ProjNet Bidder Inquiries - Skuodas Fire Station 2022.01.11 ALL CLOSED.pdf
PDF 174 KB Posted
- Attached to
- Renovate Fire Station; Skuodas, Lithuania
- Solicitation number
- W912GB23R0012
- Issued by
-
Department of the Army European Command
About this file
This document is a solicitation announcement and related federal contract opportunity for renovation services at a fire station in Skuodas, Lithuania. The US Army Corps of Engineers, Europe District is soliciting proposals for a design-build project to complete 100% design and construction. Interested offerors must attend a mandatory site visit on December 8th and submit both price and non-price proposals by the deadline stated in the solicitation. Proposals must follow the instructions in the solicitation and any amendments. Companies must be registered in the System for Award Management to be eligible for award. The project involves renovating existing facilities, replacing windows, and adding new restroom and shower facilities. The location is provided, and offerors can find more information on doing business with the USACE Europe District on their website.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1/11/23, 10:02 AM ProjNet: Logged In User https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicAdminReportAll&strReportType=AllCOR 1/3
Controlled Unclassified Information (CUI) Only
Bid Inquiry Contracting Officers Report All Inquiries
Project: Skuodas Fire Station Renovation, Lithuania Review: Bidder Inquiry - Skuodas Fire Station Renovation, Lithuania (00001) (sorted by CommentID ) Displaying 6 inquiries.
Id Discipline Sheet Detail Spec 10010648 Contracting PAST PERFORMANCE Number of PPQs RFP Comment Classification: Public (Public)
Dear Sirs, Regarding the Past Performance Questionnaire factor, the number of PPQs that must be provided is not explicitly described.
Please define the minimum and maximum number of PPQs to deliver. Thank you
By: francisco ignacio gutierrez rivera; AID Corporation; (0034656828522). On: Dec 01 2022. Forward request by email.
1-0 Evaluation Concurred. There is no minimum or maximum; however, proposals evaluated with no past performance questionnaires submitted may receive a rating of neutral on Factor 3 for past performance. By: Thomas Bookout; NAU Contracting; (491746326882) On: Dec 08 2022
1-1 Government Response. There is no minimum or maximum; however, proposals evaluated with no past performance questionnaires submitted may receive a rating of neutral on Factor 3 for past performance. By: Thomas Bookout; NAU Contracting; (491746326882) On: Dec 08 2022
Current Request Status: Request Closed Information for this report is procurement sensitive.
10041655 Architectural Drawings Drawings and Specifications mechanical and sewage Comment Classification: Controlled Unclassified Information (CUI)
According to technical aspects of the project, the following questions arise:
1. Administration rooms do not have ventilation systems, so the ceilings and walls are moldy. Is it planned to install mechanical ventilation in these rooms, and in this case, where must be the ventilation device located, where an air intake and air removal openings from the outside to be located?
2. The facility is planning to replace the roof, but there is no place to drain the rainwater from the roof. Is it possible to channel rainwater into the city's rainwater collection networks? In this case, where is the nearest rainwater collection well, indicate its location and distance to it.
3. Since the building has a small basement and its outer wall is damaged by rainwater, is it planned to carry out waterproofing of the basement wall?
By: francisco ignacio gutierrez rivera; AID Corporation; (0034656828522). On: Dec 22 2022. Forward request by email.
1-0 Evaluation Concurred. 1. It is not planned to install mechanical ventilation in the administration rooms.
2. See Section 01 10 10 Statement of Work, Section 3.0 Architectural. In particular, see paragraph 3.1.2 DESIGN SUBMITTALS. The Contractor shall design a provide a plan of all roof areas, indicating direction of slope and method of drainage. See also paragraph 3.4.3.4.3 ROOF GUTTERS, DOWNSPOUTS AND FLASHING.
3. See Section 01 10 10 Statement of Work, Section 3.0 Architectural. In particular, see paragraph 3.4.3.1.1 STEM WALLS. By: Joshua Mueller; NAU Project Management; (+49 611 9744 2127) On: Jan 03 2023
1-1 Government Response. 1. It is not planned to install mechanical ventilation in the administration rooms.
2. See Section 01 10 10 Statement of Work, Section 3.0 Architectural. In particular, see paragraph 3.1.2 DESIGN SUBMITTALS. The Contractor shall design a provide a plan of all roof areas, indicating direction of slope and method of drainage. See also paragraph 3.4.3.4.3 ROOF GUTTERS, DOWNSPOUTS AND FLASHING.
3. See Section 01 10 10 Statement of Work, Section 3.0 Architectural. In particular, see paragraph 3.4.3.1.1 STEM WALLS. By: Joshua Mueller; NAU Project Management; (+49 611 9744 2127) On: Jan 03 2023
Current Request Status: Request Closed Information for this report is procurement sensitive.
10041657 Contracting RFP Standard Form RFP Comment Classification: Controlled Unclassified Information (CUI) https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicAdminReportAll&strReportType=AllCOR&RequestTimeout=1000&pagStrRowSort=CommentID https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicAdminReportAll&strReportType=AllCOR&RequestTimeout=1000&pagStrRowSort=Discipline https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicAdminReportAll&strReportType=AllCOR&RequestTimeout=1000&pagStrRowSort=Sheet https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicAdminReportAll&strReportType=AllCOR&RequestTimeout=1000&pagStrRowSort=Detail https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicAdminReportAll&strReportType=AllCOR&RequestTimeout=1000&pagStrRowSort=SpecText mailto:bid@aid-corp.com https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=10010648 mailto:thomas.m.bookout@usace.army.mil mailto:thomas.m.bookout@usace.army.mil mailto:bid@aid-corp.com https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=10041655 mailto:Joshua.D.Mueller@usace.army.mil https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicAdminReportAll&strReportType=AllCOR 2/3
Please confirm that the explicit non-inclusion in the standard form sf 1442 of amendment recognition is reason for considering the proposal as non responsive.
By: francisco ignacio gutierrez rivera; AID Corporation; (0034656828522). On: Dec 22 2022. Forward request by email.
1-0 Evaluation Concurred. Offerors will be considered non-responsive if proposals are not congruent with all of the amendments. By: Thomas Bookout; NAU Contracting; (491746326882) On: Dec 27 2022 1-1 Government Response. Offerors will be considered non-responsive if proposals are not congruent with all of the amendments. By: Thomas Bookout; NAU Contracting; (491746326882) On: Dec 27 2022 Current Request Status: Request Closed
Information for this report is procurement sensitive.
10053359 Architectural SoW Comment Classification: UNCLASSIFIED (U)
SOW Section 3.4.3.4.1 it states that, "Provide new roof structure, roof lathing..." however on section 4.7.1 there is a statement which says that, "For contractor's price proposal only, the roof framing is estimated to need 10% repair/ replacement of members and shall be completed as needed." Does the existing roof structure shall be used as it is with small repairs or is it to be removed completely and replaced with the new roof structure?
By: Abdul Mateen QADER; CONTECH INSAAT TAAHHUT ITHALAT IHRACAT LIMITED SIRKETI; (00903122872702). On:
Jan 06 2023. Forward request by email.
1-0 Evaluation Concurred. Bid the roof as shown. The contractor shall design and construct the the roof and attic in accordance with the requirements stipulated in the statement of work, plus local codes and standards. By: Joshua Mueller; NAU Project Management; (+49 611 9744 2127) On: Jan 09 2023
1-1 Government Response. Bid the roof as shown. The contractor shall design and construct the the roof and attic in accordance with the requirements stipulated in the statement of work, plus local codes and standards. By: Thomas Bookout; NAU Contracting; (491746326882) On: Jan 09 2023
Current Request Status: Request Closed Information for this report is procurement sensitive.
10053368 Architectural 01 10 10 Statement of Work Comment Classification: UNCLASSIFIED (U) in reference to paragraph 3.4.3.1.2 EXTERIOR WALL INSULATION FINISH SYSTEM (EIFS);
Does the new exterior insulation finish system is required for the tower structure as well?
By: Abdul Mateen QADER; CONTECH INSAAT TAAHHUT ITHALAT IHRACAT LIMITED SIRKETI; (00903122872702). On:
Jan 06 2023. Forward request by email.
1-0 Evaluation Check and Resolve. See forthcoming amendment, which will clarify that the tower structure will not require exterior wall insulation. By: Joshua Mueller; NAU Project Management; (+49 611 9744 2127) On: Jan 09
1-1 Government Response. See forthcoming amendment, which will clarify that the tower structure will not require exterior wall insulation. By: Thomas Bookout; NAU Contracting; (491746326882) On: Jan 09 2023
Current Request Status: Request Closed Information for this report is procurement sensitive.
10053384 Architectural 01 10 10 Statement of Work Comment Classification: UNCLASSIFIED (U)
3.1 PROJECT DESCRIPTION
New restroom and shower facilities will be provided in room 1-5. Does the existing windows will be removed or replaced with the smaller windows?
By: Abdul Mateen QADER; CONTECH INSAAT TAAHHUT ITHALAT IHRACAT LIMITED SIRKETI; (00903122872702). On:
Jan 06 2023.
Requires Amendment.
Forward request by email.
1-0 Evaluation Concurred. See forthcoming amendment, which will clarify the requirements for replacing the existing windows in room 1-5:
"3.4.3.3.1 EXTERIOR WINDOWSILLS
Existing windows in room 1-5 must be replaced with smaller windows with higher windowsill to provide privacy and sufficient room for new showers. Provide new PVC windows and frames. Window frames must be 5-chamber PVC factory finished commercial grade with surround frame. All windows must be 100% operable with tilt and turn functionality and meet life safety requirements. Provide all accessories and hardware including drip sills, hinges, lever mailto:bid@aid-corp.com https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=10041657 mailto:thomas.m.bookout@usace.army.mil mailto:thomas.m.bookout@usace.army.mil mailto:metin@con-tech.org https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=10053359 mailto:Joshua.D.Mueller@usace.army.mil mailto:thomas.m.bookout@usace.army.mil mailto:metin@con-tech.org https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=10053368 mailto:Joshua.D.Mueller@usace.army.mil mailto:thomas.m.bookout@usace.army.mil mailto:metin@con-tech.org https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicCommentReportEmail&PKeyComment=10053384 https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicAdminReportAll&strReportType=AllCOR 3/3 handles and latch lock. Anchor and secure window frames to structure as recommended by the manufacturer to meet the wind and seismic loads. Caulk all joints between window frames and building with sealant to provide a watertight installation and proper finish. All windows must have double pane, insulated glazing at a minimum. Windows must have a maximum assembly U-factor in accordance with applicable codes and standards. Provide obscured glass for all bathroom and shower windows." By: Joshua Mueller; NAU Project Management; (+49 611 9744 2127) On: Jan 11 2023
1-1 Government Response. See forthcoming amendment, which will clarify the requirements for replacing the existing windows in room 1-5:
"3.4.3.3.1 EXTERIOR WINDOWSILLS
Existing windows in room 1-5 must be replaced with smaller windows with higher windowsill to provide privacy and sufficient room for new showers. Provide new PVC windows and frames. Window frames must be 5-chamber PVC factory finished commercial grade with surround frame. All windows must be 100% operable with tilt and turn functionality and meet life safety requirements. Provide all accessories and hardware including drip sills, hinges, lever handles and latch lock. Anchor and secure window frames to structure as recommended by the manufacturer to meet the wind and seismic loads. Caulk all joints between window frames and building with sealant to provide a watertight installation and proper finish. All windows must have double pane, insulated glazing at a minimum. Windows must have a maximum assembly U-factor in accordance with applicable codes and standards. Provide obscured glass for all bathroom and shower windows." By: Joshua Mueller; NAU Project Management; (+49 611 9744 2127) On: Jan 11
Current Request Status: Request Closed Information for this report is procurement sensitive.
Report Complete
Controlled Unclassified Information (CUI) Only Patent 11/892,984 ProjNet property of ERDC since 2004.