W912ES25Q0059-0001 Amendment 1.pdf

PDF 731 KB Posted

Attached to
Lead Paint Abatement at Fountain City Service Base Bldg # 2
Solicitation number
W912ES25Q0059
Issued by

About this file

This document is an Amendment (0001) to a federal solicitation for lead paint abatement services at the U.S. Army Corps of Engineers Fountain City Service Base in Wisconsin. The amendment modifies the original solicitation (W912ES25Q0059) by extending the response deadline from 26-Jun-2025 to 01-Jul-2025 and adding a new Contract Line Item (CLIN 0004) for boiler pipe removal and asbestos testing. The scope of work involves removing seven lead-painted shelving units, replacing an interior metal door, remediating the door jamb, and removing abandoned air exchanger ductwork in Building 2. The contractor is required to properly dispose of materials off-site, recycle metal shelving, and comply with all federal, state, and local regulations regarding lead abatement and hazardous waste handling.

Key changes include slight modifications to existing CLINs, specifically CLIN 0002's description changing from "replace or remediate door jamb" to "remediate door jamb", and the addition of CLIN 0004 for boiler pipe removal and asbestos testing. The project is set aside for small businesses, with a NAICS code of 562910 (Remediation Services) and an estimated value under $25,000. The work will be performed at 431 North Shore Drive, Fountain City, WI 54629, with on-site supervision by Cody Wiig (Facilities Specialist) or Adam Loven (Facilities Manager).

View the file

Other files

File Type Posted
W912ES25Q0059 RFQ for FCSB Bldg 2 Lead Abatement.pdf PDF
Statement of Work.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W81G6751609549

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of Amendment 0001 is to add Item 0004 and make modifications to the Statement of Work.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 6

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 25-Jun-2025

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912ES25Q0059

X 9B. DATED (SEE ITEM 11)

10-Jun-2025

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

25-Jun-2025

CODE

CONTRACTING DIVISION

USACE, ST PAUL

332 MINNESOTA STREET

SUITE E1500

ST PAUL MN 55101-1323

W912ES 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912ES25Q0059

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00 10 00 - SOLICITATION

The required response date/time has changed from 26-Jun-2025 11:00 AM to 01-Jul-

2025 11:00 AM.

CLIN 0002

The CLIN extended description has changed from:

Replace interior metal door and replace or remediate door jamb

To:

Replace interior metal door and remediate door jamb

CLIN 0004 is added as follows:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0004 1 Job Boiler Pipe Removal and Asbestos Testing

FFP

Asbestos Testing and Removal of abandoned boiler pipe FOB: Destination

PURCHASE REQUEST NUMBER: W81G6751609549

PSC CD: R499

NET AMT

The following Delivery Schedule for CLIN 0004 has been added:

DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

60 dys. ADC 1 FOUNTAIN CITY SERVICE BASE

AARON PIPELOW

431 NORTH SHORE DRIVE

FOUNTAIN CITY WI 54629-0397

651-290-5166 FOB: Destination

965605

The following have been modified:

STATEMENT OF WORK

Scope of Work – FCSB Building 2 Lead Painted Shelving Removal

PROJECT DESCRIPTION:

The St Paul District of the U.S. Army Corps of Engineers (USACE), Fountain City Service Base (FCSB), Physical Support Branch (PSB), requests the award of a contract for FCSB Building 2 Lead Painted Shelving Removal. Building #2 is being reconfigured for file storage and the existing shelving and air ducts need to be removed. Lead testing with XRF analyzer resulted in a detection range of .8 to 13.9 mg/cm² for all indicated shelves, door, and air return ductwork. The items containing lead paint shall be removed and recycled or disposed offsite to reduce exposure to USACE employees.

LOCATION:

The project is located at the US Army Corps of Engineers Fountain City Service Base at 431 N Shore

Drive, Fountain City, WI 54629. Building #2 is an unoccupied storage room where remediation will occur.

SCOPE OF WORK:

This specification covers but is not limited to FCSB Building 2 Lead Painted Shelving Removal. This work shall include:

Supply labor and materials to disassemble or cut and remove 7 separate homemade shelving units found to have been sealed by paint containing lead

Supply labor and materials to remove interior door found to have been sealed by paint containing lead, replacement of metal door, remediation or removal and replacement of existing door jamb. Door frame is not load bearing, but there is a legitimate concern that removal of the frame could compromise the existing brick above door as there is no header in the existing construction. Contractor shall remove as much paint as possible from door frame by scraping or other methods that do not create hazardous conditions.

Supply labor and materials to remove abandoned air exchanger ductwork found to have been sealed by paint containing lead.

Ensure any existing disturbed paint is properly sealed and properly disposed Contractor to be responsible for offsite disposal of all identified shelving, door, ductwork, waste materials and disturbance of lead contaminated products in compliance with Federal, state, and local regulations Contractor to be responsible for TCLP testing of any debris generated during the removal process to determine if waste is above the regulatory level. Cutting debris must be collected and stored properly to restrict off-target transfer

All metal shelving, outside of metal cutting debris generated, MUST be recycled to reduce reportable waste generation for the Government

As much material to be disassembled without grinding/cutting where possible, to minimize reportable waste

If reportable generation exceeds 220lbs, contractor to adhere to Planned Episodic Event Generation Alternative Standards as defined by Subpart L (40CFR 262.232), in order to maintain Fountain City Service Base’s current waste generator status as Very Small Quantity Generator

All other hardware, devices, or controls for safe and efficient operation

SITE VISITS:

The project areas are open to visitation for recon or measurement purposes by contacting:

Cody Wiig Facilities Specialist cody.w.wiig@usace.army.mil

(608) 690-0914

SPECS:

Contractor shall seal any exposed openings to the east side of Building #2 or exterior of west side of

Building #2 to prevent transfer of disturbance or contamination from reaching non-worksite areas Contractor shall collect debris or disturbance if any is generated during the disassembly process. Contractor shall test debris or disturbance via TCLP to determine if it is a hazardous waste and report the results to Government

Contractor shall remove metal and wood shelving found to contain lead paint. The metal shelving is welded in place and will need to be cut to be removed. The wood shelving is nailed together, but free-standing.

Shelf #7 has a metal frame with wood decking, the wood is to also be disposed

Contractor shall remove interior metal door found to contain lead paint. The hinge is welded to the frame and will need to be cut to be removed. Contractor shall replace interior door with metal door having a fire rating of at least 1 hour with a door closer. Minimum clear opening dimensions of door to be 32” wide.

Contractor may frame in door to sufficient dimensions but cannot remove or damage brick or spill containment berm on threshold. All framed components must have a minimum fire rating of at least 1 hour.

Contractor shall sandblast and remove paint on door jamb and repaint if removal is not possible. Contractor to remove as much paint from door frame as possible to reduce exposure hazards. Areas unable to have paint removed due to concerns with damaging existing brick or compromising structural integrity to be minimized, but allowed to be encapsulated where necessary.

Contractor shall remove abandoned air exchanger ductwork found to contain lead paint. The ductwork to be cut or disconnected at the top seam near the ceiling to leave the vent intact and preserve weatherproofing for the building. Cap the underside of the vent with sheet metal cut to size to prevent heat loss. Ductwork shall be removed for future space requirements of file storage. Contractor to remove as much paint from ductwork as possible from termination point. Areas unable to have paint removed due to concerns with compromising structural integrity to be minimized, but allowed to be encapsulated where necessary.

Remove single abandoned boiler pipe fed through shelving. The pipe is disconnected on both ends but requires shelving disassembly to remove. Contractor responsible for pipe disposal. Contractor to provide means to test pipe for presence of asbestos and be responsible for appropriate disposal if detected. If asbestos is detected, Contractor shall submit proposal for removal IAW clause 52.243-5 - Changes and Changed Conditions.

The Government will be available to provide freight unloading with forklift if needed. Single pallet weight not to exceed 16,500lbs or require fork length greater than 72” to safely move, lift height restricted to 11’

RESPONSIBILITIES:

The Government to remove supplies from shelving in work area prior to project start The Contractor shall assume full responsibility and liability for the compliance with all applicable Federal, state, and local regulations including USACE Specifications pertaining to work practices, transport, disposal, and protection of workers, visitors to the site, and persons occupying areas adjacent to the site

Contractor shall be responsible to engage work practice controls to protect USACE employees from lead exposure. USACE employee parking adjacent to work site can be restricted at contractor’s request.

The Contractor shall hold the Government harmless for failure to comply with any applicable hazardous materials abatement, transport, disposal, safety, health or other regulation on the part of themself, their employees, or their subcontractors.

Abatement contractor’s workforce shall be supervised by experienced trained workers, knowledgeable and qualified in the techniques of lead abatement, handling and disposal of lead-containing and/or lead-contaminated materials, and the subsequent cleaning of contaminated areas

Contractor to provide its employees with all necessary PPE and training for use

Contractor to provide its own Risk Assessment Plan, Accident Prevention Plan, when applicable Contractor to provide and maintain within the construction area field-type sanitary facilities in accordance with EM 385-1-1. These facilities must include but not be limited to toilet, washing, and drinking water facilities. Government toilet facilities will not be available to Contractor's personnel.

Contractor shall make all required written notifications to regulatory agencies as needed and assist Government in hazardous waste determination, including TCLP testing and assisting with reporting hazardous waste to WI DNR. The Government will provide its site’s EPA ID when requested and assist in paperwork completion

Contractor shall obtain all necessary permits, licenses, inspections, releases and similar documentation, as well as payments, statements and similar requirements associated with codes, regulations, and standards

Contractor to provide a copy of any Hazardous Waste Manifest(s) or other disposal document(s) to Government for internal record keeping purposes

Contractor shall be responsible for repair of damages to existing building or materials during work if any occur

Contractor to provide its employees copies of Safety Data Sheets (SDS) for solvents, encapsulants, wetting agents, replacement materials, or other substances brought by Contractor to the Project Site when requested. SDSs shall be available the first day that subject materials/substances are present on the project site. Copies of SDS shall be made available upon request of the Government

Contractor shall confine operations at the site to the area(s) permitted under the Contract. Portions of the site beyond areas on which work is indicated are not to be disturbed.

The contractor shall be responsible for mapping all utilities located in the work area, when applicable. This also includes drains, sewer, and septic.

CLEAN-UP:

The contractor shall practice good housekeeping to maintain a safe job site. The contractor shall keep the work area, including any storage areas, free from the accumulation of waste materials. Upon completing work in an area, the contractor shall remove any tools, equipment, and materials that are not the property of the Government. Upon completion of work, the contractor shall clean up the job site to the satisfaction of the Government. All construction debris shall be disposed of off-site by the contractor.

CODES AND REGULATIONS:

Contractor shall abide by OSHA 1926.62 lead clean-up standards, Resource Conservation and Recovery Act (RCRA), and Toxic Substances Control Act (TSCA).

Contractor must apply lead-safe work practices to all specified hazard controls in this scope of work.

Contractor is responsible to follow all federal, state, and local regulations, codes, and ordinances while completing all mitigation.

Subpart L – Alternative Standards for Episodic Generation (40CFR 262.232), https://www.ecfr.gov/current/title-40/chapter-I/subchapter-I/part-262/subpart-L

The offered service must be in compliance with US Army Corps of Engineers Safety and Occupational Health Requirements (EM 385-1-1, recent updated edition), Occupational Safety and Health Administration (OSHA), or BNSF Railroad and Federal Railroad Administration codes, when applicable

Delivery Instructions:

United States Army Corps of Engineers Fountain City Service Base 431 N Shore Dr Fountain City, WI 54629

Hours of Operation:

0700 – 1530: Monday – Friday Closed: Weekends & Holidays

Billing/ Delivery Address:

Adam Loven Facilities Manager 431 North Shore Drive Fountain City, WI 54629 E-mail: adam.f.loven@usace.army.mil

On-site Supervisor’s and Technical Point of Contacts:

Cody Wiig Facilities Specialist 431 North Shore Drive Fountain City, WI 54629 Cell #: 608-690-0914 E-mail: cody.w.wiig@usace.army.mil

OR

Adam Loven Facilities Manager 431 North Shore Drive Fountain City, WI 54629 Cell #: 612-712-0153 E-mail: adam.f.loven@usace.army.mil

SECTION 00 70 00 - CONDITIONS OF THE CONTRACT

The following Acceptance/Inspection Schedule was added for CLIN 0004:

INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

N/A N/A N/A Government

(End of Summary of Changes)