This sources sought announcement and market survey questionnaire are seeking information from contractors interested in a single award task order indefinite-delivery indefinite-quantity job order contract for work in Turkey. The U.S. Army Corps of Engineers Europe District intends to issue a solicitation for real property repair, maintenance, and force protection work at U.S. facilities in Incirlik, Ankara, and Malatya, Turkey. This work includes general building renovation, road and pavement repair, minor construction, excavation, plumbing, demolition, electrical, structural, mechanical, concrete, and incidental environmental remedial efforts. The contract value is not to exceed $30 million over a one-year base period and four one-year options, for a total performance period of five years. The pre-solicitation and solicitation are estimated to occur before April 9, 2019. Interested contractors are requested to respond with company and point of contact information along with a completed market survey questionnaire by the stated deadline in order to be considered for the work.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| UPB_Germany_Italy_Europe_2015-2005.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| MARKET SURVEY |
| TURKEY JOC QUESTIONS |
| For a JOC in Turkey, the Government may will incorporate a Unit Price Book (UPB) that will dictate the prices for all projects under the JOC. The Government intends to utilize a German UPB for this purpose. The German UPB is provided via attachment to this announcement. The German UPB is a compilation of construction-related tasks specifically tailored for the European community and is based on the Deutsche Institut für Normung (German Institute for Standardization – DIN) standards from the years 2011-2014. This UPB contains thousands of pre-priced line items, and the Offerors will propose a coefficient for Pre-priced Items in the UPB. The coefficient will be applied to the pre-priced line items totals and will account for all overhead, management/supervision, profit, etc. The coefficient can be negative (a discount off the pre-priced items) or positive (a premium on top of the pre-priced items). |
Do you see a need for a separate coefficient for work outside normal hours?
1. Do you see any concerns with utilizing the German UPB as described above (and provided via attachment) under a JOC in Turkey? If so, do you have recommendations of how the JOC can be re-designed to mitigate your concerns?
| 2. Do you know of any alternatives to the German UPB as described above (and provided via attachment) that would be suitable for a JOC in Turkey? For example: | |
| Sigma Estimates | https://sigmaestimates.com/products/sigma-estimation-software/ |
| European Construction Costs: | http://constructioncosts.eu/cost-estimator/building-types/ |
| Spon's European Construction Costs Handbook: | https://www.crcpress.com/Spons-European-Construction-Costs-Handbook/Everest/p/book/9780419254607 |
3. Are there significant circumstances that impact your application of overhead expenses and profit on material costs vs. on labor costs? For a JOC, does it make sense to have a separate coefficient for Material/Equipment and another for Labor? For example: Material and Equipment 1.01; Labor 0.36
4. The Government intends to issue a JOC that will cover work across the entire country of Turkey. However the majority of the work will be done in Incirlik and Ankara. Please answer the following for each location.
| LOCATION | Do you have an active network of subcontractors in this area? | Do you think this area should utilize a separate coefficient in a JOB ORDER CONTRACT? In other words, are there significantly different conditions in this location that will impact unit prices, overhead expenses, profitability, etc. | Is the attached unit pricebook applicable for this area? | Additional Comments on Area: |
| Incirlik, Turkey | ||||
| Ankara, Turkey | ||||
| All Other Locations, Turkey | ||||
| TURKEY CONSTRUCTION GENERAL QUESTIONS | ||||
| 1. What is the average hourly labor costs for construction work in Turkey. Does this significantly vary between the areas under consideration? Are skilled labor rates much higher? |
2. What is a typical percentage for labor burden in Turkey? Does it vary between the areas considered? Labor burden being defined as non-wage costs for an employee (holidays, insurance, social benefits, taxes paid on behalf of the employee).
3. Are there difficulties in hiring in the areas under consideration? How does that increase costs for construction work, beyond higher wages?
4. Is there sufficient skilled labor in the areas considered? If not, are skilled laborers brought in from other areas of Turkey? Are they paid per diem or other expenses? What are typical values of per diem if paid?
5. For Turkey, are basic construction materials available in all areas?
6. For Turkey, are specialized construction materials available in all areas (HVAC equipment, electrical equipment, etc.)?
7. For Turkey, is construction equipment available in all areas?