This bid abstract summarizes bids received in response to Solicitation Number W912ES23B0012 issued by the Department of the Army Corps of Engineers Engineering District St Paul for the Fargo Moorhead Metropolitan Area Flood Risk Management Project, Southern Embankment Reach SE-1B. Four bids were received for construction services including demolition, excavation, embankment, paving, drainage, landscaping and irrigation. The bids ranged in total price from $13.2 million from Norcon Corporation to $22.1 million from the government estimate. Specific line items and unit pricing for 43 contract line items were provided for each bidder. The bid opening was held on January 25, 2024 and was certified as received and recorded by Contracting Officer Kevin P. Henricks.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FMM Southern Embankment Reach SE-1B Solicitation Number: W912ES23B0012 US Army Corps of Engineers. 332 Minnesota Street, Suite E1500. Saint Paul, Minnesota 55101 BID OPENING: 01/25/2024 2:00pm local

Contracting Officer: Kevin P. Henricks Contract Specialist: Scott E. Hendrix

Unit Unit Unit Unit Item Description Quantity Unit Price Amount Price Amount Price Amount Price Amount

ITEMS (CLINS 0001 - 0043)

0001 PERFORMANCE AND PAYMENT BONDS 1 JOB $220,000.00 $220,000.00 $195,750.00 $195,750.00 $64,200.00 $64,200.00 $90,000.00 $90,000.00 0002 DEMOLITION 1 JOB $1,080,320.00 $1,080,320.00 $621,000.00 $621,000.00 $1,491,000.00 $1,491,000.00 $325,000.00 $325,000.00 0003 TRAFFIC CONTROL 1 JOB $71,300.00 $71,300.00 $77,970.00 $77,970.00 $246,300.00 $246,300.00 $71,200.00 $71,200.00 0004 TEMPORARY EROSION CONTROL 1 JOB $40,560.00 $40,560.00 $747,500.00 $747,500.00 $46,600.00 $46,600.00 $325,000.00 $325,000.00 0005 TOPSOIL STRIPPING 1 JOB $500,780.00 $500,780.00 $1,992,375.00 $1,992,375.00 $1,265,100.00 $1,265,100.00 $3,400,000.00 $3,400,000.00 0006 INSPECTION TRENCH 3,940 LF $15.73 $61,976.20 $23.00 $90,620.00 $50.00 $197,000.00 $36.00 $141,840.00

0007 EXCAVATION

0007AA FIRST 9,000 CY 9,000 CY $32.07 $288,630.00 $13.80 $124,200.00 $5.50 $49,500.00 $9.50 $85,500.00 0007AB OVER 9,000 CY 5,000 CY $16.62 $83,100.00 $10.35 $51,750.00 $6.00 $30,000.00 $9.50 $47,500.00

0008 BORROW EXCAVATION

0008AA FIRST 127,000 CY 127,000 CY $10.82 $1,374,140.00 $31.80 $4,038,600.00 $14.70 $1,866,900.00 $26.00 $3,302,000.00 0008AB OVER 127,000 CY 20,000 CY $10.82 $216,400.00 $18.40 $368,000.00 $14.80 $296,000.00 $26.00 $520,000.00

0009 EMBANKMENT

0009AA FIRST 268,000 268,000 CY $6.98 $1,870,640.00 $21.51 $5,764,680.00 $6.60 $1,768,800.00 $15.85 $4,247,800.00 0009AB OVER 268,000 40,000 CY $6.98 $279,200.00 $10.35 $414,000.00 $7.95 $318,000.00 $10.60 $424,000.00

0010 TURF REINFORCEMENT MAT 38,000 SY $16.55 $628,900.00 $21.74 $826,120.00 $13.00 $494,000.00 $18.00 $684,000.00 0011 AGGREGATE SURFACE 2,500 TON $96.49 $241,225.00 $46.00 $115,000.00 $37.10 $92,750.00 $51.50 $128,750.00

0012 SALVAGED BASE COURSE

0012AA FIRST 14,900 CY 14,900 CY $53.12 $791,488.00 $28.75 $428,375.00 $62.60 $932,740.00 $67.60 $1,007,240.00 0012AB OVER 14,900 CY 1,400 CY $53.12 $74,368.00 $18.40 $25,760.00 $57.40 $80,360.00 $67.60 $94,640.00

0013 PERMANENT CR16 & CR17 ASPHALT PAVEMENT 10,900 SY $89.54 $975,986.00 $64.98 $708,282.00 $59.60 $649,640.00 $63.00 $686,700.00 0014 PERMANENT CR16 & CR17 CONCRETE PAVEMENT 9,750 SY $341.74 $3,331,965.00 $236.90 $2,309,775.00 $156.00 $1,521,000.00 $154.00 $1,501,500.00 0015 EDGEDRAIN 1,305 LF $26.13 $34,099.65 $26.45 $34,517.25 $12.30 $16,051.50 $24.00 $31,320.00 0016 HEADWALL - PRECAST CONCRETE 4IN 6 EA $5,339.50 $32,037.00 $1,437.50 $8,625.00 $2,390.00 $14,340.00 $1,200.00 $7,200.00 0017 PIPE CONC REINF 36IN CL III 84 LF $296.95 $24,943.80 $327.75 $27,531.00 $423.00 $35,532.00 $415.00 $34,860.00 0018 PIPE CONC REINF 42IN CL III 266 LF $395.00 $105,070.00 $408.25 $108,594.50 $534.00 $142,044.00 $465.00 $123,690.00 0019 PIPE CONC REINF 48IN CL III 172 LF $595.35 $102,400.20 $529.00 $90,988.00 $707.00 $121,604.00 $540.00 $92,880.00 0020 PIPE CORR STEEL .064IN 24IN 50 LF $151.25 $7,562.50 $155.25 $7,762.50 $184.00 $9,200.00 $85.00 $4,250.00 0021 PIPE CORR STEEL .064IN 30IN 58 LF $194.50 $11,281.00 $178.25 $10,338.50 $250.00 $14,500.00 $96.00 $5,568.00 0022 PIPE CORR STEEL .064IN 48IN 48 LF $243.30 $11,678.40 $218.50 $10,488.00 $295.00 $14,160.00 $136.00 $6,528.00 0023 END SECTION CONC REINF 36IN 2 EA $4,336.80 $8,673.60 $4,542.50 $9,085.00 $3,620.00 $7,240.00 $5,500.00 $11,000.00 0024 END SECTION CONC REINF 42IN 6 EA $5,121.50 $30,729.00 $5,255.50 $31,533.00 $4,290.00 $25,740.00 $6,500.00 $39,000.00 0025 END SECTION CONC REINF 48IN 4 EA $5,624.00 $22,496.00 $5,750.00 $23,000.00 $4,730.00 $18,920.00 $7,500.00 $30,000.00 0026 END SECTION CORR STEEL .064IN 24IN 2 EA $1,952.50 $3,905.00 $1,840.00 $3,680.00 $1,280.00 $2,560.00 $546.00 $1,092.00 0027 END SECTION CORR STEEL .064IN 30IN 2 EA $2,128.10 $4,256.20 $2,242.50 $4,485.00 $1,640.00 $3,280.00 $980.00 $1,960.00 0028 END SECTION CORR STEEL .064IN 48IN 2 EA $5,364.30 $10,728.60 $4,237.75 $8,475.50 $2,950.00 $5,900.00 $2,500.00 $5,000.00

0029 TOPSOIL RESPREAD

0029AA FIRST 54,000 CY 54,000 CY $3.61 $194,940.00 $21.62 $1,167,480.00 $4.00 $216,000.00 $5.00 $270,000.00

Government Estimate Norcon Corporation HSG Park Joint Venture 2, LLC Gladen Construction Inc.

5600 Municipal Street Schofield, WI 54476

2972 25th St. NE; PO Box 213 Harvey, ND 58341

40739 US Hwy 71 Laporte, MN 56461

0029AB OVER 54,000 CY 5,000 CY $3.61 $18,050.00 $8.05 $40,250.00 $3.60 $18,000.00 $5.00 $25,000.00 0030 SEEDING - ZONE 1 98.9 AC $4,345.04 $429,724.46 $3,277.50 $324,144.75 $2,420.00 $239,338.00 $1,623.00 $160,514.70 0031 SEEDING - ZONE 2 1.4 AC $4,345.04 $6,083.06 $5,462.50 $7,647.50 $5,070.00 $7,098.00 $1,678.00 $2,349.20 0032 SEEDING - ZONE 3 20.1 AC $4,345.04 $87,335.30 $3,162.50 $63,566.25 $1,720.00 $34,572.00 $1,303.00 $26,190.30 0033 SEEDING - ZONE 4 3.6 AC $4,345.04 $15,642.14 $3,967.50 $14,283.00 $3,040.00 $10,944.00 $1,865.00 $6,714.00 0034 SEEDING - ZONE 5 4.8 AC $4,345.04 $20,856.19 $4,283.75 $20,562.00 $3,780.00 $18,144.00 $2,110.00 $10,128.00 0035 SEEDING - ZONE X 3.8 AC $4,345.04 $16,511.15 $2,903.75 $11,034.25 $2,200.00 $8,360.00 $790.00 $3,002.00 0036 RIPRAP GRADE 1 220 TON $188.34 $41,434.80 $126.50 $27,830.00 $417.00 $91,740.00 $165.00 $36,300.00 0037 ACCESS GATE 2 EA $11,331.10 $22,662.20 $23,486.00 $46,972.00 $16,900.00 $33,800.00 $17,800.00 $35,600.00 0038 PAVEMENT MARKING 1 JOB $178,300.00 $178,300.00 $140,875.00 $140,875.00 $135,000.00 $135,000.00 $129,000.00 $129,000.00 0039 PERMANENT HIGHWAY SIGNS 1 JOB $52,990.00 $52,990.00 $30,906.25 $30,906.25 $24,200.00 $24,200.00 $26,500.00 $26,500.00 0040 PERMANENT HIGHWAY LIGHTING 1 JOB $319,610.00 $319,610.00 $294,400.00 $294,400.00 $186,300.00 $186,300.00 $175,850.00 $175,850.00 0041 MEDIAN LANDSCAPING 1 JOB $57,490.00 $57,490.00 $59,077.80 $59,077.80 $77,200.00 $77,200.00 $40,000.00 $40,000.00 0042 TEMPORARY IRRIGATION SYSTEM 1 JOB $61,490.00 $61,490.00 $215,000.00 $215,000.00 $211,600.00 $211,600.00 $100,000.00 $100,000.00 0043 WATERING 1 JOB $719,220.00 $719,220.00 $367,020.00 $367,020.00 $55,000.00 $55,000.00 $120,000.00 $120,000.00

TOTAL CLINS 0001 THROUGH 0043 $14,783,178.45 $22,109,909.05 $13,208,257.50 $18,644,166.20

I certify that I have opened, read, and recorded on this abstract all bids received in response to this solicitation.

Kevin P. Henricks Contracting Officer