Book 99
| Book 99 | Demolition Price Book | | |
| Division 06 | Sewer Work | | |
| 06-22-35203 | to be demolished | 51.10 | m3 |
| 06-22-354 | Reinforced concrete for sewer manhole/structure | | |
| 06-22-35407 | to be demolished | | |
| 06-22-3540701 | Thickness up to 20 cm | 102.00 | m3 |
| 06-22-3540702 | Thickness more than 20 cm up to 30 cm | 102.00 | m3 |
| 06-23 | Masonry | | |
| 06-23-370 | Masonry work for sewer manhole/structure | | |
| 06-23-37003 | to be demolished | | |
| 06-23-3700301 | Thickness up to 24 cm | 76.70 | m3 |
| 06-23-3700302 | Thickness more than 24 cm up to 36.5 cm | 81.80 | m3 |
| 06-24-382 | Channels and treads to be demolished | | |
| 06-24-38201 | in sewer manhole/structure | | |
| 06-24-3820101 | Channels up to DN 300 | 92.00 | m |
| 06-24-3820102 | Channel DN 400 | 153.00 | m |
| 06-24-3820103 | Channel DN 500 | 230.00 | m |
| 06-24-3820104 | Channel DN 600 | 332.00 | m |
| Division 15 | ROAD CONSTRUCTION WORKS | | |
| 15-21 | Base Courses without binders | | |
| 15-21 | to be broken up | | |
| 15-21-020 | Unbound mineral material mixes, to be broken up <-> Min. Materials, to be broken up | | |
| 15-21-02001 | Break up mineral material mixes | | |
| 15-21-0200101 | Thickness 12 to 15 cm | 3.80 | m2 |
| 15-21-0200102 | Thickness more than 15 to 20 cm | 4.90 | m2 |
| 15-21-0200103 | Thickness more than 20 to 25 cm | 6.30 | m2 |
| 15-21-0200104 | Thickness more than 25 to 30 cm | 7.60 | m2 |
| 15-21-0200105 | Thickness more than 30 to 40 cm | 9.70 | m2 |
| 15-21-0200106 | | 27.60 | m3 |
| 15-21-0202 | stored for re-use | | |
| 15-21-0200201 | Thickness 12 to 15 cm | 2.10 | m2 |
| 15-21-0200202 | Thickness more than 15 to 20 cm | 2.70 | m2 |
| 15-21-0200203 | Thickness more than 20 to 25 cm | 3.50 | m2 |
| 15-21-0200204 | Thickness more than 25 to 30 cm | 4.30 | m2 |
| 15-21-0200205 | Thickness more than 30 to 40 cm | 5.40 | m2 |
| 15-21-0200206 | | 15.30 | m3 |
| Sect 15-5 | Top courses with hydraulic binders | | |
| 15-51 | to be broken up | | |
| 15-51-100 | Concrete pavement, to be cut in full demolition depth | | |
| 15-51-10001 | unreinforced | | |
| 15-51-1000101 | Thickness up to 10 cm | 10.00 | m |
| 15-51-1000102 | Thickness more than 10 to 15 cm | 11.60 | m |
| 15-51-1000103 | Thickness more than 15 to 20 cm | 19.70 | m |
| 15-51-1000104 | Thickness more than 20 to 25 cm | 24.60 | m |
| 15-51-1000105 | Thickness more than 25 to 30 cm | 29.50 | m |
| 15-51-1000106 | Thickness more than 30 to 40 cm | 34.50 | m |
| 15-51-10002 | reinforced | | |
| 15-51-1000201 | Thickness up to 10 cm | 12.40 | m |
| 15-51-1000202 | Thickness more than 10 to 15 cm | 16.30 | m |
| 15-51-1000203 | Thickness more than 15 to 20 cm | 21.20 | m |
| 15-51-1000204 | Thickness more than 20 to 25 cm | 26.10 | m |
| 15-51-1000205 | Thickness more than 25 to 30 cm | 31.00 | m |
| 15-51-1000206 | Thickness more than 30 to 40 cm | 36.00 | m |
| 15-51-102 | Concrete pavement, to be demolished, broken up | | |
| 15-51-10201 | unreinforced, joints doweled and anchored, <-> to be broken up, un reinf. | | |
| 15-51-1020101 | Thickness up to 10 cm | 6.40 | m2 |
| 15-51-1020102 | Thickness more than 10 to 15 cm | 9.60 | m2 |
| 15-51-1020103 | Thickness more than 15 to 20 cm | 13.50 | m2 |
| 15-51-1020104 | Thickness more than 20 to 25 cm | 17.30 | m2 |
| 15-51-1020105 | Thickness more than 25 to 30 cm | 21.10 | m2 |
| 15-51-1020106 | | 76.70 | m3 |
| 15-51-10202 | reinforced, joints doweled and anchored, <-> to be broken up, reinforced | | |
| 15-51-1020201 | Thickness up to 10 cm | 7.95 | m2 |
| 15-51-1020202 | Thickness more than 10 to 15 cm | 11.50 | m2 |
| 15-51-1020203 | Thickness more than 15 to 20 cm | 16.10 | m2 |
| 15-51-1020204 | Thickness more than 20 to 25 cm | 20.70 | m2 |
| 15-51-1020205 | Thickness more than 25 to 30 cm | 25.30 | m2 |
| 15-51-1020206 | | 92.00 | m3 |
| 15-51-104 | Concrete pavement, to be demolished, broken up, indiv. Area up to 10 m2, as surcharge | | |
| 15-51-10401 | unreinforced, joints doweled and anchored | | |
| 15-51-1040101 | Thickness up to 10 cm | 14.60 | m2 |
| 15-51-1040102 | Thickness more than 10 to 15 cm | 19.20 | m2 |
| 15-51-1040103 | Thickness more than 15 to 20 cm | 26.80 | m2 |
| 15-51-1040104 | Thickness more than 20 to 25 cm | 34.50 | m2 |
| 15-51-1040105 | Thickness more than 25 to 30 cm | 42.20 | m2 |
| 15-51-10402 | reinforced, joints doweled and anchored | | |
| 15-51-1040201 | Thickness up to 10 cm | 16.40 | m2 |
| 15-51-1040202 | Thickness more than 10 to 15 cm | 20.50 | m2 |
| 15-51-1040203 | Thickness more than 15 to 20 cm | 28.60 | m2 |
| 15-51-1040204 | Thickness more than 20 to 25 cm | 36.80 | m2 |
| 15-51-1040205 | Thickness more than 25 to 30 cm | 45.00 | m2 |
| Sec 15-6 | Bituminous base, top courses | | |
| 15-6 1- | to be broken up | | |
| 15-6 1-200 | Bituminous pavement, to be demolished, broken up | | |
| 15-6 1-20000 | Bituminous pavement to be broken up | | |
| 15-6 1-2000001 | Overall thickness up to 10 cm | 10.70 | m2 |
| 15-6 1-2000002 | Overall thickness more than 10 to 15 cm | 16.10 | m2 |
| 15-6 1-2000003 | Overall thickness more than 15 to 20 cm | 18.80 | m2 |
| 15-6 1-2000004 | Overall thickness more than 20 to 25 cm | 24.20 | m2 |
| 15-6 1-2000005 | Overall thickness more than 25 to 30 cm | 29.60 | m2 |
| 15-6 1-2000006 | | 107.00 | m3 |
| 15 6 1-202 | Demolish bituminous pavement, Individual area up to 10 m2, as surcharge | | |
| 15-6 1-20201 | to be broken up | | |
| 15-6 1-2020101 | Overall thickness up to 10 cm | 16.10 | m2 |
| 15-6 1-2020102 | Overall thickness more than 10 to 15 cm | 24.10 | m2 |
| 15-6 1-2020103 | Overall thickness more than 15 to 20 cm | 28.20 | m2 |
| 15-6 1-2020104 | Overall thickness more than 20 to 25 cm | 36.30 | m2 |
| 15-6 1-2020105 | Overall thickness more than 25 to 30 cm | 44.30 | m2 |
| Division 30 | Masonry | | |
| 30-717- | Building Demolish | | |
| 30-717-100 | Demolition of Buildings | | |
| 30-7170101 | Building with lightweight walls, concrete to ~1 meter below bottom of foundation; normal lading capacity floors; wood/metal frame suspension ceiling; lightweight int. partitions: c-block or wood/metal stud ~3 meters high; basic electrical & mechanical services. | 14.30 | m3 |
| 30-7170102 | Building with solid masonry walls, ceilings and floors up to approximately 1 meter below the bottom of the foundation; minimum number of interior partitions; and basic electrical and mechanical services. | 18.20 | m3 |
| 30-717-0200 | Surcharges for Building Demolition 30.17.01 | | |
| 30-717-0201 | Surcharge for buildings with an average number of partitions. | 1.73 | m3 |
| 30-717-0202 | Surcharge for buildings with an above average number of partitions. | 3.46 | m3 |
| 30-717-0203 | Surcharge for buildings with an normal electrical and mechanical services. | 1.73 | m3 |
| 30-717-0204 | Surcharge for buildings with complex electrical and mechanical services. | 3.46 | m3 |
| 30-717-0205 | Surcharge for buildings with oversized structure due to heavier than normal static loads. | 6.50 | m3 |
| 30-717-0206 | Surcharge for buildings with more than one floor. | 3.90 | m3 |
| 30-717-0207 | Surcharge for demolition of basement walls down to approximately one (1) meter below surrounding ground elevation. | 32.49 | m3 |
| 30-717-0208 | Backfilling construction pit, recycled material, then soil, including compaction by layers. | 22.96 | m3 |
Book 100
| Book 100 | Service Price Book | |
| Labor Category | Unit |
| 100-1 | Project Manger | € 45.00 |
| 100-2 | Environmental Engineer (Senior) | € 40.00 |
| 100-3 | Environmental Scientist (Mid Level) | € 30.00 |
| 100-4 | Environmental Scientist (Senior) QA/QC | € 40.00 |
| 100-5 | Typist | € 20.00 |
| 100-6 | Civil Engineer (Senior) | € 36.00 |
| 100-7 | Environmental Scientist (Junior) | € 23.00 |
| 100-8 | | |
e7ct9m1j: e7ct9m1j:
Do we need the categories of typist and graphics technician? What about the Civil engineer? Graphics Technician € 22.00