contractor to review the contractor's performance. At these meetings the contracting officer will apprise the contractor of how the government views the contractor's performance and the contractor will apprise the Government of problems, if any, being experienced. Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the government.
1.10.10 Contracting Officer Representative (COR): The (COR) will be identified by separate letter. The COR monitors all technical aspects of the contract and assists in contract administration The COR is authorized to perform the following functions: assure that the Contractor performs the technical requirements of the contract:
perform inspections necessary in connection with contract performance: maintain written and oral communications with the Contractor concerning technical aspects of the contract: issue written interpretations of technical requirements, including Government drawings, designs, specifications: monitor Contractor's performance and notifies both the Contracting Officer and Contractor of any deficiencies; coordinate availability of government furnished property, and provide site entry of Contractor personnel. A letter of designation issued to the COR, a copy of which is sent to the Contractor, states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting order.
1.10.11 Key Personnel: The follow personnel are considered key personnel by the government: Jason Colbert.
The contractor shall provide a contract manager who shall be responsible for the performance of the work. The name of this person and an alternate who shall act for the contractor when the manager is absent shall be designated in writing to the contracting officer. The contract manager or alternate shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract. The contract manager or alternate shall be available between 0630-1700 Monday thru Friday except Federal holidays or when the government facility is closed for administrative reasons.
1.10.12 Identification of Contractor Employees: All contract personnel attending meetings, answering Government telephones, and working in other situations where their contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression in the minds of members of the public that they are Government officials. They must also ensure that all documents or reports produced by contractors are suitably marked as contractor products or that contractor participation is appropriately disclosed.
1.10.13 Contractor Travel : N/A
1.10.14 Other Direct Costs: N/A
1.10.15 Data Rights: NA
1.10.16 Organizational Conflict of Interest: Contractor and subcontractor personnel performing work under this contract may receive, have access to or participate in the development of proprietary or source selection information (e.g., cost or pricing information, budget information or analyses, specifications or work statements, etc.) or perform evaluation services which may create a current or subsequent Organizational Conflict of Interests (OCI) as defined in FAR Subpart 9.5. The Contractor shall notify the Contracting Officer immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the Contracting Officer to avoid or mitigate any such OCI. The Contractor's mitigation plan will be determined to be acceptable solely at the discretion of the Contracting Officer and in the event the Contracting Officer unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the Contracting Officer may effect other remedies as he or she deems necessary, including prohibiting the Contractor from participation in subsequent contracted requirements which may be affected by the OCI.
1.10.17 Phase In /Phase Out Period:N/A
1.10.18 Environmental Notification: Contractor shall comply with the following Environmental Sections.
Sec. 1- Compliance with Environmental Laws and Regulations:
Contractor shall comply with all applicable federal, state, and local environmental laws, statutes, regulations, executive orders, permits, Army regulations (with supplements), as well as Major Subordinate Command (MSC) and Sierra Army Depot (SIAD) regulation, policy, Host Tenant Agreement, Interagency Service Support Agreement, or Status-of-Forces Agreement. Contractor shall immediately report any conflicts between applicable federal, state, local environmental laws, statutes, executive orders, and provisions of Army Regulation 200-1, and any specifications within this contract to the Contracting Officer Representative (COR).
Sec. 2 - Compliance with Green Procurement Requirements:
Contractor shall follow Federal EPA Comprehensive Procurement guidelines (www.epa.gov/cpg) and Army Contracting Command Quick Guide (https://acc.aep.army.mil/accapps/ACCMAP/Documents/Quick-Guide-for- Sustainable-Procurement.docx) for acquisition of building materials and products and select materials that have a long life cycle; the least toxic materials; recyclable materials; materials that are resource-efficient; materials with the maximum recycled content; materials harvested on a sustained yield basis; and products causing the least pollution during their manufacture, use, and reuse.
Sec. 3 - Compliance with License and Certification Requirements:
Contractor shall obtain all license and certification required by Federal, State, and Local environmental laws and regulations necessary to adhere to the specifications of this contract. The Contractor shall submit all plans, notifications, reports, submittal documents, and fees required by Federal, State, and Local environmental laws and regulations to the appropriate Federal, State, and Local authority and/or agency as necessary to adhere to the specification of this contract. All required licenses and certifications required by Federal, State, and Local environmental laws and/or regulations shall be considered a contract deliverable upon award.
Sec. 4 - Notification of Federal and State Regulators:
Contractor shall immediately notify the COR of the arrival on site of any Federal, State, local and/or DoD environmental regulator or enforcement agent and/or the receipt of any correspondence from above mentioned environmental regulatory agencies.
Sec. 5 - Inspections of Work Sites:
Contractor shall submit to potential Federal, State, Local, Army and installation work site environmental regulatory inspections and/or investigations into noncompliance, and fully cooperate with such inspections/investigations by providing the appropriate records and documentation. Environmental regulatory agencies are authorized by law to inspect any work site for environmental compliance with regulatory requirements. If an inspection is conducted, it will not stop or disrupt ongoing contract activities. The inspection will only require the work site environmental officer, or supervisor/manager to answer questions and/or escort the inspector to specific work site areas with the potential to affect environmental quality.
Sec. 6 - Reporting Noncompliance:
Contractor shall immediately report any nonconformance and/or noncompliance with applicable Federal, State or Local environmental laws, Army and installation environmental regulations or policies to the COR.
Sec. 7 - Verification of National Environmental Policy Act Documents:
Contractor shall obtain and comply with AMC's National Environmental Policy Act Policy and 32 CFR 651 which addresses actions to be taken by contractor (copies available from the COR). These documents include but is not limited to the analysis-associated decision document of an Environmental Impact Statement and Record of Decision; Environmental Assessment and Finding of No Significant Impact or Notice to Proceed; or Record of Environmental Consideration on the proposed contract actions prior to commencement of such actions.
Sec. 8 - Conformance with Environmental Management System (EMS):
Contractor shall take the necessary actions to identify, monitor, and control those contract operations and activities that pose risk of contamination, or can negatively impact the natural and/or human environment. SIAD currently operates and maintains an International Organization of Standards (ISO) 14001 certified program, "Fence to Fence". Contractor shall comply with all EMS program requirements.
Sec. 9 - Assignment of Environmental Compliance Designee (ECD): N/A on this project.
Contractor shall appoint a primary and alternate ECD for all contract work periods exceeding 180 consecutive days and for each production, shop or work area that uses and/or stores hazardous materials and/or generates hazardous wastes. Contractor ECDs shall monitor implementation of all environmental regulatory requirements, report all environmental noncompliance to the work site supervisor, correct all environmental noncompliance, and verify implementation of directed actions to correct identified environmental noncompliance. Contractor shall have at least one ECD on duty at all times at each shop or work area. Contractor shall require all personnel designated as ECDs to complete the initial ECD training through the installation or Major Subordinate Command (MSC) environmental compliance point of contact within 15 days of the start of contract performance. Contractor personnel appointed as ECDs may perform other duties provided they do not prevent the performance of ECD duties. Contractors may request a waiver of this requirement through the COR, if using and/or storing very small quantities of hazardous materials.
Sec. 10 - Competency Training for Contractor Personnel:
Contractor shall not allow personnel to perform any activities and/or tasks on AMC installations (SIAD) without proper and adequate qualifications or job competency training. In the event of any identified noncompliance, the Contractor shall, if requested, provide proof of contract personnel training or qualification (individual name, training/qualification type, training/qualification certificate, and date of training/qualification) to perform those contract activities associated with the identified noncompliance.
Sec. 11 - Generation of Solid Waste:
Contractor shall dispose of all solid waste generated, which cannot be recycled, into the appropriately marked solid waste containers and roll-offs provided. Contractor shall comply with the SIAD Integrated Solid Waste Management Plan.
11.1. Contractor shall make every effort to divert construction, demolition debris, and all other solid waste to comply with the Army Integrated Solid Waste Management Policy.
11.2. The Contractor shall coordinate with the installation Qualified Recycling Program (QRP) and Solid Waste Managers and COR to arrange for recyclable materials to be removed and diverted from the waste stream.
11. 3. Submit in writing the quantities of waste removed and recycled to the COR on a monthly basis. The submittal shall include the date of disposal/recycling, the disposal/recycling facility, the types of material disposed/recycled and the quantities of materials disposed/recycled by weight or volume.
11. 4. The Contractor shall promote cost-effective waste reduction in all operations and facilities covered by the contract. This includes collection, separation, and processing products or other materials recovered from solid waste streams for use in the form of raw materials.
11. 5. The Contractor shall make maximum effort to reduce and prevent waste.
Sec. 12 - Generation of Hazardous Waste:
Contractor shall assign all hazardous waste management responsibilities to the appointed ECD or designated personnel. Contractor shall contact the COR to obtain technical assistance from the Environmental Office for assisting the ECD with achieving and maintaining compliance with hazardous waste storage and disposal requirements. Contractor shall properly identify all waste and how generated as part of this contract to determine if any waste is hazardous waste as defined by both Federal and State EPA (40 CFR and Title 22 CCR). Contractor shall accumulate and properly manage hazardous waste in a satellite accumulation point at or near the point of generation or in a less-than-90-day site, in accordance with Federal, State, Local, Army, and installation regulation, policy, Host Tenant Agreement, Interagency Service Support Agreement or Status-of-Forces Agreement. The Contractor shall properly package all hazardous waste. The contractor shall arrange for pickup or deliver, all hazardous waste generated by contract activities from the installation, to the Hazardous Waste Storage facility, B. 380. The COR and Environmental Office shall assist contractors with hazardous waste generators training and on-site management of their waste upon request.
Sec. 13. - Use of Hazardous Materials:
Contractor shall assign all hazardous materials management responsibilities to the appointed ECD or designated personnel. Contractor shall contact the COR to obtain technical assistance from Environmental Office for assisting the ECD with achieving and maintaining compliance with hazardous material storage, issue, use, and disposal requirements. Contractor shall submit to the COR a hazardous material inventory. The hazardous material inventory will be submitted 30 days prior to commencement of work for contracts that exceed 180 consecutive days. The inventory list will contain the hazardous material type and maximum quantities of materials anticipated to be stored on-site. The hazardous material shall be properly identified and include any applicable identification number, such as National Stock Number or Special Item Number. The Contractor shall maintain copies of Safety Data Sheets for all hazardous materials used and stored on-site during performance of the contract. Contractor shall not supply or deliver any hazardous materials or chemicals to an installation that are listed on EPA toxic chemical list (33/50 Program - AKA 17 List) without prior written approval from the COR.
Sec. 14. - Prevention of Storm Water Pollution:
The Contractor shall perform, track, participate, implement, and comply with storm water pollution prevention minimum control measures, protocols, and best management practices (BMP) and ensure that water quality standards are not violated in accordance with all regulations and policies as applicable to the National Pollutant Discharge Elimination System (NPDES) general permit requirements. Applicable permits may include, but not limited to:
1) The installation's Small Municipal Separate Storm Sewer System (MS4) Permit;
2) The Multi-Sector General Permit for Storm Water Discharges Associated with Industrial Activities (MSGP);
and,
3) All Construction Activity Storm Water permits minimum control measures include, but not limited to:
Public Education and Outreach on Storm Water Impacts Public Involvement and Participation Illicit Discharge Detection and Elimination Construction Site Storm Water Run-off Control Post Construction Storm Water Management in New Development and Redevelopment Pollution Prevention/Good Housekeeping for Municipal Operations Contractors will comply with the MSGP permit when the activity is identified as a permitted industrial activity. BMPs include, but are not limited to:
Practicing spill prevention and good housekeeping.
Installing and managing erosion and sediment control.
Meeting the requirements of the MS4 permit.
Contractors will comply with obtaining permit coverage for construction activities disturbing over one acre of land (total acreage is cumulative across all portions of the project). BMPs include, but are not limited to:
Preparing and implementing a site-specific Storm Water Pollution Prevention Plan (SWPPP) as outlined in the permit and prior to any soil disturbance.
Installing and managing erosion and sediment control.
Make available, upon request, permit associated documentation.
Practicing spill prevention and good housekeeping.
Meeting the requirements of the MS4 permit.
Schedule inspections and provide corrective actions for noted deficiencies.
Sec. 15 - Storm Water Management Low Impact Design/Development (LID):
The Contractor shall perform, track, participate, implement, and comply with Section 438 of the Energy Independence and Security Act; Executive Order 13514; and the DOA memorandum (2010) for full implementation of low impact design/development (LID) techniques to restore predevelopment hydrology to the maximum extent technically feasible for both new and renovation construction projects regardless of size. In support of LID, Contractors will adhere to installation landscape codes and the guidance found in the Installation Design Guide concerning Low Impact Design/Development for storm water management. The following LID practices include, but are not limited to:
Restoring predevelopment hydrology to the maximum extent technically feasible Promoting natural removal of pollutants such as nutrients, oil and grease, and sediments from storm water Managing rainfall at the point where it falls Meeting the requirements of the MS4 permit Important Note: Utilization of permanent retention/detention ponds is prohibited without authorization from the Installation Planning Division.
Sec. 16 - Use of Pesticides: N/A
The Contractor shall not apply any pesticides without the expressed written permission from the COR in consultation with the Installation Pesticide Management Coordinator (IPMC). The Contractor shall utilize Integrated Pest Management (IPM) technology and procedures in strict compliance with all applicable Federal, State, local, Army, and SIAD regulations, to include the installation's Integrated Pest Management Plan as guidance. The Contractor shall not contract out any pesticide services without the expressed written permission from the COR in consultation with the Installation Pesticide Management Coordinator (IPMC).
Sec. 17 - Protection of Work Site Resources:
Contractor shall confine all activities to areas defined by the drawings and specifications. Prior to the beginning of any work, the Contractor shall identify any land resources to be preserved within the work area. Except in areas indicated on the drawings or specified to be cleared, the Contractor shall not remove, cut, deface, injure, or destroy land resources including trees, shrubs, vines, grasses, topsoil, and landforms. The Contractor shall provide effective protection for land and vegetative resources at all times. Prior to site clearing and grubbing, the Contractor shall coordinate with the COR. Contractor shall notify the COR if any trees are required to be disposed or removed. The Contractor is not authorized to remove or dispose of any tree greater than 6 inches in diameter unless permission has been granted in writing by the COR.
Sec. 18 - Prevention of Spills:
Contractor shall adopt the installation's Spill Prevention Control and Countermeasures Plan (SPCC) if transporting, processing, storing, or in any way managing hazardous waste, hazardous material, petroleum-oils-lubricants, or other restricted items. In case of a spill, the person in control of the spill site or their designated representative shall take appropriate action to protect workers and bystanders; contain the spill (if it can be done safely); secure the spill site; restrict ignition sources; and immediately contact the installation Fire and Emergency Services (Fire Department).
Sec. 19 - Protection of Sensitive Areas:
Contractor shall comply with all installation designated sensitive and/or off-limit area restrictions. Sensitive areas are generally demarked indicating what activities (e.g., driving, digging, foot traffic) are prohibited. The Contractor shall also adhere to the following installation sensitive areas requirements:
19.1. Cultural Resources Sites: Do not excavate, remove, damage, or otherwise deface any archeological resource.
19.2 Endangered Species Habitats: Do not initiate any action that may disturb, endanger, or damage to any degree the habitat of a threatened and endangered species.
19.3 Wetlands: Do not excavate or take any action that could fill or damage any wetland unless working under a project specific Corps of Engineers 404 permit. Wetlands include streams, riparian areas, bogs, marshes, and swamps.
Sec. 20 - Corrective Action for Noncompliance:
Contractor shall, when given a verbal and/or written notice of environmental noncompliance or nonconformance by the COR, take immediate corrective action. Failure or refusal to comply promptly may be grounds for the Contracting Officer to invoke the appropriate contractual remedies. This may cause all or part of the work to be stopped immediately until satisfactory corrective action has been taken.
Sec. 21 - Noise: N/A.
Make the maximum use of low-noise emission products, as certified by the EPA. Blasting or use of explosives will not be permitted without written permission from the Contracting Officer, and then only during the designated times. Pile-driving operations shall be coordinated through the COR.
Sec. 22 - Mercury: N/A.
Mercury is prohibited, unless specified otherwise, and with the exception of mercury vapor lamps and fluorescent lamps. Dumping of mercury-containing materials and devices such as mercury vapor lamps, fluorescent lamps, and mercury switches, in rubbish containers is prohibited. Remove without breaking, pack to prevent breakage, and transport out of the activity in an unbroken condition to the Hazardous Waste Storage facility, B. 380.
Immediately report to the COR instances of breakage or mercury spillage. Clean mercury spill area to the satisfaction of the Contracting Officer and Environmental Office. Cleanup of a mercury spill shall not be recycled and shall be managed as a hazardous waste for disposal.
Sec. 23 - Universal Waste / e-Waste Management: N/A.
Universal waste including but not limited to some mercury containing building products such florescent lamps, mercury vapor lamps, high pressure sodium lamps, CRTs, batteries, aerosol paint containers, electrical equipment containing PCBs, and consumed electronic devices, shall be managed in accordance with applicable environmental law and SIAD Hazardous Waste Management Plan. Consult the Environmental Office for assistance.
Sec. 24 - Pollution Prevention / Hazardous Waste Minimization:
Minimize the use of hazardous materials and the generation of hazardous waste. Consult with the Environmental Office for suggestions from the installation's pollution prevention/hazardous waste minimization plan for supporting waste minimization goals.
PART 2
DEFINITIONS AND ACRONYMS
2 DEFINITIONS AND ACRONYMS:
2.1 DEFINITIONS:
2.1.1 CONTRACTOR. A supplier or vendor awarded a contract to provide specific supplies or service to the government. The term used in this contract refers to the prime.
2.1.2 CONTRACTING OFFICER. A person with authority to enter into, administer, and or terminate contracts, and make related determinations and findings on behalf of the government. Note: The only individual who can legally bind the government.
2.1.3 CONTRACTING OFFICER'S REPRESENTATIVE (COR). An employee of the U.S. Government appointed by the contracting officer to administer the contract. Such appointment shall be in writing and shall state the scope of authority and limitations. This individual has authority to provide technical direction to the Contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have authority to change the terms and conditions of the contract.
2.1.4 DEFECTIVE SERVICE. A service output that does not meet the standard of performance associated with the Performance Work Statement.
2.1.5 DELIVERABLE. Anything that can be physically delivered, but may include non-manufactured things such as meeting minutes or reports.
2.1.6 KEY PERSONNEL. Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the Key Personnel listed in the PWS. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.
2.1.7 PHYSICAL SECURITY. Actions that prevent the loss or damage of Government property.
2.1.8 QUALITY ASSURANCE. The government procedures to verify that services being performed by the Contractor are performed according to acceptable standards.
2.1.9 QUALITY ASSURANCE SURVEILLANCE PLAN (QASP). An organized written document specifying the surveillance methodology to be used for surveillance of contractor performance.
2.1.10 QUALITY CONTROL. All necessary measures taken by the Contractor to assure that the quality of an end product or service shall meet contract requirements.
2.1.11 SUBCONTRACTOR. One that enters into a contract with a prime contractor. The Government does not have privity of contract with the subcontractor.
2.1.12 WORK DAY. The number of hours per day the Contractor provides services in accordance with the contract.
2.1.13 WORK WEEK. Monday through Friday, unless specified otherwise.
2.2 ACRONYMS:
ACOR Alternate Contracting Officer's Representative AFARS Army Federal Acquisition Regulation Supplement AR Army Regulation CCE Contracting Center of Excellence CFR Code of Federal Regulations CONUS Continental United States (excludes Alaska and Hawaii) COR Contracting Officer Representative COTR Contracting Officer's Technical Representative COTS Commercial-Off-the-Shelf DA Department of the Army DD250 Department of Defense Form 250 (Receiving Report) DD254 Department of Defense Contract Security Requirement List DFARS Defense Federal Acquisition Regulation Supplement DMDC Defense Manpower Data Center DOD Department of Defense FAR Federal Acquisition Regulation HIPAA Health Insurance Portability and Accountability Act of 1996
KO Contracting Officer OCI Organizational Conflict of Interest OCONUS Outside Continental United States (includes Alaska and Hawaii) ODC Other Direct Costs PIPO Phase In/Phase Out POC Point of Contact PRS Performance Requirements Summary PWS Performance Work Statement QA Quality Assurance QAP Quality Assurance Program QASP Quality Assurance Surveillance Plan QC Quality Control QCP Quality Control Program TE Technical Exhibit
PART 3
GOVERNMENT FURNISHED PROPERTY, EQUIPMENT, AND SERVICES
3 GOVERNMENT FURNISHED ITEMS AND SERVICES:
3.1 Services: N/A
3.2 Facilities: N/A
3.3 Utilities: The Contractor shall instruct employees in utilities conservation practices. The contractor shall be responsible for operating under conditions that preclude the waste of utilities, which include turning off the water faucets or valves after using the required amount to accomplish cleaning vehicles and equipment.
3.4 Equipment: N/A
3.5 Materials: N/A
PART 4
CONTRACTOR FURNISHED ITEMS AND SERVICES
4 CONTRACTOR FURNISHED ITEMS AND SERVICES:
4.1 General : The Contractor shall furnish all supplies, equipment, facilities and services required to perform work under this contract that are not listed under Section 3 of this PWS.
4.2 Secret Facility Clearance : N/A
4.3 Materials. N/A
4.4 Equipment. N/A
PART 5
SPECIFIC TASKS
5 SPECIFIC TASKS:
5.1 Basic Services. The contractor shall provide services for Purchase Ready-Mix Concrete.
5.1.1 Ready-Mix Concrete. The contractor shall provide ready-Mix Concrete per attached Sierra Army Depot Concrete Specifications.
5.1.2 Set-Retarding add mix. The contractor shall provide set-retarding add mix.
5.1.3 Fiber add mix. The contractor shall provide fiber add mix.
5.1.4 Air-entrainment add mix. The contractor shall provide Air-entrainment.
5.1.5 Accelerator add mix. The contractor shall provide accelerator add mix to be used as requested to speed setting during cold weather.
5.1.6 Superplasticizer add mix. The contractor shall provide superplasticizer add mix.
5.1.7 Hot water add mix. The contractor shall provide hot water add mix.
5.1.8 Line pumping per cubic yard.. The contractor shall provide line pumping as requested per cubic yard.
5.2 CONTRACTOR MANAGEMENT REPORTING (CMR) Complete in accordance with local narrative
CS7237.
PART 6
APPLICABLE PUBLICATIONS
6 APPLICABLE PUBLICATIONS:
6.1 The Contractor must abide by all applicable regulations, publications, manuals, and local policies and procedures.
6.2 USACE Manual 385-1-1 (Safety) and CESPK (United States Army Corps of Engineers, Sacramento District) PAM 415-1-2 Construction Control Manual, Sampling & Testing Construction Materials.
6.3 SIAD Regulation 420-7 (Fire Prevention and Protection)
Note:
USACE Manual 385-1-1 (Safety) is available for view at https://www.usace.army.mil/Safety-and-Occupational-Health/Safety-and-Health-Requirements-manual/
USACE CESPK PAM 415-1-2 is available for view at https://vdocuments.mx/construction-control-manual-cespk-pam-416-1-2-sampling-testing-construction.html
PART 7
ATTACHMENT/TECHICAL EXHIBIT LIST
7 ATTACHMENT/TECHICAL EXHIBIT LIST:
7.1 Attachment 1/Technical Exhibit 1 -- Performance Requirements Summary
TECHNICAL EXHIBIT 1
PERFORMANCE REQUIREMENTS SUMMARY
The contractor service requirements are summarized into performance objectives that relate directly to mission essential items. The performance thresholds briefly describe the minimum acceptable levels of service required for each requirement. These thresholds are critical to mission success.
Performance Objectives
Standards Performance Thresholds
Methods of Surveillance
Ready-Mix Concrete. The contractor shall provide ready-Mix Concrete per attached Sierra Army Depot Concrete Specifications.
Zero defects Direct Inspection
Set-Retarding add mix
The contractor shall provide set-retarding add mix. Zero Defects Direct Inspection
Fiber add mix The contractor shall provide fiber add mix. Zero Defects Direct Inspection Air-entrainment add mix
The contractor shall provide Air-entrainment Zero Defects Direct Inspection
Accelerator add mix The contractor shall provide accelerator add mix to be used as requested to speed setting during cold weather.
Zero Defects Direct Inspection
Superplasticizer add mix
The contractor shall provide superplasticizer add mix. Zero Defects Direct Inspection
Hot water add mix The contractor shall provide hot water add mix. Zero Defects Direct Inspection line pumping per cubic yard.
The contractor shall provide line pumping as requested per cubic yard.
Zero Defects Direct Inspection
Local Narratives CS3001 (EMS Awareness)
C.___ EMS AWARENESS TRAINING REQUIREMENTS FOR CONTRACTORS
(a) All contractors working for, on behalf of or on Sierra Army Depot are required to complete and submit a Contractor Environmental Briefing/Method Statement in accordance with the instructions on the form. The Contractor Environmental Briefing/Method Statement form is available at http://www.sierra.army.mil/pdf/Environmental%20Briefing%20&%20Contractor%20Method%20Statement%20201 4-09-15.pdf
(b) Contractors – Long Term: Any contractor or contracting organization working on or for Sierra Army Depot for sixty-one (61) days or more. All long term contractors are required to receive EMS training.
(c) Contractors – Short Term:
(1) Short term contractors and their direct employees who work on or for SIAD for sixty (60) days or less and are performing work in areas identified as areas of Significant Aspects or Impacts are required to receive ISO 14001:2004 EMS training.
(2) Short term contractors and their direct employees who work on or for SIAD for sixty (60) days or less and are not performing work in areas identified as areas of Significant Aspects or Impacts are NOT required to take the training and will be provided the ISO 14001:2004 Visitor and Contractor Environmental Brochure.
(d) Significant Aspect/Impact Areas include: Hazardous Waste Storage Facility; operations that affect hazardous waste generation; operations that affect groundwater and/or drinking water, operations that involve hydrocarbons (fuels/oils) that could impact the soil; and Paint Facilities/Operations.
(e) Environmental Aspect: An element of an organization’s activities, products or services that can interact with the environment.
(f) Environmental Impact: Any change to the environment, whether adverse or beneficial, wholly or partially resulting from an organization’s activities, products or services.
(g) Training for contractors shall be documented on either SIAD Form 1149, Attendance Roster or the contractor’s own record of training form. The contractors’ record of training form must include: training facilitator’s name;
training topic; training location; date trained; employee name (last name, first name, middle initial); employee signature; phone number; and work location. To verify the SIAD ISO 14001:2004 EMS Awareness Training was performed, the completed SIAD Form 1149, Attendance Roster, or the contractor’s record of training form must be provided to the SIAD office initiating the contract (Contracting Office or USACE), prior to beginning work at or on SIAD, or no later than the first two weeks of beginning work at or on SIAD. The completed original hard copy of SIAD Form 1149 or the contractor’s record of training form will be filed with retention for the period the contractor is working for or on SIAD, plus the remainder of that fiscal year. Contractor organizations that return to SIAD for additional work after previous training records have been purged will require re-training in EMS. Training records for contractors and subcontractors shall be maintained at the local level of the organization for which the training was performed.
(h) Additional site specific training records for contractors and subcontractors shall be maintained at the local level of the organization for which the training was performed.
(i) The Environmental Management System (EMS) Awareness Training and Contractor Environmental Briefing/Method Statement can be accessed at:
http://www.sierra.army.mil/Public/docs/ISO_14001_EMS_Awareness_Training-2014-03-12.pdf
CS6520
C.__ ANTI-TERRORISM (AT) LEVEL I TRAINING REQUIREMENT
All contractor employees, including subcontractor employees, requiring access to Army installations, facilities, or controlled access areas shall complete AT Level I awareness training within 60 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever applies. The contractor shall submit certificates of completion for each contractor employee and subcontractor employee requiring access to Army installations, facilities, or controlled access areas to the COR (or to the contracting officer, if a COR is not assigned) within 60 calendar days after completion of training. AT Level I awareness training is available at https://jkodirect.jten.mil Course #JS-US007-14.
CS6522
C.__ iWATCH TRAINING
The contractor and all associated subcontractors shall brief all employees on the local iWATCH program (training standards provided by the requiring activity Anti-Terrorism Officer (ATO)). This locally developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR, if assigned, or the Contracting Officer. This training shall be completed within 60 calendar days of contract award and within 60 calendar days of new employees’ commencing performance, with the results reported to the COR, or Contracting Officer, no later than 90 calendar days after contract award. Training may be obtained at http://www.myarmyonesource.com/familyprogramsandservices/iwatchprogram/default.aspx.
CS7520
C.__ ACCESS AND GENERAL PROTECTION/SECURITY POLICY AND PROCEDURES
(a) The contractor and all associated subcontractors’ employees shall comply with applicable installation, facility, and area commander installation and facility access and local security policies and procedures (provided by the Government representative). The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by the installation Provost Marshal Office, Director of Emergency Services, or Security Office. The contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9 “Personal Identity Verification of Contractor Personnel”) as directed by DoD, HQDA, and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.
(b) For contractors requiring Common Access Card (CAC). Before CAC issuance, the contractor employee requires, at a minimum, a favorably adjudicated National Agency Check with Inquiries (NACI) or an equivalent or higher investigation in accordance with Army Directive 2014-05, The contractor employee will be issued a CAC only if duties involve one of the following: (1) Both physical access to a DoD facility and access, via logon, to DoD networks on-site or remotely; (2) Remote access, via logon, to a DoD network using DoD-approved remote access procedures; or (3) Physical access to multiple DoD facilities or multiple non-DoD federally controlled facilities on behalf of the DoD on a recurring basis for a period of six (6) months or more. At the discretion of the sponsoring activity, an initial CAC may be issued on a favorable review of the FBI fingerprint check and a successfully scheduled NACI at the Office of Personal Management.
(c) For contractors that do not require CAC, but require access to a DoD facility or installation. Contractor and all associated sub-contractors employees shall comply with adjudication standards, and procedures using the…