This submittal register outlines the required submittals for a security fence installation project at the Lower Saint Anthony Falls Lock and Dam. The contractor must provide submittals including a list of contact personnel, submittal register, accident prevention plan, activity hazard analysis, fence installation drawings, product data sheets for fence fabric, posts, post caps, braces, rails, tension wire, barbed wire, barbed wire supporting arms, and wire ties. The Department of the Army Corps of Engineers Engineering District St Paul is the contracting agency, and solicitations for the project are issued under number W912ES24Q0006. Response and approval dates are included in the submittal register template.

View the file

Other files

File Type Posted
W912ES24Q00060001.pdf PDF
Appendix B - Pictures Front Gate.pdf PDF
LSAF Security Fence Installation.pdf PDF
W912ES24Q0006.pdf PDF
Appendix A - Site Map Front Gate.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 1 PAGES

LSAF Security Fence Installation

01 14 00 SD-01 Preconstruction Submittals

1.3.1.1List of Contact Personnel

01 33 00 SD-01 Preconstruction Submittals

1.8 GSubmittal Register

01 35 26 SD-01 Preconstruction Submittals

GAccident Prevention Plan (APP)

1.7Activity Hazard Analysis (AHA)

32 31 13.53 SD-02 Shop Drawings

3.2.1 GFence Installation Drawings

SD-03 Product Data

2.1.1.1Fabric

2.1.2Posts

2.1.2.2Post Caps

2.1.3Chain Link Braces

2.1.3Rails

2.1.2.2Tension Wire

2.2.1.2Barbed Wire

2.1.2.2Barbed Wire Supporting Arms

2.2.1.1Wire Ties

2.2.2Concrete

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)