This experience information sheet is an attachment to a solicitation for a multiple-award task order contract for design-build and design-bid-build construction projects in Turkey. Offerors must provide details on a minimum of five past projects demonstrating their experience, including whether they served as the prime contractor or subcontractor, final project costs, locations and completion dates. Projects must have been at least 50% complete by the closing date of this solicitation. Offerors must describe the nature and scope of construction work performed on each project. The soliciting agency is the Department of the Army European Command for indefinite-delivery, indefinite-quantity contracts with a one-year base period and four one-year options periods for design and construction services in Turkey.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT 2

Fiscal Year 2020 Turkey DB DBB MATOC W912GB20R0006

EXPERIENCE INFORMATION SHEET

PROJECT NO. _____, Page 1 (project number is taken from column 1 on Attachment 1) Must have a total of 5 projects, more than 5 will not be evaluated; less than 5 may result in a lower rating Project Name:

Experience:

1. Indicate whether the work was performed as the prime contractor, a subcontractor, or as a partner of a Joint Venture. If work was performed as a subcontractor or JV partner, clearly describe what part of the work the firm for which the experience information is submitted performed (both in magnitude and description of the work performed).

2. The final cost of this project: $_________________________

3. The location the work was performed is: ___________________________________

4. The day, month, and year work was completed: _______________

5. Is this project more than 50% complete by the closing date of this solicitation? ____ Yes ____ No

6. Work involves building renovations, civil work, or environmental work ____ Yes ____ No (see RFP Section 00 22 00 for further details)

6. Describe the nature of the work. Do not provide a listing of existing or previous contracts, but rather provide detailed information of the construction work.

(Continue typing if required to provide more information)

ATTACHMENT 2 - EXPERIENCE INFORMATION SHEET

PROJECT NO. _____ Page 2