This is a solicitation announcement for design and construction services for renovation of a school facility in Tsirguliina, Estonia. The U.S. Army Corps of Engineers, Europe District is seeking proposals for a design-build project that includes basic design criteria. Interested offerors must be registered in the System for Award Management to be eligible for award of the contract resulting from this solicitation. Offerors are encouraged to attend an optional pre-proposal site visit scheduled for December 9, 2022. Proposals are due by the deadline specified in the solicitation and must include both price and non-price components to be considered. The project location is provided, and a presentation on the USACE procurement process is referenced for additional information.

View the file

Other files

Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1/6/23, 2:08 PM ProjNet: Logged In User https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicPublicReportAll&strReportType=AllCont 1/8

Controlled Unclassified Information (CUI) Only

Bid Inquiry Contractor Report All Inquiries

Project: Tsirguliina School Renovation, Estonia Review: Bidder Inquiry - Tsirguliina School Renovation (00001) (sorted by CommentID ) Displaying 17 inquiries.

Id Discipline Sheet Detail Spec 10010647 Contracting PAST PERFORMANCE Number of PPQs RFP Comment Classification: Public (Public)

Dear Sirs, Regarding the Past Performance Questionnaire factor, the number of PPQs that must be provided is not explicitly described.

Please define the minimum and maximum number of PPQs to deliver.

Thank you

On: Dec 01 2022.

Government Response. . There is no maximum amount of PPQ to submit with proposal. It is a given that the solicitation states that offerors are required to submit at least 1 PPQ. Submit at least a "page 1" (first page complete) of PPQ for all relevant past work that the offeror would like evaluated with proposal. On: Dec 01 2022

Current Request Status: Request Closed Information for this report is procurement sensitive.

10014072 Other Original Date Offers Due Standard Form 1442 Comment Classification: Public (Public)

Dear Sir/Madam, While the bid date of the tender published on Sam.gov as Notice ID W912GB23R0008 appears to be January 30, when we download the relevant tender documents on Sam.gov, we see that this date is January 09 in the 13th part of Standard Form 1442. We kindly request you let us know the last date of the proposal and whether we will send it to you via e-mail or as a hard copy.

Thank you.

On: Dec 05 2022.

Government Response. . The final date for submission of proposals is 30 January. Solicitation document 1442 updated in SAM.Gov. On: Dec 05 2022 Current Request Status: Request Closed

Information for this report is procurement sensitive.

10015928 Contracting B.08.02 23R0008_Tsirguliina School Renovation_Final

Comment Classification: Controlled Unclassified Information (CUI)

Dear Sir/Madam, Document "B.08.02 23R0008_Tsirguliina School Renovation_Final" is deleted from the attachments list. Will there be a new version of this document uploaded?

Thank you.

On: Dec 06 2022.

Government Response. . The solicitation is updated with a Final version that is not in draft format. On: Dec 06

Current Request Status: Request Closed

Information for this report is procurement sensitive.

10015929 Contracting BLA / BLG https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicPublicReportAll&strReportType=AllCont&RequestTimeout=1000&pagStrRowSort=CommentID https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicPublicReportAll&strReportType=AllCont&RequestTimeout=1000&pagStrRowSort=Discipline https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicPublicReportAll&strReportType=AllCont&RequestTimeout=1000&pagStrRowSort=Sheet https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicPublicReportAll&strReportType=AllCont&RequestTimeout=1000&pagStrRowSort=Detail https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicPublicReportAll&strReportType=AllCont&RequestTimeout=1000&pagStrRowSort=SpecText https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicPublicReportAll&strReportType=AllCont 2/8

Comment Classification: Controlled Unclassified Information (CUI)

Dear Sir/Madam, Since the banks will not issue guarantees with indefinite term, would it be acceptable to amend the wording of a guarantee in a way that the initial term is set until the end of the warranty period and the bank agrees to extend the guarantee if the contractor office requires the bank to do so?

Thank you.

On: Dec 06 2022.

Government Response. . Please use the template for the BLA template provided to submit with your proposal. The

BLG is not required until after award. The BLA doesn't require the term. On: Dec 08 2022 Current Request Status: Request Closed

Information for this report is procurement sensitive.

10026688 Civil Site visit Comment Classification: Controlled Unclassified Information (CUI)

Please clarify the following questions. 1. Is it needed to build a service walkway in the kindergarten attic?

2. Is it needed to install service walkways on the top of all roofs? 3. During the site visit, it was discussed how and where to lead the rainwater drainage, seepage field (if there is any) or connect to town's main drainage line. If there is a seepage field please clarify the location.

On: Dec 13 2022.

Government Response. . 1. See Section 01 10 10 Statement of Work, Section 3.0 Architectural. In particular, see paragraph 3.4.3.2.4 ATTIC THERMAL INSULATION.

2. See Section 01 10 10 Statement of Work, Section 3.0 Architectural. In particular, see paragraph 3.1.2 DESIGN SUBMITTALS and paragraph 3.2.1 LIFE SAFETY REQUIREMENTS. The contractor shall design and construct the roof in accordance with local codes and standards.

3. See Section 01 10 10 Statement of Work, Section 2.0 Civil and Section 3.0 Architectural. In particular, see paragraph 2.10.1 STORM SYSTEM, paragraph 3.1.2 DESIGN SUBMITTALS, and paragraph 3.4.3.2.3 ROOF GUTTERS, DOWNSPOUTS AND FLASHING. See also the Statement of Work Attachment #2, Conceptual Site Plan (best known drainage ditch location and key notes #1-4). The contractor shall design and construct the storm drainage system in accordance with the requirements stipulated in the statement of work, plus local codes and standards. On:

Jan 04 2023

Government Response. . The text below appends or clarifies ALL previous replies.

With regards to question #3, see forthcoming amendment, which will clarify that a storm water pump may be required for the drainage system and which will provide minimum expectations for a storm water pump, if needed. The contractor shall design and construct the storm drainage system in accordance with the requirements stipulated in the statement of work, plus local codes and standards. On: Jan 06 2023

Current Request Status: Request Closed Information for this report is procurement sensitive.

10032639 General RFP Final SF1442 Comment Classification: Public (Public)

Because of Christmas and some public holidays at Estonia and in our Country, we are kindly asking at least 15 days time extansion for preparing our best proposal to your organisation.

On: Dec 16 2022.

Government Response. . Offers are currently due 30 JAN. We currently do not anticipate extending. On: Dec 28

Current Request Status: Request Closed

Information for this report is procurement sensitive.

10041664 Architectural Drawings Drawings and Specifications architectural details

Comment Classification: Controlled Unclassified Information (CUI)

Certain technical and administrative questions arise after the site visit:

1. What kind of roofing can we offer? Asbestos-free slate or tin roofing?

2. Since the sports hall is planned to have a new roof and insulation, the height of the roof will change, as well as the height of the building. How will this be resolved legally?

https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicPublicReportAll&strReportType=AllCont 3/8

3. Please provide the measurements of the gymnasium roof.

4. is it possible to get the existing architectural drawings of the buildings in PDF format?

5. Where is the rainwater from the newly installed roofs supposed to go? The description provides for the installation of French drainage in the green areas, but according to the current situation, they include a children's playground. Should the dismantling and re-installation of the playground be considered? Maybe there is a possibility to lead the rain to the rain collection wells belonging to the city networks?

6. Is it planned to install a fire alarm system in the attic?

7. Is it planned to cover the existing wooden roof structure with fire protection?

8. Is it planned to install a lightning arrester on the roof?

On: Dec 22 2022.

Government Response. . 1. See Section 01 10 10 Statement of Work, Section 3.0 Architectural. In particular, see paragraph 3.1.2 DESIGN SUBMITTALS, paragraph and subpragraphs under 3.4.3.2 ROOFING, and paragraph 3.4.3.3

EXTERIOR METAL.

2. See Section 00 74 01-SPECIAL CONDITIONS. In particular, see section 00 74 01 paragraph and subparagraphs under 1.7 PERMITS, paragraph 1.9 CONTRACTOR OBLIGATION, paragraph 1.10 SUBMITTALS, and paragraph 3.4

CONTRACTOR LIAISON AND COMMUNICATION WITH HOST GOVERNMENTS.

3. All available information is already provided in the solicitation. The contractor shall field verify all provided information. See also Section 01 10 10 Statement of Work, paragraph 1.2 GENERAL REQUIREMENTS and paragraph 3.1.1 Design (Architectural).

4. All available information is already provided in the solicitation. The contractor shall field verify all provided information. See also Section 01 10 10 Statement of Work, paragraph 1.2 GENERAL REQUIREMENTS and paragraph 3.1.1 Design (Architectural).

5. See Section 01 10 10 Statement of Work, Section 2.0 Civil and Section 3.0 Architectural. In particular, see paragraph 2.10.1 STORM SYSTEM, paragraph 3.1.2 DESIGN SUBMITTALS, and paragraph 3.4.3.2.3 ROOF GUTTERS, DOWNSPOUTS AND FLASHING. See also the Statement of Work Attachment #2, Conceptual Site Plan (best known drainage ditch location and key notes #1-4). The contractor shall design and construct the storm drainage system in accordance with the requirements stipulated in the statement of work, plus local codes and standards.

6. See Section 01 10 10 Statement of Work, Section 3.0 Architectural. In particular, see paragraph 3.2.1 LIFE SAFETY REQUIREMENTS. The contractor shall design and construct the the roof and attic in accordance with the requirements stipulated in the statement of work, plus local codes and standards.

7. See Section 01 10 10 Statement of Work, Section 3.0 Architectural. In particular, see paragraph 3.2.1 LIFE SAFETY REQUIREMENTS. The contractor shall design and construct the the roof and attic in accordance with the requirements stipulated in the statement of work, plus local codes and standards.

8. See Section 01 10 10 Statement of Work, Section 5.0 Electrical. In particular, see paragraph 5.1.1 APPLICABLE DESIGN CRITERIA, paragraph 5.1.4 DRAWINGS AND DESIGN ANALYSIS, paragraph 5.2 ELECTRICAL SCOPE, and paragraph 5.4.1 LIGHTNING PROTECTION AND GROUNDING. The contractor shall design and construct the lightning protection system in accordance with the requirements stipulated in the statement of work, plus local codes and standards. On: Jan 04 2023

Government Response. . The text below appends or clarifies ALL previous replies.

With regard to question #5, see forthcoming amendment, which will clarify that a storm water pump may be required for the drainage system and which will provide minimum expectations for a storm water pump, if needed. The contractor shall design and construct the storm drainage system in accordance with the requirements stipulated in the statement of work, plus local codes and standards. On: Jan 06 2023

Current Request Status: Request Closed Information for this report is procurement sensitive.

10042833 Civil Drawings Drawings and Specifications Architectural Details

Comment Classification: Public (Public)

Certain technical and administrative questions arise after the site visit:

1. While the surrounding of the building is being excavated for isolation, the building entrance stairs will be broken and rebuilt.

Please confirm

2. The roof of the gym will be completely dismantled and rebuilt as the existing carcass will be redesigned. Please confirm

3. The gaps between the roof slab and the roof covering will be closed with suitable material. Photograph EST 02 . Please confirm.

4. Will the damaged surfaces under the eaves on the building facade be repaired? If it is repaired, will it be painted? If there will be paint, shouldn't those parts be painted over the entire facade? Photograph EST 01

5. Will there be a fire extinguishing system in the attic? like springler sys.

https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicPublicReportAll&strReportType=AllCont 4/8

6. Will there be a smoke detector in the attic?

7. Will lightning protection (lightning rod) be made throughout the school?

8. Will thermal insulation be made in the foundation curtain insulation?

9. When the slopes of the roof of the gym change, the parapets will rise on the two short sides, so it will be necessary to build walls in these parts. therefore, the exterior of the gym will need to be plastered and painted. Please confirm

(Attachment: EST01-EST02.pdf) On: Dec 23 2022.

Government Response. . 1. No demolition of the stairs is required. The Contractor shall treat the stairs as part of the perimeter of the building.

2. See Section 01 10 10 Statement of Work, Section 3.0 Architectural and Section 4.0 Structural. In particular, see paragraph 3.1.2 DESIGN SUBMITTALS, 4.1 GENERAL, and 4.3.1 DESIGN SUBMITTALS. The contractor shall design and construct the roof in accordance with the requirements stipulated in the statement of work, plus local codes and standards.

3. See Section 01 10 10 Statement of Work, Section 3.0 Architectural and Section 4.0 Structural. In particular, see paragraph 3.1.2 DESIGN SUBMITTALS, 4.1 GENERAL, and 4.3.1 DESIGN SUBMITTALS. The contractor shall design and construct the roof in accordance with the requirements stipulated in the statement of work, plus local codes and standards.

4. See Section 01 10 10 Statement of Work, Section 3.0 Architectural and Section 4.0 Structural. In particular, see paragraph 3.1.2 DESIGN SUBMITTALS, 3.4.2.4 CORROSION PREVENTION, 3.4.3.2.2 EAVES, OVERHANGS, AND SOFFITS, 3.4.3.3 EXTERIOR METAL, and 4.3.1 DESIGN SUBMITTALS. The contractor shall design and construct the roof in accordance with the requirements stipulated in the statement of work, plus local codes and standards.

5. See Section 01 10 10 Statement of Work, Section 3.0 Architectural. In particular, see paragraph 3.2.1 LIFE SAFETY REQUIREMENTS. The contractor shall design and construct the the roof and attic in accordance with the requirements stipulated in the statement of work, plus local codes and standards.

6. See Section 01 10 10 Statement of Work, Section 3.0 Architectural. In particular, see paragraph 3.2.1 LIFE SAFETY REQUIREMENTS. The contractor shall design and construct the the roof and attic in accordance with the requirements stipulated in the statement of work, plus local codes and standards.

7. See Section 01 10 10 Statement of Work, Section 5.0 Electrical. In particular, see paragraph 5.1.1 APPLICABLE DESIGN CRITERIA, 5.1.4 DRAWINGS AND DESIGN ANALYSIS, 5.2 ELECTRICAL SCOPE, and 5.4.1 LIGHTNING PROTECTION AND GROUNDING. The contractor shall design and construct the lightning protection system in accordance with the requirements stipulated in the statement of work, plus local codes and standards.

8. See Section 01 10 10 Statement of Work, Section 3.0 Architectural. In particular, see paragraph 3.4.2.3 THERMAL INSULATION, 3.4.3.1.1 WALLS BELOW GRADE, and 3.4.3.1.2 EXTERIOR WALL INSULATION. The contractor shall design and construct the insulation in accordance with the requirements stipulated in the statement of work, plus local codes and standards.

9. See forthcoming amendment, which will edit Section 01 10 10 Statement of Work paragraph 3.4.3.1 EXTERIOR WALLS to clarify that some adaptations to the exterior walls of the gym building will be necessary. On: Jan 04 2023

Current Request Status: Request Closed Information for this report is procurement sensitive.

10042834 Civil Drawings Drawings and Specifications Architectural Details

Comment Classification: Public (Public)

Certain technical and administrative questions arise after the site visit:

*Do we need to do geological survey ? Is there any existing geological survey ?

* Waterproofing and insulation – how deep it is necessary to dig up the foundations ? How deep the foundation wall needs to be insulated ? Insulation material – can it be PUR foam ?

* Schoolhouse roof – can the existing insulation layer be left on the roof ceiling ? And add an additional layer of insulation according to the requirements.

* Existing open cracks in the external walls and facades – whether and what we should consider in these positions ?

* Pavement width around the buildings perimeter - on site visit there was this information, that the surrounding area is probably inclined towards the building, so our limit of the job (1 m width pavement) will not give the desired waterproofing result. Which specific volumes of work should we consider in the proposal ?

* What specific permits and approvals we need to obtain in connection with the renovation of various buildings ?

On: Dec 23 2022.

Government Response. . 1. See Section 01 10 10 Statement of Work, Section 2.0 Civil and 4.0 Structural. In particular, see paragraphs 2.2.3 GEOTECHNICAL, 2.2.5 EXISTING CONDITIONS INVESTIGATION, 2.3.1 DESIGN https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicPublicFileDownload&strApp=&strPrevCob=BicPublicReportAll&strShown=EST01-EST02.pdf&intView=1 https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicPublicReportAll&strReportType=AllCont 5/8

ANALYSIS, 2.5 GEOTECHNICAL INVESTIGATION AND REPORT, paragraph 4.1 GENERAL, and paragraph 4.3.1 DESIGN SUBMITTALS. The contractor shall design and construct the project in accordance with the requirements stipulated in the statement of work, plus local codes and standards.

2. See Section 01 10 10 Statement of Work, Section 3.0 Architectural. In particular, see paragraph 3.4.2.3 THERMAL INSULATION, 3.4.3.1.1 WALLS BELOW GRADE, and 3.4.3.1.2 EXTERIOR WALL INSULATION. The contractor shall design and construct the insulation in accordance with the requirements stipulated in the statement of work, plus local codes and standards.

3. See Section 01 10 10 Statement of Work, Section 3.0 Architectural. In particular, see paragraph 3.1 PROJCET DESCRIPTION, 3.4.1 DEMOLITION, 3.4.2.3 THERMAL INSULATION, and 3.4.3.2.4 ATTIC THERMAL INSULATION.

The contractor shall design and construct the insulation in accordance with the requirements stipulated in the statement of work, plus local codes and standards.

4. See Section 01 10 10 Statement of Work, Section 3.0 Architectural and Section 4.0 Structural. In particular, see paragraph 3.1.2 DESIGN SUBMITTALS, paragraph paragraph 3.4.2.4 CORROSION PREVENTION, 3.4.3.2.2 EAVES, OVERHANGS, AND SOFFITS, paragraph 3.4.3.3 EXTERIOR METAL, and paragraph 4.3.1 DESIGN SUBMITTALS.

The contractor shall design and construct the roof and attic in accordance with the requirements stipulated in the statement of work, plus local codes and standards.

5. See Section 01 10 10 Statement of Work, Section 2.0 Civil and Section 3.0 Architectural. In particular, see paragraphs 2.3 DESIGN SUBMITTALS, 2.3.1 DESIGN ANALYSIS, 2.8 DEMOLITION, 2.10.1 STORM SYSTEM, 2.11 PAVEMENT, 3.1.2 DESIGN SUBMITTALS, and 3.4.3.2.3 ROOF GUTTERS, DOWNSPOUTS AND FLASHING. The contractor shall design and construct the storm drainage system in accordance with the requirements stipulated in the statement of work, plus local codes and standards.

6. See Section 00 74 01-SPECIAL CONDITIONS. In particular, see section 00 74 01 paragraph and subparagraphs under 1.7 PERMITS, paragraph 1.9 CONTRACTOR OBLIGATION, paragraph 1.10 SUBMITTALS, and paragraph 3.4 CONTRACTOR LIAISON AND COMMUNICATION WITH HOST GOVERNMENTS. On: Jan 04 2023

Government Response. . The text below appends or clarifies ALL previous replies.

With regards to question #5, see forthcoming amendment, which will clarify that a storm water pump may be required for the drainage system and which will provide minimum expectations for a storm water pump, if needed. The contractor shall design and construct the storm drainage system in accordance with the requirements stipulated in the statement of work, plus local codes and standards. On: Jan 06 2023

Current Request Status: Request Closed Information for this report is procurement sensitive.

10048022 Contracting Page 18 of 39 The Contract due date Comment Classification: Controlled Unclassified Information (CUI)

We have a remark about the schedule due date. In the Solicitation it is said that we have to complete the work within 455 days after NTP.

Please see following text under the topic "Schedule Assumptions.:

"For the purposes of evaluation under this factor, the Offeror should utilize the following assumptions: plan for a 455 calendar day construction duration, Offeror should use the dates of 30 March 2023 for award and 15 April 2023 for issuance of the NTP, and should prepare the schedule assuming that all base line items and options will be awarded on that date."

In Estonia there are four seasons and best seasons to build a roof and also to do drainage works (including exchanging insulation on the plinth) are end of spring till end of summer.

If we plan that NTP is on the 15.04.2023 and we must apply for building permit, then we assume that we will get all the permits and 100% Design ready by end of summer. That means next best time to build is in year 2024 spring-summer. But is you add 455 days to 15.04.2023, then due date for the work is 13.07.2024.

Our question is: Is there a possibility that the due date for this work would be 01.09.2024 = +50 days = 505 days from the NTP (assumed that the NTP is on 15th of April 2023).

On: Jan 03 2023.

Government Response. . Yes, the Government will change the period of performance to 505 days, given that this extended period will affect better offer pricing. Forthcoming amendment will be provided. On: Jan 04 2023 Current Request Status: Request Closed

Information for this report is procurement sensitive.

10048025 General SF1442 Comment Classification: Controlled Unclassified Information (CUI)

We are kindly asking time extension for preparing our proposal.

https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicPublicReportAll&strReportType=AllCont 6/8

On: Jan 03 2023.

Government Response. . No time extension will be given, due to Government time constraints. On: Jan 04 2023 Current Request Status: Request Closed

Information for this report is procurement sensitive.

10048092 Civil 2.10.1 STORM SYSTEM Comment Classification: Controlled Unclassified Information (CUI)

Storm water / drainage systems - There is no existing ponds/ditches having sufficiently low base level to lead drainage water there with natural slope (as drainage pipe will be located more than 3 meters below ground level). It means that the only way is to use pumping systems. Do we have to consider the drainage system with the pump? Or where do we have to lead drainage water?

On: Jan 03 2023.

Government Response. . See forthcoming amendment, which will clarify that a storm water pump may be required for the drainage system and which will provide minimum expectations for a storm water pump, if needed. The contractor shall design and construct the storm drainage system in accordance with the requirements stipulated in the statement of work, plus local codes and standards. On: Jan 06 2023

Current Request Status: Request Closed Information for this report is procurement sensitive.

10048096 Civil Page 10 of 27 to Page 12 of

Comment Classification: Controlled Unclassified Information (CUI)

How deep do we need to excavate around the building perimeter?

SOW says that we have to assume demolition and replacement of 1 meter wide section around building perimeters. Same time SOW says that we have to excavate down to the foundation top and remove loose exterior plaster, dirt and loose mortar.

Example the "School Building" basement is about 3 meters high. It means that we have to dig ... 2...3m wide section ( depending on soil conditions) so that we would not have a dangerous situation with edges of the ditch.

SOW paragraphs 2.11 and 3.4.3.1.1.

On: Jan 03 2023.

Government Response. . See forthcoming amendment, which will edit the statement of work to clarify that the 1 meter wide excavation is meant as a minimum expectation for bidding purposes. The contractor shall design and construct the walls below grade in accordance with the requirements stipulated in the statement of work, plus local codes and standards. On: Jan 06 2023

Current Request Status: Request Closed Information for this report is procurement sensitive.

10048099 Structural Page 15 of 27 3.4.3.1.1.

Comment Classification: Controlled Unclassified Information (CUI)

1. In the paragraph and 3.4.3.1.1. there is written "Excavate walls below existing grade. Excavate down to foundation top and remove loose exterior plaster, dirt and loose mortar. Thoroughly clean exterior walls below grade with pressure cleaner. Allow walls to dry in accordance with manufacturer requirements. Provide fluid-applied monolithic membrane waterproofing on all existing concrete and masonry walls below grade.". There is mentioned many times "below grade". Does below grade mean below existing asphalt level? As the plinth (in Estonian sokkel) for some buildings is above the grade, then we see that for correct finishing we must also renovate some part of the exterior wall that is above the grade. May you please confirm? May you please send us pictures of the buildings with marked section till what line we have to renovate the exterior walls?

2. What do we do with the windows in the basement? Do we have to demolish them and fill the openings with masonry?

On: Jan 03 2023.

Government Response. . 1. Confirmed. "Below grade" in the statement of work means below the existing asphalt.

2. The contractor shall leave the existing windows in place. On: Jan 06 2023 Current Request Status: Request Closed

Information for this report is procurement sensitive.

10048101 Structural Page 15 of 27 to 16 of 27 3.4.3.2.1.

Comment Classification: Controlled Unclassified Information (CUI)

1. In paragraph 3.4.3.2.1. there is written: "Roof and wall insulation must be continuous to eliminate thermal breaks". Our question: Do we have to insulate walls? What is meant by this point? As much as we understand vertical insulation of walls is not considered to be in our scope.

https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicPublicReportAll&strReportType=AllCont 7/8

2. In paragraph 3.4.3.2.1. there is written: "Metal roofs must have a 20 year warranty". Our question: Do we understand correctly that the metal roof material must have a 20 year warranty? Or do you mean that the whole roof as a construction (including work) must have a 20 year warranty? We have understood that the project has a 2-year warranty.

On: Jan 03 2023.

Government Response. . 1. See forthcoming amendment, which will clarify that this refers only to roof insulation and not wall insulation. See also paragraph 3.4.2.3 THERMAL INSULATION, 3.4.3.1.1 WALLS BELOW GRADE, and

3.4.3.1.2 EXTERIOR WALL INSULATION. The statement of work requires insulation in the exterior walls only below grade (not the walls above ground in contact with the roof). The contractor shall design and construct the insulation in accordance with the requirements stipulated in the statement of work, plus local codes and standards.

2. Confirmed. The metal roof must have a 20 year warranty in accordance with the Section 01 10 10 Statement of Work paragraph 3.4.3.2.1. The whole roof as a construction must have a 2 year warranty in accordance with the Warranty of Construction clause contained in the solicitation Section 00 73 00. On: Jan 06 2023

Current Request Status: Request Closed Information for this report is procurement sensitive.

10048104 Structural Page 16 of 27 3.4.3.2.4 Comment Classification: Controlled Unclassified Information (CUI)

What is meant under the point: "Attic and wall insulation must be continuous to eliminate thermal breaks" in the paragraph 3.4.3.2.4? Do we have to insulate walls inside or outside of the attic?

On: Jan 03 2023.

Government Response. . See forthcoming amendment, which will clarify that this refers only to roof insulation and not wall insulation. See also paragraph 3.4.2.3 THERMAL INSULATION, 3.4.3.1.1 WALLS BELOW GRADE, and

3.4.3.1.2 EXTERIOR WALL INSULATION. The statement of work requires insulation in the exterior walls only below grade (not the walls above ground in contact with the roof). The contractor shall design and construct the insulation in accordance with the requirements stipulated in the statement of work, plus local codes and standards. On: Jan 06

Current Request Status: Request Closed Information for this report is procurement sensitive.

10048108 Structural Page 16 of 27 3.4.3.2.2 Comment Classification: Controlled Unclassified Information (CUI)

1. In paragraph 3.4.3.2.2 there is written "Provide roof overhangs a minimum of 600 mm from the face of exterior walls".

Do all the roofs must have a minimum of overhangs of 600 mm from the face of exterior walls? Example Gymnasium roof side and end walls need extra construction to have overhangs of 600 mm or more. Same questions about end walls of School building and Kindergarten, where existing overhang is much less than 60cm.

2. In paragraph 3.4.3.2.2 there is written "Enclose all eaves and overhangs with factory finished metal soffits". May you please provide an example of the product for metal soffits? In Estonia we usually build lower horizontal part of eaves and overhangs with wooden boards. As it is built previously for the School building and Kindergarten.

3. Do we have to build netting system on the eaves against insects and birds?

4. Do we have to renovate the canopies of the entrances? As well provide overhangs of 600 mm minimum?

On: Jan 03 2023.

Government Response. . 1. The contractor shall design and construct the roofs in accordance with the requirements stipulated in the statement of work, plus local codes and standards. Paragraph 3.4.3.2.2 EAVES, OVERHANGS, AND SOFFITS states that the MINIMUM distance between the exterior wall faces and the overhangs is 600 mm. 600 mm is the minimum distance for the roof overhangs for all three buildings.

2. See forthcoming amendment, which will edit the statement of work to clarify that typical local design/construction solutions are acceptable (wood soffit). The contractor shall design and construct the roofs in accordance with the requirements stipulated in the statement of work, plus local codes and standards.

3. See forthcoming amendment, which will edit the statement of work to clarify that yes, netting is required. The contractor shall design and construct the roofs in accordance with the requirements stipulated in the statement of work, plus local codes and standards.

4. Entrance canopies are not part of the scope of this project. On: Jan 06 2023 Current Request Status: Request Closed

Information for this report is procurement sensitive.

Report Complete https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicPublicReportAll&strReportType=AllCont 8/8

Controlled Unclassified Information (CUI) Only Patent 11/892,984 ProjNet property of ERDC since 2004.

http://projnet.com/index.php

File details come from the government source that posted it. Updated .