SECTION 01 22 00 Page 1

Macedonia Ministry of the Interior Renovation of Barracks Skopje, North Macedonia

SECTION TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 01 22 00

PRICE AND PAYMENT PROCEDURES

01/19

PART 1 GENERAL

1.1 SINGLE JOB PAYMENT ITEMS

PART 2 PRODUCTS

PART 3 EXECUTION

-- End of Section Table of Contents --

SECTION 01 22 00 Page 2

PRICE AND PAYMENT PROCEDURES

01/19

PART 1 GENERAL

SINGLE JOB PAYMENT ITEMS

Payment items for the work of this contract for which contract job payments will be made are listed in the BID SCHEDULE and described below. All costs for items of work, which are not specifically mentioned to be included in a particular job or unit price payment item, are included in the listed job item most closely associated with the work involved.

The job price and payment made for each item listed constitutes full compensation for design and for furnishing all plant, labor, materials, and equipment, and performing any associated Contractor quality control, environmental protection, meeting safety requirements, tests and reports, and for performing all work required for which separate payment is not otherwise provided.

If there is any work required of this contract that is not associated with a base bid item description or bid option description, then the costs for that work shall be included in the first base bid item.

1.1.1 Base Bid Item 0001: First Floor Mechanical/Electrical Room Renovation and access to room 109 and Stairwell and Second Floor Renovation of Barracks

1.1.1.1 Payment

Payment will be made for costs associated with the design and construction of a renovation of partial first floor to include the stairwell, mechanical/electrical rooms and doorway access to room 109 and entire second floor of a barracks in North Macedonia. The facility shall accommodate 28 trainees. One room shall accommodate 20 trainees and 8 shall be single rooms. This work also includes the renovation of the mechanical and electrical rooms on the first floor as well as the first floor stairwell. All work shall be built as described in the statement of work and specifications. This item excludes works included in Bid Options 0001-0003.

1.1.2 Base Bid Item 0002: Roof Renovation and Replacement

1.1.2.1 Payment

Payment will be made for costs associated with the design and replacement of the existing roof structure. This includes providing a new roof structure, waterproofing foil, counter lathing, and metal roofing. All work shall be built as described in the statement of work and specifications.

1.1.2.2 Unit of Measure: job.

1.1.3 Bid Option 0001: Entire Exterior EIFS System

1.1.3.1 Payment

Payment will be made for costs associated with the design and

SECTION 01 22 00 Page 3 construction of a new exterior insulation finish system (EIFS). This includes new thermal insulation, stucco and paint. The work shall include all necessary caulking, expansion joints, thresholds, base - and corner rails, diagonal fiberglass-reinforcing fabric at the window and door corners and end flashing at eaves. All work shall be built as described in the statement of work and specifications.

1.1.3.2 Unit of Measure: job.

1.1.4 Bid Option 0002: Exterior Doors and Windows

1.1.4.1 Payment

Payment will be made for costs associated with the design and construction of the replacement of all exterior windows and doors. New factory finished hollow metal exterior thermal break doors and frames shall be provided. Exterior doors shall include a commercially manufactured threshold with a vinyl or silicone rubber weather stripping insert in the face of the stop. This also includes the demolition of all existing windows and to provide new windows and frames. All windows shall be 100% operable and they shall meet life safety requirements.

All work shall be built as described in the statement of work and specifications.Unit of Measure: job.

1.1.5 Bid Option 0003: Third Floor Renovation of Barracks

1.1.5.1 Payment

Payment will be made for costs associated with design and construction of the third floor of the barracks in North Macedonia. The facility shall accommodate 28 trainees. One room shall accommodate 20 trainees and 8 shall be single rooms. All work shall be built as described in the statement of work and specifications.Unit of Measure: job.

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

Not Used

-- End of Section --

PART 1 GENERAL
1.1 SINGLE JOB PAYMENT ITEMS
1.1.1 Base Bid Item 0001: First Floor Mechanical/Electrical Room Renovation and access to room 109 and Stairwell and Second Floor Renovation of Barracks
1.1.1.1 Payment
1.1.2 Base Bid Item 0002: Roof Renovation and Replacement
1.1.2.1 Payment
1.1.2.2 Unit of Measure: job.
1.1.3 Bid Option 0001: Entire Exterior EIFS System
1.1.3.1 Payment
1.1.3.2 Unit of Measure: job.
1.1.4 Bid Option 0002: Exterior Doors and Windows
1.1.4.1 Payment
1.1.5 Bid Option 0003: Third Floor Renovation of Barracks
1.1.5.1 Payment
PART 2 PRODUCTS
PART 3 EXECUTION