W912ES26BA014 Bidding Abstract.pdf

PDF 151 KB Posted

Attached to
Gull Lake Recreation Area Self-Contained Flush Vault Restroom
Solicitation number
W912ES26BA014
Issued by

About this file

This is a Bid Opening Abstract for a construction contract solicitation issued by the U.S. Army Corps of Engineers. The solicitation number is W912ES26BA014 for the Gull Lake Recreation Area Flush Vault Restroom project located in Saint Paul, Minnesota. The bid opening occurred on July 1, 2026 at 2:00 p.m., with Kevin P. Henricks serving as the Contracting Officer and Roberta L. Just as the Contract Specialist.

The project consists of four line items: Bonds (Performance and Payment), a Prefab Precast Concrete Self-Contained Flush Vault Restroom Arapahoe Model, Aggregate Base, and Concrete Apron & Sidewalk. Four bids were received with the following total prices: Government Estimate at $496,748.16, Construction Solutions Group LLC (St. Louis, Missouri) at $480,500.00, Tunheim Construction LLC (Fargo, North Dakota) at $512,001.00, and Huot Construction and Services, Inc. (South St. Paul, Minnesota) at $593,863.55. The individual line item pricing shows variation across bidders, with the restroom unit itself ranging from $460,000.00 to $535,438.86. Construction Solutions Group LLC submitted the lowest bid at $480,500.00 total contract value.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation Number:

Bid Opening: 1 July 2026 at 2:00pm

Contract Specialist: Roberta L. Just Contracting Officer: Kevin P. Henricks

Line Item Description Quantity Unit of

Measure Unit Price Ext. Amount Unit Price Ext. Amount Unit Price Ext. Amount Unit Price Ext. Amount 0001 Bonds (Performance and Payment) 1 Job $4,918.30 $4,918.30 $2,500.00 $2,500.00 $6,036.00 $6,036.00 $12,683.19 $12,683.19

Prefab Precast Concrete Self-Contained Flush Vault Restroom Arapahoe Model 1 Job $483,674.16 $483,674.16 $460,000.00 $460,000.00 $492,260.00 $492,260.00 $535,438.86 $535,438.86

0003 Aggregate Base 1 Job $2,551.35 $2,551.35 $3,000.00 $3,000.00 $1,600.00 $1,600.00 $28,400.00 $28,400.00 0004 Concrete Apron & Sidewalk 1 Job $5,604.35 $5,604.35 $15,000.00 $15,000.00 $12,105.00 $12,105.00 $17,341.50 $17,341.50

TOTAL $496,748.16 $480,500.00 $512,001.00 $593,863.55

I certify that I have opened, read, and recorded on this abstract all bids received in response to this solicitation.

Kevin P. Henricks Contracting Officer US Army Corps of Engineers 332 Minnesota Street, Suite E1500 Saint Paul, Minnesota 55101

Gull Lake Recreation Area Flush Vault Restroom, U.S. Army Corps of Engineers, 332 Minnesota St., E1500, Saint Paul, MN 55101

W912ES26BA014

Government Estimate

Construction Solutions Group

LLC

425 Highland Ave St. Louis, MO 63122

Huot Construction and Services, Inc.

120 Bridgepoint Way, Ste A South St. Paul, MN 55075

Tunheim Construction LLC 3950 25th St. N Fargo, ND 58102

HENRICKS.KEVIN.PHIL

IP.1249726873

Digitally signed by

HENRICKS.KEVIN.PHILIP.1249726873

Date: 2026.07.01 14:53:18 -05'00'

File details come from the government source that posted it. Updated .