W912ES22Q0002 Amendment 0001.pdf

PDF 713 KB Posted

Attached to
66 ft x 24 ft Attached Storage Building - Cross Lake Recreation Area
Solicitation number
W912ES23Q0002
Issued by

About this file

This federal contract opportunity solicitation and related amendment seek quotes to construct a storage building attached to an office building at a recreation area in Minnesota. The solicitation requests quotes to prepare the site, pour a concrete foundation slab with in-floor heating, and erect an approximately 66 foot by 24 foot storage building. The building is to include three 16 foot by 9 foot overhead garage doors, two service doors, steel siding, windows, and a steel roof. The contractor will also apply spray foam insulation and install an electric panel. Quotes are due by December 13, 2022. The solicitation is reserved for small businesses and is estimated to be valued between $100,000 and $250,000. The U.S. Army Corps of Engineers District in St. Paul, Minnesota is the contracting agency.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W81G6722435363

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of Amendment 0001 is to clarify the dimensions of the overhead doors, change the location of the electrical transformer, change roof sheathing material, make changes to the Notes to Quoters section, updates the Davis-Bacon Wage Determination, and add pictures. The amendment also extends the solicitation close date.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 13

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 21-Nov-2022

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912ES23Q0002

X 9B. DATED (SEE ITEM 11)

03-Nov-2022

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

21-Nov-2022

CODE

CONTRACTING DIVISION

USACE, ST PAUL

332 MINNESOTA STREET

SUITE E1500

ST PAUL MN 55101-1323

W912ES 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912ES23Q0002

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00 10 00 - SOLICITATION

The required response date/time has changed from 06-Dec-2022 11:00 AM to 13-Dec-2022 11:00 AM.

The required performance has changed from The contractor shall furnish all plant, materials, equipment, supplies, labor and transportation required to supply payment & performance bonds, prepare the site, pour a reinforced concrete foundation slab with in-floor hydronic heating system, and erect an approx. 66 ft x 24 ft storage building/garage attached to the Main Office building at Cross Lake Recreation Area, in Crow Wing County, MN.

The building shall include, but are not limited to three 16 ft x 9 ft steel insulated overhead garage doors with electric openers, two 36 in x 80 in insulated steel service doors, galvanized steel siding, two 22 in octagonal insulated windows, and a green Met-Tile (or equal) steel roof. Contractor shall apply high pressure spray polyurethane foam insulation to underside of roof and inside of all exterior walls. Contractor shall install and connect a 400-amp meter base and electric panel. The magnitude of construction on this project is between $100,000 and $250,000. This Request for Quotes (RFQ) solicitation is 100% set-aside for Small Businesses under NAICS code 236220, with a size standard of $39,500,000. This solicitation should result in one (1) firm-fixed price (FFP) construction contract, awarded using SAP. This is NOT an Invitation for Bids (IFB) - No Bid Bonds are required. to The contractor shall furnish all plant, materials, equipment, supplies, labor and transportation required to supply payment & performance bonds, prepare the site, pour a reinforced concrete foundation slab with in-floor hydronic heating system, and erect an approx. 66 ft x 24 ft storage building/garage attached to the Main Office building at Cross Lake Recreation Area, in Crow Wing County, MN. The building shall include, but are not limited to three 16 ft W x 9 ft H steel insulated overhead garage doors with electric openers, two 36 in x 80 in insulated steel service doors, galvanized steel siding, two 22 in octagonal insulated windows, and a green Met-Tile (or equal) steel roof. Contractor shall apply high pressure spray polyurethane foam insulation to underside of roof and inside of all exterior walls. Contractor shall install and connect a 400-amp meter base and electric panel. The magnitude of construction on this project is between $100,000 and $250,000. This Request for Quotes (RFQ) solicitation is 100% set-aside for Small Businesses under NAICS code 236220, with a size standard of $39,500,000. This solicitation should result in one (1) firm-fixed price (FFP) construction contract, awarded using SAP. This is NOT an Invitation for Bids (IFB) - No Bid Bonds are required..

The following have been modified:

STATEMENT OF WORK

Scope of Work

SITE PREP, POUR CONCRETE SLAB & CONSTRUCT A STORAGE BUILDING AT

CROSS LAKE RECREATION AREA.

C-1. GENERAL.

C-1.1. Scope of Work. The work to be performed under this contract consists of furnishing all plant, materials, equipment, supplies, labor and transportation and performing all work in accordance with the terms, conditions, specifications included in this solicitation as well as all applicable federal, state and local laws and regulations. All work materials and services not expressly called for in the specifications or shown on the drawings but which are necessary for completion of the contract requirements shall be performed and furnished by the Contractor at no increase in cost to the Government.

C-1.2. Payment. Payment will be made in accordance with the terms and conditions herein.

The contractor must submit a detailed invoice to the Contracting Officer’s Representative

(COR).

C-1.3. Description and Location. Cross Lake Recreation Area is a U.S. Army Corps of Engineers managed recreation area that includes heavily utilized facilities including a dam, campground, boat ramps, picnic areas, playgrounds, etc. It is located on Cross Lake in Crow Wing County approximately 35 miles northeast of Brainerd, within the city of Crosslake, MN.

Address is 35507 County Road 66, Crosslake, MN 56442.

C-1.4. Site Visit. Contractors are highly encouraged to visit the site prior to bidding. Contact the COR, Jason Hauser, to schedule a site visit at 218-260-0521 or jason.a.hauser@usace.army.mil.

C-1.5. Orientation. Prior to the start of work, the Government will provide an orientation to the Contractor and their personnel which will include discussion of contract requirements, safety considerations, quality control, security and administration.

C-2 SPECIFICATIONS

C-2.1. Site Prep: The asphalt surface currently in place shall be removed. The contractor shall remove existing soil and install a minimum of 12 inches compacted class 5 gravel base under the slab and apron. This gravel pad shall be adequate for the 66 foot by 24 foot garage. The Cross Lake site staff will stake out the location of the 66 foot by 24 foot garage.

C-2.2. Concrete Slab: Using forta-ferro fiber (or equal) in the concrete, the Contractor shall pour a 5 ½ inch thick Monolithic concrete floating slab with a 16 inch wide by 12 inch deep footing.

The slab shall have a reinforced ½ inch rebar grid installed 2 foot on centers with 2 runs of ½ inch rebar centered in the footing. The rebar grid shall be centered in the 5 ½ inch thick slab.

The finished concrete slab elevation shall be approximately 2” above the existing asphalt parking lot.

C-2.3. Floor Heating System: The slab shall also contain a Hydronic Radiant Floor Heating System, installed per manufacturers recommendation. Location of boiler to be determined with placement of electrical service on the west side of building.

C-2.4. Row Cement Block: The Contractor shall lay one row of 6 inch cement blocks on the slab.

The blocks shall be core filled and anchored to the slab every 4 feet according to the local building code. The sill plate shall be anchor to the row of blocks at least every 6 feet with a 5/8 inch J bolt style anchor or equal. The concrete slab and block shall be sealed with an approved cement sealer according to the manufacturer’s recommendations.

C-2.5. Exterior Walls: The exterior walls shall be 2x6x10 foot minimum # 2 grade lumber 16 inches on center of studs. The bottom sill plate that rests on the row of block shall be 2x6 minimum # 2 grade treated lumber. The sill plate shall be attached to the row of blocks at a minimum of every 6 foot. The Contractor shall install a layer of sill sealer between the sill plate and row of block. The exterior walls shall be sheeted with 7/16 inch OSB sheathing and wrapped with a house wrap (TYVEK) or equal.

C-2.6 Roof: The roof shall have a 6/12 pitch with 2x6 trusses located 16 inches on centers with a (42/10/10) load rating. The roof sheathing shall be ½ inch 5/8 inch OSB sheathing with H-clips installed between the trusses. There shall be a 1 foot overhang on the gable ends with a 2 foot overhang on the eves. The Contractor shall install a 2x6 sub fascia with steel fascia and steel vented soffits. A layer of Ice and Water Shield shall be installed over all of the roof decking before the steel roof is installed. The Ice and Water Shield shall be installed according to the manufacturer’s recommendations.

C-2.6.1 Roof System: Green colored Met-Tile steel roof (or equal) shall be installed over the ice and water barrier according to the manufacturer’s recommendations. The steel roof panels shall be one piece and run the full length of the roof from eve to ridge with an overhang at the eve according to the manufacturer’s recommendation. All trim, facia, drip edge and ridge cap shall be of the same green color and style as the existing office building. The installation of the steel roof panels and accessories shall be completed according to the manufacturer’s recommendations and the complete roof system shall meet all local, County and State building codes.

C-2.7 Doors: The garage shall have 3 – 16 foot (wide) by 9 foot (high) steel insulated overhead garage doors (Raynor Traditions MasterPiece) or equal located on the eve side of the garage.

The doors shall be spaced out starting approximately 2 foot from the end of the left side of the garage and 3 foot apart in the middle (Attachment 1). The Contractor shall install Laminated veneer lumber (LVL) headers to support the overhead garage doors according to the local building codes. Two - 36” X 80” insulated steel service doors shall be installed, one shall be installed on the gable end of the garage facing the existing storage building (location to be determined by the site staff) and one will be on the same side that the garage doors are located.

All overhead garage doors shall have electric garage door openers (Raynor RCT 211 or equal) installed according to the manufacture’s recommendations.

C-2.8. Galvanized Steel Siding: The Contractor shall provide and install galvanized steel siding and accessories to meet the following specifications. All work shall be performed according to the manufacturer’s recommendations and must meet local, County and State building codes.

28-gauge G60 hot dipped galvanized steel siding and accessories Style to be 5-inch double lap siding Withstands winds up to 235 mph 50-year Warranty on hail dents 35-year Warranty on color chalking and fading Class A / Class 1 fire rating A color sampling of the siding that will coordinate with the existing office building will be provided to site staff for selection.

C-2.9. Windows: The Contractor shall install 2 - 22 inch Octagon insulated windows (TAFCO) or equal in each gable end of the building centered above the top sill plate.

C-2.10. Spray Foam: The contractor shall spray Closed Cell Spray Polyurethane Foam (here-in referred to as ccSPF) insulation to the underside of the roof and the inside of all exterior walls.

The ceiling insulation shall be sprayed to obtain an R-value of at least R49 and the walls shall be sprayed to obtain an R-value of at least R21. No gaps shall remain unsprayed between the walls and the ceiling. It is the responsibility of the contractor to determine quantity prior to quoting the job, as no allowance will be made for any additional quantities required.

The installing contractor shall have current industry recognized professional training or accreditation for high pressure spray polyurethane foam insulation. Proof of training or accreditation shall be provided to the COR at the pre-work conference. Upon completion of the foaming the contractor shall provide the COR with a summary of the installation, including at a minimum: manufacturer of the insulation, R-Value of the product, date of installation, and the contractor’s certification that the installation has been performed in accordance with local code requirements.

Installation of the ccSPF shall follow all federal, state, and local regulations, including, but not limited to, OSHA National Emphasis Program guidance on Isocyanates. Installation shall comply with all manufacturer’s specifications for installation and utilize industry best practices. The contractor will be responsible for placement of health and safety barriers within the work zone. Contractor will be responsible for all clean-up, removal and disposal of materials associated with spray polyurethane foam installation including, but not limited to decontamination of any surfaces that have come into contact with isocyanates or other ccSPF chemicals, all dust, debris, foam trimmings, empty and partially used containers or drums in accordance with applicable federal, state, and local requirements.

Closed Cell Spray Polyurethane Foam Specifications:

Interior grade Two-component closed-cell foam High pressure application

C-2.10. Concrete Apron: The contractor shall place a minimum of 12 inches of compacted class 5 gravel under the apron. Using forta-ferro fiber (or equal) in the concrete, the Contractor shall pour a 5 ½ inch by 3-foot apron in front of all doors. Expansion joint material shall be used between the apron and the building slab the full length of the apron. The apron height shall be the same as the slab so there is a smooth transition between the apron and the floor of the garage.

The concrete apron shall be reinforced with ½ inch rebar installed in a grid pattern 2 foot on centers.

C-2.12. Electrical: The Contractor shall provide a 400-amp meter base with a lever by-pass and breaker style service rated disconnect. The 400-amp service and electric panel shall be installed on the west, inside wall of the new building. Coordination with Crow Wing Power will be necessary to mount the equipment. Coordination with Crow Wing Power and the Cross Lake Recreation Area will be necessary to determine placement of a new meter. The Contractor will be responsible for trenching from the meter to the main load center in the building. The contractor will be responsible for coordinating work and payment with Crow Wing Power to accomplish the trenching from the three-phase junction box to the meter. All electrical work shall be installed according to local, county and state codes and according to the manufacturer’s recommendations.

C-2.13. Work Area: The Contractor is responsible for leaving the work area in the same condition as before the start of contract work. Any damages shall be repaired at the contractor’s expense. All construction debris shall be removed and disposed of off-site in accordance with local and state regulations.

C-3.0. PHOTOS: See Attachment 3

SECTION 00 21 00 - INSTRUCTIONS

INSTRUCTIONS TO QUOTERS

PLEASE E-MAIL ALL QUESTIONS to John Riederer, Contract Specialist, John.P.Riederer@usace.army.mil

This is a 100% Small Business Set-Aside request for quotes (RFQ).

NAICS Code: 236220 Size Standard: $39.5 million

This solicitation is NOT an Invitation for Bids (IFB) or a Request for Proposals (RFP). Bid Bonds are NOT required. The Government intends to award one firm-fixed price contract for construction using Simplified Acquisition Procedures (SAP).

It is preferred that the quote is e-mailed to:

John Riederer, Contract Specialist, John.P.Riederer@usace.army.mil

The offeror may also submit the quote by mail / courier to the following:

USACE – ST PAUL

CONTRACTING DIVISION

ATTN: John Riederer

332 MINNESOTA ST, SUITE E1500

ST. PAUL, MN 55101

Offerors are highly encouraged to schedule a site visit. Please see clause 52.236-27 Alt 1 and SOW paragraph C-1.5 for more information.

Please Note: Contractor is responsible for obtaining ALL permits required and full compliance with applicable local, state and Federal codes and regulations.

OFFEROR SHALL BE REGISTERED IN SAM (System for Award Management) https://www.sam.gov to include the FAR and DFARS Reps and Certs sections with the NAICS code applicable to the solicitation.

For assistance with SAM, contact information is below:

SAM by GSA Hours of Operation:

Monday – Friday 8am to 8pm ET, U.S. Calls 866-606-8220, Service desk website: http://www.fsd.gov/

Initial registration and registration renewal in SAM requires Internal Revenue Service verification of Employer ID Number, a process which can take several days to complete.

Quotes must be RECEIVED no later than the Offer Due Date/Time listed in the FBO.gov solicitation posting.

Quotes received after the deadline are considered late, and may not be considered for award.

Quotes must include specific acknowledgement of all amendments to the solicitation (if any).

Quotes that do not acknowledge amendments may not be considered for award.

SECTION 00 73 00 - SUPPLEMENTARY CONDITIONS

DAVIS-BACON WAGE DETERMINATION

General Decision Number: MN20220105 11/18/2022

Superseded General Decision Number: MN20210105

State: Minnesota

Construction Type: Building

Counties: Crow Wing, Kittson, Lake of the Woods, Mahnomen, Marshall, Norman, Red Lake, Roseau, Traverse, Wadena and Wilkin Counties in Minnesota.

BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).

Note: Contracts subject to the Davis-Bacon Act are generally required to pay at least the applicable minimum wage rate required under Executive Order 14026 or Executive Order 13658.

Please note that these Executive Orders apply to covered contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but do not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60).

|If the contract is entered |. Executive Order 14026 | |into on or after January 30, | generally applies to the | |2022, or the contract is | contract. | |renewed or extended (e.g., an |. The contractor must pay | |option is exercised) on or | all covered workers at | |after January 30, 2022: | least $15.00 per hour (or | | | the applicable wage rate | | | listed on this wage | | | determination, if it is | | | higher) for all hours | | | spent performing on the | | | contract in 2022. | |If the contract was awarded on|. Executive Order 13658 | |or between January 1, 2015 and| generally applies to the | |January 29, 2022, and the | contract. | |contract is not renewed or |. The contractor must pay all| |extended on or after January | covered workers at least | |30, 2022: | $11.25 per hour (or the | | | applicable wage rate listed| | | on this wage determination,| | | if it is higher) for all | | | hours spent performing on | | | that contract in 2022. |

The applicable Executive Order minimum wage rate will be adjusted annually. If this contract is covered by one of the Executive Orders and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must still submit a conformance request.

Additional information on contractor requirements and worker protections under the Executive Orders is available at https://www.dol.gov/agencies/whd/government-contracts.

Modification Number Publication Date 0 01/07/2022 1 02/18/2022 2 02/25/2022 3 04/01/2022 4 05/27/2022 5 07/29/2022 6 11/18/2022

ASBE0034-001 06/13/2022

Rates Fringes

ASBESTOS WORKER/HEAT & FROST

INSULATOR........................$ 41.00 37.99

BOIL0647-008 04/01/2021

Rates Fringes

BOILERMAKER......................$ 40.94 28.44

BRMN0001-014 05/03/2021

Rates Fringes

BRICKLAYER.......................$ 35.54 26.04

* CARP0068-009 05/02/2022

Rates Fringes

SOFT FLOOR LAYER.................$ 31.03 22.65

CARP1934-003 05/03/2021

Rates Fringes

CARPENTER (Includes Drywall Hanging, and Form Work, and Excludes Soft Floor Layer).......$ 27.03 20.60

ENGI0049-002 05/01/2020

Rates Fringes

POWER EQUIPMENT OPERATOR

Bulldozer...................$ 40.93 21.70 Crane.......................$ 42.69 21.70 Forklift....................$ 40.93 21.70 Oiler.......................$ 38.30 21.70

IRON0512-024 05/01/2022

Rates Fringes

IRONWORKER, REINFORCING..........$ 41.00 33.11

LABO0563-053 01/01/2021

Rates Fringes

LABORER (ASBESTOS ABATEMENT

(Removal from Ceilings, Floors, and Walls))..............$ 37.40 19.09

PAIN0681-006 05/02/2022

Rates Fringes

PAINTER (Spray)..................$ 32.29 21.53

PAIN1324-002 02/26/2018

Rates Fringes

GLAZIER..........................$ 30.43 14.90

PLAS0633-009 05/01/2021

Rates Fringes

CEMENT MASON/CONCRETE FINISHER...$ 34.63 23.20

PLUM0539-006 05/01/2021

Rates Fringes

PIPEFITTER (HVAC Pipe Installation Only)...............$ 38.72 32.70

ROOF0096-020 06/01/2022

Rates Fringes

ROOFER...........................$ 37.51 20.63

SFMN0669-004 04/01/2022

Rates Fringes

SPRINKLER FITTER (Fire Sprinklers)......................$ 39.18 25.53

SHEE0010-048 04/04/2020

Rates Fringes

SHEET METAL WORKER (Excludes HVAC Duct and Unit Installation)....................$ 39.59 25.32

* UAVG-MN-0003 01/01/2019

Rates Fringes

LABORER: Pipelayer..............$ 31.45 16.32

* UAVG-MN-0004 01/01/2019

Rates Fringes

OPERATOR: Loader................$ 31.87 20.30

* UAVG-MN-0006 01/01/2019

Rates Fringes

DRYWALL FINISHER/TAPER...........$ 24.64 10.04

PAINTER (Brush and Roller).......$ 28.64 16.43

SUMN2015-040 06/22/2018

Rates Fringes

ELECTRICIAN......................$ 27.76 16.96

HVAC MECHANIC (Installation of HVAC Duct and Unit)...........$ 27.29 15.19

IRONWORKER, STRUCTURAL...........$ 31.61 22.85

LABORER: Common or General......$ 21.40 14.51

LABORER: Mason Tender - Brick...$ 23.25 15.77

OPERATOR:

Backhoe/Excavator/Trackhoe.......$ 25.22 8.59

PIPEFITTER (Excludes HVAC Pipe Installation)...............$ 27.95 15.82

PLUMBER..........................$ 27.95 15.82

TILE SETTER......................$ 24.38 12.63

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at https://www.dol.gov/agencies/whd/government-contracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010

08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour National Office because National Office has responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

(End of Summary of Changes)

File details come from the government source that posted it. Updated .