A.02.16.3_ar150_Att_3_Conceptual_Floor_Plans.pdf
PDF 384 KB Posted
- Solicitation number
- W912GB19R0037
About this file
Attachment 1.3 - Conceptual Floor Plans
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
9.
2.
0.
3.500 10.500 10.500 10.500
2 23 3 3
95.2 m²
CLASSROOM #1
95.2 m²
CLASSROOM #2
95.2 m²
CLASSROOM #3
4 4
8 7 7
5 5 5
4 4 4
18.8 m²
OFFICE
18.8 m²
OFFICE
4 4 4
4 4 4
4 4
TERRACE
35.150
.3
7 8
US Army Corps of Engineers ®
SHEET OF
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
'D
FI
LE
N
AM
E:
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
FI
LE
N U
M
BE
R
1 2 3 4 5
D
C
B
A
A-101
FL
O
O R
P
LA
N
SC
H O
O L
BU
IL
D
IN
G
FY
A
FR
IC
O
M H
U M
AN
IT
AR
IA
N A
SS
IS
TA
N
C E:
B
EN
IN
AZ
IZ
O
N
KA
N M
E
PR
IM
AR
Y
SC
H O
O L
EU
R
O
PE
D
IS
TR
IC
T W
IE
SB
AD
EN
, G
ER
M
AN
Y
NTSA-101
1 FLOOR PLAN
# NOTE
1 ACCESSIBILITY RAMP WITH HANDRAILS (8.3% SLOPE MAXIMUM)
2 CONCRETE STAIR WITH HANDRAILS
3 CONCRETE RETAINING WALL FILLED WITH SOIL FOR PLANTING
4 OPERABLE METAL LOUVER (2200 W x 1200 H MM MINIMUM) 5 DOUBLE DOOR (1600 W x 2100 H MM MINIMUM) 6 BUILT-IN STORAGE (1600 W x 450 D MM MINIMUM INTERNAL CLEAR) 7 CHALK BOARD WITH CHALK RAIL (6000 W x 1250 H MM) 8 CHALK BOARD WITH CHALK RAIL (5000 W x 1250 H MM) 9 CHALK BOARD WITH CHALK RAIL (3000 W x 1250 H MM)
10 VENTED ROOF RIDGE FLASHING
11 INSULATION ABOVE CEILING
12 BIRD MESH AT ALL VENTED SOFFITS
13 STEEL SECURITY BARS BETWEEN TRUSSES
14 INSULATED METAL PANEL ROOFING
ATTACHMENT #3: FLOOR PLANS
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
A-102
A-102
A-102
FIN. FLOOR
0.500
ROOF
3.600
GRADE
0.000
T.O. WALL
1.600
A-102
2 2 2
3 3 3
4 4
4 4
FIN. FLOOR
0.500
ROOF
3.600
GRADE
0.000
T.O. WALL
1.600
FIN. FLOOR
0.500
ROOF
3.600
GRADE
0.000
T.O. WALL
1.600
12 12
US Army Corps of Engineers ®
SHEET OF
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
'D
FI
LE
N
AM
E:
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
FI
LE
N U
M
BE
R
1 2 3 4 5
D
C
B
A
A-102
R O
O F
PL
AN
, E
LE
VA
TI
O N
S, S
EC
TI
O N
SC
H
O O
L
BU
IL
D
IN
G
FY
A
FR
IC
O
M H
U M
AN
IT
AR
IA
N A
SS
IS
TA
N
C E:
B
EN
IN
AZ
IZ
O
N
KA
N M
E
PR
IM
AR
Y
SC
H O
O L
EU
R
O
PE
D
IS
TR
IC
T W
IE
SB
AD
EN
, G
ER
M
AN
Y
D es ig ne r
Au th or
C he ck er
NTSA-102
1 ROOF PLAN
NTSA-102
2 SOUTH FACADE
NTSA-102
3 EAST FACADE
NTSA-102
4 SECTION
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
ATTACHMENT #3: FLOOR PLANS
# NOTE
1 ACCESSIBILITY RAMP WITH HANDRAILS (8.3% SLOPE MAXIMUM)
2 CONCRETE STAIR WITH HANDRAILS
3 CONCRETE RETAINING WALL FILLED WITH SOIL FOR PLANTING
4 OPERABLE METAL LOUVER (2200 W x 1200 H MM MINIMUM) 5 DOUBLE DOOR (1600 W x 2100 H MM MINIMUM) 6 BUILT-IN STORAGE (1600 W x 450 D MM MINIMUM INTERNAL CLEAR) 7 CHALK BOARD WITH CHALK RAIL (6000 W x 1250 H MM) 8 CHALK BOARD WITH CHALK RAIL (5000 W x 1250 H MM) 9 CHALK BOARD WITH CHALK RAIL (3000 W x 1250 H MM)
10 VENTED ROOF RIDGE FLASHING
11 INSULATION ABOVE CEILING
12 BIRD MESH AT ALL VENTED SOFFITS
13 STEEL SECURITY BARS BETWEEN TRUSSES
14 INSULATED METAL PANEL ROOFING
1.
1.
2.
5.900
1 1 1 1
5 5 5 5 5
0.800 7.400 0.800
4 4 4 4
1.8 m²
LATRINE
1.8 m²
LATRINE
1.8 m²
LATRINE
1.8 m²
LATRINE
MIN.
0.400 2 2 2
FIN. FLOOR
0.150
ROOF
3.000
GRADE
0.000
A-103
B.O. PIT
-2.000
44444
1 1 1 1
7 7 7 7
FIN. FLOOR
0.150
ROOF
3.000
GRADE
0.000
B.O. PIT
-2.000
LATRINE
PIT
7 7
US Army Corps of Engineers ®
SHEET OF
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
'D
FI
LE
N
AM
E:
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
FI
LE
N U
M
BE
R
1 2 3 4 5
D
C
B
A
A-103
FL
O
O R
P
LA
N , E
LE
VA
TI
O
N , S
EC
TI
O N
LA
TR
IN
E
FY
A
FR
IC
O
M H
U M
AN
IT
AR
IA
N A
SS
IS
TA
N
C E:
B
EN
IN
AZ
IZ
O
N
KA
N M
E
PR
IM
AR
Y
SC
H O
O L
EU
R
O
PE
D
IS
TR
IC
T W
IE
SB
AD
EN
, G
ER
M
AN
Y
1 : 25A-103
1 LATRINE FLOOR PLAN
# NOTE
1 METAL DOOR WITH PADLOCK HASP
2 HOLE IN LATRINE FLOOR, PROVIDE ONE MOVEABLE CAST
CONCRETE BLOCK TO COVER ONE HOLE PER LATRINE
3 PIT FOUNDATION BELOW
4 PIT VENTILATION PIPE WITH FLY SCREEN
5 REMOVABLE CONCRETE COVER
6 RAINWATER COLLECTION TANK WITH HANDWASHING SPIGOTS,
ATTACH TO ROOF DOWNSPOUTS
7 VENTILATION OPENING
ATTACHMENT #3: CONCEPTUAL FLOOR PLANS
1 : 25A-103
2 LATRINE FRONT FACADE
1 : 25A-103
3 LATRINE SECTION
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
| ar150_Azizonkanme Primary School_Latrines - Sheet - A-103 - FLOOR PLAN, ELEVATION, SECTION |
| Sheets |
| A-103 - FLOOR PLAN, ELEVATION, SECTION |
| ar150_Azizonkanme Primary School_School Building - Sheet - A-101 - FLOOR PLAN |
| Sheets |
| A-101 - FLOOR PLAN |
| A-102 - ROOF PLAN, ELEVATIONS, SECTION |
| ar150_Azizonkanme Primary School_School Building - Sheet - A-102 - ROOF PLAN, ELEVATIONS, SECTION |
| Sheets |
| A-101 - FLOOR PLAN |
| A-102 - ROOF PLAN, ELEVATIONS, SECTION |
File details come from the government source that posted it.