W912ES24B0005 Bid Abstract - FMM SE-5.pdf
PDF 214 KB Posted
- Attached to
- Fargo Moorhead Metropolitan Area Flood Risk Management Project, Southern Embankment Reach SE-5
- Solicitation number
- W912ES24B0005
About this file
This is a bid abstract for solicitation W912ES24B0005 issued by the US Army Corps of Engineers St. Paul District for the Fargo Moorhead Metropolitan Area Flood Risk Management Project, Southern Embankment Reach SE-5. The bid opening occurred on December 18, 2024 at 2:00pm CT.
The abstract shows bid pricing from four contractors (Sellin Brothers Inc., BCSS LLC, PWS Inc., and HSG Park Joint Venture 2 LLC) compared against the government estimate of $6,373,119.69. The work includes 33 base CLINs covering items such as performance/payment bonds, demolition, excavation, fill material, concrete box culvert construction, pipe installation, soil-cement work, paving, and erosion control. The lowest total bid was from Sellin Brothers Inc. at $12,461,980.00, while the highest bid was from HSG Park Joint Venture 2 LLC at $12,726,521.60. The abstract notes that mathematical errors were found in some highlighted items and corrections were made to the totals.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Fargo Moorhead Metropolitan Area Flood Risk Management Project, Southern Embankment Reach SE-5 Solicitation Number: W912ES24B0005 US Army Corps of Engineers. 332 Minnesota Street, Suite E1500. Saint Paul, Minnesota 55101 BID OPENING: December 18, 2024 2:00pm ct
Contracting Officer: Kevin P. Henricks Contract Specialist: Scott E. Hendrix
Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount
BASE ITEMS (CLINS 0001 - 0033)
CLIN DESCRIPTION QUANTITY UNIT
0001 PERFORMANCE AND PAYMENT BONDS 1 JOB $94,184.03 $94,184.03 $45,000.00 $45,000.00 $57,788.00 $57,788.00 $70,000.00 $70,000.00 $60,600.00 $60,600.00 0002 DEMOLITION 1 JOB $589,381.00 $589,381.00 $1,750,000.00 $1,750,000.00 $395,000.00 $395,000.00 $2,390,000.00 $2,390,000.00 $214,800.00 $214,800.00 0003 TOPSOIL STRIPPING 1 JOB $41,224.00 $41,224.00 $750,000.00 $750,000.00 $381,465.00 $381,465.00 $87,000.00 $87,000.00 $219,500.00 $219,500.00
TEMPORARY CONVEYANCE PLAN (WOLVERTON
CREEK) 1 JOB $762,144.00 $762,144.00 $100,000.00 $100,000.00 $110,000.00 $110,000.00 $87,000.00 $87,000.00 $273,500.00 $273,500.00
DOUBLE 14' X 8.5' CAST-IN-PLACE-CONCRETE BOX
CULVERT 1 JOB $926,510.00 $926,510.00 $1,750,000.00 $1,750,000.00 $1,609,000.00 $1,609,000.00 $1,000,000.00 $1,000,000.00 $3,348,000.00 $3,348,000.00
0006 CULVERT FILTER SYSTEM 1 JOB $57,303.00 $57,303.00 $60,000.00 $60,000.00 $115,000.00 $115,000.00 $72,000.00 $72,000.00 $143,600.00 $143,600.00 0007 PAVEMENT MARKING 1 JOB $4,298.00 $4,298.00 $6,000.00 $6,000.00 $27,000.00 $27,000.00 $14,000.00 $14,000.00 $16,400.00 $16,400.00 0008 PERMANENT HIGHWAY SIGNS 1 JOB $15,827.00 $15,827.00 $55,000.00 $55,000.00 $10,000.00 $10,000.00 $4,600.00 $4,600.00 $6,000.00 $6,000.00 0009 FINAL ROAD GRADING 1 JOB $5,187.00 $5,187.00 $10,000.00 $10,000.00 $42,000.00 $42,000.00 $92,000.00 $92,000.00 $50,100.00 $50,100.00 0010 WATERING 1 JOB $239,244.00 $239,244.00 $15,000.00 $15,000.00 $76,000.00 $76,000.00 $225,000.00 $225,000.00 $94,300.00 $94,300.00 0011 TEMPORARY EROSION CONTROL 1 JOB $49,410.00 $49,410.00 $75,000.00 $75,000.00 $351,000.00 $351,000.00 $180,000.00 $180,000.00 $137,100.00 $137,100.00 0012 TRAFFIC CONTROL 1 JOB $76,222.00 $76,222.00 $25,000.00 $25,000.00 $414,000.00 $414,000.00 $44,000.00 $44,000.00 $49,100.00 $49,100.00
0013 EXCAVATION - (WOLVERTON CREEK)
0013AA
EXCAVATION - (WOLVERTON CREEK) FIRST 26,700
CY 26700 CY $18.75 $500,625.00 $25.00 $667,500.00 $27.00 $720,900.00 $11.84 $316,128.00 $24.90 $664,830.00
0013AB
EXCAVATION - (WOLVERTON CREEK) OVER 26,700
CY 6700 CY $18.75 $125,625.00 $25.00 $167,500.00 $27.00 $180,900.00 $11.94 $79,998.00 $23.00 $154,100.00
0014 EXCAVATION - (OTHER)
0014AA EXCAVATION - (OTHER) FIRST 10,700 CY 10800 CY $18.75 $202,500.00 $25.00 $270,000.00 $24.00 $259,200.00 $11.11 $119,988.00 $25.40 $274,320.00 0014AB EXCAVATION - (OTHER) OVER 10,700 CY 2700 CY $18.75 $50,625.00 $25.00 $67,500.00 $24.00 $64,800.00 $11.85 $31,995.00 $25.40 $68,580.00
0015 IMPERVIOUS FILL - (WOLVERTON CREEK)
0015AA
IMPERVIOUS FILL - (WOLVERTON CREEK) FIRST
6,500 CY 6500 CY $10.99 $71,435.00 $30.00 $195,000.00 $31.00 $201,500.00 $11.08 $72,020.00 $23.00 $149,500.00
0015AB
IMPERVIOUS FILL - (WOLVERTON CREEK) OVER
6,500 CY 1630 CY $10.99 $17,913.70 $25.00 $40,750.00 $31.00 $50,530.00 $11.04 $17,995.20 $18.50 $30,155.00
0016 IMPERVIOUS FILL - (OTHER)
0016AA IMPERVIOUS FILL - (OTHER) FIRST 3,000 CY 3000 CY $38.52 $115,560.00 $40.00 $120,000.00 $34.00 $102,000.00 $3.10 $9,300.00 $18.50 $55,500.00 0016AB IMPERVIOUS FILL - (OTHER) OVER 3,000 CY 860 CY $10.99 $9,451.40 $30.00 $25,800.00 $34.00 $29,240.00 $2.63 $2,261.80 $18.50 $15,910.00
0017 AGGREGATE SURFACE 5126 TON $35.82 $183,613.32 $35.00 $179,410.00 $49.00 $251,174.00 $35.12 $180,025.12 $30.10 $154,292.60 0018 18" DIAMETER CORRUGATED METAL PIPE 176 LF $120.18 $21,151.68 $70.00 $12,320.00 $120.00 $21,120.00 $73.86 $12,999.36 $152.00 $26,752.00 0019 24" DIAMETER CORRUGATED METAL PIPE 269 LF $144.50 $38,870.50 $80.00 $21,520.00 $140.00 $37,660.00 $80.30 $21,600.70 $167.00 $44,923.00 0020 30" DIAMETER CORRUGATED METAL PIPE 65 LF $182.33 $11,851.45 $105.00 $6,825.00 $190.00 $12,350.00 $102.62 $6,670.30 $243.00 $15,795.00 0021 36" DIAMETER CORRUGATED METAL PIPE 71 LF $241.83 $17,169.93 $125.00 $8,875.00 $210.00 $14,910.00 $123.94 $8,799.74 $257.00 $18,247.00
18" DIAMETER CORRUGATED METAL PIPE END
SECTION 6 EA $753.17 $4,519.02 $500.00 $3,000.00 $1,900.00 $11,400.00 $550.00 $3,300.00 $865.00 $5,190.00
24" DIAMETER CORRUGATED METAL PIPE END
SECTION 8 EA $787.81 $6,302.48 $800.00 $6,400.00 $2,000.00 $16,000.00 $612.50 $4,900.00 $980.00 $7,840.00
30" DIAMETER CORRUGATED METAL PIPE END
SECTION 2 EA $1,262.00 $2,524.00 $1,100.00 $2,200.00 $2,500.00 $5,000.00 $900.00 $1,800.00 $1,940.00 $3,880.00
36" DIAMETER CORRUGATED METAL PIPE END
SECTION 2 EA $1,450.00 $2,900.00 $1,650.00 $3,300.00 $2,600.00 $5,200.00 $960.00 $1,920.00 $2,180.00 $4,360.00
0026 SOIL-CEMENT 9850 CY $132.86 $1,308,671.00 $510.00 $5,023,500.00 $320.00 $3,152,000.00 $659.90 $6,500,015.00 $566.00 $5,575,100.00 0027 ASPHALT PAVEMENT 1595 SY $133.86 $213,506.70 $65.00 $103,675.00 $110.00 $175,450.00 $72.10 $114,999.50 $68.20 $108,779.00 0028 REINFORCED CONCRETE PAVEMENT 1658 SY $77.55 $128,577.90 $280.00 $464,240.00 $280.00 $464,240.00 $308.81 $512,006.98 $207.00 $343,206.00
0029 TOPSOIL RESPREAD
0029AA TOPSOIL RESPREAD FIRST 14,200 CY 14200 CY $12.46 $176,932.00 $8.00 $113,600.00 $19.00 $269,800.00 $10.92 $155,064.00 $10.10 $143,420.00 0029AB TOPSOIL RESPREAD OVER 14,200 CY 3550 CY $8.23 $29,216.50 $11.00 $39,050.00 $19.00 $67,450.00 $13.52 $47,996.00 $10.10 $35,855.00
0030 SEEDING: ZONES 1, 2 16.7 AC $1,979.37 $33,055.48 $3,250.00 $54,275.00 $5,400.00 $90,180.00 $3,592.81 $59,999.93 $2,430.00 $40,581.00 0031 SEEDING: ZONE X 8.4 AC $2,828.39 $23,758.48 $950.00 $7,980.00 $1,500.00 $12,600.00 $1,904.76 $15,999.98 $914.00 $7,677.60 0032 B1 BEDDING 424 TON $70.95 $30,082.80 $120.00 $50,880.00 $180.00 $76,320.00 $73.11 $30,998.64 $130.00 $55,120.00 0033 RIPRAP 1276 TON $145.57 $185,747.32 $130.00 $165,880.00 $170.00 $216,920.00 $86.21 $110,003.96 $85.90 $109,608.40
TOTAL $6,373,119.69 $12,461,980.00 $10,097,097.00 $12,704,385.21 $12,726,521.60
I certify that I have opened, read, and recorded on this abstract all bids received in response to this solicitation.
Kevin P. Henricks Contracting Officer
2972 25th ST NE Harvey, ND 58341
HSG Park Joint Venture 2, LLC
Note: Upon reviewing the bids, mathamatical errors were discovered for the highlighted items. The highlighted amount and/or subsequent totals are correct.
Government Estimate Sellin Brothers, Inc.
Hawley, MN 56549
BCSS, LLC
Tempe, AZ 85282
PWS, Inc.
Brooklyn Park, MN 55428 1204 Hobart St. PO Box 159 1501 West Fountainhead, Parkway, 8601 73rd Ave. N, Ste 22
Sheet1
| 2024-12-18T14:51:20-0600 | |
| HENRICKS.KEVIN.PHILIP.1249726873 |
File details come from the government source that posted it. Updated .