W912ES25Q001701_Amendment.pdf
PDF 579 KB Posted
- Attached to
- LD2&3 Concrete Testing Federal contract opportunity
- Solicitation number
- W912ES25Q0017
About this file
This is Amendment 0001 to solicitation W912ES25Q0017, issued by the USACE St. Paul District to evaluate interior concrete conditions of upper guide walls at Lock and Dam No. 2 and Lock and Dam No. 3. The amendment adds a requirement that all laboratory testing must be accomplished via a certified U.S. Army Engineer Research and Development Center, with registries available at https://mtc.erdc.dren.mil/map.aspx.
The scope of work requires the contractor to drill and extract eight 4-inch diameter concrete core samples at each site (16 total), conduct permeability testing of core holes, perform petrographic analysis on 2 cores per site, and complete compressive strength testing on up to 5 samples per site. The contractor must begin on-site sample collection within 15 days of award and submit a final report within 90 days. Technical evaluation criteria have been added to match price in importance for award consideration. The amendment maintains the original question submission deadline of November 29, 2024 at 12:00 PM Central Time, with responses to be submitted electronically to the specified contracting officers.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| LD2_UGW_Coring_Reference_Drawings_Part1.pdf | ||
| W912ES25Q0017 Solicitation LD2 and 3 Concrete Condition Testing.pdf | ||
| LD2_UGW_Coring_Reference_Drawings_Part2.pdf | ||
| LD2_UGW_Coring_Reference_Drawings_Part3.pdf | ||
| LD3_UGW_Coring_Reference_Drawings.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to include the follow ing verbiage w ithin the scope of w ork:
" All lab testing must be accomplished via a certif ied U.S. Army Engineer Research and Development Center. The most current list of registries can be located at https://mtc.erdc.dren.mil/map.aspx."
Clause 52.212-2, Evaluations has been updated to include technical evaluation.
All other terms and conditions remain the same.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 7
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 25-Nov-2024
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912ES25Q0017
X 9B. DATED (SEE ITEM 11)
22-Nov-2024
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
28-Nov-2024
CODE
CONTRACTING DIVISION
USACE, ST PAUL
332 MINNESOTA STREET
SUITE E1500
ST PAUL MN 55101-1323
W912ES 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912ES25Q0017
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 1449 - CONTINUATION SHEET
The following have been modified:
NOTES TO OFFERORS
NOTES TO QUOTERS
This section provides general guidance for preparing the quotation in response to this solicitation. The Quoter’s response to this solicitation must include all data and information requested herein in accordance with these instructions.
Price Quote: This is the RFQ in its entirety. Quoter to complete the following:
• Standard Form 1449 Solicitation/Contract/Order for Commercial Items - Complete Blocks 17, and 30a/b/c
• Acknowledgement of Amendments – Complete only as necessary and provide signed copies of the Standard Form 30 Amendment of Solicitation/Modification of Contract with your quote.
• Price Quote– All pricing (unit, total, subtotal, grand total, etc.) must be in whole penny amounts.
• FAR Clause 52.212-3 Offeror Representations and Certifications – Commercial Items (Feb 2021) Alternate I (Oct 2014) – This provision is included by reference. Review paragraph (b)(2) “Annual Representations and Certifications” of the basic clause at https://www.acquisition.gov/, complete as necessary and return one copy with your quote.
Technical: All lab testing must be accomplished via a certified U.S. Army Engineer Research and Development Center. The most current list of registries can be located at https://mtc.erdc.dren.mil/map.aspx .
Submitting Quotes – All transmittals shall be submitted electronically to roberta.l.just@usace.army.mil and sharon.m.frank-scheierl@usace.army.mil and be clearly marked in the subject line of the email with the solicitation number, W912ES25Q0017. Quotes must be received no later than the date and time stated in the solicitation. Quotes received after the deadline are late and may not be considered for contract award.
Questions – All questions concerning the solicitation document shall be submitted no later than 12:00 PM Central Time, November 29, 2024, via email to roberta.l.just@usace.army.mil and sharon.m.frank-scheierl@usace.army.mil. Answers to questions will be provided to all quoters being solicited though an amendment, giving due regard to the proper protection of proprietary information.
QUOTERS SHALL BE REGISTERED IN SAM (System for Award Management) https://www.acquisition.gov/ https://mtc.erdc.dren.mil/map.aspx mailto:roberta.l.just@usace.army.mil mailto:sharon.m.frank-scheierl@usace.army.mil mailto:roberta.l.just@usace.army.mil mailto:sharon.m.frank-scheierl@usace.army.mil https://www.sam.gov to include the FAR and DFARS Reps and Certs sections (refer to FAR Clause 52.204-13 “System for Award Management Maintenance”).
SCOPE OF WORK
EVALUATING THE INTERIOR CONCRETE CONDITION OF THE
UPPER GUIDE WALLS AT LOCK AND DAM NO. 2 & 3.
SCOPE OF WORK
REV 01: 27 November 2024
1. GENERAL. This work is to investigate and evaluate the interior concrete condition of the upper guide walls within two hydraulic concrete lock structures along the Mississippi River within the St. Paul District.
This will help provide a better understanding of the extent and depth of distressed / damaged concrete vertically below and horizontally landward of the Tow Haulage Rail for a proper and durable repair. All lab testing must be accomplished via a certified U.S. Army Engineer Research and Development Center. The most current list of registries can be located at https://mtc.erdc.dren.mil/map.aspx .
USACE-MVP Concrete Materials Engineers Contact Information:
Andrew P. Aarons, P.E.
U.S. Army Corps of Engineers St. Paul District 332 Minnesota Street, Suite 1500 St. Paul, MN 55101 andrew.p.aarons@usace.army.mil 651-627-0992
Steph Brunot, E.I.T.
U.S. Army Corps of Engineers St. Paul District 332 Minnesota Street, Suite 1500 St. Paul, MN 55101 steph.brunot@usace.army.mil 651-290-5326
2. SITE LOCATIONS.
Lock and Dam No. 2 Lock and Dam No. 3 U. S. Army Corps of Engineers U. S. Army Corps of Engineers 1350 Dam Road 4330 Lock & Dam Road Hastings, MN 55033-1145 Welch, MN 55089-9644 651-290-5828 651-290-5062
3. SCHEDULE. The target date for commencement of the on-site sample collection at Lock and Dam No. 2 and
Lock and Dam No. 3 shall be no later than 15 calendar days after contract award, and the final report shall be submitted no later than 90 days after contract award. The on-site data collection shall be conducted Monday through Friday, and the contractor will be responsible for developing a daily schedule, maximum 12 hours / day. The contractor shall complete each core and clean their work areas from all coring and / or grouting equipment and operations at the end of each day. The contractor shall coordinate the on-site data collection with the USACE-MVP Concrete Materials Engineer, Andrew Aarons.
4. SITE REQUIREMENTS. The contractor shall provide ground penetrating radar and or other Non-Destructive Testing (NDT) equipment to evaluate the surface prior to coring in order to avoid interferences with subsurface utilities and steel reinforcement.
SAMPLING. Evaluate the interior concrete condition of the upper guide wall at Lock and Dam No. 2 and Lock and Dam No. 3 by vertically drilling (8) 4-inch diameter concrete core samples at each site for a total of (16) core samples. Proposed location and depth are described below in
5. Table 1. Place cores as close to the tow rail as is feasible, example core location shown in Figure 1. USACE-
MVP Concrete Materials Engineer will place spray-paint indicating approximate core locations prior to coring https://mtc.erdc.dren.mil/map.aspx mailto:andrew.p.aarons@usace.army.mil mailto:steph.brunot@usace.army.mil operations. Cores should be sampled using continuous barrel extensions such that breaking of concrete is not required to retrieve samples except for at the termination of the core. The cored holes shall not vary from vertical by more than ½-inch for the depth of the hole.
Table 1: Coring Depth and Stationing Guide Table
Site Monolith No. Stationing Minimum Depth (ft)
Lock and Dam No. 2 UG-16 698.0N 7
UG-14 640.1N 7
UG-13 518.2N 7
UG-9 444.3N 7
UG-7 390.8N 7
UG-5 298.1N 7
UG-3 244.0N 7
L-1 131.4N 7
Lock and Dam No. 3 Upper Guidewall Extension, Monolith 6 10+05.8A 5.5
Upper Guidewall Extension, Monolith 1 7+58.2A 5.5
UG-1 7+34.1A 7
UG-5 5+70.5A 7
UG-6 5+29.3A 7
UG-9 4+04.2A 7
UG-10 3+72.1A 7
UG-12 2+37.0A 7
Figure 1: Example Core Location
Example Core Location
The cores shall be retained and checked to verify the interior concrete Document sample locations using Table 2: Core Sample Log. All samples shall be delivered to USACE-MVP District office located at 332 Minnesota Street, Suite 1500, St. Paul, MN 55101 within 30 days following the completion of the final report.
Table 2: Core Sample Log Core Label
Monolith No. Stationing Offset from vertical face of riverward wall (in) Total Core Depth (ft)
Borehole Permeability (in/hr)
2-1 2-2 2-3 2-4 2-5 2-6 2-7 2-8 3-1 3-2 3-3 3-4 3-5 3-6 3-7 3-8
6. CORE HOLE PERMEABILITY TESTING. Following extraction of each core from the guidewall, the core hole shall be cleaned from debris and filled with water to measure the permeability of the interior concrete by measuring the drop in water level inside the hole. The permeability shall be measured in inches / hour and the duration shall be 8 hours.
7. LABORATORY TESTING PLAN. All lab testing must be accomplished via a certified U.S. Army Engineer Research and Development Center. The most current list of registries can be located at https://mtc.erdc.dren.mil/map.aspx . A testing plan shall be developed to accommodate the following requirements.
I. Each core from Lock and Dam No. 2 and Lock and Dam No. 3 shall be visually inspected, photographed and the physical conditioned documented.
II. A full petrographic analysis in accordance with ASTM C 856 and ASTM C 457 shall be conducted on
(2) cores, from the upper guide wall at each Lock site. (4 Total)
III. Up to (5) samples (can be from specific portions of the extracted cores) from each Lock site shall be tested for compressive strength in accordance with ASTM C 39. (10 Total)
8. REPORT. After completion of the field coring and laboratory testing, a final report shall be submitted to the
USACE-MVP Concrete Materials Engineer. The final report shall include, but is not limited to the following:
I. For Lock and Dam No. 2 and Lock and Dam No. 3, a summary of field data collection including photographs, location, depth, condition of each core sample, and the permeability of each core hole.
II. The results of the Petrographic Examination in accordance with ASTM C 856 shall include but not limited to the following:
i. Determine, in detail, the interior concrete condition of the structure at each site.
ii. Determine the hardened air content in accordance with ASTM C 457.
iii. Determine inferior quality, distress, or deterioration of concrete in the structure at each site.
iv. Determine whether alkali-silica or alkali-carbonate reaction, or cement-aggregate reaction, or reactions between contaminants and the matrix have taken place, and their effects upon the concrete.
v. Determine whether the concrete has been subjected to and affected by sulfate attack, other chemical attack, early freezing, or to other harmful effects of freezing and thawing.
III. The results of the compressive strength testing in accordance with ASTM C 39.
IV. The field data and laboratory testing results shall be organized within the report per site.
9. LOCATION AND ACCESS. The exact testing locations will be determined prior to completing the work and the government will provide access for all work and testing locations. On-site power sources located along the upper guide wall may be limited and site dependent. If available, per site, the on-site power source along the upper guide wall is currently 480V – 60 AMP. The USACE on-site power source shall not be altered to accommodate the contractor’s power cable. The contractor will be responsible for providing the correct power cable end that is compatible with the USACE power source. In the event that the on-site power source becomes unavailable, the contractor shall have a secondary power source on-site and readily available to use.
10. SAFETY. All work shall be in conformance with the latest version of the Corps of Engineers Safety and
Health Requirements Manual EM 385-1-1. The contractor shall provide all personal protective equipment (PPE) including but not limited to personal floatation devices.
11. MEASUREMENT AND PAYMENT. Payment shall constitute full compensation for furnishing all labor, materials, equipment, and incidentals required and performing all work in a satisfactory manner and in accordance with the requirements described herein.
12. SITE RESTORATION AND CLEANUP. Prior to departing each site, the contractor shall fill each core hole with a non-shrink grout conforming to ASTM C 1107, and all surface areas damaged by the Contractor’s operations shall be restored. After the project completion, the contractor shall properly dispose any project related debris in accordance with all Federal, state, and local laws, ordinances, and regulations.
All invoices shall be sent to: A copy of all invoices shall be sent to:
USACE Finance Center Fountain City Service Base St Paul District (B6) Attn: Tammy Kime 5722 Integrity Drive PO Box 397 Millington, TN 38054-5005 431 North Shore Drive Fountain City, WI 54629-0397
13. ATTACHMENTS.
I. Lock and Dam No. 2 Reference Drawings
II. Lock and Dam No. 3 Reference Drawings
52.212-2 EVALUATION--COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (NOV 2021)
(a) The Government will award a contract resulting from this solicitation to the responsible offeror whose offer conforming to the solicitation will be most advantageous to the Government, price and other factors considered. The following factors shall be used to evaluate offers:
i) Price
ii) Technical: All lab testing must be accomplished via a certified U.S. Army Engineer Research and
Development Center. The most current list of registries can be located at https://mtc.erdc.dren.mil/map.aspx .
https://mtc.erdc.dren.mil/map.aspx
Price and technical are considered equal.
(End of provision)
(End of Summary of Changes)