B.08.02.02 Attach 2 ExpInfoSheet 20R0006.docx
DOCX document 36 KB Posted
- Solicitation number
- W912GB20R0006
- Issued by
-
Department of the Army European Command
About this file
This document contains an experience information sheet template for Attachment 2 to the solicitation W912GB20R0006. The solicitation is for fiscal year 2020 Turkey design-build and design-bid-build construction multiple-award task order contracts from the Department of the Army European Command. Proposers must provide details on a minimum of five past projects demonstrating relevant experience, including whether the work was performed as a prime contractor, subcontractor, or joint venture partner. For each project, proposers must specify the final cost, location, completion date, and whether the project was over 50% complete by the closing date of the solicitation. Proposers must also describe the nature of the construction work performed and indicate if it involved building renovations, civil works, or environmental work.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT 2
Fiscal Year 2020 Turkey DB DBB MATOC W912GB20R0006
EXPERIENCE INFORMATION SHEET
PROJECT NO. _____, Page 1 (project number is taken from column 1 on Attachment 1) Must have a total of 5 projects, more than 5 will not be evaluated; less than 5 may result in a lower rating Project Name:
Experience:
1. Indicate whether the work was performed as the prime contractor, a subcontractor, or as a partner of a Joint Venture. If work was performed as a subcontractor or JV partner, clearly describe what part of the work the firm for which the experience information is submitted performed (both in magnitude and description of the work performed).
2. The final cost of this project: €_________________________
3. The location the work was performed is: ___________________________________
4. The day, month, and year work was completed: _______________
5. Is this project more than 50% complete by the closing date of this solicitation? ____ Yes ____ No
6. Work involves building renovations, civil work, or environmental work ____ Yes ____ No (see RFP Section 00 22 00 for further details)
6. Describe the nature of the work. Do not provide a listing of existing or previous contracts, but rather provide detailed information of the construction work.
(Continue typing if required to provide more information)
ATTACHMENT 2 - EXPERIENCE INFORMATION SHEET
PROJECT NO. _____ Page 2