A.01.38_-_Attachment_3_-_Conceptual_Design.pdf
PDF 634 KB Posted
- Attached to
- Kombewa Medical Clinic Renovations
- Solicitation number
- W912GB18R0016
About this file
Conceptual Design
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DD
D
D
D D
D D DD D
D
D
D D
D D
WW WW W W W W W W W W
D
D
D D
WW WWW WWW W
D DD
D D DD
W W
W
D
W W
W W
W W
D
W W
D
W W
W W
W W
D
D
D D
W W
D
W W
D
W
DD D D D D DDD
W W
W W
W W
W
D
W
DD D
D D
W
DD
1 1
2 2
3 3
4 4
5 5
6 6
7 7
A
A
B
B
C
C
D
D
E
E
F
F
G
G
H
H
I
I
J
J
K
K
L
L
M
M
N
N
O
O
1 2 3 4 5 6 7
131415161718
GROUND FLOOR PLAN (EXISTING) Scale 1:100
S0
S0
S02
S02
P V
P V
2, 4, 2, ,5
2, 4, ,5
6,000 1,500 8,000 2,000 3,500 1,500 4,200 2,800 1,500 4,500 3,200 3,000 1,500 4,500
1,9
4, 1,8
4, 1,7
3, 3, 3, ,5
2, 4, 2, ,5
2, 4, 4, 5, 2, 3, 2, 2, 1,0
200 5,800 200 1,300 200 3,100 200 7,200 200 3,000 200 3,000 200 7,200 200 3,300 200 3,000 200 4,400 4,500
6,000 1,500 8,000 2,000 3,500 1,500 4,200 2,800 1,500 4,500 3,200 3,000 1,500 4,500 47,700
200 5,900 1,400 200 3,175 150 1,500
1,500 150 3,175 200 3,300 200 2,650 200 2,650 200 4,100 200 3,050 200 3,300 200 1,650
2,000
1,400 4,500
200mm thk well dressed quary natural stone wallreinforced with 20mm gauge hoop iron straps at every alternate course bedded and jointed in cement sand (1:4) motar (all external walls)
Overhead storage cup boards to detail 1800mm high above the floor level
60mm thk. terrazzo made smooth
60mm thk. terrazzo made smooth
60mm thk. terrazzo made smooth
60mm thk. terrazzo made smooth
60mm thk. terrazzo made smooth
60mm thk. terrazzo made smooth
TO EXISTING SEPTIC
AND SOAK PIT
wc wc wcwcwhb shower tray w c whb w hb shower tray shower tray wc w hb shower tray wc w hb w c w hb w cw hb u ri na l w c wc whb whb w c whb whb
3 4
3 4 ic ic ic ic ic icic ic ic icic ic
Director Office
Consent
Consent
Consent
Consent
Clinical Research
Office Clinical Officer
Passage
Consultation Room 06
Consultation Room 05
TreatmentFemale DormMale Dorm
Janitor
Consultation Room 01
Consultation Room 02
Lobby
Waiting AreaPhamarcy
Consultation Room 03
Consultation Room 04
Passage Long Term store
Terrazzo floor fin
General store Terrazzo floor fin
Sterilization
Washroom
Research Laboratory Microscopy
Room
Clinical Laboratory Phlebotomy
Male Female
Male Female
Passage
Passage
Porch
Data entry files & Records
DEMOLISH EXISTING STAIRS,
CONSTRUCT NEW CODE
COMPLIANT STAIRWAY.
IPE 240 IPE 240 IPE 240
NEW COLUMN
NEW COLUMN
CUT OUT CONC.
BEAM, INSTALL
IPE 300
IP
E
IP
E
IPE 450
IPE 450
IPE 240IPE 240
IP
E
IP
E
IP
E
LOCATE DIRECTLY BENEATH
UNSUPPORTED WALL
100x100x4
IPE 240 IPE 240 IPE 240 IPE 240IPE 240
GROUND FLOOR STRUCTURAL MODIFICATIONS - KOMBEWA CLINICAL RESEARCH CENTER
Verify existing conditions and dimensions for design of structural repair elements.
Evaluate the existing emergency shoring in place in the building.
Contractor’s Structural Engineer shall inspect and approve shoring, and the shoring inspection certi�cate shall be furnished to the COR.
Notify USACE Europe District Structural Engineers immediately if adverse conditions are determined.
Movement of emergency shoring and reshoring may be required to provide su�cient area to perform structural repairs. Contractor’s Structural Engineer shall inspect and approve shoring, shoring inspection certi�cate shall be approved by the COR before proceeding.
Repair cracks in the �oor slabs by exposing the cracks and injecting an approved epoxy adhesive.
Remove plaster to provide a bearing surface directly on the concrete for new steel supporting elements.
Indicated girders shall be located directly beneath unsupported �rst �oor masonry walls to carry the wall line loads.
New ground �oor columns shall be located below the unsupported �rst �oor columns to provide continuity of the load path.
STRUCTURAL NOTES:
1.
2.
3.
4.
5.
6.
7.
Modify existing wooden built-in cabinetry with glass doors in Data Entry room to accomodate new structural members.
S-001
IPE 240 IPE 240 IPE 240
IPE 450
IP
E
IP
E
0IP
E
IPE 450
IPE 240 IPE 240
IPE 450
IPE 240
8.
100x100x4
1 1
2 2
3 3
4 4
5 5
6 6
7 7
A
A
B
B
C
C
D
D
E
E
F
F
G
G
H
H
I
I
J
J
K
K
L
L
M
M
N
N
O
O
1 2 3 4 5 6 7
131415161718
S0
S0
S02
S02
7,400 200 3,100 200 4,500 200 6,800 200 12,800 200 3,000 200 8,900
7,400 200 6,450 200 6,650 200 5,500 200 7,350 200 13,350
1,8
4, 1,8
6, 3, 1,8
4, 1,9
4, 1,8
6, 3, 1,8
4, 7,600 800 1,500 1,500
1,000 1,500 1,500
1,500 1,500 1,500
7,200 13,050 800
1,350 800
8,100
2, 4, 2, ,5
2, 4, ,5
6,000 1,500 8,000 2,000 3,500 1,500 4,200 2,800 1,500 4,500 3,200 3,000 1,500 4,500 47,700
6,000 1,500 8,000 2,000 3,500 1,500 4,200 2,800 1,500 4,500 3,200 3,000 1,500 4,500 47,700
7,400 1,500 1,500
2,000 1,500 1,500
1,675 1,500 1,500
1,350 1,500 1,500
1,825 2,000 1,500
11,750 6,100
4, 1,8
1,2
1,1
2, 1,2
1,5
2, 1,2
2, 1,2
1,5
2, 1,7
2, 1,5
3, D3 D3 v p-6
W v p-1 W v p-1
W
D
D3 D3 D3D3D3
W2-pvW2-pvW2-pv W2-pv W1-pv W1-pv W1-pvW1-pv
W2-pv W2-pv
D
D
D4 D4 D4D4
D
W 2-p v v p-2 W
W 5-p v
W 5-p v
W 5-p v
W 4-p v
W 1-p v
D 1-p v
W2-pv W2-pv W10-pv W10-pv W10-pvW2-pv W1-pv W1-pv W1-pv W1-pvW1-pvW1-pv
W 1-p v
W 3-p v
W 1-p v v p-1
W v p-1 W v p-1
W
W 1-p v
W 1-p v
W 1-p v
D2
D
D2D2
D1 D2
D2 D2
D
W 7-p v
W 8-p v
W 9-p v
W 2-p v
W 2-p v
W10-pv W10-pv W10-pv
W2-pvW2-pv
D3D3 D3 F
Fabricated steel spiral stairs
(NEW COLUMN)
(NEW COLUMN)
900mm high RHS handrail and ballastrades to detail
900mm high RHS handrail and ballastrades to detail wc wc wcwcwhb w c w hb w hb whb whb whb w hb
Records/Data terrazzo floor fin
Chief Nurse Terrazzo floor fin
Common Room terrazzo floor fin
Clinical Research Room terrazzo floor fin
Meeting Room terrazzo floor fin
TBD
terrazzo floor fin
TBD
terrazzo floor fin
Laboratory terrazzofloor fin
Open terrace (Break/Smoking) quary tiles floor fin
Computer room terrazzo floor fin
Passage
Conference Room terrazzo floor fin
Break room terrazzo floor fin
Kitchen terrazzo floor fin
Store terrazzo floor fin
Passage
Male Female Lobby
M a le
Fe m a le
Passage Passage
SHORE ROOF AND POUR
NEW BOND BEAM
DEMOLISH EXISTING STAIRS,
CONSTRUCT NEW CODE
COMPLIANT STAIRWAY.
Follow shoring plan to support the roof structure during bond beam repairs. No excavation may begin before shoring is installed and inspected. Contractor’s Structural Engineer shall inspect and approve shoring, and the shoring inspection certi�cate shall be approved by the COR before work proceeds.
Remove plaster to provide a bearing surface directly on the concrete for shoring support. Patch and repair ceiling plaster after removing shoring.
Evaluate masonry courses below the bond beam and repaire/repoint masonry as required.
1. 2.
3.
S-002
FIRST FLOOR STRUCTURAL MODIFICATIONS - KOMBEWA CLINICAL RESEARCH CENTER
STRUCTURAL NOTES: