Fargo Moorhead Metropolitan Area Flood Risk Management Project, Southern Embankment Reach SE-4
Solicitation number
W912ES23B0015
Issued by

About this file

This document is an Abstract of Bids for the Fargo Moorhead Metropolitan Area Flood Risk Management Project, Southern Embankment Reach SE-4, Solicitation Number W912ES23B0015, issued by the US Army Corps of Engineers. The solicitation calls for demolition, site preparation, utilities, paving, drainage, and landscaping work. The bid opening date is May 7, 2024. The government estimate for the contract is $37,485,404.00. Six bids were received, with prices ranging from $23,893,746.95 to $38,571,686.50. The lowest responsive bidder was PWS, Inc. at $23,893,746.95. The document provides a detailed bid tabulation with unit prices and extended amounts for over 50 line items, including performance and payment bonds, demolition, traffic control, erosion control, earthwork, drainage, paving, and seeding. Relevant federal contracting requirements are referenced.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Fargo Moorhead Metropolitan Area Flood Risk Management Project, Southern Embankment Reach SE-4 Solicitation Number: W912ES23B0015 US Army Corps of Engineers. 332 Minnesota Street, Suite E1500. Saint Paul, Minnesota 55101 BID OPENING: May 7, 2024 2:00pm ct

Contracting Officer: Kenneth J. Eshom Contract Specialist: Scott E. Hendrix

PO Box 435 1481 81st Ave NE 11040 183rd Circle NW; Ste B

Unit Unit Unit Unit Unit Unit Unit Item Description Quantity Unit Price Amount Price Amount Price Amount Price Amount Price Amount Price Amount Price Amount

ITEMS (CLINS 0001 - 0054)

0001 Performance and Payment Bonds 1 JOB 381,973.30 381,973.30 $120,295.00 $120,295.00 $105,300.00 $105,300.00 $190,150.00 $190,150.00 $300,000.00 $300,000.00 $120,100.00 $120,100.00 $220,000.00 $220,000.00 0002 Demolition 1 JOB 175,083.00 175,083.00 $200,000.00 $200,000.00 $154,000.00 $154,000.00 $70,210.00 $70,210.00 $475,000.00 $475,000.00 $22,000.00 $22,000.00 $150,000.00 $150,000.00 0003 Temporary Traffic Control 1 JOB 136,305.00 136,305.00 $500,000.00 $500,000.00 $207,300.00 $207,300.00 $114,750.00 $114,750.00 $75,000.00 $75,000.00 $101,000.00 $101,000.00 $90,000.00 $90,000.00 0004 Temporary Erosion Control 1 JOB 237,806.00 237,806.00 $700,000.00 $700,000.00 $362,800.00 $362,800.00 $598,250.00 $598,250.00 $380,000.00 $380,000.00 $390,000.00 $390,000.00 $270,000.00 $270,000.00 0005 Traffic Control Signs 1 JOB 10,330.00 10,330.00 $25,000.00 $25,000.00 $21,800.00 $21,800.00 $19,140.00 $19,140.00 $10,000.00 $10,000.00 $18,000.00 $18,000.00 $24,000.00 $24,000.00 0006 Clearing and Grubbing 1 JOB 153,065.00 153,065.00 $400,000.00 $400,000.00 $104,300.00 $104,300.00 $53,570.00 $53,570.00 $500,000.00 $500,000.00 $70,000.00 $70,000.00 $220,000.00 $220,000.00 0007 Removal of Road Surfacing 2,265 CY 20.53 46,500.45 $67.00 $151,755.00 $23.70 $53,680.50 $49.00 $110,985.00 $60.00 $135,900.00 $13.00 $29,445.00 $12.00 $27,180.00 0008 Removal of Road Surfacing ‐ 180th Ave S 168 CY 20.53 3,449.04 $185.00 $31,080.00 $63.80 $10,718.40 $65.00 $10,920.00 $60.00 $10,080.00 $56.00 $9,408.00 $12.00 $2,016.00 0009 Stripping 1 JOB 3,345,398.00 3,345,398.00 $3,085,000.00 $3,085,000.00 $1,777,000.00 $1,777,000.00 $3,180,800.00 $3,180,800.00 $2,700,000.00 $2,700,000.00 $2,400,000.00 $2,400,000.00 $2,699,000.00 $2,699,000.00 0010 Inspection Trench 29,919 LF 16.63 497,552.97 $30.00 $897,570.00 $19.70 $589,404.30 $36.50 $1,092,043.50 $40.00 $1,196,760.00 $6.40 $191,481.60 $30.00 $897,570.00 0011 Inspection Trench ‐ 180th Ave S 307 LF 16.63 5,105.41 $30.00 $9,210.00 $42.50 $13,047.50 $45.00 $13,815.00 $40.00 $12,280.00 $10.00 $3,070.00 $30.00 $9,210.00 0012 Excavation

0012AA First 20,000 Cubic Yards 20,000 CY 7.48 149,600.00 $7.00 $140,000.00 $4.25 $85,000.00 $9.70 $194,000.00 $8.00 $160,000.00 $5.40 $108,000.00 $6.00 $120,000.00 0012AB Over 20,000 Cubic Yards 8,772 CY 7.72 67,719.84 $7.00 $61,404.00 $4.90 $42,982.80 $9.00 $78,948.00 $8.00 $70,176.00 $5.35 $46,930.20 $6.00 $52,632.00

0013 Excavation ‐ 180th Ave S 2,538 CY 8.77 22,258.26 $11.00 $27,918.00 $7.20 $18,273.60 $10.50 $26,649.00 $8.00 $20,304.00 $6.30 $15,989.40 $6.00 $15,228.00 0014 Embankment

0014AA First 1,250,000 Cubic Yards 1,250,000 CY 14.66 18,325,000.00 $10.00 $12,500,000.00 $7.00 $8,750,000.00 $14.50 $18,125,000.00 $9.25 $11,562,500.00 $5.90 $7,375,000.00 $7.20 $9,000,000.00 0014AB Over 1,250,000 Cubic Yards 90,702 CY 14.43 1,308,829.86 $8.00 $725,616.00 $0.01 $907.02 $9.00 $816,318.00 $9.25 $838,993.50 $5.35 $485,255.70 $7.20 $653,054.40

0015 Embankment ‐ 180th Ave S 4,005 CY 14.43 57,792.15 $10.00 $40,050.00 $9.70 $38,848.50 $10.50 $42,052.50 $9.25 $37,046.25 $5.50 $22,027.50 $7.00 $28,035.00 0016 Embankment ‐ Stockpiles 17,000 CY 10.83 184,110.00 $10.00 $170,000.00 $4.35 $73,950.00 $13.00 $221,000.00 $10.00 $170,000.00 $3.00 $51,000.00 $7.00 $119,000.00 0017 Aggregate Surface 56,013 TN 42.10 2,358,147.30 $50.00 $2,800,650.00 $28.70 $1,607,573.10 $37.00 $2,072,481.00 $47.50 $2,660,617.50 $25.00 $1,400,325.00 $27.00 $1,512,351.00 0018 Aggregate Surface ‐ 180th Ave S 3,050 TN 42.10 128,405.00 $50.00 $152,500.00 $26.30 $80,215.00 $37.00 $112,850.00 $50.00 $152,500.00 $27.50 $83,875.00 $26.00 $79,300.00 0019 Aggregate Base 2,377 TN 37.82 89,898.14 $50.00 $118,850.00 $37.40 $88,899.80 $41.00 $97,457.00 $50.00 $118,850.00 $37.80 $89,850.60 $81.00 $192,537.00 0020 Aggregate Base ‐ 180th Ave S 177 TN 37.82 6,694.14 $50.00 $8,850.00 $58.70 $10,389.90 $42.50 $7,522.50 $50.00 $8,850.00 $37.65 $6,664.05 $75.00 $13,275.00 0021 Hot-Mix Asphalt 5,940 SY 71.21 422,987.40 $130.00 $772,200.00 $86.30 $512,622.00 $139.00 $825,660.00 $115.00 $683,100.00 $70.00 $415,800.00 $74.82 $444,430.80 0022 Hot-Mix Asphalt ‐ 180th Ave S 429 SY 70.42 30,210.18 $130.00 $55,770.00 $103.00 $44,187.00 $139.00 $59,631.00 $115.00 $49,335.00 $85.00 $36,465.00 $82.30 $35,306.70 0023 Pavement Marking 5,540 LF 2.15 11,911.00 $3.00 $16,620.00 $3.70 $20,498.00 $2.30 $12,742.00 $2.50 $13,850.00 $2.10 $11,634.00 $2.22 $12,298.80 0024 Topsoil Respread 1 JOB 2,305,654.00 2,305,654.00 $4,225,000.00 $4,225,000.00 $1,595,000.00 $1,595,000.00 $2,932,450.00 $2,932,450.00 $3,300,000.00 $3,300,000.00 $2,853,000.00 $2,853,000.00 $3,950,000.00 $3,950,000.00 0025 Topsoil - Stockpile 13,000 CY 2.82 36,660.00 $5.00 $65,000.00 $4.60 $59,800.00 $9.30 $120,900.00 $5.00 $65,000.00 $3.75 $48,750.00 $6.00 $78,000.00 0026 Turf Reinforcement Mat (TRM) 215,860 SY 16.28 3,514,200.80 $20.00 $4,317,200.00 $17.50 $3,777,550.00 $22.00 $4,748,920.00 $18.00 $3,885,480.00 $17.25 $3,723,585.00 $20.03 $4,323,675.80 0027 Turf Reinforcement Mat (TRM) ‐ 180th Ave S 432 SY 16.28 7,032.96 $20.00 $8,640.00 $17.50 $7,560.00 $29.50 $12,744.00 $18.00 $7,776.00 $17.25 $7,452.00 $26.96 $11,646.72 0028 18-Inch Corrugated Steel Pipe 54 LF 78.00 4,212.00 $130.00 $7,020.00 $89.10 $4,811.40 $109.00 $5,886.00 $125.00 $6,750.00 $120.00 $6,480.00 $148.00 $7,992.00 0029 18-Inch Corrugated Steel Pipe Flared End 2 EA 424.00 848.00 $350.00 $700.00 $731.00 $1,462.00 $403.00 $806.00 $1,750.00 $3,500.00 $715.00 $1,430.00 $570.00 $1,140.00 0030 24-Inch Corrugated Steel Pipe 368 LF 88.00 32,384.00 $155.00 $57,040.00 $150.00 $55,200.00 $127.00 $46,736.00 $140.00 $51,520.00 $140.00 $51,520.00 $155.00 $57,040.00 0031 24-Inch Corrugated Steel Pipe Flared End 14 EA 640.00 8,960.00 $475.00 $6,650.00 $799.00 $11,186.00 $543.00 $7,602.00 $1,150.00 $16,100.00 $1,060.00 $14,840.00 $690.00 $9,660.00 0032 30-Inch Corrugated Steel Pipe 200 LF 99.00 19,800.00 $200.00 $40,000.00 $198.00 $39,600.00 $156.00 $31,200.00 $160.00 $32,000.00 $180.00 $36,000.00 $200.00 $40,000.00 0033 30-Inch Corrugated Steel Pipe Flared End 4 EA 841.00 3,364.00 $855.00 $3,420.00 $1,400.00 $5,600.00 $1,015.00 $4,060.00 $2,150.00 $8,600.00 $1,340.00 $5,360.00 $1,100.00 $4,400.00 0034 48-Inch Corrugated Steel Pipe 612 LF 139.00 85,068.00 $355.00 $217,260.00 $332.00 $203,184.00 $241.00 $147,492.00 $250.00 $153,000.00 $290.00 $177,480.00 $340.00 $208,080.00 0035 48-Inch Corrugated Steel Pipe Flared End 12 EA 2,310.00 27,720.00 $1,800.00 $21,600.00 $2,140.00 $25,680.00 $1,615.00 $19,380.00 $2,350.00 $28,200.00 $2,170.00 $26,040.00 $2,840.00 $34,080.00 0036 60-Inch Corrugated Steel Pipe 1,162 LF 218.00 253,316.00 $485.00 $563,570.00 $421.00 $489,202.00 $252.00 $292,824.00 $325.00 $377,650.00 $342.00 $397,404.00 $351.00 $407,862.00 0037 60-Inch Corrugated Steel Pipe Flared End 16 EA 4,553.00 72,848.00 $2,850.00 $45,600.00 $3,150.00 $50,400.00 $2,895.00 $46,320.00 $3,000.00 $48,000.00 $2,909.00 $46,544.00 $3,600.00 $57,600.00 0038 64-Inch by 43-Inch Corrugated Steel Arch Pipe 320 LF $197.00 $63,040.00 $430.00 $137,600.00 $382.00 $122,240.00 $293.00 $93,760.00 $315.00 $100,800.00 $349.00 $111,680.00 $400.00 $128,000.00 0039 64-Inch by 43-Inch Corrugated Steel Arch Pipe ‐ 180th Ave S118 LF $197.00 $23,246.00 $430.00 $50,740.00 $344.00 $40,592.00 $293.00 $34,574.00 $315.00 $37,170.00 $349.00 $41,182.00 $420.00 $49,560.00 0040 64-Inch by 43-Inch Corrugated Steel Arch Pipe Flared End 4 EA $4,081.00 $16,324.00 $3,035.00 $12,140.00 $3,290.00 $13,160.00 $3,025.00 $12,100.00 $4,000.00 $16,000.00 $2,472.00 $9,888.00 $4,200.00 $16,800.00 0041 64-Inch by 43-Inch Corrugated Steel Arch Pipe Flared End 6 EA $4,081.00 $24,486.00 $3,035.00 $18,210.00 $3,240.00 $19,440.00 $3,025.00 $18,150.00 $4,000.00 $24,000.00 $3,311.00 $19,866.00 $4,200.00 $25,200.00 0042 Bedding - B1 650 TN $94.89 $61,678.50 $165.00 $107,250.00 $112.00 $72,800.00 $121.00 $78,650.00 $160.00 $104,000.00 $70.00 $45,500.00 $88.00 $57,200.00 0043 Bedding - B2 1,342 TN $87.01 $116,767.42 $165.00 $221,430.00 $135.00 $181,170.00 $121.00 $162,382.00 $160.00 $214,720.00 $68.00 $91,256.00 $80.00 $107,360.00 0044 Riprap - R20 855 TN $108.53 $92,793.15 $175.00 $149,625.00 $120.00 $102,600.00 $136.00 $116,280.00 $200.00 $171,000.00 $94.00 $80,370.00 $82.00 $70,110.00 0045 Riprap - R45 307 TN $129.40 $39,725.80 $175.00 $53,725.00 $120.00 $36,840.00 $148.00 $45,436.00 $200.00 $61,400.00 $96.50 $29,625.50 $76.00 $23,332.00 0046 Riprap - R80 668 TN $125.54 $83,860.72 $175.00 $116,900.00 $122.00 $81,496.00 $147.00 $98,196.00 $200.00 $133,600.00 $91.30 $60,988.40 $78.00 $52,104.00 0047 Riprap - R140 1,407 TN $117.83 $165,786.81 $185.00 $260,295.00 $122.00 $171,654.00 $153.00 $215,271.00 $215.00 $302,505.00 $95.00 $133,665.00 $83.00 $116,781.00 0048 Access Gates 8 EA $6,307.00 $50,456.00 $15,000.00 $120,000.00 $18,400.00 $147,200.00 $2,725.00 $21,800.00 $25,000.00 $200,000.00 $4,800.00 $38,400.00 $10,000.00 $80,000.00 0049 Access Gates ‐ 180th Ave S 1 EA $6,307.00 $6,307.00 $15,000.00 $15,000.00 $22,700.00 $22,700.00 $2,725.00 $2,725.00 $25,000.00 $25,000.00 $4,800.00 $4,800.00 $10,000.00 $10,000.00 0050 Seeding 490 AC $2,067.40 $1,013,026.00 $2,150.00 $1,053,500.00 $1,860.00 $911,400.00 $1,500.00 $735,000.00 $2,750.00 $1,347,500.00 $2,020.00 $989,800.00 $1,246.19 $610,633.10 0051 Seeding ‐ 180th Ave S 16 AC $2,067.40 $33,078.40 $2,150.00 $34,400.00 $1,860.00 $29,760.00 $1,850.00 $29,600.00 $2,750.00 $44,000.00 $2,020.00 $32,320.00 $1,246.19 $19,939.04 0052 Temporary Irrigation System 1 JOB $514,160.00 $514,160.00 $456,750.00 $456,750.00 $521,500.00 $521,500.00 $168,200.00 $168,200.00 $900,000.00 $900,000.00 $1,000,000.00 $1,000,000.00 $20,000.00 $20,000.00 0053 Watering 1 JOB $645,969.00 $645,969.00 $975,000.00 $975,000.00 $327,400.00 $327,400.00 $168,200.00 $168,200.00 $1,800,000.00 $1,800,000.00 $300,000.00 $300,000.00 $300,000.00 $300,000.00 0054 Monthly Internet Service 26 MO $250.00 $6,500.00 $300.00 $7,800.00 $3,750.00 $97,500.00 $273.00 $7,098.00 $125.00 $3,250.00 $200.00 $5,200.00 $230.00 $5,980.00

TOTAL $37,485,404.00 $37,079,403.00 $23,999,384.82 $38,571,686.50 $35,809,663.25 $23,893,746.95 $27,770,600.36

Note: Upon reviewing the bids, mathamatical errors were discovered for the highlighted items. The highlighted amount and/or subsequent totals are correct.

I certify that I have opened, read, and recorded on this abstract all bids received in response to this solicitation.

Kenneth J. Eshom Contracting Officer

74 Digital Drive STE 6 Novato, CA 94949

Government Estimate Maloney-Odin, A Joint VentureRJ Zavoral & Sons, Inc.

East Grand Forks, MN 56721

Park Construction Company

Minneapolis, MN 55432

U.S. SiteWork, Inc.

Elk River, MN 55330

PWS, Inc.

8601 73rd Ave N, Suite 22 Brooklyn Park, MN 55428

Ames Construction, Inc.

2500 CR 42 West Burnsville, MN 55337-6911

2024-05-08T08:20:50-0500
ESHOM.KENNETH.JAMES.1165952878