W912GY-17-R-0026.pdf
PDF 521 KB Posted
- Attached to
- REACH STACKER RENTAL
- Solicitation number
- W912GY-17-R-0026
About this file
SOLICITATION W912GY-17-R-0026
View the file
Other files
| File | Type | Posted |
|---|---|---|
| PAST_PERFORMANCE_QUESTIONNAIRE.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE ADDENDUM
(No Collect Calls)
W912GY-17-R-0026 21-Sep-2017
b. TELEPHONE NUMBER
530-827-4831
8. OFFER DUE DATE/LOCAL TIME
05:00 PM 23 Oct 2017
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA – FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER)
ADDENDA X ARE
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
23.
CODE 10. THIS ACQUISITION IS
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TELEPHONE NO.
W912GY9. ISSUED BY
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
RHONDA A. LONG
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
1 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.X
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
20.
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
SEE SCHEDULE
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
. YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
% FOR:SET ASIDE:UNRESTRICTED ORX
SMALL BUSINESS
17a.CONTRACTOR/ CODE FACILITY
OFFEROR CODE
SIERRA ARMY DEPOT
CONTRACTING OFFICE
74 C STREET BUILDING 60
HERLONG CA 96113
18a. PAYMENT WILL BE MADE BY CODE
RATED ORDER UNDER
DPAS (15 CFR 700)
13a. THIS CONTRACT IS A
13b. RATING
CODE15. DELIVER TO CODE W62G2W 16. ADMINISTERED BY
12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
14. METHOD OF SOLICITATION
RFQ IFB RFPX
DIRECTORATE OF BASE SUPPORT
MOTORPOOL
SIERRA ARMY DEPOT
HERLONG CA 96113
TEL: 530-827-4697 FAX:
530-827-4722FAX:
TEL: 530-827-5146 SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
8(A)
HUBZONE SMALL
BUSINESS
SIZE STANDARD:
$32,500,000
NAICS:
532412
X
OFFER DATED
29. AWARD OF CONTRACT: REF.
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
EMAIL:
TEL:
31c. DATE SIGNED
SEE SCHEDULE
SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT
24.22.21.19.
WOMEN-OWNED SMALL BUSINESS (WOSB)
ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
PAGE 2 OF56
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA – FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE SCHEDULE
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY UNIT
22. 23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
W912GY-17-R-0026
Section SF 1449 - CONTINUATION SHEET
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 24 Each
BASE - REACH STACKERS RENTALS
FFP
Rental of Two (2) Each Reach Stackers for a Base period of performance of 12 months. Each = Month. Specifications are per the Statement of Work. Delivery of Units will be within 12 weeks of award.
FOB: Destination
NSN: AASSVC722201CX
MILSTRIP: W62G2W722201CX
PURCHASE REQUEST NUMBER: W62G2W722201CX
NET AMT
0002 4 Each
DELIVERY, PICKUP, AND FUEL SURCHARGE
FFP
Equipment Delivery, Pickup, and Fuel Surcharge if required.
FOB: Destination
NSN: AASSVC722201CY
MILSTRIP: W62G2W722201CY
PURCHASE REQUEST NUMBER: W62G2W722201CY
CONTRACT DATA REQUIREMENT LIST (CDRL)
FFP
Contract Data Requirement List A001: Contractor shall submit copy of certification of factory certified maintenance technician/equipment operator at equipment delivery and within 5 working days when any changes in personnel are made thereafter, per SOW 1.13 and CDRL A001. NOT SEPARATELY PRICED.
FOB: Destination
1001 24 Each
OPTION OPTION 1 - REACH STACKERS RENTAL
FFP
Rental of Two (2) Each Reach Stackers for Option 1 period of performance of 12 months. Each = Month. Specifications are per the Statement of Work.
FOB: Destination
NSN: AASSVC722201CX
2001 24 Each
OPTION OPTION 2 - REACH STACKERS RENTAL
FFP
Rental of Two (2) Each Reach Stackers for Option 2 period of performance of 12 months. Each = Month. Specifications are per the Statement of Work.
FOB: Destination
NSN: AASSVC722201CX
STATEMENT OF WORK
1.1 General: The contractor shall provide the listed equipment on a monthly basis. Contractor shall be responsible for delivery of equipment to Sierra Army Depot (SIAD) at the beginning of the rental period and pick up of equipment at the end of the rental period.
1.2 Minimum Requirements:
Reach Stackers Rental (2 Each)
Load Capacity: 99,000 pounds (45 metric tons).
Stacking Capability: Capable of stacking a maximum of 4 containers high and extracting a container on the second row back. (Maximum container height is 9’6”.)
Boom: Telescoping stationary over the cab type boom with visibility on both sides and the front.
Spreader Bar: Top lift with spreading capability from 20 feet to 40 feet and rotation a minimum of 90 degrees in both directions (carrying a container sideways instead of length wise). Spreader bar shall have the capability of side shift and tilting a maximum of 5 degrees. ISO twist locks for 20-ft. and 40-ft.
positions.
Engine Emission Standards: Tier 3 or current standard. Must meet CA EPA standards.
Transmission: Minimum of 3 gears forward and 3 gears reverse.
Steering: Power steering.
Reverse activated backup alarm.
Cab: Enclosed cab with heater/defroster and air conditioning.
Must include on-site training for automated systems.
Model: Hyster HR45-27, Taylor XRS-9972, or Equal.
1.3 Applicable Documents:
1.3.1 SIAD Regulation 420-7 (Fire Prevention and Protection)
1.3.2 SIAD Regulation 385-1 (Safety)
1.3.3 All local, state and federal laws
1.4 Equipment Approval: Equipment shall be approved by the POC prior to delivery in accordance with the SOW 1.2 Minimum Requirements.
1.5 Point of Contact (POC): The Primary POC is Terry Mossi, Phone: 530-827-4159. The Administrative POC is Murray Schultz, Ph: 530-827-5311, who shall be responsible for verifying that services have been rendered.
1.6 Rental Commencement: Contractor shall deliver the equipment to the work location within twelve (12) weeks after award of contract. This may change for the convenience of the government.
1.7 Unscheduled Interruptions: Pick up, delivery, repair or maintenance operations are subject to unscheduled interruptions and contractor personnel may be required to immediately leave the designated work area or be denied access due to security operations. Mission requirements may necessitate suspension or cancellation of operations for that period. All incomplete work shall be rescheduled for completion at a later time/date mutually agreed upon by the Quality Assurance personnel.
1.8 Delays: The government is not liable on any delay caused by the occupant, security inspections on the gate or any security measures imposed by the Installation Commander and/or higher authority.
1.9 Contract Performance Period: Contract period of performance to include a base monthly period covering twelve (12) months after award, with two (2) consecutive option years.
1.10 Environmental:
Sec. 1- Compliance with Environmental Laws and Regulations:
Contractor shall comply with all applicable federal, state, and local environmental laws, statutes, regulations, executive orders, permits, Army regulations (with supplements), as well as Major Subordinate Command (MSC) and Sierra Army Depot (SIAD) regulation, policy, Host Tenant Agreement, Interagency Service Support Agreement, or Status-of-Forces Agreement. Contractor shall immediately report any conflicts between applicable federal, state, local environmental laws, statutes, executive orders, and provisions of Army Regulation 200-1, and any specifications within this contract to the Contracting Officer’s Representative (COR).
Sec. 2 - Compliance with Green Procurement Requirements:
Contractor shall follow Federal EPA Comprehensive Procurement guidelines (www.epa.gov/cpg) and Army Contracting Command Quick Guide (https://acc.aep.army.mil/accapps/ACCMAP/Documents/Quick-Guide-for- Sustainable-Procurement.docx) for acquisition of building materials and products and select materials that have a long life cycle; the least toxic materials; recyclable materials; materials that are resource-efficient; materials with the maximum recycled content; materials harvested on a sustained yield basis; and products causing the least pollution during their manufacture, use, and reuse.
Sec. 3 - Compliance with License and Certification Requirements:
Contractor shall obtain all license and certification required by Federal, State, and Local environmental laws and regulations necessary to adhere to the specifications of this contract. The Contractor shall submit all plans, notifications, reports, submittal documents, and fees required by Federal, State, and Local environmental laws and regulations to the appropriate Federal, State, and Local authority and/or agency as necessary to adhere to the specification of this contract. All required licenses and certifications required by Federal, State, and Local environmental laws and/or regulations shall be considered a contract deliverable upon award.
Sec. 4 - Notification of Federal and State Regulators:
Contractor shall immediately notify the COR of the arrival on site of any Federal, State, local and/or DoD environmental regulator or enforcement agent and/or the receipt of any correspondence from above mentioned environmental regulatory agencies.
Sec. 5 - Inspections of Work Sites:
Contractor shall submit to potential Federal, State, Local, Army and installation work site environmental regulatory inspections and/or investigations into noncompliance, and fully cooperate with such inspections/investigations by providing the appropriate records and documentation. Environmental regulatory agencies are authorized by law to inspect any work site for environmental compliance with regulatory requirements. If an inspection is conducted, it will not stop or disrupt ongoing contract activities. The inspection will only require the work site environmental officer, or supervisor/manager to answer questions and/or escort the inspector to specific work site areas with the potential to affect environmental quality.
Sec. 6 - Reporting Noncompliance:
Contractor shall immediately report any nonconformance and/or noncompliance with applicable Federal, State or Local environmental laws, Army and installation environmental regulations or policies to the COR.
Sec. 7 - Verification of National Environmental Policy Act Documents:
Contractor shall obtain and comply with AMC's National Environmental Policy Act Policy and 32 CFR 651 which addresses actions to be taken by contractor (copies available from the COR). These documents include but are not limited to the analysis-associated decision document of an Environmental Impact Statement and Record of Decision; Environmental Assessment and Finding of No Significant Impact or Notice to Proceed; or Record of Environmental Consideration on the proposed contract actions prior to commencement of such actions.
Sec. 8 - Conformance with Environmental Management System (EMS):
Contractor shall take the necessary actions to identify, monitor, and control those contract operations and activities that pose risk of contamination, or can negatively impact the natural and/or human environment. SIAD currently operates and maintains an International Organization of Standards (ISO) 14001 certified program, “Fence to Fence”. Contractor shall comply with all EMS program requirements.
Sec. 9 - Assignment of Environmental Compliance Designee (ECD): N/A
Sec. 10 - Competency Training for Contractor Personnel:
Contractor shall not allow personnel to perform any activities and/or tasks on AMC installations (SIAD) without proper and adequate qualifications or job competency training. In the event of any identified noncompliance, the Contractor shall, if requested, provide proof of contract personnel training or qualification (individual name, training/qualification type, training/qualification certificate, and date of training/qualification) to perform those contract activities associated with the identified noncompliance.
Sec. 11 - Generation of Solid Waste:
Contractor shall dispose of all solid waste generated, which cannot be recycled, into the appropriately marked solid waste containers and roll-offs provided. Contractor shall comply with the SIAD Integrated Solid Waste Management Plan.
11.1. Contractor shall make every effort to divert construction, demolition debris, and all other solid waste to comply with the Army Integrated Solid Waste Management Policy.
11.2. The Contractor shall coordinate with the installation Qualified Recycling Program (QRP) and Solid Waste Managers, and COR to arrange for recyclable materials to be removed and diverted from the waste stream.
11. 3. Submit in writing the quantities of waste removed and recycled to the COR on a monthly basis. The submittal shall include the date of disposal/recycling, the disposal/recycling facility, the types of material disposed/recycled and the quantities of materials disposed/recycled by weight or volume.
11. 4. The Contractor shall promote cost-effective waste reduction in all operations and facilities covered by the contract. This includes collection, separation, and processing products or other materials recovered from solid waste streams for use in the form of raw materials.
11. 5. The Contractor shall make maximum effort to reduce and prevent waste.
Sec. 12 - Generation of Hazardous Waste:
Contractor shall assign all hazardous waste management responsibilities to the designated personnel. Contractor shall contact the COR to obtain technical assistance from the Environmental Office for assisting the ECD with achieving and maintaining compliance with hazardous waste storage and disposal requirements. Contractor shall properly identify all waste and how generated as part of this contract to determine if any waste is hazardous waste as defined by both Federal and State EPA (40 CFR and Title 22 CCR). Contractor shall accumulate and properly manage hazardous waste in a satellite accumulation point at or near the point of generation or in a less-than-90-day site, in accordance with Federal, State, Local, Army and installation regulation, policy, Host Tenant Agreement, Interagency Service Support Agreement or Status-of-Forces Agreement. The Contractor shall properly package all hazardous waste. The contractor shall arrange for pickup or deliver, all hazardous waste generated by contract activities from the installation, to the Hazardous Waste Storage facility, B. 380 as required by SIAD. The Environmental Office shall assist contractors with hazardous waste generators training and on-site management of their waste upon request.
Sec. 13. - Use of Hazardous Materials:
Contractor shall assign all hazardous materials management responsibilities to the appointed ECD or designated personnel. Contractor shall contact the COR to obtain technical assistance from Environmental Office for assisting the ECD with achieving and maintaining compliance with hazardous material storage, issue, use, and disposal requirements. Contractor shall submit to the COR a hazardous material inventory. The hazardous material inventory will be submitted 30 days prior to commencement of work for contracts that exceed 180 consecutive days. The inventory list will contain the hazardous material type and maximum quantities of materials anticipated to be stored on-site. The hazardous material shall be properly identified and include any applicable identification number, such as National Stock Number or Special Item Number. The Contractor shall maintain copies of Safety Data Sheets for all hazardous materials used and stored on-site during performance of the contract. Contractor shall not supply or deliver any hazardous materials or chemicals to an installation that are listed on EPA toxic chemical list (33/50 Program - AKA 17 List) without prior written approval from COR.
Sec. 14. - Prevention of Storm Water Pollution:
The Contractor shall perform, track, participate, implement, and comply with storm water pollution prevention minimum control measures, protocols, and best management practices (BMP) and ensure that water quality standards are not violated in accordance with all regulations and policies as applicable to the National Pollutant
Discharge Elimination System (NPDES) general permit requirements. Applicable permits may include, but not limited to:
1) The installation’s Small Municipal Separate Storm Sewer System (MS4) Permit;
2) The Multi-Sector General Permit for Storm Water Discharges Associated with Industrial Activities (MSGP);
and,
3) All Construction Activity Storm Water permits minimum control measures include, but not limited to:
• Public Education and Outreach on Storm Water Impacts
• Public Involvement and Participation
• Illicit Discharge Detection and Elimination
• Construction Site Storm Water Run-off Control
• Post Construction Storm Water Management in New Development and Redevelopment
• Pollution Prevention/Good Housekeeping for Municipal Operations Contractors will comply with the MSGP permit when the activity is identified as a permitted industrial activity. BMPs include, but are not limited to:
• Practicing spill prevention and good housekeeping.
• Installing and managing erosion and sediment control.
• Meeting the requirements of the MS4 permit.
• Contractors will comply with obtaining permit coverage for construction activities disturbing over one acre of land (total acreage is cumulative across all portions of the project). BMPs include, but are not limited to:
• Preparing and implementing a site-specific Storm Water Pollution Prevention Plan (SWPPP) as outlined in the permit and prior to any soil disturbance.
• Installing and managing erosion and sediment control.
• Make available, upon request, permit associated documentation.
• Practicing spill prevention and good housekeeping.
• Meeting the requirements of the MS4 permit.
• Schedule inspections and provide corrective actions for noted deficiencies.
Sec. 15 - Storm Water Management Low Impact Design/Development (LID): N/A
Sec. 16 - Use of Pesticides: N/A
Sec. 17 - Protection of Work Site Resources: N/A
Sec. 18 - Prevention of Spills:
Contractor shall adopt the installation's Spill Prevention Control and Countermeasures Plan (SPCC) if transporting, processing, storing, or in any way managing hazardous waste, hazardous material, petroleum-oils-lubricants, or other restricted items. In case of a spill, the person in control of the spill site or their designated representative shall take appropriate action to protect workers and bystanders; contain the spill (if it can be done safely); secure the spill site; restrict ignition sources; and immediately contact the installation Fire and Emergency Services (Fire Department).
Sec. 19 - Protection of Sensitive Areas:
Contractor shall comply with all installation designated sensitive and/or off-limit area restrictions. Sensitive areas are generally demarked indicating what activities (e.g., driving, digging, foot traffic) are prohibited. The Contractor shall also adhere to the following installation sensitive areas requirements:
19.1. Cultural Resources Sites: Do not excavate, remove, damage, or otherwise deface any archeological resource.
19.2 Endangered Species Habitats: Do not initiate any action that may disturb, endanger, or damage to any degree the habitat of a threatened and endangered species.
19.3 Wetlands: Do not excavate or take any action that could fill or damage any wetland unless working under a project specific Corps of Engineers 404 permit. Wetlands include streams, riparian areas, bogs, marshes, and swamps.
Sec. 20 - Corrective Action for Noncompliance:
Contractor shall, when given a verbal and/or written notice of environmental noncompliance or nonconformance by the COR, take immediate corrective action. Failure or refusal to comply promptly may be grounds for the Contracting Officer to invoke the appropriate contractual remedies. This may cause all or part of the work to be stopped immediately until satisfactory corrective action has been taken.
Sec. 21 - Noise:
Make the maximum use of low-noise emission products, as certified by the EPA. Blasting or use of explosives will not be permitted without written permission from the Contracting Officer, and then only during the designated times. Pile-driving operations shall be coordinated through the COR.
Sec. 22 - Mercury:
Mercury is prohibited, unless specified otherwise, and with the exception of mercury vapor lamps and fluorescent lamps. Dumping of mercury-containing materials and devices such as mercury vapor lamps, fluorescent lamps, and mercury switches, in rubbish containers is prohibited. Remove without breaking, pack to prevent breakage, and transport out of the activity in an unbroken condition to the Hazardous Waste Storage facility, B. 380 as required by SIAD. Immediately report to the COR instances of breakage or mercury spillage.
Clean mercury spill area to the satisfaction of the Contracting Officer and Environmental Office. Cleanup of a mercury spill shall not be recycled and shall be managed as a hazardous waste for disposal.
Sec. 23 - Universal Waste / e-Waste Management:
Universal waste including but not limited to some mercury containing building products such florescent lamps, mercury vapor lamps, high pressure sodium lamps, CRTs, batteries, aerosol paint containers, electrical equipment containing PCBs, and consumed electronic devices, shall be managed in accordance with applicable environmental law and SIAD Hazardous Waste Management Plan. Consult the Environmental Office for assistance.
Sec. 24 - Pollution Prevention / Hazardous Waste Minimization:
Minimize the use of hazardous materials and the generation of hazardous waste. Consult with the Environmental Office for suggestions from the installation's pollution prevention/hazardous waste minimization plan for supporting waste minimization goals.
1.11 Equipment Maintenance and/or Repair: The contractor shall be responsible for equipment failure not arising out of abuse or negligence by the Government. Reports of down equipment shall be investigated within 24 hours of the contractor being notified of same. Down equipment calls made on Friday, Saturday, Sunday or Holidays will be investigated the next workday. In the event an equipment failure, not arising out of abuse or negligence by the Government, renders a piece of equipment inoperative past seven calendar days, a replacement piece of equipment will be provided within the fourteenth calendar day, from the initial downed equipment call. All spare parts and maintenance shall be provided at no additional charge. The contractor shall be responsible for all routine maintenance, etc., except for daily checks of liquid levels. All equipment maintenance and/or repair, except for daily checks of liquid levels, shall be conducted by or observed by a factory certified maintenance technician.
The factory certified maintenance technician shall also be qualified as an equipment operator. A copy of these certifications will be provided to the Contracting Officer upon award. (See CDRL A001).
PAST PERFORMANCE QUESTIONNAIRE
Past Performance – The Offeror must submit at least three (3), but not more than five (5) references. It is the responsibility of the contractor to send the questionnaires to their customers and to ensure that they are received on time. Failure to submit surveys will result in non-responsiveness and proposal will not be evaluated.
Additional Government Past Performance Information
The Government reserves the right to obtain past performance information through random checks of provided contract references or through information maintained in the Government’s past performance database. Should this information be sufficient to negatively impact the Offeror's chance of being awarded a contract under this solicitation, the Government will provide this negative information to the Offeror and provide an opportunity for rebuttal, explanation, or clarification.
Offerors may identify federal, state, or local government or commercial contracts that were similar in nature to the current acquisition. References are limited to those for which services have been performed, in whole or in part, within the past five (5) calendar years. Any references not meeting this condition will not be evaluated. The Government will randomly check the provided past performance history, and may check and consider performance on tasks not identified by the Contractor.
PAST PERFORMANCE QUESTIONNAIRE INSTRUCTIONS
Army Contracting Command – Warren
Sierra Army Depot, CA
The information obtained from this questionnaire will be utilized to evaluate the past and present performance of offerors submitting proposals in response to W912GY-17-R-0026 – Sierra Army Depot (SIAD) for the Rental of 2 each Super Stackers. The information you provide will be instrumental in allowing the Government to evaluate how well the contractor performed under your contract(s).
a. Please complete all sections of the attached questionnaire. Include your name and title, organizational address, e-mail address, telephone and fax number.
b. Include the contractor’s name and address, the title and/or description of the type of work performed, the award number, the value of the contract (including options), the award and completion date of the project and the type of award/solicitation.
c. Use the rating scale found on the bottom left corner of the questionnaire to rate each performance element.
d. Comments are encouraged and would be appreciated. The last page may be used if additional space is needed for comments. Clear handwritten responses are sufficient.
e. Due to time constraints, it is important that the questionnaire be completed and returned by the date proposal is due Thursday October 23, 2017. Please FAX or e-mail your response to the Contract Specialist whose number and address is shown at the bottom right corner of the questionnaire.
Thank you for your time and participation.
YOUR NAME & TITLE
YOUR ORGANIZATIONAL NAME AND ADDRESS
TEL NO.
FAX :
E-MAIL:
CONTRACTOR’S NAME & ADDRESS
TITLE OR DESCRIPTION OF REQUIREMENT:
CONTRACT NUMBER: CONTRACT VALUE (INCLUDING OPTIONS):
CONTRACT TYPE:
FIXED PRICE COST + FEE
COMPETITIVE NON-COMPETITIVE
SET-ASIDE
SEALED BID NEGOTIATED
CONTRACT AWARD & COMPLETION DATE:
PAST PERFORMANCE ELEMENT
RATING
1 2 3 4 5 6 NA
1. Contractor demonstrated a thorough understanding of technical requirements of the contract/task.
Comments:
2. Contractor anticipated/identified and resolved problems effectively.
3. Contractor managed and directed resources (i.e.
personnel, subcontractors, equipment, etc.)
effectively.
4. Rate the Contractor’s use of available resources to accomplish tasks identified in the contract.
Comments:
5. Contractor was responsive to most questions, inquiries and general communication.
FOR OFFICIAL USE ONLY - SOURCE SELECTION SENSITIVE WHEN COMPLETED
PAST PERFORMANCE ELEMENT
RATING
1 2 3 4 5 6 NA
6. Contractor met scheduled contract delivery dates.
7. Contractor provided accurate, complete and high quality deliverables.
8. Contractor complied with the terms of the contract.
9. Contractor was diligent in forecasting and controlling contract cost.
10. I would recommend award to this contractor again.
1 0 – 25% of the time Strongly Disagree PLEASE RETURN COMPLETED
RESPONSE TO:
Army Contracting Command-Warren Sierra Army Depot Contracting Office ATTN: Rhonda Long 74 Currant Street Building 60 Herlong, CA 96113 E-MAIL: rhonda.a.long.civ@mail.mil
FAX: 530-827-4722
2 26 – 40% of the time Disagree
3 41 – 55% of the time Somewhat Disagree
4 56 – 70% of the time Somewhat Agree
5 71 – 85% of the time Agree
6 86 – 100% of the time Strongly Agree
NA No Knowledge of This Element
FOR OFFICIAL USE ONLY - SOURCE SELECTION SENSITIVE WHEN COMPLETED
CONTRACT DATA REQUIREMENT LIST
DD FORM 1423, FEB 2001
CONTRACT DATA REQUIREMENT LIST Form Approval OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Executive Services Directorate (0704-0188).
Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization.
Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.: 0003 D. SYSTEM/ITEM:
B. EXHIBIT: E. CONTRACT/PR NO.:
C. CATEGORY: TDP ____ TM ____ OTHER ____ F. CONTRACTOR:
1. DATA ITEM NO: A001
2. TITLE: Certification of Factory Certified Maintenance Technician
3. SUBTITLE:
4. AUTHORITY:
5. CONTRACT REFERENCE: 1.13
6. REQUIRING OFFICE:
7. DD250 REQ: No
8. APP CODE:
9. DIST. STATEMENT REQ:
10. FREQUENCY: A copy of the certifications will be provided to the Contracting Officer upon equipment delivery and within five (5) working days of personnel changes.
11. AS OF DATE: Contract Award
12. DATE OF FIRST SUBMISSION: 1 NOV 2017 Base
13. DATE OF SUBS. SUBMISSION: 1 NOV of each Option Period 2018-2020
14. DISTRIBUTION:
A. ADDRESSEE:
B. COPIES:
DRAFT:
FINAL:
REG: 1 REPRO:
15. TOTAL COPIES: 1
16. REMARKS: A copy of the certifications will be provided to the Contracting Officer upon equipment delivery and within five (5) working days of personnel changes. For required information see SOW para. 1.13.
17. PRICE GROUP:
18. ESTIMATED TOTAL PRICE: Not Seperatley Priced (NSP)
G. PREPARED BY:
H: DATE:
I: APPROVED BY:
J: DATE:
INSTRUCTIONS TO OFFERORS
1. Solicitation W912GY-17-R-0026 is for Rental of two (2) REACH STACKERS.
2. This solicitation will result in a Base Year and two (2) Option Periods of 12-months each.
3. Award of this contract will be on Lowest Price basis.
4. A responsive quote to this solicitation consists of:
a. Fully executed solicitation (SF 1449 Form) includes Base and Options pricing and all clause fill-ins completed.
b. Submit at least three (3) but not more than five (5) completed Past Performance Questionnaires.
5. Award of this contract will be a single award with all CLINs priced.
6. See Electronic Quotes Required for information on quote submission.
ELECTRONIC QUOTES REQUIRED
ELECTRONIC QUOTES REQUIRED IN RESPONSE TO THIS SOLICITATION
(a) All Army Contracting Command - Warren (SIAD) solicitations will be publicized on the Federal Business Opportunities website (https://www.fbo.gov). Any additional attachments, when available electronically, will be separate attachments or links embedded in the solicitation.
(b) Bids/Proposals must be submitted in electronic media. When submitting your bid/proposal electronically, the bid/proposal and any supplemental information (such as spreadsheets, backup data, technical information), can be submitted using any of the following electronic formats:
(1) Microsoft* Office Products (Sierra can read Microsoft* Office 2007 and lower); Word, Excel, or PowerPoint. Spreadsheets must be sent in a format that includes all formulate macro and format information. Print image is not acceptable.
(2) Files in Adobe PDF (Portable Document Format). Scanners should be set to 300 dots per inch.
(3) Files in HTML (Hypertext Markup Language). HTML documents must not contain active links to live Internet sites or pages. All linked information must be contained within your electronic bid/offer and be accessible offline.
(4) Other electronic formats are not acceptable.
(c) Transmission method:
(1) As of 10 August 2015, online via the Federal Business Opportunities (FBO) System.
Requirements for the online FBO bid submission:
Vendors must login to the FBO System to be able to submit electronic responses for opportunities.
Vendors must also registered in the System for Award Management (SAM) at www.sam.gov (a Federal Government owned and operated free web site) and have a CAGE Code and CCR Marketing Partner Identification Number
(MPIN).
Once logged into the FBO System, vendors will be asked to enter basic information and then will be directed to upload one or more files containing the offer and any additional information as outlined in the solicitation. FBO will send an email to the email address on file for the user confirming the electronic submission. For additional information on submitting electronic bid responses via the Federal Business Opportunities System reference the FBO Vendor Guide – Section 4.3.1 Submitting an Electronic Response Topic (https://www.fbo.gov/downloads/FBO_Vendor_Guide.pdf).
(d) Timely receipt of offers/proposals:
(1) Your attention is called to the solicitation closing date and time on the solicitation is local time for the Army Contracting Command – Warren (SIAD). Lateness rules for electronic submissions for bids are outlined in FAR 52.214-7, “Late Submissions, Modifications, and Withdrawal of Bids,” for proposals in FAR 52.215-1, “Instructions to Offerors—Competitive Acquisition” or FAR 52.212-1, “Instructions to Offerors-Commercial Items.” Pay particular attention to the applicable clause as it relates to the timing of submissions.
(2) NOTE: There is no “expected” or “target” length of time for proposal submission; size and content may be factors, therefore offerors are strongly cautioned to submit their proposals allowing adequate time for submission.
(3) Solicitations may remain posted on the ASFI Open Solicitation Web page after the solicitation closes.
Even though the system will allow you to submit a proposal after the closing date/time, your proposal will beconsidered late and may not be considered for award.
(f) Security Note: If you choose to password-protect access to your bid/offer, you must provide the password to Sierra Army Depot at least ten days prior to the opening/closing date. Contact the buyer identified in the solicitation Passwords used only for the purpose of write protecting files need not be provided.
(g) Electronic bids/proposals must include, as minimum:
(1) Proposals must include a signed SF 33 cover sheet, SF 1449 or SF 1442 (whichever is applicable).
(2) All applicable fill-in provisions. For solicitations issued on an SF 33, this would include Sections A, B, F, and K., For solicitations issued on an SF 1442, this would include Sections 00010 and 00600. For solicitations issued on an SF 1449, you must review the solicitation to ascertain where all of the required fill-ins are located since commercial acquisitions do not have designated sections.
(3) A statement of agreement to all the terms, conditions, and provisions of the solicitation.
(4) Any other information required by the solicitation.
(h) Please see FAR 14.406 for a description of the steps the Government shall take with regard to unreadable electronic bids received via the media described in paragraphs (b) above. See FAR 15.207(c) for a description of steps the government shall take with regard to unreadable proposals.
(i) Bidders/Offerors shall make every effort to ensure that their bid/proposal is virus-free. Bids/proposals (or portions thereof) submitted which DO reflect the presence of a virus, or which are otherwise rendered unreadable by damage in electronic transit, shall be treated as “unreadable” per paragraph (h) above. Use of any formats other than those listed above may result in the file being quarantined and will be considered by Sierra Army Depot to be “unreadable” files.
*Registered trademark
(End of Provision)
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001 Destination Government Destination Government
0002 Destination Government Destination Government 0003 Destination Government Destination N/A 1001 Destination Government Destination Government 2001 Destination Government Destination Government
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC
0001 POP 01-NOV-2017 TO
31-OCT-2018
N/A DIRECTORATE OF BASE SUPPORT
MOTORPOOL
SIERRA ARMY DEPOT
HERLONG CA 96113
530-827-4697
W62G2W
0002 POP 01-NOV-2017 TO
31-OCT-2020
N/A (SAME AS PREVIOUS LOCATION)
0003 N/A N/A N/A N/A
1001 POP 01-NOV-2018 TO
31-OCT-2019
N/A DIRECTORATE OF BASE SUPPORT
MOTORPOOL
SIERRA ARMY DEPOT
HERLONG CA 96113
530-827-4697
2001 POP 01-NOV-2019 TO
31-OCT-2020
N/A (SAME AS PREVIOUS LOCATION)
CLAUSES INCORPORATED BY REFERENCE
52.202-1 Definitions NOV 2013 52.203-3 Gratuities APR 1984 52.203-6 Alt I Restrictions On Subcontractor Sales To The Government
(Sep 2006) -- Alternate I
OCT 1995
52.203-12 Limitation On Payments To Influence Certain Federal Transactions
OCT 2010
52.203-17 Contractor Employee Whistleblower Rights and Requirement To Inform Employees of Whistleblower Rights
APR 2014
52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber Content Paper
MAY 2011
52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards
OCT 2016
52.204-13 System for Award Management Maintenance OCT 2016
52.204-16 Commercial and Government Entity Code Reporting JUL 2016 52.204-17 Ownership or Control of Offeror JUL 2016 52.204-18 Commercial and Government Entity Code Maintenance JUL 2016 52.204-19 Incorporation by Reference of Representations and
Certifications.
DEC 2014
52.204-20 Predecessor of Offeror JUL 2016 52.204-22 Alternative Line Item Proposal JAN 2017 52.208-4 Vehicle Lease Payments APR 1984 52.208-5 Condition of Leased Vehicles APR 1984 52.208-6 Marking of Leased Vehicles APR 1984 52.208-7 Tagging of Leased Vehicles MAY 1986 52.209-6 Protecting the Government's Interest When Subcontracting
With Contractors Debarred, Suspended, or Proposed for Debarment
OCT 2015
52.209-7 Information Regarding Responsibility Matters JUL 2013 52.209-10 Prohibition on Contracting With Inverted Domestic
Corporations
NOV 2015
52.209-11 Representation by Corporations Regarding Delinquent Tax Liability or a Felony Conviction under and Federal Law
FEB 2016
52.212-1 Instructions to Offerors--Commercial Items JAN 2017 52.212-4 Contract Terms and Conditions--Commercial Items JAN 2017 52.217-5 Evaluation Of Options JUL 1990 52.219-4 Notice of Price Evaluation Preference for HUBZone Small
Business Concerns
OCT 2014
52.219-8 Utilization of Small Business Concerns NOV 2016 52.219-9 Small Business Subcontracting Plan JAN 2017 52.219-14 Limitations On Subcontracting JAN 2017 52.219-28 Post-Award Small Business Program Rerepresentation JUL 2013 52.222-1 Notice To The Government Of Labor Disputes FEB 1997 52.222-3 Convict Labor JUN 2003 52.222-19 Child Labor -- Cooperation with Authorities and Remedies OCT 2016 52.222-21 Prohibition Of Segregated Facilities APR 2015 52.222-26 Equal Opportunity SEP 2016 52.222-50 Combating Trafficking in Persons MAR 2015 52.222-52 Exemption from Application of the Service Contract Labor
Standards to Contracts for Certain Services--Certification
MAY 2014
52.223-18 Encouraging Contractor Policies To Ban Text Messaging While Driving
AUG 2011
52.225-13 Restrictions on Certain Foreign Purchases JUN 2008 52.228-8 Liability and Insurance - Leased Motor Vehicles MAY 1999 52.229-3 Federal, State And Local Taxes FEB 2013 52.232-17 Interest MAY 2014 52.232-23 Assignment Of Claims MAY 2014 52.232-33 Payment by Electronic Funds Transfer--System for Award
Management
JUL 2013
52.232-39 Unenforceability of Unauthorized Obligations JUN 2013 52.232-40 Providing Accelerated Payments to Small Business
Subcontractors
DEC 2013
52.233-1 Disputes MAY 2014 52.233-2 Service Of Protest SEP 2006 52.233-3 Protest After Award AUG 1996 52.233-4 Applicable Law for Breach of Contract Claim OCT 2004 52.242-13 Bankruptcy JUL 1995 52.242-15 Stop-Work Order AUG 1989 52.246-16 Responsibility For Supplies APR 1984
52.247-34 F.O.B. Destination NOV 1991 52.253-1 Computer Generated Forms JAN 1991 252.203-7002 Requirement to Inform Employees of Whistleblower Rights SEP 2013 252.204-7003 Control Of Government Personnel Work Product APR 1992 252.204-7004 Alt A System for Award Management Alternate A FEB 2014 252.204-7011 Alternative Line Item Structure SEP 2011 252.204-7012 Safeguarding Covered Defense Information and Cyber
Incident Reporting
OCT 2016
252.204-7015 Notice of Authorized Disclosure of Information for Litigation Support
MAY 2016
252.205-7000 Provision Of Information To Cooperative Agreement Holders DEC 1991 252.209-7004 Subcontracting With Firms That Are Owned or Controlled By
The Government of a Country that is a State Sponsor of Terrorism
OCT 2015
252.219-7003 Small Business Subcontracting Plan (DOD Contracts)--Basic MAR 2016 252.219-7004 Small Business Subcontracting Plan (Test Program) OCT 2014 252.222-7007 Representation Regarding Combating Trafficking in Persons JAN 2015 252.225-7001 Buy American And Balance Of Payments Program-- Basic
(Dec 2016)
DEC 2016
252.225-7002 Qualifying Country Sources As Subcontractors DEC 2016 252.225-7012 Preference For Certain Domestic Commodities DEC 2016 252.225-7012 Preference For Certain Domestic Commodities DEC 2016 252.225-7031 Secondary Arab Boycott Of Israel JUN 2005 252.225-7048 Export-Controlled Items JUN 2013 252.226-7001 Utilization of Indian Organizations and Indian-Owned
Economic Enterprises, and Native Hawaiian Small Business Concerns
SEP 2004
252.232-7003 Electronic Submission of Payment Requests and Receiving Reports
JUN 2012
252.232-7010 Levies on Contract Payments DEC 2006 252.243-7001 Pricing Of Contract Modifications DEC 1991 252.243-7002 Requests for Equitable Adjustment DEC 2012 252.244-7000 Subcontracts for Commercial Items JUN 2013 252.247-7023 Transportation of Supplies by Sea APR 2014
CLAUSES INCORPORATED BY FULL TEXT
52.204-7 SYSTEM FOR AWARD MANAGEMENT (OCT 2016)
(a) Definitions. As used in this provision--
Electronic Funds Transfer (EFT) indicator means a four-character suffix to the unique entity identifier. The suffix is assigned at the discretion of the commercial, nonprofit, or Government entity to establish additional System for Award Management records for identifying alternative EFT accounts (see subpart 32.11) for the same entity.
Registered in the System for Award Management (SAM) database means that--
(1) The Offeror has entered all mandatory information, including the unique entity identifier and the EFT indicator, if applicable, the Commercial and Government Entity (CAGE) code, as well as data required by the Federal Funding Accountability and Transparency Act of 2006 (see subpart 4.14) into the SAM database;
(2) The offeror has completed the Core, Assertions, and Representations and Certifications, and Points of Contact sections of the registration in the SAM database;
(3) The Government has validated all mandatory data fields, to include validation of the Taxpayer Identification Number (TIN) with the Internal Revenue Service (IRS). The offeror will be required to provide consent for TIN validation to the Government as a part of the SAM registration process; and
(4) The Government has marked the record ``Active''.
Unique entity identifier means a number or other identifier used to identify a specific commercial, nonprofit, or Government entity. See www.sam.gov for the designated entity for establishing unique entity identifiers.
(b)(1) By submission of an offer, the Offeror acknowledges the requirement that a prospective awardee shall be registered in the SAM database prior to award, during performance, and through final payment of any contract, basic agreement, basic ordering agreement, or blanket purchasing agreement resulting from this solicitation.
(2) The Offeror shall enter, in the block with its name and address on the cover page of its offer, the annotation ``Unique Entity Identifier'' followed by the unique entity identifier that identifies the Offeror's name and address exactly as stated in the offer. The Offeror also shall enter its EFT indicator, if applicable. The unique entity identifier will be used by the Contracting Officer to verify that the Offeror is registered in the SAM database.
(c) If the Offeror does not have a unique entity identifier, it should contact the entity designated at www.sam.gov for establishment of the unique entity identifier directly to obtain one. The Offeror should be prepared to provide the following information:
(1) Company legal business name.
(2) Tradestyle, doing business, or other name by which your entity is commonly recognized.
(3) Company physical street address, city, state, and Zip Code.
(4) Company mailing address, city, state and Zip Code (if separate from physical).
(5) Company telephone number.
(6) Date the company was started.
(7) Number of employees at your location.
(8) Chief executive officer/key manager.
(9) Line of business (industry).
(10) Company headquarters name and address (reporting relationship within your entity).
(d) If the Offeror does not become registered in the SAM database in the time prescribed by the Contracting Officer, the Contracting Officer will proceed to award to the next otherwise successful registered Offeror.
(e) Processing time, which normally takes 48 hours, should be taken into consideration when registering. Offerors who are not registered should consider applying for registration immediately upon receipt of this solicitation.
(f) Offerors may obtain information on registration at https://www.acquisition.gov.
(End of clause)
52.204-4001 ACCESS TO SIERRA ARMY DEPOT (MAY 2002)
(a) Contractors by virtue of contract award will be given access privileges to Sierra Army Depot. Contractors and Sub-Contractors are required to provide a completed SIAD Form 1246R, 96 hours prior to the start of work. Form may be submitted via email to the contract POC or faxed to 530-827-4675. (Applies to contracts that require access to restricted areas)
(b) Each member of the Contractor’s work force shall be individually badged at the Depot Pass & Identification Office in Building 106. The badge shall be retained and worn by the Contractor’s employees throughout the contract period. (Applies to contracts that require access to restricted areas)
(c) Contractor is responsible for the turn-in of all security badges, including sub-contractors badges, daily and upon completion of the contract or termination of individual employees. (Applies to contracts that require access to restricted areas)
(d) Report lost badges to the Depot Pass & Identification Office and the Contracting Officer as soon as the loss is discovered. (Applies to contracts that require access to restricted areas)
(e) Be prepared to produce security badges each time entering a security area. Temporary badges for any individual who may have forgotten his/her badge can be obtained form the Depot Pass & Identification Office. (Applies to contracts that require access in restricted areas)
(f) Traffic Enforcement:
(1) Sierra Army Depot traffic laws are enforced by the Law Enforcement and Security Division using California state codes. All roads/streets have speed limit signs posted;
(2) Traffic violations are adjudicated by the U.S. Magistrate located at Sierra Army Depot. Court appearances may be requested or mandatory; and (c) Radar is used to enforce traffic speed limits.
(g) Vehicles:
(1) Vehicles entering Sierra Army Depot, whether Contractor-owned or privately owned, shall undergo inspections and may be issued a pass if entering a restricted area. Vehicle permits for restricted areas will be issued for up to 30 days maximum. Each vehicle will be required to carry a fire extinguisher at all times;
(2) Company or privately-owned vehicles, when parked, must have ignition keys removed. After duty hours, vehicles left on the Depot will be parked outside restricted areas unless otherwise stipulated in the contract. Vehicles or equipment remaining inside restricted areas will be locked or immobilized;
(3) Contractor is solely responsible for the removal of incapacitated vehicles or equipment from restricted areas;
(4) All vehicles shall be parked at least 20 meters from all buildings unless unloading or loading; and
(5) The contractor can expect to be inspected at any of the manned gates. The contractor should expect five to ten minute delays at each gate. In addition, to get to some of the remote areas, the contractor should expect at least a 15-minute delay both in and out to allow security to open necessary gates.
(h) Prohibited within the general confines of Sierra Army Depot
(1) Firearms/dangerous weapons
(2) Drugs/intoxicants
(3) Cameras/camera equipment (unless authorized by the Provost Marshal/Security Officer)
(4) Matches, lighters or other fire flame or spark producing devices outside of designated areas
(5) Fireworks without the Commander’s approval
(6) Smoking in all buildings, when handling flammable and hazardous materials, in railroad cars, trucks…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .