W912ES23B0016 Bid Abstract - FMM SE-3.pdf
PDF 713 KB Posted
- Attached to
- Fargo Moorhead Metropolitan Area Flood Risk Management Project, Southern Embankment Reach SE-3
- Solicitation number
- W912ES23B0016
About this file
This is a bid abstract for solicitation W912ES23B0016 from the US Army Corps of Engineers St. Paul District for the Fargo Moorhead Metropolitan Area Flood Risk Management Project, Southern Embankment Reach SE-3. The abstract shows detailed line-item pricing from six bidders along with the government estimate for both base work (CLINs 0001-0036) and option work (CLINs 1001-1017).
The base work totals ranged from $18.7M to $31.4M and includes major components like embankment construction, topsoil work, concrete box culverts, erosion control, traffic control, and various types of riprap. The option work totals ranged from $3.6M to $7.5M and includes additional embankment, excavation, erosion control and related items. HSG Park Joint Venture 2 LLC submitted the lowest total combined bid at $22.3M, while U.S. SiteWork Inc. submitted the highest at $38.8M. The bid opening occurred on November 26, 2024 at 2:00 PM CT. The abstract notes that some mathematical errors were discovered and corrected during bid review.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Fargo Moorhead Metropolitan Area Flood Risk Management Project, Southern Embankment Reach SE-3 Solicitation Number: W912ES23B0016 US Army Corps of Engineers. 332 Minnesota Street, Suite E1500. Saint Paul, Minnesota 55101 BID OPENING: November 26, 2024 2:00pm ct
Contracting Officer: Kenneth J. Eshom Contract Specialist: Scott E. Hendrix
Item Description Quantity Unit Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount
BASE ITEMS (CLINS 0001 - 0036)
0001 PERFORMANCE AND PAYMENT BONDS 1 JOB $276,278.62 $276,278.62 $126,092.00 $126,092.00 $164,955.80 $164,955.80 $159,500.00 $159,500.00 $140,000.00 $140,000.00 $123,700.00 $123,700.00 0002 DEMOLITION 1 JOB $515,010.13 $515,010.13 $1,250,000.00 $1,250,000.00 $868,820.79 $868,820.79 $1,350,000.00 $1,350,000.00 $623,250.00 $623,250.00 $2,741,600.00 $2,741,600.00 0003 TEMPORARY TRAFFIC CONTROL 1 JOB $34,078.02 $34,078.02 $32,000.00 $32,000.00 $28,512.60 $28,512.60 $100,000.00 $100,000.00 $23,670.00 $23,670.00 $21,400.00 $21,400.00 0004 TEMPORARY EROSION CONTROL 1 JOB $223,883.57 $223,883.57 $885,000.00 $885,000.00 $359,585.18 $359,585.18 $400,000.00 $400,000.00 $313,950.00 $313,950.00 $68,300.00 $68,300.00 0005 WATER AND SEWER 1 JOB $598,055.98 $598,055.98 $1,150,000.00 $1,150,000.00 $1,437,920.19 $1,437,920.19 $3,000,000.00 $3,000,000.00 $1,254,600.00 $1,254,600.00 $990,600.00 $990,600.00 0006 COMUNICATION AND ELECTRICAL 1 JOB $592,317.46 $592,317.46 $450,000.00 $450,000.00 $708,206.42 $708,206.42 $750,000.00 $750,000.00 $854,600.00 $854,600.00 $331,400.00 $331,400.00 0007 TOPSOIL STRIPPING 1 JOB $2,547,669.87 $2,547,669.87 $2,239,587.10 $2,239,587.10 $2,527,127.85 $2,527,127.85 $2,500,000.00 $2,500,000.00 $2,700,000.00 $2,700,000.00 $847,900.00 $847,900.00 0008 PAVEMENT MARKING 1 JOB $14,967.68 $14,967.68 $32,000.00 $32,000.00 $43,168.34 $43,168.34 $24,000.00 $24,000.00 $35,830.00 $35,830.00 $32,400.00 $32,400.00 0009 PERMANENT HIGHWAY SIGNS 1 JOB $18,351.11 $18,351.11 $3,000.00 $3,000.00 $12,873.69 $12,873.69 $8,855.00 $8,855.00 $10,690.00 $10,690.00 $9,670.00 $9,670.00 0010 TEMPORARY IRRIGATION SYSTEM 1 JOB $147,940.64 $147,940.64 $400,000.00 $400,000.00 $251,886.95 $251,886.95 $381,000.00 $381,000.00 $97,670.00 $97,670.00 $386,400.00 $386,400.00 0011 WATERING 1 JOB $34,096.92 $34,096.92 $150,000.00 $150,000.00 $251,886.95 $251,886.95 $36,000.00 $36,000.00 $104,950.00 $104,950.00 $161,000.00 $161,000.00 0012 INSPECTION TRENCH 8,600 LF $15.94 $137,084.00 $5.80 $49,880.00 $31.75 $273,050.00 $16.90 $145,340.00 $38.50 $331,100.00 $27.80 $239,080.00
0013 EMBANKMENT
0013AA FIRST 715,694 CY - EMBANKMENT 715,694 CY $15.15 $10,842,764.10 $7.80 $5,582,413.20 $7.09 $5,074,270.46 $8.15 $5,832,906.10 $15.50 $11,093,257.00 $6.10 $4,365,733.40 0013AB OVER 715,694 CY - EMBANKMENT 178,923 CY $15.16 $2,712,472.68 $10.00 $1,789,230.00 $5.30 $948,291.90 $8.15 $1,458,222.45 $14.50 $2,594,383.50 $5.00 $894,615.00
0014 TURF REINFORCEMENT MAT (TRM) 879,968 SF $1.08 $950,365.44 $2.30 $2,023,926.40 $2.93 $2,578,306.24 $1.55 $1,363,950.40 $3.80 $3,343,878.40 $2.25 $1,979,928.00 0015 AGGREGATE SURFACE 18,719 TON $61.76 $1,156,085.44 $56.00 $1,048,264.00 $56.78 $1,062,864.82 $39.00 $730,041.00 $39.50 $739,400.50 $33.00 $617,727.00
0016 SALVAGED BASE COURSE
0016AA FIRST 6,391 - SALVAGED BASE COURSE 6,391 CY $37.74 $241,196.34 $105.00 $671,055.00 $94.26 $602,415.66 $108.00 $690,228.00 $33.50 $214,098.50 $62.50 $399,437.50 0016AB OVER 6,391 - SALVAGED BASE COURSE 1,598 CY $37.74 $60,308.52 $105.00 $167,790.00 $70.29 $112,323.42 $82.00 $131,036.00 $34.50 $55,131.00 $41.75 $66,716.50
0017 PERMANENT CR81 ASPHALT PAVEMENT 16,499 SY $66.06 $1,089,923.94 $60.00 $989,940.00 $70.99 $1,171,264.01 $47.00 $775,453.00 $59.00 $973,441.00 $53.70 $885,996.30 0018 PIPE CORRUGATED STEEL; .064IN 24IN 90 LF $191.29 $17,216.10 $90.00 $8,100.00 $242.73 $21,845.70 $90.00 $8,100.00 $118.00 $10,620.00 $86.30 $7,767.00 0019 PIPE CORRUGATED STEEL; .064IN 30IN 92 LF $213.89 $19,677.88 $100.00 $9,200.00 $267.31 $24,592.52 $100.00 $9,200.00 $138.00 $12,696.00 $103.00 $9,476.00 0020 PIPE CORRUGATED STEEL; .064IN 36IN 52 LF $232.09 $12,068.68 $110.00 $5,720.00 $413.25 $21,489.00 $125.00 $6,500.00 $167.00 $8,684.00 $126.00 $6,552.00 0021 END SECTION CORRUGATED STEEL; .064IN 24IN 4 EA $1,661.79 $6,647.16 $900.00 $3,600.00 $4,071.03 $16,284.12 $585.00 $2,340.00 $642.00 $2,568.00 $1,650.00 $6,600.00 0022 END SECTION CORRUGATED STEEL; .064IN 30IN 4 EA $2,267.24 $9,068.96 $1,100.00 $4,400.00 $5,300.03 $21,200.12 $950.00 $3,800.00 $1,225.00 $4,900.00 $2,010.00 $8,040.00 0023 END SECTION CORRUGATED STEEL; .064IN 36IN 2 EA $2,899.12 $5,798.24 $1,400.00 $2,800.00 $6,759.46 $13,518.92 $1,350.00 $2,700.00 $1,280.00 $2,560.00 $2,050.00 $4,100.00 0024 PRECAST REINFORCED CONCRETE BOX (RCB) CULVERT; 10 X 5 92 LF $3,434.05 $315,932.60 $2,300.00 $211,600.00 $6,309.34 $580,459.28 $2,700.00 $248,400.00 $2,040.00 $187,680.00 $2,420.00 $222,640.00
0025 PRECAST REINFORCED CONCRETE BOX (RCB) CULVERT; 10 X 7 69 LF $3,465.65 $239,129.85 $2,500.00 $172,500.00 $8,241.93 $568,693.17 $3,050.00 $210,450.00 $2,945.00 $203,205.00 $2,780.00 $191,820.00
0026 PRECAST REINFORCED CONCRETE BOX(RCB) CULVERT; 10 X 10 364 LF $6,774.52 $2,465,925.28 $3,000.00 $1,092,000.00 $5,338.43 $1,943,188.52 $3,150.00 $1,146,600.00 $3,225.00 $1,173,900.00 $3,370.00 $1,226,680.00 0027 PRECAST CONCRETE END SECTION; 10 X 5 2 EA $48,138.92 $96,277.84 $21,000.00 $42,000.00 $58,223.48 $116,446.96 $39,000.00 $78,000.00 $18,760.00 $37,520.00 $20,000.00 $40,000.00 0028 PRECAST CONCRETE END SECTION; 10 X 7 2 EA $48,138.92 $96,277.84 $29,000.00 $58,000.00 $100,316.45 $200,632.90 $65,000.00 $130,000.00 $27,270.00 $54,540.00 $30,500.00 $61,000.00 0029 PRECAST CONCRETE END SECTION; 10 X 10 4 EA $72,170.89 $288,683.56 $60,000.00 $240,000.00 $108,458.51 $433,834.04 $77,000.00 $308,000.00 $54,770.00 $219,080.00 $59,900.00 $239,600.00
0030 TOPSOIL RESPREAD
0030AA FIRST 229,850 - TOPSOIL RESPREAD 229,850 CY $3.45 $792,982.50 $7.00 $1,608,950.00 $8.37 $1,923,844.50 $4.50 $1,034,325.00 $9.30 $2,137,605.00 $3.00 $689,550.00 0030AB OVER 229,850 - TOPSOIL RESPREAD 57,463 CY $3.45 $198,247.35 $7.00 $402,241.00 $6.27 $360,293.01 $4.15 $238,471.45 $5.60 $321,792.80 $2.75 $158,023.25
0031 SEEDING 140.11 AC $2,108.18 $295,377.10 $2,500.00 $350,275.00 $3,176.94 $445,121.06 $2,300.00 $322,253.00 $7,665.00 $1,073,943.15 $2,560.00 $358,681.60 0032 RIPRAP; R20 634 TON $168.72 $106,968.48 $135.00 $85,590.00 $211.71 $134,224.14 $260.00 $164,840.00 $189.00 $119,826.00 $124.00 $78,616.00 0033 RIPRAP; R30 442 TON $204.67 $90,464.14 $135.00 $59,670.00 $205.06 $90,636.52 $215.00 $95,030.00 $182.00 $80,444.00 $127.00 $56,134.00 0034 RIPRAP; R80 384 TON $251.32 $96,506.88 $150.00 $57,600.00 $202.82 $77,882.88 $235.00 $90,240.00 $182.00 $69,888.00 $122.00 $46,848.00 0035 RIPRAP; R140 664 TON $328.17 $217,904.88 $170.00 $112,880.00 $198.18 $131,591.52 $210.00 $139,440.00 $177.00 $117,528.00 $125.00 $83,000.00 0036 ACCESS GATE 2 EA $13,139.97 $26,279.94 $15,000.00 $30,000.00 $20,683.93 $41,367.86 $14,500.00 $29,000.00 $17,170.00 $34,340.00 $15,500.00 $31,000.00
$27,590,285.72 $23,597,303.70 $25,644,878.01 $24,104,221.40 $31,377,219.85 $18,689,731.55
OPTION 1 (CLINS 1001 - 1017)
1001 PERFORMANCE AND PAYMENT BONDS 1 JOB $61,384.29 $61,384.29 $20,180.00 $20,180.00 $23,291.17 $23,291.17 $26,000.00 $26,000.00 $35,000.00 $35,000.00 $24,400.00 $24,400.00 1002 DEMOLITION 1 JOB $37,746.01 $37,746.01 $48,000.00 $48,000.00 $110,910.31 $110,910.31 $675,000.00 $675,000.00 $16,950.00 $16,950.00 $357,600.00 $357,600.00 1003 TEMPORARY TRAFFIC CONTROL 1 JOB $27,772.50 $27,772.50 $11,000.00 $11,000.00 $3,176.78 $3,176.78 $7,500.00 $7,500.00 $3,480.00 $3,480.00 $3,150.00 $3,150.00 1004 TEMPORARY EROSION CONTROL 1 JOB $34,715.63 $34,715.63 $39,000.00 $39,000.00 $83,269.38 $83,269.38 $85,000.00 $85,000.00 $127,350.00 $127,350.00 $21,500.00 $21,500.00 1005 TOPSOIL STRIPPING 1 JOB $674,498.58 $674,498.58 $254,000.00 $254,000.00 $527,488.35 $527,488.35 $342,000.00 $342,000.00 $900,000.00 $900,000.00 $198,600.00 $198,600.00 1006 PERMANENT HIGHWAY SIGNS 1 JOB $13,886.25 $13,886.25 $12,000.00 $12,000.00 $5,876.46 $5,876.46 $5,335.00 $5,335.00 $6,440.00 $6,440.00 $5,830.00 $5,830.00 1007 TEMPORARY IRRIGATION SYSTEM 1 JOB $147,940.64 $147,940.64 $150,000.00 $150,000.00 $55,455.16 $55,455.16 $165,000.00 $165,000.00 $27,030.00 $27,030.00 $164,900.00 $164,900.00 1008 WATERING 1 JOB $34,096.92 $34,096.92 $70,000.00 $70,000.00 $55,455.16 $55,455.16 $23,000.00 $23,000.00 $29,390.00 $29,390.00 $112,300.00 $112,300.00
TOTAL BASE (ITEM NOS. 0001 THROUGH 0036)
1501 West Fountainhead, Parkway, Suite 550 2762 310th Street 1204 Hobart St. PO Box 159
HSG Park Joint Venture 2, LLC
2972 25th ST NE Harvey, ND 58341
Government Estimate BCSS, LLC
Tempe, AZ 85282
Hendrickson Transportation, LLC
Hamburg, IA 51640
Sellin Brothers, Inc.
Hawley, MN 56549 11040 183rd Circle NW; Suite B Elk River, MN 55330
U.S. SiteWork, Inc.
1009 INSPECTION TRENCH 2,176 LF $15.91 $34,620.16 $3.80 $8,268.80 $40.60 $88,345.60 $16.90 $36,774.40 $38.50 $83,776.00 $27.70 $60,275.20
1010 MUCK EXCAVATION
1010AA FIRST 14,222 - MUCK EXCAVATION 14,222 CY $11.14 $158,433.08 $15.00 $213,330.00 $13.56 $192,850.32 $16.90 $240,351.80 $18.50 $263,107.00 $13.70 $194,841.40 1010AB OVER 14,222 - MUCK EXCAVATION 3,556 CY $11.14 $39,613.84 $15.00 $53,340.00 $13.56 $48,219.36 $16.90 $60,096.40 $18.50 $65,786.00 $14.20 $50,495.20
1011 EMBANKMENT
1011AA FIRST 147,098 - EMBANKMENT 147,098 CY $15.15 $2,228,534.70 $7.50 $1,103,235.00 $5.30 $779,619.40 $7.15 $1,051,750.70 $20.50 $3,015,509.00 $6.30 $926,717.40 1011AB OVER 147,098 - EMBANKMENT 36,774 CY $15.17 $557,861.58 $7.50 $275,805.00 $5.30 $194,902.20 $7.15 $262,934.10 $19.50 $717,093.00 $6.50 $239,031.00
1012 TURF REINFORCEMENT MAT (TRM) 198,281 SF $1.08 $214,143.48 $2.30 $456,046.30 $2.22 $440,183.82 $1.55 $307,335.55 $3.80 $753,467.80 $2.25 $446,132.25 1013 AGGREGATE SURFACE 867 TON $61.71 $53,502.57 $48.00 $41,616.00 $46.18 $40,038.06 $37.00 $32,079.00 $42.50 $36,847.50 $39.90 $34,593.30
1014 TOPSOIL RESPREAD
1014AA FIRST 56,458 - TOPSOIL RESPREAD 56,458 CY $3.46 $195,344.68 $5.60 $316,164.80 $6.27 $353,991.66 $3.95 $223,009.10 $9.00 $508,122.00 $2.80 $158,082.40 1014AB OVER 56,458 - TOPSOIL RESPREAD 14,114 CY $3.45 $48,693.30 $5.60 $79,038.40 $6.27 $88,494.78 $3.95 $55,750.30 $5.50 $77,627.00 $2.80 $39,519.20
1015 ARTICULATED CONCRETE BLOCK 27,326 SF $53.89 $1,472,598.14 $28.00 $765,128.00 $13.65 $372,999.90 $31.00 $847,106.00 $17.50 $478,205.00 $18.00 $491,868.00 1016 SEEDING 38.73 AC $2,108.18 $81,649.81 $2,500.00 $96,825.00 $2,406.44 $93,201.42 $2,300.00 $89,079.00 $7,665.00 $296,865.45 $2,560.00 $99,148.80 1017 RIPRAP; R20 84 TON $162.41 $13,642.44 $135.00 $11,340.00 $141.57 $11,891.88 $290.00 $24,360.00 $187.00 $15,708.00 $201.00 $16,884.00
TOTAL OPTION 1 (ITEM NOS. 1001 THROUGH 1017) $6,130,678.60 $4,024,317.30 $3,569,661.17 $4,559,461.35 $7,457,753.75 $3,645,868.15
TOTAL BASE AND OPTION 1 $33,720,964.32 $27,621,621.00 $29,214,539.18 $28,663,682.75 $38,834,973.60 $22,335,599.70
Note: Upon reviewing the bids, mathamatical errors were discovered for the highlighted items. The highlighted amount and/or subsequent totals are correct.
I certify that I have opened, read, and recorded on this abstract all bids received in response to this solicitation.
Kenneth J. Eshom Contracting Officer
| 2024-11-27T09:15:48-0600 | |