Amendment 0001 - Revision to Price Breakout Schedule

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Solicitation Number W912GB18R0028 is for the design build constructionfor the Mekom Nkodje School renovation and addition and the Amitie Primary School Expansion os hereby amended as follow s:

The price breakout schedule has been replaced in its entirety.

1. CONTRACT ID CODE PAGE OF PAGES

1 4

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912GB18R0028

X 9B. DATED (SEE ITEM 11)

07-Aug-2018

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

16-Aug-2018

CODE

CONTRACTING DIVISION

US ARMY CORPS OF ENGINEERS

KONRAD ADENAUER RING 39

D-65187 WIESBADEN GERMANY

WIESBADEN 65187

W912GB 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912GB18R0028

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00 10 00 - SOLICITATION

The following have been modified:

PRICE BREAKOUT SCHEDULE

PRICE SCHEDULE

Request for Proposal (RFP)

Mekom Nkodje Primary School Expansion and

Amitie Primary School Expansion Oyem, Woleu-Ntem, Gabon

The Offeror shall propose on all base bid and option items. Provide completion of all design and construction of award items from the Notice to Proceed as described in the contract FAR Clause 52.211-10 “ COMMENCEMENT, PROSECUTION AND COMPLETION OF WORK” according to the following schedule. Each CLIN duration is as per the price breakout schedule and the calendar days are from issuance of the Notice to Proceed (NTP). The contractor shall have the project fully functional and available for normal, regular use no later than the end date of the period of performance.

See FAR Clause 52.211-12 for Liquidated Damages. Liquidated damages apply to any completion date specified in the contract or price breakout schedule including interim completion dates for individual facilities.

Base Period of Performance: The base period of performance is 365 calendar days from issuance of the notice to proceed (NTP).

Award of Options and Period of Performance: The Government reserves the right to award any or all options up to 120 calendar days following issuance of NTP for the base bid work. Any optional work awarded shall be completed as noted within a particular CLIN, as described in contract FAR Clause 52.211-10 “COMMENCEMENT, PROSECUTION AND COMPLETION OF WORK”. If an option is exercised, they must be completed within the base period of performance of 365 calendar days.

This project is a Design-Build and the contractor shall be required to prepare a detailed design as well as provide for construction of the project.

Allowable Work Hours: The allowable working hours are from 0800-1900 Local Time, Monday through Saturday.

Work on local holidays and outside of these hours shall not be performed without prior approval from the Contracting Officer. Office hours for coordination with Government representatives are from 0730-1600 hours CET, except U.S. holidays.

Prices: All prices are to be proposed in U.S. Dollars.

Liquidated Damages: Liquidated damages shall be assessed in the amount of 400 US Dollars per calendar day of delay beyond the required completion date of the contract.

BASE ITEMS: The base items include all labor, transportation, equipment, materials, and any other services necessary for the design, renovation and expansion construction of the Mekom Nkodje Primary School and for design and construction of an expansion to the Amitie Primary School the as described in the Statement of Work and specifications except the work described in the options below.

CLIN

0001 Base Item 1: Mekom - New School Building

All work associated with the design and construction of a single-story masonry/concrete school building with wood and corrugated metal panel sloped roof. School building shall consists of: three (3) classrooms (10mx9m ea.), one (1) refectory (10mx9m), one (1) office (6.5mx9m), and one (1) covered verandah (2mx47.5m) for a total net functional area of 513.5 m2.

This item also includes performance of all required surveys for entire project, mobilization and demobilization of necessary equipment, earthwork and grading, installation, adaptation or relocation of utilities, design and construction of storm drainage, a rainwater catchment system and any other work directly related to this item as described in the statement of work and specifications except those items defined in the options.

CLIN

0002 Base Item 2: Amitie - New School Building

All work associated with the design and construction of a single-story masonry/concrete school building with wood and corrugated metal panel sloped roof. School building shall consists of: three (3) classrooms (8m x 9m ea), one (1) office (4.38m x 9m), and one (1) covered verandah (29.05m x 2m) for a total net functional area of 313.5 m2. This item also includes performance of all required surveys for entire project, mobilization and demobilization of necessary equipment, earthwork and grading, installation, adaptation or relocation of utilities, design and construction of a rainwater harvesting system, storm drainage and any other work directly related to this item as described in the statement of work and specifications except those items defined in the options.

CLIN

0003 Base Item 3: Amitie - New Toilet Facility

All work associated with the design and construction of a single-story masonry/concrete toilet facility with wood and corrugated metal panel sloped roof. Building shall consists of four (4) total stalls: two (2) boys and two (2) girls. This item includes the design and construction a complete septic system connected to the toilet facility and an elevated tank (in addition to the rainwater tank) and pump system. This item also includes mobilization and demobilization of necessary equipment, earthwork and grading, installation, adaptation or relocation of utilities, design and construction of site drainage features, and any other work directly related to this item as described in the statement of work and specifications except those items defined in the options.

BASE ITEMS TOTAL: $____________

OPTIONAL ITEMS:

CLIN

0004 Option Item 1: Mekom - New Toilet Facility

All work associated with the design and construction of a single-story masonry/concrete toilet facility with wood and corrugated metal panel sloped roof. Building shall consists of six (6) total stalls: one (1) staff, one (1) kindergarten, two (2) boys, and two (2) girls. This item includes the design and construction a complete septic system connected to the toilet facility and an elevated tank (in addition to the rainwater tanks) and pump system. This item also includes mobilization and demobilization of necessary equipment, earthwork and grading, installation, adaptation or relocation of utilities, design and construction of site drainage features and any other work directly related to this item as described in the statement of work and specifications except those items defined in the options.

CLIN

0005 Option Item 2: Mekom - Existing North & South Building Renovations

All work associated with design and renovation of the existing North and South buildings. Renovation shall include new chalk boards and exterior insect screens. This item also includes mobilization and demobilization of necessary equipment and any other work directly related to this item as described in the statement of work and specifications except those items defined in the base.

CLIN

0006 Option Item 3: Mekom - Landscaping

All work associated with the provision of green spaces by lawn seeding and with the protection/replacement of existing/damaged vegetation if any. $____________

CLIN

0007 Option Item 4: Amitie - Landscaping

All work associated with the provision of green spaces by lawn seeding and with the protection/replacement of existing/damaged vegetation if any.

OPTION ITEMS TOTAL: $____________

TOTAL PRICE – ALL BASE AND OPTION ITEMS: $____________