SECTION 01 22 00 Page 1

Macedonia Ministry of the Interior Renovation of Barracks Skopje, North Macedonia

SECTION TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 01 22 00

PRICE AND PAYMENT PROCEDURES

01/19

PART 1 GENERAL

1.1 SINGLE JOB PAYMENT ITEMS

PART 2 PRODUCTS

PART 3 EXECUTION

-- End of Section Table of Contents --

SECTION 01 22 00 Page 2

PRICE AND PAYMENT PROCEDURES

01/19

PART 1 GENERAL

SINGLE JOB PAYMENT ITEMS

Payment items for the work of this contract for which contract job payments will be made are listed in the BID SCHEDULE and described below. All costs for items of work, which are not specifically mentioned to be included in a particular job or unit price payment item, are included in the listed job item most closely associated with the work involved.

The job price and payment made for each item listed constitutes full compensation for design and for furnishing all plant, labor, materials, and equipment, and performing any associated Contractor quality control, environmental protection, meeting safety requirements, tests and reports, and for performing all work required for which separate payment is not otherwise provided.

If there is any work required of this contract that is not associated with a base bid item description or bid option description, then the costs for that work shall be included in the first base bid item.

1.1.1 Base Bid Item 0001: Provide a New 3 Story Apartment Type Building Scenario Facility

1.1.1.1 Payment

Payment will be made for costs associated with the design and construction of a reinforced concrete / masonry construction apartment type building as shown in sketches. Building shall be a minimum of 3 floors high and have a flat roof terrace with a continuous parapet wall.

The building shall have one interior concrete staircase from ground floor up to the roof terrace. Provide interior Concrete Masonry Units (CMU) walls and door openings as well as balconied and “loggias” as shown in attached sketches. This item includes any necessary clearing, grubbing and grading as well as an access drive and a gravel perimeter apron around the apartment. All work shall be built as described in the statement of work and specifications.

1.1.2 Base Bid Item 0002: Narrow Street Scenarios Facility

1.1.2.1 Payment

Payment will be made for costs associated with the design and construction of a narrow street scenario facility. The facility shall be CMU walls with reinforced concrete columns and ring beam (to include footings down to typical frost depth) and ring beam as well as a double door/gate, as shown on attached sketch. All work shall be built as described in the statement of work and specifications.

1.1.3 Base Bid Item 0003: Shooting Range

1.1.3.1 Payment

Payment will be made for costs associated with the design and renovation

SECTION 01 22 00 Page 3 of an existing above ground silo. The existing long walls of the above ground silo, measure approximately 40 meters in length and are spaced approximately 10 meters apart. Provide a roof to protect the space below to serve as a shooting range for hand fire arms and rifles.

Provide a corrugated metal roof on the new roof structure on existing reinforced concrete walls. The roof shall cover the shooting positions only and be approximately 10 meters in length and 20 meters in width.

Provide certified standard bullet traps and systems to avoid projectiles ricocheting off the walls, roof, roof structure and floor. All work shall be built as described in the statement of work and specifications.

1.1.4 Base Bid Item 0004: Hotel, Restaurant and Movie Theater Scenarios Facility

1.1.4.1 Payment

Payment will be made for costs associated with the design and renovation of two existing barn type buildings into 3 different scenarios. One of the existing barn type buildings shall be subdivided vertically along the middle. The wall will divide the movie theater from the hotel and restaurant side. The Hotel and Restaurant side must be provided with a new wooden or concrete ceiling to separate the restaurant on the first floor, from the hotel on the upper floor. At least two staircases must be provided up to the hotel room floor. The restaurant on the first floor shall also serve as the hotel reception and provide a foyer type space for the hotel. The theater room shall have raised podium seating as in a typical movie theater. All work shall be built as described in the statement of work and specifications.

1.1.5 Bid Option 0001: Tactical Object (Shoot House)

1.1.5.1 Payment

Payment will be made for costs associated with design and renovation of an existing barn type building into a shoot house. The barn shall be turned into a fully functional shoot house for non-live fire practice of different scenarios. Provide movable partitions that allow for building different floor plan layouts. Provide catwalk for instructor with two remotely located staircases. All work shall be built as described in the statement of work and specifications.

1.1.6 Bid Option 0002: Market Place and School Scenario Facility

1.1.6.1 Payment

Payment will be made for costs associated with design and renovation of an existing u-shaped complex. Provide a shop type layout along the street side (south side) in the existing u-shaped stable building complex. Existing interior stable floors shall be made level. The yard behind the shop shall be used as an outdoor market place. Provide a school type layout along the hill side (north side) in the existing u-shaped stable building conference. Provide classroom size rooms on both sides of a centrally located corridor. Roof should be renovated to prevent rain and snow from entering the building. The yard behind the classrooms shall be used as a school yard. All work shall be built as

SECTION 01 22 00 Page 4

1.1.7 Bid Option 0003: Photovoltaic Street Lighting

1.1.7.1 Payment

Payment will be made for costs associated with design and installation of street lighting. Lighting shall illuminate the roads, parking lots and pedestrian paths without any exterior power connected. All work shall be built as described in the statement of work and specifications.

1.1.8 Bid Option 0004: Furniture and Furnishings

1.1.8.1 Payment

Payment will be made for costs associated with procurement of furniture that will be used to make the scenarios as real as possible. These furnishing shall be used and not new. All work shall be built as

1.1.9 Bid Option 0005: Provide a 4th Story to the Apartment Type Building Scenario Facility

1.1.9.1 Payment

Payment will be made for costs associated with the design and construction of a fourth floor on the reinforced concrete / masonry construction apartment type building. Provide interior Concrete Masonry Units (CMU) walls and door openings as well as balconied and “loggias” as shown in attached sketches. All work shall be built as described in the statement of work and specifications.

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

Not Used

-- End of Section --

PART 1 GENERAL
1.1 SINGLE JOB PAYMENT ITEMS
1.1.1 Base Bid Item 0001: Provide a New 3 Story Apartment Type Building Scenario Facility
1.1.1.1 Payment
1.1.2 Base Bid Item 0002: Narrow Street Scenarios Facility
1.1.2.1 Payment
1.1.3 Base Bid Item 0003: Shooting Range
1.1.3.1 Payment
1.1.4 Base Bid Item 0004: Hotel, Restaurant and Movie Theater Scenarios Facility
1.1.4.1 Payment
1.1.5 Bid Option 0001: Tactical Object (Shoot House)
1.1.5.1 Payment
1.1.6 Bid Option 0002: Market Place and School Scenario Facility
1.1.6.1 Payment
1.1.7 Bid Option 0003: Photovoltaic Street Lighting
1.1.7.1 Payment
1.1.8 Bid Option 0004: Furniture and Furnishings
1.1.8.1 Payment
1.1.9 Bid Option 0005: Provide a 4th Story to the Apartment Type Building Scenario Facility
1.1.9.1 Payment
PART 2 PRODUCTS
PART 3 EXECUTION

File details come from the government source that posted it.