Rental of 45 CFM Dust Collector
Solicitation number
W912ES24Q0014
Issued by

About this file

This modification amends a solicitation for the rental of a 45 CFM dust collector to be used by the Department of the Army Corps of Engineers Engineering District St Paul. The dust collector will be used to collect dust from concrete sawing and will require multiple 16-inch inlet connections as well as manufacturer-approved lifting points for moving with a crane. It will need to maintain performance over 600 feet of duct hose, which can be supplied in approximately 25-foot sections with couplings. The primary filter area is specified as 18,000 square feet for the 40,000 CFM capacity machine.

View the file

Other files

File Type Posted
W912ES24Q000140002.pdf PDF
W912ES24Q0014.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W81G6732894122

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The reason for this amendment is to answ er questions from industry.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 25-Oct-2023

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912ES24Q0014

X 9B. DATED (SEE ITEM 11)

20-Oct-2023

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

25-Oct-2023

CODE

CONTRACTING DIVISION

USACE, ST PAUL

332 MINNESOTA STREET

SUITE E1500

ST PAUL MN 55101-1323

W912ES 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912ES24Q0014

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 1449 - CONTINUATION SHEET

The following have been added by full text:

QUESTIONS FROM INDUSTRY

1. What is the actual material that the dust collector will be expected to extract?

a. It will be used to collect dust from concrete sawing.

2. The primary filter area is defined as 18,000 sq. ft. which is unusual for a reverse pulse machine with a 40,000 cfm capacity. Are these specifications correct?

a. Yes.

3. The 16” inlet size is also unusual for a machine with 40,000 cfm as duct sizes are usually larger especially with long duct hose installations. Can an adapter at the end of hose be utilized?

a. 16” is preferred due to having hose left from previous use.

4. The consumables indicate 600 feet of 16” inch heavy duty duct hose. 600’ is a considerable distance for a small duct hose with the expectations of the machine maintaining an acceptable pressure drop and performance. A better understanding of the application is desirable. Are you able to supply any application information?

a. It won’t be one single run of 600’. The hoses get damaged from moving them around.

5. Are multiple duct hose attachment points on the machine required?

a. Yes, multiple inlets will be used.

6. The consumables indicate 600 feet of 16” inch heavy duty duct hose. The common lengths are ~25’ sections. Is this acceptable?

a. Yes, would just need to include some couplings to couple hoses together.

7. Are the manufacture approved pick points need as stated in the SOW?

a. Yes they are needed as this machine will need to be picked up and moved around by a crane.

(End of Summary of Changes)