This document provides information about an upcoming solicitation for multiple award task order contracts for environmental remediation services in Germany and Poland. The solicitation will be issued by the U.S. Army Corps of Engineers, Europe District and intends to award five indefinite delivery/indefinite quantity contracts with a one year base period and four one-year option periods. The objective is to provide services for a variety of environmental remediation and contaminant mitigation activities at various sites, including groundwater, soil and building remediation using in-situ, ex-situ and other treatment methods. The pre-solicitation notice estimates proposal due dates will be no less than 30 days after issuance of the request for proposals, which is planned for on or around November 3, 2018. Interested parties must register in the Federal Business Opportunities and System for Award Management websites to receive solicitation documents in electronic format only. The notice provides instructions on new SAM registration requirements and registration timelines.
W912B19R0010 RFP - Environmental Remediation Services in DE-POL MATOC
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE ADDENDUM
(No Collect Calls)
W912GB19R0010 07-Nov-2018
b. TELEPHONE NUMBER 8. OFFER DUE DATE/LOCAL TIME
03:00 PM 09 Dec 2018
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA – FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER)
ADDENDA ARE
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
23.
CODE 10. THIS ACQUISITION IS
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TELEPHONE NO.
W912GB9. ISSUED BY
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
NATASHA S MCKELLUM
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
0 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
20.
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
. YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
% FOR:SET ASIDE:UNRESTRICTED ORX
SMALL BUSINESS
17a.CONTRACTOR/ CODE FACILITY
OFFEROR CODE
CONTRACTING DIVISION
US ARMY CORPS OF ENGINEERS
KONRAD ADENAUER RING 39
D-65187 WIESBADEN GERMANY
WIESBADEN 65187
18a. PAYMENT WILL BE MADE BY CODE
RATED ORDER UNDER
DPAS (15 CFR 700)
13a. THIS CONTRACT IS A
13b. RATING
CODE15. DELIVER TO CODE 16. ADMINISTERED BY
SEE SCHEDULE
12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
14. METHOD OF SOLICITATION
RFQ IFB RFPX
FAX:
TEL: SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
8(A)
HUBZONE SMALL
BUSINESS
SIZE STANDARD:
$20,500,000
NAICS:
562910
X
OFFER DATED
29. AWARD OF CONTRACT: REF.
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
EMAIL:
TEL:
31c. DATE SIGNED
SEE SCHEDULE
SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT
24.22.21.19.
WOMEN-OWNED SMALL BUSINESS (WOSB)
ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
PAGE 2 OF116
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA – FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE SCHEDULE
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY UNIT
22. 23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 41,100,000 Job Environmental Remediation Svcs Base Year
FFP
The contractor shall provide all labor, supervision, administration, transportation, supplies, vehicles, tools, materials, facilities, equipment, and incidentals necessary to fully execute required environmental remediation and contaminant mitigation services for a variety of media including but not limited to groundwater, soil, surface water, drinking water, air, and buildings, techniques for remediation and mitigation also vary; they include but are not limited to in-situ methods; ex-situ methods; removal; natural attenuation; physical, chemical, or biological processes;
or any combination thereof. The specific requirements are site and contaminant dependent; they are defined during site investigations site assessments, remedial investigations, feasibility studies, and/or scoping and may require prompt action due to mission, legal, environmental, or health protection issues.
FOB: Destination
NET AMT
0002 Job Contractor Manpower Reporting Base Year
FFP
The contractor shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the US ARMY CORPS OF ENGINEERS via a secure data collection site. The contractor is required to completely fill in all required data fields using the following web address: https://www.ecmra.mil/Login.aspx. Reporting inputs will be for the labor executed during the period of performance during each Government fiscal year (FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year of contract/task order performance.
Contractors may direct questions to the help desk at: http://www.ecmra.mil to review user manuals and gain an understanding about the data fields that will be included in the reporting structure that is hosted at http://www.ecmra.mil/.
1001 1 Job OPTION Environmental Remediation Option YR One
FFP
The contractor shall provide all labor, supervision, administration, transportation, supplies, vehicles, tools, materials, facilities, equipment, and incidentals necessary to fully execute required environmental remediation and contaminant mitigation services for a variety of media including but not limited to groundwater, soil, surface water, drinking water, air, and buildings, techniques for remediation and mitigation also vary; they include but are not limited to in-situ methods; ex-situ methods; removal; natural attenuation; physical, chemical, or biological processes;
or any combination thereof. The specific requirements are site and contaminant dependent; they are defined during site investigations site assessments, remedial investigations, feasibility studies, and/or scoping and may require prompt action
1002 Job OPTION Contractor Manpower Reporting Option 1
FFP
The contractor shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the US ARMY CORPS OF ENGINEERS via a secure data collection site. The contractor is required to completely fill in all required data fields using the following web address: https://www.ecmra.mil/Login.aspx. Reporting inputs will be for the labor executed during the period of performance during each Government fiscal year (FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year of contract/task order performance.
Contractors may direct questions to the help desk at: http://www.ecmra.mil to review user manuals and gain an understanding about the data fields that will be
2001 1 Job OPTION Environmental Remediation Option YR 2
FFP
The contractor shall provide all labor, supervision, administration, transportation, supplies, vehicles, tools, materials, facilities, equipment, and incidentals necessary to fully execute required environmental remediation and contaminant mitigation services for a variety of media including but not limited to groundwater, soil, surface water, drinking water, air, and buildings, techniques for remediation and mitigation also vary; they include but are not limited to in-situ methods; ex-situ methods; removal; natural attenuation; physical, chemical, or biological processes;
or any combination thereof. The specific requirements are site and contaminant dependent; they are defined during site investigations site assessments, remedial investigations, feasibility studies, and/or scoping and may require prompt action
2002 Job OPTION Contractor Manpower Reporting Option 2
FFP
The contractor shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the US ARMY CORPS OF ENGINEERS via a secure data collection site. The contractor is required to completely fill in all required data fields using the following web address: https://www.ecmra.mil/Login.aspx. Reporting inputs will be for the labor executed during the period of performance during each Government fiscal year (FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year of contract/task order performance.
Contractors may direct questions to the help desk at: http://www.ecmra.mil to review user manuals and gain an understanding about the data fields that will be
3001 1 Job OPTION Environmental Remediation Option YR 3
FFP
The contractor shall provide all labor, supervision, administration, transportation, supplies, vehicles, tools, materials, facilities, equipment, and incidentals necessary to fully execute required environmental remediation and contaminant mitigation services for a variety of media including but not limited to groundwater, soil, surface water, drinking water, air, and buildings, techniques for remediation and mitigation also vary; they include but are not limited to in-situ methods; ex-situ methods; removal; natural attenuation; physical, chemical, or biological processes;
or any combination thereof. The specific requirements are site and contaminant dependent; they are defined during site investigations site assessments, remedial investigations, feasibility studies, and/or scoping and may require prompt action
3002 Job OPTION Contractor Manpower Reporting Option 3
FFP
The contractor shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the US ARMY CORPS OF ENGINEERS via a secure data collection site. The contractor is required to completely fill in all required data fields using the following web address: https://www.ecmra.mil/Login.aspx. Reporting inputs will be for the labor executed during the period of performance during each Government fiscal year (FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year of contract/task order performance.
Contractors may direct questions to the help desk at: http://www.ecmra.mil to review user manuals and gain an understanding about the data fields that will be
4001 1 Job OPTION Environmental Remediation Option YR 4
FFP
he contractor shall provide all labor, supervision, administration, transportation, supplies, vehicles, tools, materials, facilities, equipment, and incidentals necessary to fully execute required environmental remediation and contaminant mitigation services for a variety of media including but not limited to groundwater, soil, surface water, drinking water, air, and buildings, techniques for remediation and mitigation also vary; they include but are not limited to in-situ methods; ex-situ methods; removal; natural attenuation; physical, chemical, or biological processes;
or any combination thereof. The specific requirements are site and contaminant dependent; they are defined during site investigations site assessments, remedial investigations, feasibility studies, and/or scoping and may require prompt action
4002 Job OPTION Contractor Manpower Reporting Option 4
FFP
he contractor shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the US ARMY CORPS OF ENGINEERS via a secure data collection site. The contractor is required to completely fill in all required data fields using the following web address: https://www.ecmra.mil/Login.aspx. Reporting inputs will be for the labor executed during the period of performance during each Government fiscal year (FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year of contract/task order performance.
Contractors may direct questions to the help desk at: http://www.ecmra.mil to review user manuals and gain an understanding about the data fields that will be
Section C - Descriptions and Specifications
PWS
SECTION C
DESCRIPTION /SPECIFICATIONS/WORK STATEMENT ENVIRONMENTAL REMEDIATION AND
CONTAMINANT MITIGATION SERVICES
C.l GENERAL
ACRONYMS
AECS Army Environmental Cleanup Strategy BTEX Benzene-Toluene-Ethylbenzene- Xylene CADD Computer Aided Design Drafting CC Compliance Cleanup CD Compact Disk CENAU U.S. Army Corps of Engineers, Europe District CHC Chlorinated Hydrocarbons CHWM Certified Hazardous Waste Management CIH Certified Industrial Hygienist CMS Corrective Measures Study COR Contractor Officer Representative CQC Contractor Quality Control Plan DOD Department of Defense DODI Department of Defense Instruction EOD Explosive Ordnance Disposal FFP Firm Fixed Price FSC Federal Service Code GIS Geographic Information System GPS Geographic Positioning System HASP Health and Safety Plan HN Host Nation HTRW Hazardous, Toxic, Radioactive Waste IAP Installation Action Plan IDIQ Indefinite Delivery/Indefinite Quantity KO Contracting Officer LTM Long Term Management O&M Operation and Maintenance PAH Polynuclear Aromatic Hydrocarbons PBA Performance Based Acquisition PBC Performance Based Contracting PFT Perfluoriated Tensides PM Project Manager PMP Project Management Plan POC Point of Contact PWS Performance Work Statement QA Quality Assurance QASP Quality Assurance Surveillance Plan QCS Quality Control Supervisor RAO Remedial Action Objective RC Remediation Complete RFP Request for Proposal RI/FS Remedial Investigation/Feasibility Study RIP Remediation In Place SC Site Closure
SHO Safety and Health Officer SI Site Inspection SOO Statement of Objectives SOW Scope of Work SVOC Semi-Volatile Organic Compound TO Task Order UIC Unit Identification Code USAEC U.S. Army Environmental Center USAG U.S. Army Garrison USAREUR U.S. Army Europe UTM Universal Transverse Mercator UXO Unexploded Ordnance VOC Volatile Organic Compound WP Work Plan XMLExtensible Markup Language
W912GB19R0010
C.1.1 General Information - The objective of the contract is to provide FFP IDIQ MATOC for Environmental Remediation Services in support of the U.S. Army Environmental Command and other DoD Customers throughout Germany and Poland. These contracts will include FFP features for a wide range of environmental remediation services at various known or suspected contaminated sites. It will also be used to perform other contamination mitigation actions including excavation and/or removal of contaminated soil. Work will be executed under a Performance-Based Acquisition (PBA) Task Order (TO) using Performance Work Statements (PWSs). Furthermore, our primary customer, U.S. Army Environmental Center (USAEC), requires a comprehensive environmental remediation services contract to support the Army Environmental Cleanup Strategy (AECS) in Europe. The Compliance Cleanup (CC) Program implements the AECS pursuant to DOD Instruction 4715.08, Remediation of Environmental Contamination Outside the United States. Response complete is a distinct milestone reached when the selected remedy has achieved remedial action objectives specified in an Army approved Decision Document. Many of the USAEC efforts will be through PBAs.
C.1.2 Minimum Guarantee - Each awarded IDIQ contract shall have a total guarantee minimum amount of $5,000 for the base period. There are no minimum guarantees for option years that are exercised by the Government. The guaranteed minimum may be met with the obligation of a TO meeting or exceeding the guarantee amount and shall be de-obligated when the obligation occurs.
C.1.3 Location – The awarded contracts shall be in geographic groupings as follows: Germany, Poland
C.1.4 Scope of Remediation and Contamination Mitigation Measures - Contractors will be responsible for fully executing required environmental remediation and contaminant mitigation services for a variety of media including but not limited to groundwater, soil, surface water, storm water, drinking water, air, and buildings, techniques for remediation and mitigation also vary; they include but are not limited to in-situ methods; ex-situ methods; removal; natural attenuation; physical, chemical, or biological processes; or any combination thereof. The specific requirements are site and contaminant dependent; they are defined during site investigations, site assessments, remedial investigations, feasibility studies, and/or scoping and may require prompt action due to mission, legal, environmental, or health protection issues.
Work that might be tasked under this contract includes, but is not limited to, the following (for a more detailed list of efforts see Section C.2.2:
Surveys, assessments and plans:
Performing environmental assessments to include sampling and/or testing of any media (including geotechnical testing);
Consulting services such as providing recommendations, design planning assistance, development of Operation and Maintenance manuals, and reporting remediation results;
Studies and Reports:
Corrective Measures Study (CMS) and Remedial Investigation /Feasibility Study (RI/FS);
Related efforts to include: risk assessments, pilot tests, fate and transport analyses, groundwater modeling or other techniques;
Studies related to contamination mitigation requirements such as radon, asbestos, etc.
In situ/ex situ cleanup:
Monitoring by sampling groundwater, surface water, storm water, sediment, soil, and/or air;
Installation and/or operation and maintenance of remediation systems. To include optimization or pilot testing;
Removing and/or disposing of contaminated media (contamination mitigation);
Other Mitigation and Environmental Services
Emergency Spill Response and Assessment of spill areas;
Protecting/repairing eroded (or potentially eroding) areas;
Repairing/replacing compromised storage tanks;
Conducting topographic surveys and other elevation and location measurements;
Removing/Mitigating asbestos, lead and radon;
Non-hazardous, toxic, chemical, and radioactive environmental projects;
Conducting site surveys and evaluations of Unexploded Ordinance (UXO);
C.1.5 Conduct of Work - The Contractor, the Contractor's subcontractors and the Contractor's suppliers shall perform all work while respecting Host Nation (HN) and U.S. environmental laws, DODI 4715.08 (for remediation efforts), and in compliance with an approved management plan. The Contractor shall be responsible for acquiring the latest version of applicable laws, regulations and regulatory agency guidance and the referenced documents cited within this solicitation and/or subsequent TOs issued after award of the Contract, unless otherwise specified.
C.1.6 Performance Based Task Orders- Work will generally fall under performance based task orders using Performance Work Statements (PWSs). The PWS will describe the work in terms of the required results rather than either “how” the work is to be accomplished. The PWS will enable assessment of work performance against measurable performance standards (objectives and measures) and provides for payment only when results meet or exceed those standards. Performance standards establish the performance level required by the Government to meet the contract requirements. The standards shall be measurable and structured to permit an assessment of the contractor’s performance. Performance based acquisitions rely on measurable performance standards in a competitive environment to encourage competitors to develop and institute innovative and cost-effective methods of performing the work.
The description of work stated herein provides a general understanding of the Contractor functions to be performed; individual task orders will contain the specific performance based requirements and the award evaluation criteria. The evaluation criteria will be identified in each task order as either lowest cost/technically acceptable or tradeoff. Technical requirements described herein in no way limit the activities that may be required under the terms of the contract. Exclusive of the program management functions, the Contractor may utilize subcontractors or consultants identified in the accepted proposal or subsequently approved by the USACE Contracting Officer to perform any of the functions required within the specific task orders.
Task orders issued under this Contract will be Firm-Fixed Price.
The Contractor shall be responsible for acquiring and following the latest version of applicable regulatory or agency guidance unless otherwise specified.
Specific objectives, milestones, and pricing information under this contract will be included in each task order. The Government will require some level of detail to properly analyze the pricing on a task order by task order basis so that the Contracting Officer can document that the price is fair and reasonable. The level of detail may vary depending on the level of complexity of the project. In all cases, the Government will request the Contractor provide a cost breakdown, which specifies the proposed mix of labor resources, travel costs, other direct costs, with the underlying assumptions to support those costs and their technical approach.
C.1.7 Task Order Limitations - Project specific TOs will be issued under the basic contract and ordering period.
C.1.7.1 Use of Subcontractors or Consultants - Exclusive of the program management functions, the Contractor may utilize subcontractors or consultants identified in the accepted proposal or subsequently approved by the Contracting Officer (KO) to perform any of the functions required within the specific TO.
C.1.7.2 Task Order Solicitation Requirements - Specific objectives, milestones, and pricing information under this contract will be included in each TO. The Government will require some level of detail to properly analyze the pricing on a TO so that the Contracting Officer (KO) can document that the price is fair and reasonable. The level of detail may vary depending on the level of complexity of the project. In all cases, the Government will request the Contractor provide a cost breakdown.
C.2 TASK ORDERS
Information provided by CENAU on any site will be dependent on the current status of the site. Each TO will define the requirements of the Contractor. The description of work stated herein provides a general understanding of the Contractor functions which may be performed.
C.2.1 Task Order Types - The two types of Task Orders under which work may be solicited are prescriptive or performance based. A description of each is given below with more detail provided on the latter as more effort and input from the Contractor is required under these actions
C.2.1.1 Prescriptive Task Orders - A Prescriptive TO SOW under this contract will include site or project specific information. Scopes will vary in detail but will provide an adequate description of the actual services required to allow suitable proposals from the Contractors. Typically the individual TO will provide the Contractor with the location, description of work, and schedule of execution. When applicable, the quantities of a particular item that is required will be stated. As attachments, the Government will provide, as necessary, reference materials to further clarify the work effort, and any additional applicable project background information.
C.2.1.2 Performance-Based Task Orders: (1) describe the requirements in terms of results required rather than methods of performing the work; (2) use measurable performance standards (e.g., terms of quality, timeliness, quantity); (3) specify procedures for deficient services; and (4) may include performance incentives/disincentives where appropriate. PBC methods are intended to ensure that required performance quality levels are achieved and that the Government’s total payment is commensurate with the quantity and quality of services received. Performance-based task orders, with a tailored TO-specific Quality Assurance Surveillance Plan (QASP) typically will be issued with the TO.
C.2.1.2.1 Performance Work Statement (PWS). FAR 2.101 defines PWS as “a statement of work for performance-based acquisitions that describes the required results in clear, specific and objective terms with measurable outcomes” and Statements of Objectives (SOO) as a “Government-prepared document incorporated into the solicitation that states the overall performance objectives. It is used in solicitations when the Government intends to provide the maximum flexibility to each offeror to propose an innovative approach.” PBCs tend to require more engineering support than traditional prescriptive contracts. This is because PBCs specify what the final goal of a project is, but not how it is to be accomplished. Basically, the PWS and SOO describe the end result the Contractor is required to achieve on a specific project but do not tell them how to complete it, thus allowing for maximum flexibility for offerors to propose innovative approaches. PWSs emphasize performance that can be contractually defined so that the results of the Contractor's effort can be measured in terms of technical and quality achievement, schedule progress, or cost performance. Under a PWS, milestone payments occur only when the results meet or exceed the stated objectives. Simply meeting the Milestone/ Objective, (i.e., submittal of a document for review) is not the same as completion of the Milestone/Objective, (i.e., acceptance of the document by the approval authority). Only upon the completion and acceptance will the Government pay for that Milestone/Objective. For a performance-based task order, the Contractor will be required to use its expertise and develop the methods to achieve the required end result.
A PWS for a task order will to every extent possible:
Define desired results/outcomes.
Define what level of performance is expected (and ensure it is meaningful and fair) and use performance standards and QASP.
Provide all information known about the site(s) or where it can be located and accessed by the
Contractor.
Define incentives and disincentives.
Define the measurement terms using clear and concise language avoiding vague or broad statements.
C.2.1.2.2 Project Management Plan (PMP): The Contractor may be required to develop and maintain a detailed PMP. The PMP, typically based on the schedule prepared as part of the Contractor’s proposal, shall specify the schedule, technical approach and activities required for the planning, execution, and completion of the performance objectives. As part of the PMP, the Contractor shall identify and implement a means for providing project status reports to the Contracting Officer Representative (COR).
The PMP shall address the content of status reports, frequency shall usually be monthly. The first draft of the PMP shall be as stated in the TO and shall include a payment milestone schedule. Elements of this draft PMP shall be part of the Contractor’s submittal of the TO proposal. The draft PMP, proposed payment milestones, and subsequent revisions shall be subject to Government review and acceptance, through the COR. The final PMP typically shall be due within 15 calendar days of receipt of COR comments on the draft PMP. The Contractor shall update the PMP to reflect progress towards achievement of the performance objectives and delineate proposed actions to accomplish future project milestones.
C.2.1.2.3 Project Schedule: As part of the PMP, the Contractor shall develop and maintain an activity-based schedule that fully supports the technical approach and outlines activities and milestones defined at the appropriate detail level and logically sequenced to support and manage completion of the performance objectives in the PWS. Additionally, the Contractor shall identify the due dates for all payable deliverables in the activity-based schedule. A payment plan shall be included with the schedule that may allow for payments to the Contractor based on successful completion of interim milestones proposed by the Contractor. Proposed payment milestones and subsequent revisions shall be subject to Government review and acceptance, through the COR. The Contractor shall appropriately name activities identified in the Government-provided QASP within the project schedule to allow for Government planning of Quality Assurance (QA) inspections. The Government will make payments after verification of milestone completion in accordance with this schedule. The Contractor must complete all performance objectives within the allowable contract period of performance provided the Government has exercised all contract options.
C.2.1.2.4 Quality Assurance Surveillance Plan (QASP): Each TO shall have a QASP prepared which unless otherwise noted shall follow the QASP requirements for service contracts as set forth in FAR Subpart 37.6. The QASP details how and when the Government will survey, observe, test, sample, evaluate and document Contractor performance according to the PWS. The QASP focuses on the quality, timeliness, etc. of the performance outputs to be delivered by the Contractor and not the individual steps required or procedures used to provide the product or services. The Government's QASP and the Contractor's Quality Control Plan (see Section C.4.8) work together to ensure that all project performance standards are met.
A template for the QASP is written concurrently with the PWS because what is written in the PWS influences what is put into the QASP. After award, the Government shall submit a draft QASP per requirements set forth in the TO. The final QASP will be developed by the COR and provided to the Contractor typically within 30 calendar days of receiving Contractor comments to the draft QASP.
The QASP should highlight key quality control activities or events that the COR will use to determine when Government inspections can be conducted to assess progress toward and/or completion of milestones. The Contractor shall appropriately identify the activities identified in the QASP within the activity-based project schedule to allow for Government planning of QA inspections.
C.2.1.2.5 Milestone Presentations: As specified in each TO PWS, milestone presentations shall be made to the COR at the completion of each milestone specified to provide analysis and lessons learned, and to present approaches for completion of future milestones. At the COR’s request, the Contractor may also make milestone presentations to the other project stakeholders to show achievement of the performance objectives. This may include participation in annual USAEC-E/Garrison Installation Action Plan (IAP) meetings, if requested by the COR.
C.2.1.2.6 Payment Milestones a n d Army Acceptance: Payments milestones will be defined in each TO.
Typical milestones are shown below. The Contractor may propose a revision to the payment milestones to provide for a limited number of interim payment milestones. Additional payment milestones will only be considered by the Government if they represent significant progress toward performance objective completion, and completion of these interim steps can be measured and demonstrated as complete (e.g., final acceptance of a report rather than submission of a draft). All milestones must have a defined means for demonstrating completion in order to facilitate certification and acceptance. These payment milestone revisions will be subject to Government review and acceptance through the COR.
Government acceptance and HN concurrence of Site Inspection (SI) at the site Government acceptance and HN concurrence of Remedial Investigation (RI) at the site Government acceptance and HN concurrence of Pre-Remedy Monitoring report(s) Government acceptance and HN concurrence of Remediation In Place (RIP), Remediation
Complete (RC), or Site Closure (SC) at the site Government acceptance and HN concurrence of Remedial Action Objective (RAO) and/or
Long Term Management (LTM) report(s) Government acceptance and HN concurrence of an exit or ramp-down strategy for RAO and/or LTM Government acceptance and HN concurrence of other Remedy review(s) Government acceptance and HN concurrence of successful correction of deficiencies noted in other Remedy review(s)
C.2.2 Task Order Content - The Contractor may be required to perform any or all of the efforts described in this section under one PWS TO. Note that descriptions here are largely confined to remediation efforts. The Contactor may be required to prepare work plans, perform studies/assessments and remove hazardous materials as needed for contamination mitigation. This includes excavation and/or removal of soil.
C.2.2.1 Work Plans - For each awarded TO, the Contractor is required to submit a Work Plan (WP) as appropriate. The WP basically describes the Contractor's activities as outlined in the TO. The WP shall contain but not be limited to the following, when relevant:
Description of available data and contaminant characterization;
Statement of the work to be accomplished including a statement of Data Quality
Objective(s);
Discussion on implementation of the project including the method of operation, type of equipment, personnel required, and other special considerations;
A schedule that presents the requirements to complete any required field work and key project milestones;
Permits, licenses, and certificates, identification number, and location of the disposal facility, if necessary;
Key personnel to be used on the project along with their roles and responsibilities;
Site-specific assumptions and clarifications;
Site control measures;
Logs, reports, and record keeping to be utilized;
The Contractor Quality Control Plan (CQC) (See Section C.4.8); and Health and Safety Plan (HASP) See Section C.4.9
The Government will review and provide comments on the draft WP. The Contractor shall submit a Final WP according to the agreed schedule with the Government. The WP shall be modified to address and incorporate the Government’s comments and concerns, as appropriate. The plan will be reviewed and accepted by the COR or returned to the Contractor, with comments, for further revision prior to field mobilization. Acceptance of the Contractor’s WP by the Government is required prior to any field mobilization. During execution of the TO the Contractor shall follow the approved WP. Deviations or proposed changes to the approved WP must be submitted to the COR for review, comment, and acceptance. Acceptance must come before any field change occurs. The Government reserves the right to require the Contractor to make changes in his WP and operations as necessary.
C.2.2.2 Investigation and Field Studies - The Contractor shall perform all planning, fieldwork, analysis and preparation of any reports as specified in the TOs. The investigative services to be provided generally consist of, but are not limited to, performing investigations to determine the contaminant(s) source(s), geology and groundwater conditions, contaminant concentration, nature and extent of contamination, and geotechnical characteristics as well as any other related tasks. The Contractor shall prepare associated reports as described in each individual TO.
The Contractor shall have the capability and experience to provide a wide range of investigative and response services required at sites which might require remediation efforts or eventual contaminant mitigation and/or removal including, but not limited to:
Site characterization and evaluation;
Identification of action levels/cleanup levels of contaminants through review of US and HN laws, regulations, or guidance, or developed through risk assessments. This shall also include coordination with appropriate regulatory agencies;
Emergency Response;
Survey and Mapping, Geographic Information System (GIS), remote sensing;
Boring for soil sampling, testing (field and/or laboratory) or other geotechnical analysis;
Drilling, installation and development of groundwater monitoring wells, production wells, extraction wells, piezometers or other instrumentation;
Conducting surface or down hole geophysical surveys;
Conducting hydrogeological field-testing and performing analyses and data interpretation;
Sampling and sample handling techniques for chemical and geotechnical characteristics including data management and data interpretation:
Short and long term soil, soil-gas, groundwater, surface water, storm water, sediment, or air monitoring;
Evaluation of available response actions and recommendation of the most sustainable, environmentally sound, and cost effective alternatives, to include recommendation of an optimal alternative with cost estimates.
Preparing and submitting plans (e.g. closure plans, waste analysis plans, Spill Prevention, Control and Countermeasure, Underground Storage Tank Site Assessment plans, Contingency Plans, etc.)
Risk assessments;
Fate and transport;
Groundwater modeling Federal and HN laws, regulations, and guidance determinations Regulatory coordination Environmental permitting Expert Testimony;
Sampling and analysis on soils, waters, sludge, solids, sediments, paints and wipes.
C.2.2.3 Engineering Support and Remedial Design - The Contractor may be required to provide a wide variety of incidental engineering services to support remediation and contaminant mitigation actions. The extent of the environmental services may typically include environmental, geotechnical, geology/hydrology, civil, cost engineering, and other engineering support. The successful Contractor shall perform all necessary planning and fieldwork, and prepare all engineering documents identified in the TO.
Engineering documents shall be representative of industry, HN, or Government standards for drawings and specifications or by performance specifications. No TO award will include services defined as “Architect/Engineer” in FAR 2.101 to a dominant or significant extent. Any such services should be identified in the project scope. Engineering documents may include, but not be limited to:
• Design Analysis, containing the criteria, design assumptions, calculations and other pertinent data;
• Decision Documents;
• Performance specifications or completely edited Government furnished guide specifications;
• Computer Aided Design Drafting (CADD) generated drawings must be compatible with USACE software.
• Cost estimating utilizing an industry approved software package capable of providing sufficient information to adequately and accurately capture the projected project costs;
• Record drawings, modifications or as-built drawings;
• Treatability studies, evaluation of engineering controls; various pump tests, pilot test reports;
• Constructability reviews;
• Other engineering and technical support may include:
Technical expertise or expert testimony during regulatory negotiations;
Securing permits as required;
Liaison and interface with regulatory agencies; and Resolution of problems during response actions.
C.2.2.4 Remedial Actions and Removals - The Contractor shall perform all necessary planning, fieldwork and implementation of the remedial action requirements identified in order to meet task order milestones/objectives. The Contractor shall specify and perform any and all necessary quality control and verification testing, at required frequencies, in order to adequately control and monitor the remedial action. Remediation may or may not be performed in conjunction with site investigation/characterization activities. The Contractor shall perform planning, fieldwork, incidental construction activities, intrusive activities, and implementation of response, removal or remediation activities. The successful Contractor selected for this work shall have the capability and experience to perform a broad range of remedial actions and removals at contaminant mitigation sites including but not limited to:
A wide variety of technologies for on-site source control and containment;
A wide variety of technologies for on-site treatment;
Preparation of Manifests for Customer Signature;
Transportation to and/or storage, treatment and/or disposal of waste at a selected off site facility, including hazardous waste, debris, demolition, buried drums, and tanks;;
Tank and piping removal and/or other tank closure actions;
Emergency response actions;
Survey, removal, transportation and disposal of asbestos containing materials;
Installation of all support facilities; including facilities needed by the Contractor such as an office trailer, onsite laboratory, or supply trailer;
Preparation of all applicable Operation and Maintenance (O&M) Manuals and associated training of facility personnel for equipment installed;
Problem solving during response with unexpected conditions or execution problems at the site;
Provide monitoring to meet the scope of services/milestone objectives or to provide pre-remedy monitoring; and Removal and disposal of contaminants such as soil,, asbestos lead, etc.
C.2.2.5 Remediation Operations and Maintenance - The Contractor shall operate and maintain the existing systems; perform other work in accordance with regulatory requirements contained in the applicable operations and maintenance manuals; and perform necessary associated remedial actions.
Typical operations may include:
Operation and maintenance and repair of environmental remediation facilities, including storage tanks;
Evaluation and optimization of existing environmental systems and or facilities, including storage tanks;
Performing routine sampling and chemical analysis;
Providing sampling and chemical, radiological and treatment analyses from offsite laboratories;
Providing operating reports;
Providing initial and refresher safety training for site operators and supervisors;
Sampling groundwater monitoring wells, groundwater collection sumps, and/or treated groundwater;
Providing necessary utilities at the site;
Providing telephone communications including an autodialing paging system for notifying operators of alarms and upset conditions at the site;
Providing notification to the KO of needed equipment replacement, renovation or other capital improvements;
Providing notification to the KO and others, as required, for site emergencies;
Provide training for follow-on users;
Soil screening, well gauging, potable well surveys;
Various pump tests;
Response to emergency failures at contracted facilities;
Assistance in environmental permitting and discussions/negotiations with HN regulatory agencies during operation of subject facilities; and Recurring reviews.
C.2.6 Monitoring - The Contractor may be required to provide for monitoring at those sites where remedial actions are complete or to provide pre-remedy monitoring as a distinct performance objective.
These services may include, but are not limited to the following: groundwater sampling, storm water sampling, surface water sampling, sediment sampling, soil sampling, air sampling for a suite of analyses agreed to with the Army and regulatory community.
C.3 TASK ORDER EXECUTION.
C.3.1 Request for Proposal - As each project is identified for execution under this agreement, the Contractor will be notified by a Request for Proposal (RFP) letter. Each RFP letter will contain the:
• Project title & location,
• Basis for award, Best Value (either lowest price/technically acceptable or tradeoff)
• The name of the Government POC,
• If a site visit is required, and
• Proposal due date.
As attachments to the RFP, the Government will provide, as necessary, proposal format information and applicable project background information.
C.3.2 PWS - RFPs under this agreement will include a site or project specific performance work statement. PWS’ will vary in detail, but will provide an adequate description of the actual services be it a very prescriptive type with a list of major tasks to be accomplished and when applicable, the information on performance objectives and milestones (PWS).
C.3.3 Task Order Requirements- Additional specific requirements will be identified with the RFP and the related site specific scope of work. Some often more common requirements are discussed below.
(a) The Contractor, operating as an independent Contractor and not as an agent of the Government, shall provide all labor, materials, facilities and equipment and perform all work identified in each individual TO. The Contractor shall be cognizant of all appropriate laws, regulations, and guidance. The Contractor shall ensure that all work activities performed by his personnel, subcontractors and suppliers are executed as required by these laws and regulations.
Any incident of noncompliance noted by the Contractor shall immediately be brought to the attention of the KO and/or the COR by written notice. Nothing in this contract shall relieve the Contractor of his responsibility to comply with these laws and regulations. Any conflicts between laws/regulations and contract/TO requirements shall be brought to the attention of the KO and/or COR.
(b) Time Schedule- the Contractor shall be required to commence work required by a TO at the time specified on that TO. The Contractor shall execute the work, and complete the entire project not later than the completion time specified in the TO. Any TO issued during the effective period of the base contract but not completed within that time period (i.e., prior to expiration of the base contract) shall be completed by the Contractor within the time specified in the individual TO. This agreement shall govern the Contractor's and Government’s rights and obligations with respect to that order to the same extent as if the TO was completed during the effective period of the contract;
(c) Acceptances. As required under the TO; the Contractor must receive acceptance from the KO or Authorized Representative on all site specific plans (i.e., HASP, Work Plans; CQC plans, etc.)
prior to initiating any on site activity.
(d) Language. All submissions shall be in English. Unless otherwise directed, draft final and final reports must be submitted in HN language (in addition to English).
(e) Field Notes. If so specified in a TO, the Contractor will be required to maintain field notes in a bound book. The field notes would contain daily log of all activities. Contractor personnel on site by name as well as a description of the field activities performed that day. All field activities, including collection of samples, problems encountered, etc. would be documented in this book. The original field notes would be submitted to the KO or Authorized Representative with the final report submitted upon completion of each individual TO.
(f) Data Requirements - The Contractor will use, but not be limited to, a variety of cost data, aerial photography, satellite imagery, GIS data, and computer programming to complete the work for each deliverable. All data required, used or otherwise handled remains the property of the U.S.
Government, the installation and agency that provided the data. The Contractor may not use datasets or other materials relating to this contract or developed from this contract for publication without the expressed, written consent of the US Government. The Contractor shall contact the KO to begin discussions with regard to data manipulations and authorship prior to conducting data analysis with the intent of publication. The Contractor shall make available to the US Government draft copies of any publications, based on work conducted or data collected under this contract, for review and comment.
All data required, used, or otherwise handled remains the property of the installation or agency that provided it. The Contractor may not use datasets or other materials relating to this contract for publication without the expresses written consent of the program manager. The Contractor shall contact the program manager to discuss data manipulations and authorship prior to conducting data analysis with the intent of publication. The Contractor shall make available to the program manager draft copies of draft publications, based on work conducted or data collected under this contract, for their review and comment. All equipment purchased under any TO remains the property of the Government.
(g) Cost Proposals. The contract items shown in Section B of this contract will be used as a basis for developing cost proposals for SOWs and PWSs. Contractor must obtain at least three quotes for any subcontract over $25,000.00 with selection justification and provide with cost proposal.
(h) Notifications.
The Contractor is reminded that neither they nor any of their subcontractors are to accept direction or to proceed with any activity they feel is outside of the scope of any particular TO without the written authority of the KO. The Contractor shall notify the KO or Authorized Representative upon completion of a TO.
The KO will notify the Contractor of any non-compliance on a TO. The Contractor shall, after receipt of such notice, immediately take corrective action. Such notice, when delivered to the Contractor or its authorized representative at the work site, shall be deemed sufficient for the purpose of notification.